LE-PROFILE ver.3 rev.5.4 28-Mar-2012 LINDENBERG-EMIRATES LLC
Company Profile 3~16 About Lindenberg Emirates 3 Scope of Activities 4 Completed Projects 5 Ongoing Projects 6~7 Representation of Lindenberg Anlagen 8 Company Organization Chart 9 Company Manpower Chart 10 Company Reg., PQ & Classification 11~14 Project References 15~16 Lindenberg Power Division 17~33 Division Profile 17~18 Scope of Activities 19 Typical Power Project Organization Chart 20 Featured Projects 21~32 Power Stations 33 Lindenberg Water & Drainage Division 34~46 Division Profile 34~35 Scope of Activities 35 Typical Water Project Organization Chart 36 Featured Projects 37~46 Quality, Health & Safety & Environment 47~48 Company Recourses 49~57 Workforce & Labour Camp 49 Store Facilities 50 Plant, Machinery, Vehicles & Equipments 51 Contact Information 52
About Lindenberg-Emirates Located in the United Arab Emirates, with its center of operation and main office in Abu Dhabi, Lindenberg-Emirates LLC specializes in Engineering, Procurement, and Construction (EPC) mode of project delivery. Lindenberg-Emirates LLC employs manpower expertise in all aspects of contracting including civil engineering, pipeline construction, turn-key industrial plants, substations, mechanical and electrical installations, and services to the electromechanical industry including testing, commissioning, maintenance and operational activities. Company Details Date Established: 20.11.2001 Ownership: UAE Partner 51%, Lindenberg Anlagen (Germany) 49% Incorporated in: Abu Dhabi, United Arab Emirates Principal Bankers: Arab Bank for Investment Foreign Trade Mashreqbank National Bank of Abu Dhabi HSBC Bank National Bank of Fujairah 3
Scope of Activities Power Related Activities Construction & Installation of Power Transmission and Distribution Networks Installation of High Voltage Cables Substation Turnkey Low, Medium and High Voltage & Package Substation Installation High & Medium Voltage Switchgear & Transformer Installation Submarine Cable Installation Civil & Electro-mechanical General Contracting Water Transmission & Distribution, Storm Water, Drainage & Irrigation Networks EPC Projects of Water & Sewerage including Pumping Stations Submarine Pipe Laying Oil & Gas Related Activities On Shore and Off Shore Oil and Gas Field Services Maintenance Services for Oil/Gas Production Utilities Technical Maintenance for Equipment, Industrial and Petroleum Plant Repair & Maintenance Works 4 Repair and Maintenance of Pumping Stations, Sewerage Networks & Water Drainage Lines
5 Projects Successfully Completed in U.A.E. Power Supply for Presidential Palaces and Hospitals Construction of Water Supply Network to Sadiyat Island Power Supply for Presidential Palaces and Hospitals Construction of Water Transmission Pipeline in Baniyas Construction of Water Transmission Pipeline in Dubai Water Transmission Lines inside Al Reem Island Security & Upgrading of 11kV Electrical Networks Supply of LV Panels Switchgear for Ruwais Housing Complex Power Supply for Palaces and Hospitals Stage3 Construction of Water Transmission Line from Sweihan to Remah Transfer of 11kV Load & Primary Substation in Abu Dhabi Modification of Switching Stations in Abu Dhabi Project Value (AED) 177 Million 108 Million 103 Million 94 Million 84 Million 56 Million 40 Million 29 Million 26 Million 26 Million 19 Million 17 Million
Ongoing Power & Civil Projects in Abu Dhabi, U.A.E. Replacement of 11 KV Switchgears and Substations Transfer of Load to New 132/11 kv W24 and E01 Primary Substations Civil Works for Shuweihat S3 Independent Power Plant Supply and Installation of 11kV Package Unit Substation for Braka Nuclear Power Plant Transfer of 11kV Load to New 132/11kV W02 Primary Substation Distribution Network Expansion for Farms & Ezabs Belonging to VIP Customers in Eastern Region Installation of 22kV cables from 132/22 kva - A Beach Primary to Masdar City Project Value (AED) 82 Million 34 Million 29 Million 16.8 Million 13.6 Million 13 Million 2 Million 6
Ongoing Water & Drainage Projects in Abu Dhabi, U.A.E. Water Transmission Scheme inside Sadiyat Island Water Supply to ADCO & GASCO Facilities at Buhasa and Habshan EPC for 2 Nos. 25 MiG Steel Tanks & associated Civil & Pipeline Works Replacement of Existing Sewer Networks Inside Abu Dhabi Island Construction of Sewerage Connections and Related Works in Abu Dhabi Enhancement of Sector Main Loop for Sector E25 in Abu Dhabi City Sheikh Khalifa Interchange, Water Pipeline Diversion Project Value (AED) 577 Million 180 Million 174.5 Million 116 Million 80 Million 7 Million 2.8 Million 7
Representation of Lindenberg Anlagen Lindenberg Emirates represents Lindenberg Anlagen GmbH Germany for its products and services in the United Arab Emirates. Lindenberg Anlagen GmbH Germany is a world class leader in the design and manufacturing of Power Generation System and has international presence in more than 72 countries. For more information about Lindenberg Anlagen GmbH, please visit www.lindenberg-anlagen.de. 8
Company Organization Chart CHAIRMAN Exec. Secretary / Doc. Controller GENERAL MANAGER Senior Business Associate Office Manager Exec. Sec. / D.C. Admin Clerk FINANCE & ACCOUNTS DEPARTMENT RECRUITMENT DEPARTMENT HR / ADMIN DEPARTMENT OPERATIONS DEPARTMENT CONTRACTS DEPARTMENT LEGAL DEPARTMENT BUSINESS DEVELOPMENT DEPARTMENT Finance Director Recruitment Manager HR/Admin Manager Operations Manager Contracts Manager Head of Legal Department Business Development Director Recruitment Assistant Sr. HR/Admin Officer Personnel Officer Asst. Personnel Off r. Sr. Administrator PRO Doc. Controller Admin Clerk Camp Boss Asst. Camp Boss Senior Administrator Secretary Legal Advisor Legal Secretary Business Dev t. Associate Sales Engineer Secretary FINANCE & ACCOUNTS DEPARTMENT IT DEPARTMENT BUSINESS SYSTEM - ERP DEPARTMENT DOCUMENTS CONTROL DEPARTMENT PURCHASING DEPARTMENT ESTIMATION & TENDERING DEPARTMENT PLANT / WORKSHOP DEPARTMENT POWER DIVISION WATER & DRAINAGE DIVISION CIVIL DEPARTMENT COST CONTROL DEPARTMENT PLANNING DEPARTMENT HSE DEPARTMENT QA/QC DEPARTMENT Treasury Manager Accounts Manager Sr. Accountants Accountants Secretary IT Administrator and Team Business Systems Analyst Document Controller Commercial Manager Estimation Manager Plant Manager Asst. Operations Manager - LPD Division Manager - LWD Civil Department Manager Cost Control Manager Planning Department Manager HSE Manager QA/QC Manager Procurement Engrs. Asst. Proc. Engrs. Purchase Officers Secretary Sr. Estimation Engrs. Estimation Engrs. Secretary W/S Superintendent W/S Administrator Foremen Mechanics Mechanics Storekeeper PRO Plant Office Asst. Projects Manager Construction Mngrs. Design Engineers Project Engineers T&C Engineers Sr. Qty Surveyor Quantity Surveyor Exec. Secretary Proj. Support Team Foremen Work Crew Project Managers Construction Mngrs. Project Engineers Sr. Qty. Surveyors Quantity Surveyors I & C Engineers Exec. Secretary Secretary Doc. Controller Proj. Support Team Foremen Work Crew Projects Manager Construction Mngr. Design Engineers Project Engineers Quantity Surveyors Proj. Support Team Foremen Work Crew Lead Cost Control Engineer Technical Secretary Sr. Planning Engrs. Planning Engineers Sr. HSE Engineers HSE Engineers Sr. Safety Officers Safety Officers Male Nurse QA/QC Engineers QA/QC Inspectors QHSE Secretary 9
Company Manpower Chart Lindenberg has got sufficient manpower, including Chartered Engineers, Certified Accountants, Certified Electrical and Civil Discipline Technicians to participate and execute Mega Projects with utmost professionalism and to the satisfaction of our Clients. Staff Category (Total: 256) Skilled & Unskilled Workers (Total: 801) Foreman & Supervisors, 46 Project Managers / Dept. Heads, 29 Carpenters, 119 Masons, 68 Engineers - All Discipline, 62 Office Assistants, 17 Secretaries, 14 Laborers, 293 Electrician, 66 Steel Fixers, 59 10 QA/QC Engineers, 4 Planning & Cost Control, 4 Draftsman - All Discipline, 9 Doc Controllers, 7 Coordinators, 6 Officers & Legal Advisors, 6 Administrators, 6 Storekeepers / Timekeepers, 10 Safety Officers, 12 Accountants, 11 Land Surveyors, 13 Painters, 6 Mechanics, 9 Welders, 12 Pipe Fitters, 19 Charged Hands, 27 Operators, 46 Cleaners / Office Boy, 30 Drivers - All Discipline, 47 Data as of Dec-2011
11 Registration / Clients List Lindenberg is registered / pre-qualified or have submitted tender with the following companies / government agencies: 1. Abu Dhabi Distribution Company (ADDC) 2. Abu Dhabi Future Energy Company (MASDAR) 3. Abu Dhabi Gas Industries Ltd. (GASCO) 4. Abu Dhabi Health Services Co. PJSC (SEHA) 5. Abu Dhabi Marine Operating Company (ADMA-OPCO) 6. Abu Dhabi Ministry of Defense Military Works Department 7. Abu Dhabi National Oil Company (ADNOC) 8. Abu Dhabi Oil Refining Company (TAKREER) 9. Abu Dhabi Police General Head Quarters 10. Abu Dhabi Polymers Co. Ltd. (Borouge) 11. Abu Dhabi Sewerage Services Company (ADSSC) 12. Abu Dhabi Transmission & Despatch Company (TRANSCO) 13. Abu Dhabi Water & Electricity Authority (ADWEA) 14. Al Ain Distribution Company (AADC) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 15. ALDAR Properties PJSC 20. Municipality of Abu Dhabi 16. Dubai Electricity & Water Authority (DEWA) 21. National Central Cooling Co. PJSC (TABREED) 17. Federal Electricity & Water Authority (FEWA) 22. Sultanate of Oman Public Authority for Electricity and Water 18. International Petroleum Investment Co. (IPIC) 23. Tourism Development & Investment Company (TDIC) 19. Mubadala Development Company 24. UAE Armed Forces Special Operations Command
Registration / Clients List Lindenberg is highly experienced working with the following Project Consultants: 1. Deutsche Energie Consult GmbH (DECON) 1 2 3 4 2. Dorsch Consult 3. Dr. M. H. Ali El-Saie Consulting Engineers 4. Hyder Consulting Middle East Limited 5. ILF Consulting Engineers 5 6 7 8 6. Italconsult 7. Lahmeyer International GmbH 8. Mott Macdonald 9. Ozen Levent Power Engineering Consultancy LLC 9 10 11 12 10. Parsons Brinckerhoff Power 11. Parsons International Ltd. 12. Tebodin Consultants & Engineers 12
Lindenberg was Prequalified & Tendered for ADSSC s STEP Project: 1. Lindenberg Emirates was one of the 5 prequalified companies for the Sewerage Tunnel Enhancement Project STEP Project comprising of a 45 km tunnel of 5-meter diameter at a depth of 40-45 meters which is expected to be worth of AED 3 Billion. For this tender, Lindenberg formed a consortium with Major Korean Construction Companies. 2. Tender No. O-1506, STEP Deep Tunnel Sewer Contract T-02. 13 3. Tender No. O-1578, STEP Deep Tunnel Sewer Contract T-03.
Company Classification at Abu Dhabi Department of Planning & Economy SN Field Scope of Works Category 1. WATER PROJECTS 1. Water Transport Plants & Networks 2. Water Distribution Plants & Networks 1 st 1 st 2. ELECTRICAL PROJECTS 1. Power Distribution Networks & Plants 2. Communications Networks 2 nd 5 th 3. SEWERAGE PROJECTS 1. Main Sewerage Networks 2. Sewerage Sub-Networks & House Connections 5 th 5 th 4. MECHANICAL & ELECTRICAL WORKS PROJECTS 1. Mechanical and Electrical Works 5 th 5. BUILDING PROJECTS 1. All types of Buildings 2. Metallic Constructions 5 th 5 th 14
Selected Power & Civil Projects SN Contract No. Contract Name Client Contract Value Award Date Consultant Status 1 R-99-0157 2 G-6334 3 G-1882 Security of the Electric Power Supply and Upgrade of the Network for Presidential Palaces and Hospitals Electrical & Civil Engineering Works for the Implementation of 4 MW NGK Battery Energy Storage (42MW) Security of the Electric Power Supply and Upgrade of the Network for Presidential Palaces and Hospitals (Stage-III Phase-III) ADWEA AED 176,957,025 08.02.2000 Mott MacDonald Completed ADWEA AED 142,271,120 23.11.2009 DECON Ongoing ADWEA AED 103,122,825 07.08.2005 Lahmeyer International GmbH 4 D-6990 Replacement of 11 KV Switchgears in W13, E15 and Salt & Chlorine Substations ADDC AED 81,991,962 03.01.2010 Parsons Brinckerhoff Ongoing Completed 5 D-7150 6 D-10624 7 115979C13E Security and Upgrading of 11 kv Electrical Network for H.H. Shk. Khalifa Palace in Abu Dhabi & Erection of Equipment in Substation No. 4 & 5 in Beach Palace Transfer of Load to New 132/11 kv W24 and E01 Primary Substations in Abu Dhabi Island Ruwais Housing Complex Expansion Phase III, Procurement of Electrical Equipment Low Voltage (LV) Panels Switchgear 8 - Shuweihat S3 IPP Civil Work Package 3 9 G-1494 10 D-10599 Security of the Electric Power Supply and Upgrade of the Network for Presidential Palaces and Hospitals, Stage-III Phase-III, Lot-1 Transfer of 11kV Load to E48/02 & Khalifa A2 Primary Substation in Abu Dhabi Island & Eastern Region ADDC AED 40,667,381 05.05.2008 Ozen Levent Power Engineering Consultancy LLC Completed ADDC AED 34,028,598 25.05.2010 DECON Ongoing ADNOC AED 29,675,361 23.04.2009 - Completed Daewoo E&C AED 29,191,474 27.07.2011 ADWEA AED 25,914,216 05.02.2003 Fichtner Consulting Engineers Lahmeyer International GmbH Ongoing Completed ADDC AED 19,683,403 10.02.2010 DECON Completed 11 D-7720 Modification of Switching Stations in Abu Dhabi Island ADDC AED 16,999,999 06.10.2008 - Completed 12 4600037153 Supply and Installation of 11kV Package Unit Substation for Braka Nuclear Power Plant Hyundai E&C AED 16,865,843 27.07.2011 - Ongoing 15
Selected Water & Drainage Projects SN Contract No. Contract Name Client Contract Value Award Date Consultant Status 1 N-5807 Water Transmission Scheme from Sas Al Nakheel (UAN) Junction to Sadiyat / Abu Dhabi Island TRANSCO AED 569,594,995 20.01.2008 2 D-10924 Water Supply to ADCO & GASCO Facilities at Buhasa and Habshan ADDC AED 179,999,340 08-01-2012 3 N-6821 4 O-1463 EPC Works for Al Ain Distribution Network Pipelines Umn Ghaffa Floating Reservoir Station Lot D Works Associated with the Replacement of Existing Sewer Networks at Some Sectors Inside Abu Dhabi Island - Category A TRANSCO AED 174,524,364 07.03.2010 Tebodin Consultants and Engineers Tebodin Consultants and Engineers ILF Consulting Engineers Ongoing Ongoing Ongoing ADSSC AED 116,026,699 13.06.2010 Dorsch Gruppe Ongoing 5 N-2622.1 Water Supply to Sadiyat Island and Adjacent Areas Lot A,B, & C TRANSCO AED 108,118,493 22.07.2007 Tebodin Consultants & Engineers Completed 6 D-7310.1 Replacement of 2 DN 600 Pipelines in Baniyas along Al Ain Highway ADDC AED 94,037,448 22.05.2008 Italconsult Completed 7 O-10841 8 CW/119C/ 2007 Construction of Sewerage Connections and Related Works in Abu Dhabi Island and Main Land - Phase VII Supply, Installation, Testing and Commissioning of Fiber Cement / Glass Reinforced Epoxy / Ductile Iron Water Transmission Pipelines and Associated Works at Various Locations in Emirates of Dubai (1200 mm Dia Pipeline Along Emirates Road) ADSSC AED 80,000,000 29-Mar-2012 DEWA AED 73,794,659 08-Jul-2007 9 N-5386 Water Transmission Lines Inside Al Reem Island Lot A TRANSCO AED 56,455,067 03.02.2008 AECOM Middle East Ltd. NJS Consultants Co. Ltd. Tebodin Consultants and Engineers Ongoing Completed Completed 10 N-4604 DN 1000mm Transmission Pipeline from Sweihan to Remah TRANSCO AED 25,889,764 23.07.2007 Mott Mac Donald Completed 11 D-5630 Urgent Works at Al Qadra Village Owned by HH Sheikh Mansour Bin Zayed ADWEA AED 16,877,777 15.04.2006 Italconsult Completed 16 12 O-1047 Sewerage and Surface Drainage Works (SAS Al Nakheel & Seeh Shua ib) ADSSC AED 10,400,000 30.01.2008 Parsons Intl Ltd Completed
Division Profile Lindenberg Power Division provides expertise in implementing Electromechanical and Instrumentation projects on turnkey basis, starting from the design stage to construction, testing and commissioning and maintenance services for diverse industrial projects. Having the expertise in turnkey contracting on many projects, the Power Division is very familiar with all criteria necessary for the successful execution of Electromechanical projects. The Power Division builds these mandatory requirements into all projects: Reliable and efficient performance Single-point responsibility ISO-certified quality control procedures Proven safety programs Cost controls and reductions Productive and on-time scheduling 17
Division Profile The Power Division provides a dedicated technical and managerial team necessary to design and construct new facilities or upgrades. By bringing together every aspect of a power project under a single management team, the division provides economical and efficient solutions to meet the needs of a diverse industry base. The project management team comprised of specialists in the design, construction and operation of complex type of projects. From concept through acceptance, the division provides the optimal resources, equipment and services to meet all contractual requirements. The EPC team is accountable for the following critical functions: Planning, organizing and procedures Scheduling and tracking Cost control Document control Single-point customer contact Progress reporting 18
Scope of Activities Contracting works for Power Networks and Distribution Systems Underground cable network including jointing, termination, testing and commissioning Complete electrical and instrumentation works for Power Plants, Refineries, Power Stations, Desalination Plants and Sewerage Treatment Plants Turnkey contracting works for LV / MV / HV Substations EPC works for electric generators Installation and commissioning of auxiliary powers, package substation, control panels and transmission lines Contracting works for plant fire fighting and safety alarm systems, remote monitors, and fire suppression systems. Control / MCC room fire suppression systems installation Submarine Cable Installation Industrial Building Construction HVAC Works LV / MV / HV Switchgear and Transformer Installation Installation and Commissioning of Auxiliary Power Supplies 19
Typical Power Project Organization Chart HEAD OF POWER DIVISION PROJECT MANAGER ENGINEERING PLANNING & QS CONSTRUCTION HSE & QA/QC OFFICE SUPPORT Civil Engineer Electrical Engineer Planning Engineer Quantity Surveyor Construction Manager / Project Engineer HSE Engineer QA/QC Engineer Coordinator Secretary Doc. Controller Storekeeper Timekeeper Watchman Mechanical Engineer Site Civil Engineer Site Electrical Engineer Testing & Comm. Eng. Design Coordinator Mechanical Foreman Civil Foreman Electrical Foreman Draftsmen 20
Featured Projects Security of the Electric Power Supply and Upgrade of the Network for Presidential Palaces and Hospitals Contract No. Client R-99-0157 Abu Dhabi Water & Electricity Authority (ADWEA) Value AED 176,957,025 Award Date Description 08-Feb-2000 Supply, Installation, Testing & Commissioning Works Project was completed. 21
Featured Projects Electrical & Civil Engineering Works for the Implementation of 4 MW NGK Battery Energy Storage (42MW) Contract No. G-6334 Client Abu Dhabi Water and Electricity Authority (ADWEA) Value AED 142,271,120 Award Date Description 23-Nov-2009 Design & Construction of 10 Nos. BESS Substation & Installation Testing Commissioning of NGK Batteries & Supply of Auxiliary Items. 22
Featured Projects Security of the Electric Power Supply and Upgrade of the Network for Presidential Palaces & Hospitals (Stage-III Phase-III) Contract No. G-1882 Client Abu Dhabi Water & Electricity Authority (ADWEA) Value AED 103,122,825 Award Date Description 07-Aug-2005 Design, Supply, Installation Testing and Commissioning including remote control monitoring system, ISMS, and Medium Voltage Panels. Project was completed in May 2010. 23
Featured Projects Replacement of 11 KV Switchgears in W13, E15 and Salt & Chlorine Substations Contract No. D-6990 Client Value AED 81,991,962 Award Date Description Abu Dhabi Distribution Company (ADDC) 03-Jan-2010 Design & Construction of 1 New 132/11 kv Substation & Modification of 11 kv Network and Replacement with new 11 kv Switchgear @ 2 nos. Substation. 24
Featured Projects Security and Upgrading of 11 kv Electrical Network for H.H. Shk. Khalifa Palace in Abu Dhabi & Erection of Equipment in Substation No. 4 & 5 in Beach Palace Contract No. D-7150 Client Value AED 40,667,381 Award Date Description Abu Dhabi Distribution Company (ADDC) 05-May-2008 Design, Supply, Installation Testing and Commissioning of 11KV Switching Station & replacement of Switchgears, Control Panels, DC system in Beach Palace Stations B4, B5 Stations & Standby power plant in H.H.Shk Khalifa Switching station. Completed in July 2010. 25
Featured Projects Security of the Electric Power Supply and Upgrade of the Network for Presidential Palaces and Hospitals Stage-III Phase-III. Lot-1 Contract No. G-1494 Client Value AED 25,914,216 Award Date Description Abu Dhabi Water & Electricity Authority (ADWEA) 05-Feb-2003 Design, Supply, Installation Testing and Commissioning Works Project was completed. 26
Featured Projects Transfer of 11kV Load to E48/02 & Khalifa A2 Primary Substation in Abu Dhabi Island & Eastern Region (2010) Contract No. D-10599 Client Value AED 19,683,403 Award Date Abu Dhabi Distribution Company (ADDC) 10-Feb-2010 Description Installation of Underground 11 kv Cables of 112 km & FO Cables of 20 km. 27
Featured Projects Supply and Installation of 8 Nos. 415 Volts Diesel Generators Contract No. G-1206 Client Value AED 13,039,984 Award Date Abu Dhabi Water & Electricity Authority (ADWEA) 10-Apr-2002 Description Design, Supply, Installation, Testing and Commissioning of 8 Nos. 415 Volts Diesel Generators. 28
Featured Projects Transfer of Load to New 132/11 kv W24 and E01 Primary Substations in Abu Dhabi Island Contract No. D-10624 Client Value AED 34,028,598 Award Date Description Abu Dhabi Distribution Company (ADDC) 25-May-2010 Supply of 11kV Switchgear, DC System, LVAC, DMS System, Auxiliary Transformer and Joints & Terminations. Installation of Power Cables, 11/0.415kV Package S/S and Civil Works i.e. Building, Trenching, etc. Ruwais Housing Complex Expansion Phase III, Procurement of Electrical Equipment Low Voltage (LV) Panels Switchgear Contract No. 115979C13E Client Abu Dhabi National Oil Company (ADNOC) Value AED 29,675,361 Award Date 23-Apr-2009 Description Supply & Delivery of Low Voltage Panels Switchgear. 29
Featured Projects Shuweihat S3 IPP Civil Work Package 3 Client Value AED 29,191,475 Award Date Description Daewoo E&C-Siemens (Consortium) 20-Jul-2011 Civil works which includes excavation, filling, concreting, finishing, waterproofing, structural steel works, etc. for fuel gas pipelines with sleeper foundations & trenches, storm drain works and site roads with asphalt. Supply and Installation of 11kV Package Unit Substation for Braka Nuclear Power Plant Contract No. 4600037153 Client Hyundai Engineering & Construction Value AED 16,865,843 Award Date 27-Jul-2011 Description Commissioning of 18 Nos. 11 kv Package Substations. 30
Featured Projects Modification of Switching Stations in Abu Dhabi Island Contract No. D-7720 Client Value AED 16,999,999 Award Date Description Abu Dhabi Distribution Company (ADDC) 06-Aug-2008 Supply, Installation & Commissioning of RMU s and Modification of Transformer Panel to Feeder Panel in Switching Stations. Long Term Rate Agreement for Installation of Underground Cables, Electrical Distribution Equipment, OHL and allied works in Abu Dhabi Eastern Region Contract No. Client Value Award Date Description D-9710/C Abu Dhabi Distribution Company (ADDC) AED 10,000,000 per year 16-Apr-2009 Installation of Underground Cables, Electrical Distribution Equipments, OHL and Allied Works as per Work Order Basis. 31
Featured Projects Transfer of 11kV Load to New 132/11kV W02 Primary Substation in Abu Dhabi Island Contract No. D-11915 Client Value AED 13,603,107 Award Date Description Abu Dhabi Distribution Company (ADDC) 23-Oct-2011 Excavation and 11 kv cable laying works in Central Market Area, in order to transfer 11 kv load to new 132/11 kv W02 Primary Substation. Installation of 22 kv Cables from 132/22 kva - A Beach Primary to Masdar City Client Value AED 2,121,525.65 Award Date Description Abu Dhabi Distribution Company (ADDC) 15-Sep-2011 Installation & commissioning of 22 kv power cables with 144 fiber optic cables to provide the power supply to the initial demand for Masdar City Development. 32
Power Stations Power Station with Diesel Engine for operation on Diesel, Crude Oil and HFO Turnkey Power Stations up to 12 MW Powered with Diesel, Gas and Dual Fuel Engines 33 Power Station with Gas Engines Power Station with Dual Fuel Engines
Division Profile In order to accommodate the brisk developments of UAE s industry, Lindenberg Water and Drainage Division was established to provide water and drainage solutions. The Division has up-to-date working knowledge of and is very well conversant with the requirements in water supply and water distribution network. The necessary infrastructure, including manpower, reliable sources of suppliers, equipment are readily available at our disposal. 34
Division Profile The Water & Drainage Division is acknowledged as the premier provider of the highest quality professional service in the field of water and drainage facilities; insuring absolute client satisfaction through the expertise and experience of its people. The division aims to provide new technologies, processes, and materials to build and deliver water and drainage facilities that are best suitable for their class & area of usage. Scope of Activities Water Pipeline Networks Water & Irrigation Reservoirs Water & Sewerage Pumping Stations Sewage Treatment Plants Operation & Maintenance of Sewerage Networks and Pumping Stations 35
Typical Water & Drainage Project Organization Chart DIVISION MANAGER PROJECT MANAGER ENGINEERING PLANNING & QS CONSTRUCTION HSE & QA/QC OFFICE SUPPORT Civil Engineer Electromech l Engineer Inst & Ctrl. Engineer Planning Engineer Quantity Surveyor Construction Manager / Project Engineer HSE Engineer QA/QC Engineer Coordinator Secretary Doc. Controller Draftsman Storekeeper Timekeeper Site Engineer Site Engineer Site Engineer Water Tank Works (Concrete Construction) Civil Works Pipeline Works Chamber Works Electromechanical Works Inst n & Control Works Foreman Civil Foreman Pipeline Foreman Chamber Foreman E/M Foreman I & C Foreman Work Crew Land Surveyor Land Surveyor Land Surveyor E/W Work Crew I & C Work Crew Civil Work Crew Pipeline Crew Chamber Crew 36
Featured Projects Water Transmission Scheme from Sas Al Nakheel (UAN) Junction to Sadiyat / Abu Dhabi Island Contract No. N-5807 Client Abu Dhabi Transmission & Despatch Company (TRANSCO) Value AED 569,594,995 Award Date 20-Jan-2008 Description Construction of DI/CS Pipelines 37
Featured Projects Water Supply to ADCO & GASCO Facilities at Buhasa and Habshan Contract No. D-10924 Client Abu Dhabi Distribution Company (ADDC) Value AED 179,999,340 Award Date Description 08-Jan-2012 Construction of 65 km DN 400~500 DI Pipelines, 2 x 0.5 Million Gallons Storage Steel Tanks and Pump Station of 7 Million Gallons per day capacity. 38
Featured Projects EPC Works for Al Ain Distribution Network - Pipelines Umn Ghaffa Floating Reservoir Station - Lot D Contract No. N-6821 Client Abu Dhabi Transmission & Despatch Company (TRANSCO) Value AED 174,524,364 Award Date Description 07-Mar-2010 EPC for 2 Nos. 25 Million Gallons Steel Tanks and associated Civil and Pipeline Works. 39
Featured Projects Works Associated with the Replacement of Existing Sewer Networks at Some Sectors Inside Abu Dhabi Island - Category A Contract No. O-1463 Client Abu Dhabi Sewerage Services Company (ADSSC) Value AED 116,026,699 Award Date Description 13-Jun-2010 Construction, Replacement & Rehabilitation of Existing Sewer Lines and Manholes Inside Abu Dhabi Island. 40
Featured Projects Water Supply to Sadiyat Island and Adjacent Areas Lots A, B, & C Contract No. N-2622.1 Client Abu Dhabi Transmission & Despatch Company (TRANSCO) Value AED 108,118,493 Award Date 22-Jul-2007 Description Supply, Construction, & Installation of Water Supply Network The Project was completed in June 2009 41
Featured Projects Replacement of 2 DN 600 Pipelines in Baniyas along Al Ain Highway Contract No. D-7310.1 Client Abu Dhabi Distribution Company (ADDC) Value AED 94,037,448 Award Date 22-May-2008 Description Supply and Replacement of Water Transmission Pipelines The Project was completed in November 2010 42
Featured Projects Water Transmission Lines Inside Al Reem Island Lot A Contract No. N-5386 Client Abu Dhabi Transmission & Despatch Company (TRANSCO) Value AED 56,455,067 Award Date 03-Feb-2008 Description Installation of DI/CS Pipelines The Project was completed in January 2010 43
Featured Projects DN 1000mm Transmission Pipeline from Sweihan to Remah Contract No. N-4604 Client Abu Dhabi Transmission & Despatch Company (TRANSCO) Value AED 25,889,764 Award Date 23-Jul-2007 Description Supply, Construction, and Installation of Water Transmission Pipelines The Project was completed in June 2009 44
Featured Projects Urgent Works at Al Qadra Village Owned by HH Sheikh Mansour Bin Zayed Contract No. D-5630 Client Abu Dhabi Water & Electricity Authority (ADWEA) Value AED 16,877,777 Award Date 15-Apr-2006 Description Supply, Construction & Maintain Water Supply Network The Project was completed in July 2008 45
Featured Projects Sewerage and Surface Drainage Works (SAS Al Nakheel & Seeh Shua ib) Contract No. O-1047 Client Value AED 10,400,000 Award Date Description Abu Dhabi Sewerage Services Company (ADSSC) 30-Jan-2008 Miscellaneous Sewerage and Drainage Works at Sas Al Nakheel & Sash Shuhaib The Project was completed in July 2009 46
QHSE Policy LINDENBERG implements and maintains an effective QHSE Management System in line with the requirements of ISO 9001:2008, ISO 14001:2004 & OHSAS 18001:2007. It is our policy to Meet or exceed our clients' expectations, the first time and every time, through the application of proven quality principles at all levels of our business; Minimize the generation of hazardous & toxic waste, preventing the release of harmful substances into the environment, while encouraging the reduction, recycling and re-use of materials; Instilling and promoting safety consciousness to prevent ill health, injury and incidents; and provide a safe and healthy working environment for our employees, clients, and subcontractors. We are committed to Ensuring that adequate resources are made available for QHSE purposes. Ensuring that QHSE is accepted as a core management activity, given equal priority as other objectives and management functions, and included in the company business plan. Promoting a positive QHSE culture within the top management and encouraging active employee participation in QHSE throughout all levels of the company. 47 LE-IMS-Pol rev. 1 AHMAD ZAABRI General Manager
QHSE Certificates & Membership Lindenberg Emirates is an Integrated Management System (IMS) certified company and has established, implemented and maintained an effective Quality, Occupational Health & Safety and Environmental Management System, in line with the requirements of ISO 9001:2008, ISO 14001: 2004 and OHSAS 18001:2007 to ensure that customer satisfaction and requirements are being met. ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 British Safety Council 48
Workforce and Labour Camp Lindenberg-Emirates LLC employs almost 800 Skilled and Unskilled Labors. Labor Camps with all modern facilities are established in Al Faya, Mussafah and Al Ain to accommodate the requirements of the health & safety of the workforce. Camp Location Size No. of Rooms Current No. of Occupants Al Faya 1,300 m 2 96 600 Magenta Camp (rented) 46 264 Al Ain 400 m 2 28 45 49 Data as of 10-Oct-2011
Store Facilities Aside from Projects Sites Stores and Yards, two Main Stores of 30x20 m 2 are operational at Mussafah to help in storing & preserving the materials received for different projects, also used for storage of our standard erection tools required during installation/ commissioning activities. 50
Plant, Machineries, Vehicles and Equipment Lindenberg Emirates policy in Vehicles, Equipment and Machinery is to: purchase and own all equipment to cover the project needs. self-maintain these vehicles, equipment and machinery. hire vehicles, equipment and machinery to prevent delays in the project execution. 51
Contact Information We hope that the information given and detailed in this Company Profile is sufficient to illustrate the potential and capabilities of Lindenberg. We will be pleased to provide further information on your request. Kindly contact us. Lindenberg Emirates LLC Lindenberg Water & Drainage Division Villa 101, Al Nahyan Camp Area, (A Division of Lindenberg Emirates LLC) Muroor Road, P.O. Box 42630, Tel: +971 2 642 2576 Abu Dhabi, United Arab Emirates Fax: +971 2 642 2579 Tel: +971 2 642 2576 E-mail: lwd@lindenberg.ae Fax: +971 2 642 2591 E-mail: info@lindenberg.ae Lindenberg Power Division Website: www.lindenberg.ae (A Division of Lindenberg Emirates LLC) Tel: +971 2 642 2576 Fax: +971 2 642 2571 E-mail: lpd@lindenberg.ae 52
P.O. Box 42630, Abu Dhabi, United Arab Emirates Tel: +971 2 6811061, Fax: +971 2 6813655 E-mail: info@lindenberg.ae Website: www.lindenberg.ae