The Rational Method. David B. Thompson Civil Engineering Deptartment Texas Tech University. Draft: 20 September 2006



Similar documents
CHAPTER 2 HYDRAULICS OF SEWERS

Rational Method Hydrologic Calculations with Excel. Rational Method Hydrologic Calculations with Excel, Course #508. Presented by:

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness

Basic Hydrology. Time of Concentration Methodology

Computing Stormwater Runoff Rates and Volumes

Stormwater Drainage Design for Parking Lots

Module 6 : Quantity Estimation of Storm Water. Lecture 6 : Quantity Estimation of Storm Water

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes

TENNESSEE GAS PIPELINE COMPANY, L.L.C.

APPENDIX B DESIGN GUIDELINES FOR APPROVED TREATMENT METHODS

CHAPTER 3 STORM DRAINAGE SYSTEMS

DESIGN COEFFICIENT TABLES

1800 Washington Boulevard, Baltimore, MD TTY Users Larry Hogan, Governor Boyd

Estimating Storm Water Runoff

CHAPTER 5 HYDROLOGIC ANALYSIS AND DESIGN

ARTICLE II STORM DRAINAGE. (From Ordinance No ; August 4, 1987; Sections III through VIII)

Rainfall Intensities for Southeastern Arizona

Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience

CITY UTILITIES DESIGN STANDARDS MANUAL

SYNTHESIS OF TxDOT STORM DRAIN DESIGN

Assessment of the US Conservation Service method for estimating design floods

PRECIPITATION AND EVAPORATION

C.3 Workshop Track 2: Sizing Calculations and Design Considerations for LID Treatment Measures

Fort Dodge Stormwater Master Planning. Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M.

H. Khalid Jamil 9367 Verain Street San Diego, CA, (858)

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

From Civil 3D, with Love

Storm Drainage Design and Technical Criteria Manual. City of Brookings, SD

Estimating Potential Reduction Flood Benefits of Restored Wetlands

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

CITY OF CHARLOTTE STORM WATER SERVICES CREDIT APPLICATION INSTRUCTION MANUAL

URBAN DRAINAGE CRITERIA

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS

Stormwater Management Functional Servicing Report

CHAPTER 7 STORM WATER DESIGN

10/4/ slide sample of Presentation. Key Principles to Current Stormwater Management

Open channel flow Basic principle

2011 HYDRAULICS MANUAL

Introduction to Rainwater Harvesting. Department of Biological and Agricultural Engineering Texas A&M University

Appendix 3 Water-Harvesting Earthworks Calculations

Burnsville Stormwater Retrofit Study

SECTION STORM DRAINAGE TABLE OF CONTENTS

Storm Drainage Systems

Using probability to understand 100-year storms

What is the most obvious difference between pipe flow and open channel flow????????????? (in terms of flow conditions and energy situation)

Chapter 4. Flood Risk Assessment

CSO Modelling Considering Moving Storms and Tipping Bucket Gauge Failures M. Hochedlinger 1 *, W. Sprung 2,3, H. Kainz 3 and K.

Riprap-lined Swale (RS)

Hydrologic Modeling using HEC-HMS

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

CHAPTER 5 OPEN CHANNEL HYDROLOGY

Appendix F Benefit-Cost Analysis of Flood Protection Measures

STAFF REPORT TO COMMITTEE OF THE WHOLE

CHAPTER 5. Storm Sewer

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

DRAINAGE SERVICE CHARGES

Individual Residential Property Credit

APPENDIX D INLET CAPACITY AND SPACING. The capacity and spacing design of storm drainage inlets are presented in detail in this Appendix.

Costs for Green Infrastructure and Stormwater Controls

8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section:

Evaluation of Open Channel Flow Equations. Introduction :

Xing Fang, Associate Professor Department of Civil Engineering, Lamar University

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

Small Dam Hazard Assessment Inventory

Low Impact Development Checklist

When Water Comes to Town What Happens

Interactive comment on A simple 2-D inundation model for incorporating flood damage in urban drainage planning by A. Pathirana et al.

Storm Water Runoff. Managing. A Self-Assessment Guide for Wisconsin Businesses. Storm water runoff is coming. This guide provides businesses

TECHNICAL MEMORANDUM STORM DRAIN SYSTEM DESIGN EVALUATION CRITERIA. For CITY OF YREKA WILLDAN. July 14, 2006

System components and Design

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year

Drainage and Erosion Control

EXAMPLES (OPEN-CHANNEL FLOW) AUTUMN 2015

Experiment (13): Flow channel

Costs for Green Infrastructure and Stormwater Retention Practices

Chapter 5.0. Stormwater Credits for Innovative Site Planning

Permeable Interlocking Concrete Pavements

STORMWATER MANAGEMENT CHECKLIST

AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA

Rainfall and Runoff. Page Introduction Christchurch Rainfall The Rational Method Advanced Analysis 21-9

Please click on the tutorial most fitting of your expertise in order to learn about the features of the visualization tool.

A n. P w Figure 1: Schematic of the hydraulic radius

ON-SITE STORMWATER DETENTION TANK SYSTEMS TECHNICAL GUIDE

06 - NATIONAL PLUVIAL FLOOD MAPPING FOR ALL IRELAND THE MODELLING APPROACH

STORMWATER DESIGN CRITERIA MANUAL

Havnepromenade 9, DK-9000 Aalborg, Denmark. Denmark. Sohngaardsholmsvej 57, DK-9000 Aalborg, Denmark

Sharp-Crested Weirs for Open Channel Flow Measurement, Course #506. Presented by:

The value of the wastewater flow used for sewer design is the daily peak flow. This can be estimated as follows:

Guidelines for. Permeable Pavement

Catchment Scale Processes and River Restoration. Dr Jenny Mant The River Restoration Centre therrc.co.uk

SECTION 5: SANITARY SEWER SYSTEM DESIGN

How To Amend A Stormwater Ordinance

Increasing water availability through juniper control.

MODULE 2 RULES RELATING RULES RELA

Transcription:

The David B. Thompson Civil Engineering Deptartment Texas Tech University Draft: 20 September 2006 1. Introduction For hydraulic designs on very small watersheds, a complete hydrograph of runoff is not always required. The maximum, or peak, of the hydrograph is sufficient for design of the structure in question. Therefore, a number of methods for estimating a design discharge, that is, the maximum value of the flood runoff hydrograph, have been developed. The rational method is a simple technique for estimating a design discharge from a small watershed. It was developed by Kuichling (1889) for small drainage basins in urban areas. The rational method is the basis for design of many small structures. In particular, the size of the drainage basin is limited to a few tens of acres. 1 The method is also described in most standard textbooks. 2 Comments are welcome; please direct comments to david.thompson@ttu.edu. 1 Texas Department of Transportation (TxDOT) experts suggest a maximum drainage area of 200 acres for rational method application. While many analysts consider this a hard limit, in actuality the limit really depends on watershed complexity. For a complex watershed (such as an urbanized watershed), this limit should probably be much less; for a rural watershed, the limit might be much larger. Therefore, it is the analyst s responsibility to determine whether the method is applicable or not and justify application of the rational method based on professional judgment. 2 See, for example, Section 15.2 in Viessman, Jr., W. and Lewis, G. L., 1995, Introduction to hydrology, Fourth Edition, Harper Collins, pp 311ff. 1

2. Basics Application of the rational method is based on a simple formula that relates runoffproducing potential of the watershed, the average intensity of rainfall for a particular length of time (the time of concentration), and the watershed drainage area. The formula is Q = C u CiA, (1) Q = design discharge (L 3 /T), C u = units conversion coefficient, C = runoff coefficient (dimensionless), i = design rainfall intensity (L/T), and A = watershed drainage area (L 2 ). The units conversion coefficient, 3 C u, is necessary because the ia product, while it has units of L 3 /T, is not a standard unit in the traditional units system. 3. Runoff Coefficient The runoff coefficient, C, is a dimensionless ratio intended to indicate the amount of runoff generated by a watershed given a average intensity of precipitation for a storm. While it is implied by the rational method, equation 1, that intensity of runoff is proportional to intensity of rainfall, calibration of the runoff coefficient has almost always depended on comparing the total depth of runoff with the total depth of precipitation, C = R P, (2) R = Total depth of runoff (L), and P = Total depth of precipitation (L). The runoff coefficient represents the fraction of rainfall converted to runoff. Values are tabulated in table 1. 3 The product of the dimensions of i, and A, is acre-inches per hour in traditional units. Dimensional analysis of this unit will show that this is equivalent to 1.00833 cubic feet per second. This is close enough to unity to be used as an equivalence for most cases.

Table 1: General runoff coefficients for the rational method. Description Runoff Coefficient Business Downtown Areas 0.70 0.95 Neighborhood Areas 0.50 0.70 Residential Single-family 0.30 0.50 Multi-family detached 0.40 0.60 Multi-family attached 0.60 0.75 Residential suburban 0.25 0.40 Apartments 0.50 0.70 Parks, cemetaries 0.10 0.25 Playgrounds 0.20 0.35 Railroad yards 0.20 0.40 Unimproved areas 0.10 0.30 Drives and walks 0.75 0.85 Roofs 0.75 0.95 Streets Asphalt 0.70 0.95 Concrete 0.80 0.95 Brick 0.70 0.85 Lawns; sandy soils Flat, 2% slopes 0.05 0.10 Average, 2% 7% slopes 0.10 0.15 Steep, 7% slopes 0.15 0.20 Lawns; heavy soils Flat, 2% slopes 0.13 0.17 Average, 2% 7% slopes 0.18 0.22 Steep, 7% slopes 0.25 0.35 4. Storm Intensity Storm intensity, i, is a function of geographic location and design exceedence frequency (or return interval). It is true that the longer the return interval (hence, the lower the exceedence frequency), the greater the precipitation intensity for a given storm duration. Furthermore, the longer the length of the storm, the lower the storm average precipitation intensity. The relation between these three components, storm duration, storm intensity, and storm return interval, is represented by a family of curves called the intensity-durationfrequency curves, or IDF curves. The IDF curves can be determined by analysis of storms for a particular site or by the use of standard meteorological atlases, such as TP-40 (1963) and HYDRO-35 (1977). For IDF curves, TxDOT 4 uses a formula for approximating the intensity-durationfrequency curve. The formula is b i = (t c + d) e, (3) 4 TxDOT Hydraulic Design Guidelines, http://manuals.dot.state.tx.us/dynaweb/colbridg/hyd

Table 2: IDF parameters for Lubbock County. Return Interval (years) Parameter 2 5 10 25 50 100 e 0.830 0.821 0.813 0.816 0.808 0.810 b 47 60 69 82 88 101 d 10.0 10.1 10.1 10.1 10.1 10.0 i = design rainfall intensity (in/hr), t c = time of concentration (min), and b, d, e = parameters. For Lubbock County, the parameters are shown on table 2. 5. Time of Concentration The time of concentration, t c, of a watershed is often defined to be the time required for a parcel of runoff to travel from the most hydraulically distant part of a watershed to the outlet. It is not possible to point to a particular point on a watershed and say, The time of concentration is measured from this point. Neither is it possible to measure the time of concentration. Instead, the concept of t c is useful for describing the time response of a watershed to a driving impulse, namely that of watershed runoff. In the context of the rational method then, t c represents the time at which all areas of the watershed that will contribute runoff are just contributing runoff to the outlet. That is, at t c, the watershed is fully contributing. We choose to use this time to select the rainfall intensity for application of the rational method. If the chosen storm duration is larger than t c, then the rainfall intensity will be less than that at t c. Therefore, the peak discharge estimated using the rational method will be less than the optimal value. If the chosen storm duration is less than t c, then the watershed is not fully contributing runoff to the outlet for that storm length, and the optimal value will not be realized. Therefore, we choose the storm length to be equal to t c for use in estimating peak discharges using the rational method.

5.1. Estimating Time of Concentration There are many methods for estimating t c. In fact, just about every hydrologist or engineer has a favorite method. All methods for estimating t c are empirical, that is, each is based on the analysis of one or more datasets. The methods are not, in general, based on theoretical fluid mechanics. For application of the rational method, TxDOT recommends that t c be less than 300 minutes (5 hours) and greater than 10 minutes. Other agencies require that t c be greater than 5 minutes. The concept is that estimates of i become unacceptably large for durations less than 5 or 10 minutes. For long durations (such as longer than 300 minutes), the assumption of a relatively steady rainfall rate is less valid. 5.2. Morgali and Linsley Method For small urban areas with drainage areas less than ten or twenty acres, and for which the drainage is basically planar, the method developed by Morgali and Linsley (1965) is useful. It is expressed as t c = 0.94(nL)0.6 i 0.4 S 0.3, (4) t c = time of concentration (min), i = design rainfall intensity (in/hr), n = Manning surface roughness (dimensionless), L = length of flow (ft), and S = slope of flow (dimensionless). The Morgali and Linsley equation (equation 4) is implicit in that it cannot be solved for t c without i. So, iteration is required. Such a solution can be achieved by combining equation 3 with equation 4 and solving using a numerical method (such as a calculator solver). The solution of the two equations yields both t c and i. 5 5 Of course, the method of successive substitution can be used with a graph of the IDF curve to arrive at a solution as well.

5.3. Kirpich Method For small drainage basins that are dominated by channel flow, the Kirpich (1940) equation can be used. The Kirpich equation is t c = 0.0078(L 3 /h) 0.385 (5) t c = time of concentration (min), L = length of main channel (ft), and h = relief along main channel (ft). Some authors use an adjustment factor for the Kirpich approach to correct for paved channels. The Kirpich method is limited to watershed with a drainage area of about 200 acres. 5.4. Kerby-Hatheway Method For small watersheds where overland flow is an important component, but the assumptions inherent in the Morgali and Linsley approach are not appropriate, then the Kerby (1959) method can be used. The Kerby-Hatheway equation is [ ] 0.67NL 0.467 t c = (6) S t c = time of concentration (min), N = Kerby roughness parameter (dimensionless), and S = overland flow slope (dimensionless). Overland flow rarely occurs for distances exceeding 1200 feet. So, if the watershed length exceeds 1200 feet, then a combination of Kerby s equation and the Kirpich equation may be appropriate. Certainly, the combination of overland flow and channel t c is an appropriate concept. Values for Kerby s roughness parameter, N, are presented on table 3. 6. Putting It Together More here later...

Table 3: Kerby s roughness parameter. Description N Pavement 0.02 Smooth, bare packed soil 0.10 Poor grass, cultivated row 0.20 crops or moderately rough bare surfaces Pasture, average grass 0.40 Deciduous forest 0.60 Dense grass, coniferous forest, 0.80 or deciduous forest with deep litter References Kerby, W. S. (1959). Time of concentration for overland flow. Civil Engineering 29 (3), 60. Kerby s work is based on Hatheway s (1945) data. (In PDF). Kirpich, Z. P. (1940). Time of concentration of small agricultural watersheds. Civil Engineering 10 (6), 362. The original source for the Kirpich equation. (In PDF). Kuichling, E. (1889). The relation between the rainfall and the discharge of sewers in populous districts. Transactions, American Society of Civil Engineers 20, 1 56. Morgali, J. R. and R. K. Linsley (1965, May). Computer analysis of overland flow. Journal of the Hydraulics Division 91 (HY3), 81 101. National Oceanic and Atmospheric Administration (1977, June). Five- to 60-minute precipitation frequency for the eastern and central united states. Hydro-35. (In PDF). U. S. Weather Bureau (1963). Rainfall frequency atlas of the united states for durations of 30 minutes to 24 hours and return periods from 1 to 100 years. Technical Report 40, U. S. Weather Bureau.