Performance Assessment of 100 kw Solar Power Plant Installed at Mar Baselios College of Engineering and Technology



Similar documents
Solar Matters III Teacher Page

Techno-Economic Analysis of Solar PV Based FM Radio Broadcasting Stations

Additional Solar System Information and Resources

Prospects and Viability of Solar Energy in Khyber Pakhtunkhwa Pakistan

Electricity from PV systems how does it work?

Frequently Asked Questions SOLAR ENERGY:

Yield Reduction due to Shading:

Feasibility Study of Brackish Water Desalination in the Egyptian Deserts and Rural Regions Using PV Systems

Solar Energy Systems. Matt Aldeman Senior Energy Analyst Center for Renewable Energy Illinois State University

Renewable Energy. Solar Power. Courseware Sample F0

Gross/Active PV Surface Area: ,40 / ,29 m². Energy Produced by PV Array (AC):

Auburn University s Solar Photovoltaic Array Tilt Angle and Tracking Performance Experiment

OFF GRID HYBRID POWER PLANT Discover how to maximize the usage of the renewable energy.

150 Watts. Solar Panel. one square meter. Watts

Replacing Fuel With Solar Energy

FREE ONLINE APPLICATION OF CALCULATION

Design of Grid Connect PV systems. Palau Workshop 8 th -12 th April

Try to answer all of these questions. Be prepared to share your answers with a partner, and with the rest of the class.

A Proposal for Solar Energy Power in the city of Boulder, Colorado

Key words: Photovoltaic modules, insolation, charge controller, system sizing, continuous wattage, surge wattage.

Running the Electric Meter Backwards: Real-Life Experience with a Residential Solar Power System

Operational experienced of an 8.64 kwp grid-connected PV array

Solar technology. A guide to solar power at utility scale. in Africa

Energy Efficiency, Clean Power as Engine for Sustainable Growth

Solar PV Cells Free Electricity from the Sun?

Marketing Methodology of Solar PV Power Packs

32/1/ /PVSE(Part-II) Ministry of New and Renewable Energy SPV Off Grid Division

SA Power Networks Planning for Solar PV? Customer information guide to network connected solar PV inverter systems

Solar power Availability of solar energy

K.Vijaya Bhaskar,Asst. Professor Dept. of Electrical & Electronics Engineering

Solar Photovoltaic Frequently Asked Questions

ANALYSIS 2: Photovoltaic Glass Replacement

For millennia people have known about the sun s energy potential, using it in passive

Proposal prepared for Happy Solar Owner

OFF-GRID ELECTRICITY GENERATION WITH HYBRID RENEWABLE ENERGY TECHNOLOGIES IN IRAQ: AN APPLICATION OF HOMER

PLC Based PV Module Tracking with Microcontroller Backup

EFFICIENT EAST-WEST ORIENTATED PV SYSTEMS WITH ONE MPP TRACKER

The Basics of Solar Power for Producing Electricity An excellent place to start for those just beginning. The basics of solar power: 1000 W/m²

Presenter: Bruce Clay Clay Energy Fiji

Solar Energy Feasibility Study

Energy payback time and life-cycle conversion efficiency of solar energy park in Indian conditions

Performance ratio. Contents. Quality factor for the PV plant

Design & Sizing of Stand-alone Solar Power Systems A house Iraq

Stand Alone PV System Sizing Worksheet (example)

CHAPTER 5 PHOTOVOLTAIC SYSTEM DESIGN

Ministry of New and Renewable Energy. Jawaharlal Nehru National Solar Mission SOLAR PHOTOVOLTAIC WATER PUMPING SYSTEMS ( )

Advancement in Solar Panels and Improvement in Power Production with Indoor Application

Training Systems for Renewable Energies. Acquiring Practical Skills and Project-oriented Expertise

Stand-alone Photovoltaic System for a Cabin in Marsa-allam

The Planning and Design of Photovoltaic Energy Systems: Engineering and Economic Aspects. William Nichols Georgia Southern University Atlanta, GA

A Stable DC Power Supply for Photovoltaic Systems

ADB s Rooftop Solar Project. Aiming Zhou Senior Energy Specialist June th Asia Clean Energy Forum

Mailing Address 4650 Adohr Ln. Camarillo, CA Year Financial Analysis. $1,051 / mo (avg) Cost Breakdown. System Description

Education in the field of photovoltaics in the Czech Republic Prof. Vitezslav Benda

2016 Santee Cooper Solar Home & Solar Share Home Program Manual

Explanation of Net Energy Metering and Annual Net Surplus Electricity Settlement Options

Financial Analysis of Solar Photovoltaic Power plant in India

Total 5,926 24,514 66,355 97,042 68, ,

Solar Energy Discovery Lab

February 23, Paul Helstrom Minnesota Power Renewable Program Lead. Stacy Miller Minnesota Department of Commerce Solar Policy Specialist

William Haman, P.E. IAMU Energy 2013 Conference, Ankeny, IA October 1, 2013

Coslight Hybrid Power System with Solar

GUIDE TO NET ENERGY METERING.

Solar Panel Experiment

A SOLAR GUIDE - EVERYTHING YOU NEED TO KNOW

Hybrid Micro-Power Energy Station; Design and Optimization by Using HOMER Modeling Software

Yukon Government Solar Energy Pilot: Performance Monitoring Yukon Government s Energy Solutions Centre. February 2014

Solar chilled drinking water sourced from thin air: modelling and simulation of a solar powered atmospheric water generator

The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted.

DESIGN AND DEVELOPMENT OF UTILITY INTERFACE ADAPTIVE SOLAR POWER CONVERTER FOR WATER PUMPING SYSTEM IN INDIAN VILLAGES

ACTIVITY 6: Series and Parallel Wiring

Photovoltaic System Technology

Concept for a DC low voltage house

SOLAR ENERGY. Solar Energy, Kit #6A: Efficiency of Solar Cells. Solar Energy, Kit #6B: Solar Extension Activities INSTITUTE FOR SCHOOL PARTNERSHIP

The Solar Power Specialists. Elm Park House, Elm Park Court, Pinner, Middlesex, HA5 3NN Solutions House, Unit A19, 20 Heron Road, Belfast, BT3 9LE

Running on Renewables (Lesson Plan) (Utilizing HOMER: Modeling Software for Hybrid Electric Power Systems)

SOLAR ENERGY: SOLUTION TO FUEL DILEMMA

Application of photovoltaic s in the building and construction industry as a power generating facility

NBF. Electrical. WHY GO SOLAR? NBF ELECTRICAL EXPLAINS WHY

SOLARIS ENERGY SOLUTIONS

Solar Powered Smart Irrigation System

NOTICE OF INTENT Department of Revenue Policy Services Division. Income Tax Credits for Wind or Solar Energy Systems (LAC: 61:I.

SOLAR PV-WIND HYBRID POWER GENERATION SYSTEM

Solar PV, probably the best tax-free investment available today.

Flat Roof Thin-Film PV Compared to Tilted Thin Film and Crystalline PV

Own Your Power! A Consumer Guide to Solar Electricity for the Home

Solar Power for PC Deployments: Enabling ICT Beyond the Grid

SOLAR ELECTRICITY: PROBLEM, CONSTRAINTS AND SOLUTIONS

Solar Solutions and Large PV Power Plants. Oscar Araujo Business Development Director - Americas

SIMULATION OF A COMBINED WIND AND SOLAR POWER PLANT

MORE POWER. A BETTER INVESTMENT.

Design of a Photovoltaic Data Monitoring System and Performance Analysis of the 56 kw the Murdoch University Library Photovoltaic System

Solar and Wind Energy for Greenhouses. A.J. Both 1 and Tom Manning 2

Using the sun to generate electricity

Simulations of Hybrid Renewable Energy Systems and Environmental Impact for Qena Al-Gadida City

Impact of Reflectors on Solar Energy Systems

Solar Power at Vernier Software & Technology

What is Solar? The word solar is derived from the Latin word sol (the sun, the Roman sun god) and refers to things and methods that relate to the sun.

Solar Power Cost Effects on Customers

Summary of Electric Power Research Institute (EPRI) Report on Residential Off-Grid System Economics

Transcription:

Performance Assessment of 100 kw Solar Power Plant Installed at Mar Baselios College of Engineering and Technology Prakash Thomas Francis, Aida Anna Oommen, Abhijith A.A, Ruby Rajan and Varun S. Muraleedharan Dept. of Electrical and Electronics Engineering, Mar Baselios College of Engineering and Technology, Nalanchira, Thiruvananthapuram-695015 Abstract - The objective of this project work is to analyze the performance of a 230Wp capacity solar panel installed in Mar Baselios College of Engineering and Technology. The total capacity of the plant is 100kW. The first phase of the project includes the comparison of the current electricity bill with the bill before installation the photovoltaic system and conducting detailed analysis to understand (1) Energy consumption (kwh) normal vs. time, (2) Energy consumption peak vs. time.the second phase includes the comparison of the fuel consumption by the generator before and after installation of the solar panel. The third phase includes the study of the direct and indirect advantages of installing a solar panel in this institution for e.g. bill savings, tax savings and power being supplied back to the grid. Keywords-- Charge Controller, Grid Connected Inverter, Grid Tied Inverter, Net Metering, Solar Plant, Off-grid II. III. MAIN COMPONENTS Solar Panel Solar Charge Controller Grid Connected Inverter Grid Interactive Inverter Battery BLOCK DIAGRAM REPRESENTATION OF 100KW SOLAR POWER PLANT I. INTRODUCTION Solar energy is a readily available non-conventional type of energy. The energy from sun is in the form of radiation. The intensity of solar radiation reaching earth s surface is around 1369 watts per square meter. A solar electric system is typically consists of solar panels, inverter, battery, charge controller, wirings and support structures. The three most common types of solar electric systems are grid-connected, grid-connected with battery backup, and off-grid (standalone). Sunlight is always varying and this varying form of sun s energy is used to power the solar panels using the photovoltaic (PV) effect. PV effect causes electrical current to flow through a solar cell when exposed to sunlight. Several solar panels combined together make a solar array. There are four types of panels depending upon their material composition and design. They are: 1. Monocrystalline silicon 2. Polycrystalline-silicon 3. Thin film 4. Multi-junction Figure 1: Block Diagram of 100KW Solar Power Plant A 99.36kWp solar electric system is installed in our college. It is a grid interactive system with battery backup. The solar power plant uses imported Leonics make 100kW grid interactive inverter supported by additional 3 numbers of 30kW grid connected inverters. Two numbers of 30kW inverters and a total capacity of 59.8kWp solar module is installed on the B block. A 30kW grid connected inverter and 29.9kWp solar module is installed on the A block. Most important aspect of the installation is informative energy monitoring and display 694

International Journal of Emerging Technology and Advanced Engineering system, which can be monitored by 24 7 on website. A 9.66kWp solar module on the mechanical block and control panel load is connected across the 100kW grid interactive inverter. The 100kW grid interactive inverter will work in charger mode or inverter mode depending on the battery voltage at that time. In case of deep discharge or unavailability of sunshine, the battery will be charged by the utility grid. During day time if the solar module energy is less compared to energy required by load then excess energy required by the load will be taken by the utility grid. When excess energy is generated after meeting our load demands it is then fed back to the grid. IV. Total no: of modules = 432 For 30kW solar module: DESIGN ANALYSIS Open Circuit Voltage rating of 30kW inverter = 550V Panel voltage (V oc ) = 37.5V No: of panels connected in series = Panel working voltage = 30.5V = 13 Series Panel Working Voltage = 13 30.6 = 397.8V Total power = (V I) = 30kW Total power = (V I) = 30kW -------- (1) From equation (1) Working current = 75.414A From the panel details we get I sc = 8.18A No: of panels connected in parallel = 10 For 10 kw solar module: Voltage rating = 240V No: of panels connected in series = (Inverter Voltage)/(Panel voltage) = 7.8 7 Total Power = (V I) = 10kW Working Current = 46.68 No of panels connected in parallel = 5.70 6 Therefore, for 30kW inverter, we connect the panels as 13 10(i.e. 13 panels are connected in series and 10 in parallel respectively) and for battery charging purpose, we connect the panels as 7 6 (i.e. 7 panels are connected in series and 6 in parallel respectively). Battery Design Load connected - 90kW Backup in hours - 1hr No. of units consumed = 90 1=90kWh=90units Inverter Working Voltage = 240 V Total Ah = 90000/240 = 375Ah Battery rating (50% depth of discharge) = 375 2= 750 600 Ah battery used here. C-10 battery rating is used V. VARIOUS ANALYSES PERFORMED The analyses consist of two parts: 1. Bill Analysis 2. Economic Analysis To analyze the performance of the solar power plant installed in the college, the electricity bills of our college before and after installation of the solar plant were analyzed and graphs were plotted The electricity bills are classified into three zones. The first zone is the normal time which is from 6 a.m. to 6 p.m. the second zone is the peak time which is from 6 p.m. to 10 p.m. and the third zone is the off peak time which is from 10 p.m. to 6 a.m. As sun shines only during day time the graphs for normal time is only needed to be considered for assessment. Panel Working Voltage = 30.6V Series Panel Working Voltage = 7 30.6 = 214.2V 695

1. Bill Analysis 1.1 Demand in kwh for Normal Time Figure 2: Energy Consumption in kwh for Normal Time Before installation of solar plant It was found that during the years 2011-2012 from January-April the demands were almost same. There was a peak during March 2011 and 2012 due to construction works in college and also due to the high temperatures during summer. During April 2011 and 2012 the demand decreased as the college was closed for study leave. Energy consumption increased during the year 2012 compared to 2011 due to the admission of more number of students to the college for the new academic year. During June-July 2012 there was an increase in demand due to hostel construction. During September 2012 there was a peak due to welding works in 4 th floor B-block. From January March 2013 as no construction works were there, the energy consumption was also low. After installation of solar plant It was found that the energy consumption was stabilized. The demand from KSEB was reduced considerably. 1.2 Energy Charges (Normal Time) Considering the years 2011-2012-2013 the tariff rate increased yearly. From Jan 2011 to June 2012 the tariff rates for the demand charges were Rs.175 for normal time, Rs.87.5 for peak time and Rs.93.33 during off peak time. From July 2012 to April 2013 the tariff rates for demand charges were Rs.200 for normal time, Rs 100 for peak times and Rs.106.667 for off peak time. Then from May 2013 onwards the tariff rates for demand charges were considered to be equal to Rs.400 for a whole day. When the energy charges bills were considered it was found that during the year 2011 as the tariff rate was low the energy charges were also less compared to 2012 when the tariff rates increased as well as construction works going on. But even though the tariff rates increased considerably during the year 2013 it is clearly seen that the energy charges were reduced considerably after the installation of the solar plant. 1.3 The Savings Due To Installation of Solar Plant-(24 Hrs Use) Period TABLE I The Savings Due To Installation of Solar Plant (24 Hrs-Use) PV Energy (kwh) Energy drawn from KSEB (kwh) Total energy consumed (kwh) Energy charges paid to KSEB (Rs.) Amount payable to KSEB if PV is absent (Rs.) Net Savings to College (Rs.) July 9346.7 13632 22978.7 83497.5 139577.7 56080.2 Aug 12481.5 14193 26674.5 86368.5 161257.5 74889.0 Sep 12511.2 13149 25660.2 79762.5 154829.7 75067.2 Nov 11620.7 13101 24721.7 79587.0 149311.2 69724.2 Dec 13591.4 12042 25633.4 73453.5 155001.9 81548.4 Jan 13408.9 15858 29266.9 96565.5 177018.9 80453.4 Figure 3: Energy Charges During Normal Time 696

For the evaluation purpose, a period from July 2013 to December 2013 was considered. The energy consumed from KSEB with and without the solar plant was considered. The energy consumed from KSEB with solar plant installed was obtained from the electricity bill. The energy from solar was obtained from the server. Therefore the energy consumed from KSEB if the solar plant was not installed was calculated by adding the above two energy consumption. The energy charges paid to KSEB with and without the installation were also calculated and the savings were calculated. 2. Economic Analysis If money invested is in a bank Total initial investment = Rs 2, 67, 00,000.00 Subsidy = 30% of initial investment = Rs1,87,00,000.00 If rate of interest chosen to be 9.17% Then yearly interest = Rs17, 14,790.00 Since interest exceeds Rs 15, 00,000.00, then tax is deducted at source 30% of yearly interest i.e. = Rs 5, 14,437.00 So yearly we get Rs (17,14,790-5,14,437) = Rs 12,00,353.00 Energy charge (peak) - Rs 7.7 Energy charge (off peak) - Rs 4.65 Total electricity bill involves the sum of=total demand charge + total energy charge + PF incentive/penalty + electricity duty and electricity surcharge. Then keeping the tariff rates of November 2012 constant and multiplying the units consumed in November 2013 we get the bill as =113 200+45 100+0+7515 5.5+2469 7.7+4215 4.65+8 349.75+340.80 Bill in November 2013 using previous year tariff rates=rs 93,919.50. Bill in November 2012= Rs 2, 08,394.00 Thus bill saved = Rs 1, 14,570.50 Inference: Thus if we take the bills from June 2013- november2013 we indirectly get a average saving of Rs 1,14,570.50 month so this accumulates to a total saving of =1,14,570.50 12= Rs 13,74,000.00 So monthly interest after deducting tax = Rs 1, 00,029.41 Assuming factors to be remaining constant we will get the initial investment within 15-16 years, if money is invested in the 100 kw solar power generation project. 2.1 Indirect Saving Calculation on tariff Taking bills of November 2012 & 2013 to show the invisible or indirect savings from electricity bills. Tariff rates of November 2012 are kept constant, the number of units consumed in august are taken and following calculations are done. Tariff rates for the month of august 2012 are Demand charge (normal) Rs 200 Demand charge (peak) - Rs 100 Demand charge (off peak) Rs 106.67 Energy charge (normal) - Rs 5.5 697

2.2 Diesel Savings TABLE II Fuel Consumed By The Generator Before Installation of Solar Panel DATE QUANTI TY(Ltr.) UNIT PRICE(Rs) 29-03 -2012 200 44.55 26-06 2012 200 44.55 11-10-2012 200 49.60 06-11 2012 200 49.78 17-11-2012 200 49.78 19-12-2012 200 49.78 19-01- 2013 200 50.30 11-02- 2013 200 50.30 19-02- 2013 200 50.86 05-03- 2013 200 50.86 09-04- 2013 200 51.37 12-04- 2013 200 51.37 23-04- 2013 200 51.41 TOTAL 2600 AMOUNT (Rs) 8910.00 8910.00 9920.00 9956.00 9956.00 9956.00 10,060.00 10.060.00 10,172.00 10,172.00 10,274.00 10,274.00 10,282.00 1,28,902.00 TABLE III Fuel Consumed By the Generator after Installation of Solar Panel DATE QUANTITY(Ltr.) UNIT PRICE(Rs) AMOUNT (Rs) 30-04-2013 200 51.41 10,282.00 14-05-2013 200 52.50 10,500.00 13-06-2013 200 53.10 10,620.00 06-11-2013 200 57.02 11,404.00 17-12-2013 200 57.63 11,526.00 20-02-2013 200 59.32 11,864.00 TOTAL 1200 66,196.00 Average diesel consumption before installation of solar plant=2600/12= 216.6 liters Average Diesel consumption after installation of solar plant=1200/12= 100 liters Therefore savings in diesel consumption = 216.6-100= 116.6 liters In 2012 we consumed about 2600 litres of diesel for providing fuel to the generator And from the table we can see the overall money we paid for diesel alone was = Rs 1,28,902.00 In 2013 we only consumed about 1200 litres of diesel and the total cost came to = Rs 66,196.00 Based on this we saved about Rs 63,000.00 per annum 2.3 Tax Savings We almost get a tax saving of=30% of (13,74, 000+63000)=Rs 4,31,100.00 So on conclusion we can see that on adding tax savings, indirect savings and generator fuel consumption savings we get almost a total savings of Tax savings = Rs 4, 31,100.00 Indirect savings = Rs 13, 74,000.00 Saving on diesel consumption = Rs 63, 000.00 So overall we have a saving of Rs 18, 68,100.00 So if we invest the money in a solar project we would get the initial investment within a period of 9-10 years. 698

VI. CONCLUSION The installation of 100kW solar power generation plant at Mar Baselios College of Engineering and Technology not only provides a self-sustaining way of producing power from renewable energy source (i.e. sun) but also provides economic benefits. From the bill assessment it was found that the energy demand as well as the energy charges decreased after the installation of solar panel. From the economic assessment it was found that a considerable amount of savings were made and the payback period was found to be about 9-10 years. If net metering is also taken into consideration this system will become more economically viable. Net metering enables the user to sell the excess energy back to the utility grid. Thus the installation of such a renewable power generation plant not only helps in achieving economic benefits but also reduces impact on the environment by reducing pollution, and implications due to climate change. VII. ACKNOWLEDGEMENTS We thank Prof. M.K. Giridharan (Head of Department, Dept. of EEE) for his visionary leadership, without which the project would not have been possible. Our sincere gratitude to Ms. Archana A. N (Asst. Prof., Dept. of EEE) for helping the team with research analysis. REFERENCES [1] PradhanArjyadhara, Ali S.M, Jena Chitralekha, Analysis of Solar PV cell Performance with Changing Irradiance and Temperature, International Journal Of Engineering And Computer Science ISSN:2319-7242, Volume 2 Issue 1 Jan 2013 Page No. 214-220. [2] Hanif M., M. Ramzan, M. Rahman, M. Khan, M. Amin, and M. Aamir, Studying Power Output of PV Solar Panels at Different Temperatures and Tilt Angles, ISESCO JOURNAL of Science and Technology, Vo l u m e 8 - N u m b e r 1 4 - N o v e m b e r 2 0 1 2 ( 9-1 2 ). [3] E M Natsheh and A Albarbar, Solar power plant performance evaluation: simulation and experimental validation, 25th International Congress on Condition Monitoring and Diagnostic Engineering, Journal of Physics : Conference Series 364 (2012) P(1-13) [4] Yousif I. Al-Mashhadany, Mouhanad F. Al-Thalej, Design and Analysis of High Performance Home Solar Energy System, Anbar Journal for Engineering Sciences, 2011. 699