The future development of air transport in the UK Make your views known



Similar documents
FLIGHT PATH TO GROWTH THE CASE FOR INCREASING LONDON S AIR CAPACITY

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

Gatwick Airport Limited Technical Report in response to Airports Commission Consultation Congestion Charge

What do we already know about Bradford-on-Avon community area?

Discussion Paper 01: Aviation Demand Forecasting

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.

Heathrow, Gatwick and Stansted market power assessments

A Second Runway for Gatwick Initial response to the Airports Commission s recommendation report

Aircraft Noise Control at London Luton Airport. August 2015

Network Rail Sussex Rail Utilisation Study (RUS)

The economic impact of London Luton Airport Oxford Economics

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November Prepared by Capita Lovejoy on behalf of William Davis Limited

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT

The Mayor of London s Submission:

The business of Gatwick Airport Limited

Business Case and Sustainability Assessment Heathrow Airport Northwest Runway

Residential Development Travel Plan

Manchester Airport Master Plan to 2030

St Albans Local Development Framework. Core Strategy: Spatial Strategy Options

GATWICK AIRPORT* RESULTS FOR THE PERIOD ENDED 30 SEPTEMBER 2015

Aviation Demand Forecasting

Midlands Connect. Economic Impacts Study

Demand for Long Distance Travel

A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013

Thameslink Desiro City & Signalling Press Trip April 20 to 21, 2015 Evolution in Motion. Siemens Mobility Division

The Green Belt A Guide for Householders

National Planning Policy for Waste

Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners

TRANSPORT FOR LONDON BOARD CROXLEY RAIL LINK PROPOSED TRANSPORT AND WORKS ACT ORDER

H2: BIRMINGHAM INTERCHANGE STATION

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Discussion Paper 01: Aviation Demand Forecasting

Stouffville Corridor Rail Service Expansion

1. What are the major economic and social challenges facing London and its commuter hinterland over the next two to three decades?

OVERARCHING SPATIAL POLICIES

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013

PRESERVATION OF SLOTS FOR DOMESTIC SERVICES AT LONDON AIRPORTS

Place Plans & Growth Plan. Duncan Barratt November 2015

The Roaches Asset Management Review. Draft Objectives for External Consultation. Fundamental Principles

11. Monitoring Performance monitoring in LTP2

Third Runway is Key to Hong Kong s Competitiveness. Professor Anthony Cheung Bing-leung Secretary for Transport and Housing

2 Integrated planning. Chapter 2. Integrated Planning. 2.4 State highway categorisation and integrated planning

Why build the Silvertown Tunnel?

Long Term Planning Process: London and South East Market Study. October 2013

Sustainability Appraisal of the Lichfield Local Plan: Strategy

Reference: 05/00928/FUL Officer: Mr David Jeanes

HEATHROW AIRPORT LIMITED REGULATORY ACCOUNTS FOR THE YEAR ENDED 31 MARCH Performance Report 1. Notes to the Performance Report 2

WELCOME TO OUR EXHIBITION

The achievement of all indicators for policies in the whole plan collectively contribute to the delivery of Policy 1

Control of Development in Airport Public Safety Zones

Cathkin Relief Road Planning Statement

ROSTHERNE TO MANCHESTER PICCADILLY

ZERO CARBON HOMES AND NEARLY ZERO ENERGY BUILDINGS. UK Building Regulations and EU Directives

Block 0: Capabilities within our Grasp

Network Rail Consultation on Draft West Coast Main Line Route Utilisation Strategy Consultation Response by Birmingham International Airport Limited

On the instruction of Ros Goode & Roland Morgan, Joint Fixed Charge Receivers

Thameslink new Class 700 trains

73 MAIN STREET SHIRLEY SOLIHULL

A Second Runway for Gatwick. Airports Commission Final Report Areas of Concern

York Aviation BRISTOL AIRPORT LIMITED THE IMPACT OF DEVOLVING AIR PASSENGER DUTY TO WALES

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015

Queen Elizabeth Olympic Park

Bromley Town Centre. Transport Strategy Supporting the Area Action Plan. Evidence Base

Economic impact of airport: the Roissy Charles de Gaulle airport example

MARKET APPRAISAL ON THE CURRENT AND POTENTIAL FUTURE DEMAND FOR BUSINESS SPACE IN THE HORSHAM DISTRICT

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document

Welcome to our proposal for Greenwich Peninsula

Catchment area analysis

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure

Woolborough Farm. Woolborough Lane,Outwood, Surrey, RH1 5QR

Unit 4 Strand E Exemplar Work A Travel Package to Dahab, Egypt and Related Commentary

Larnaca Urban Sustainable Development Strategy

Climate Change and Infrastructure Planning Ahead

FIRST STREET NORTH CREATING PLACES FOR PEOPLE

COUNTY OF LAMBTON OFFICIAL PLAN UPDATE BACKGROUND REPORT NO.

Project Accountant (Ref:709)

Impacts of Expanding Airport Capacity on Competition and Connectivity. The case of Gatwick and Heathrow. Country-Specific Policy Analysis

Malmi - Helsinki City International Airport. Malmi operators development plan

Car Club Strategy. London Borough of Richmond upon Thames

UK AIRSPACE Introduction

Coventry Development Plan 2016 Appendix 89. Glossary of Key Terms

Transcription:

The future development of air transport in the UK Make your views known Contents Introduction 1 Introduction..................................................... 2 How much airport capacity should be provided in the East?.......... 3 Impact of expansion.............................................. 5 Maps.......................................................... 6,8,10 Summary and further information.................................... 12 How to make your views known..................................... 12 Questionnaire................................................... 15 The Government is in the process of preparing an air transport strategy for the UK to cover the long-term future of aviation and airports for the next 30 years. Last year it published a series of consultation documents seeking views on a range of options for providing additional airport capacity to help meet the growing demand for air travel. Following a legal challenge, it has now extended its consultation to include options for growth at. well as local implications, in terms of the environment, the economy and, indeed, society as a whole. For most local people, Gatwick will be the focus of attention. What happens elsewhere, however, will have an impact on the future of Gatwick. Details of how to obtain a copy of the consultation documents and how to respond directly to the Government are set out at the back of the leaflet, together with information about the exhibitions which are being held. 2 Gatwick is currently the second largest airport in the country. Its future development will have a major impact on the character of Crawley for many years to come. At the Borough Council, we believe it is vital that local people have the opportunity to assess the options being put forward by the Government and to make their views known. The Government will be holding two exhibitions in the local area in May and the Borough Council has arranged 10 further exhibitions at five locations around the Borough to widen the opportunity for you to find out more. The Borough Council will also be responding to the consultation. We will look at the options long and hard before coming to a conclusion, but it is vital that our response takes note of the views of our residents, local environment groups, the business community and others. You can help us by completing the short questionnaire at the end of this leaflet. Please take the time to fill it in and post it by Friday 16 May to our independent research company. Thank you for your help. In addition, we have prepared this leaflet to give you a summary of the options for Gatwick and an indication of some of the key issues raised by the consultation. The issues are not straightforward and have national as Cllr Doug Murdoch Executive Member for Planning and Economic Development

The future development of air transport in the UK Make your views known 3 How much airport capacity should be provided in the East? In 2002 approximately 180 million passengers used UK airports with around 114 million passengers passing through one of the four main London airports - Heathrow, Gatwick, Stansted and Luton. The Government estimates that, by 2020, if there is no constraint on the demand for air travel, (for example by increasing the cost of air travel or by not providing additional airport capacity), these figures will grow to around 500 million passengers per annum (mppa) using UK airports and around 300 mppa using London airports. The Government s consultation document explains the benefits of aviation to the UK and sets out arguments for meeting demand for air travel in the East the large economic benefits, the creation of new jobs, the advantages of being able to fly cheaply from your preferred airport, the maintenance of the UK s competitive position in the world, and the benefits of being able to fly to many different places. The consultation document also identifies the environmental costs of aviation the costs to society of aircraft noise, local air quality, landscape, biodiversity and heritage, as well as the global issue of climate change. Addressing the contribution of aviation to global warming (for example through a tax on carbon dioxide emissions) could, the Government considers, reduce demand for air travel by around 10%. The other environmental costs tend to be experienced at a more local level and the document sets out how key impacts such as noise and local air quality might be managed to provide a balance between the operation of airports and the lives of those who live around them. The Government s priorities are: To control and reduce the scale of environmental impact To take mitigation measures against remaining impacts To provide compensation where impacts still remain. How far do you think the Government should seek to meet the forecast demands for air travel? The questionnaire at the back gives you an opportunity to put your view to the Council. How should any new airport capacity be provided? The Government sees two key issues on new airport capacity in the south east: Whether the UK needs one or more hub airports Whether Heathrow should be developed further. Hub Airports (large airports with the ability to provide a high level of interconnection between flights) are seen as providing significant benefits to both business and leisure travellers with potential for a greater number of destinations and higher frequency flights. Heathrow already has two runways, but would need a third runway in order to maximise its potential as a hub. The environmental impacts of this are, however, considerable. The consultation document also explores the possibility of expansion at another airport to play a major role as a hub a new purpose built airport at Cliffe, expansion of Stansted or expansion of Gatwick. In the case of Gatwick, the consultation document suggests that with two new runways it could play a major role as a hub airport. In addition to options which concentrate new capacity and the associated environmental and economic impacts at one or two hubs, the consultation document puts forward a range of options which provide for a more dispersed pattern of growth with two or more airports sharing the growth in runway capacity. For Gatwick this could mean one new runway, combined with new runways at Heathrow and/or Stansted. What approach do you think the Government should take towards the development of Hub airports? The questionnaire at the back gives you an opportunity to put your view to the Council. Where should any new runway capacity be provided? The consultation document sets out the options for each of the main south east airports, together with an option for a new airport at Cliffe in north Kent. These options are combined into 25 packages involving different combinations of runways, built at different airports and at different times. Eighteen of the packages involve some increase in runway capacity at Gatwick. 4

GATWICK Use of the airport in 2000 Maximum use of existing runway Capacity with one new runway (close parallel) Capacity with one new runway (wide-spaced) passengers (mppa) 32 46.5 62 83 Annual Air transport movements (planes landing and taking off) 250,000 260,000 378,000 486,000 North Spur Widening HORLEY J9a J9 Capacity with two new runways 115 675,000 Lowfield Heath A23 Re-alignment 5 The document analyses the impacts which each option would have on the surrounding area. None of the options is without environmental and economic implications although the extent and nature of the impact varies for each. The information below and the impacts suggested for are drawn from the Department for Transport s consultation document. The Gatwick options in more detail In 2000, about 32 million passengers used. This number has been forecast to grow to 40 million passengers a year by 2008/09 although events over the past two years suggest that this figure will not be reached until some time later. A planning agreement signed in 2001 sets out a wide range of actions to protect the environment that BAA Gatwick has to undertake to accommodate this growth. Existing Airport Boundaries Option Boundaries Additional Runway Junction s Highway Schemes Map 1: Close Parallel Runway Map 2: Wide-Spaced Runway CRAWLEY BOROUGH 6 For four options are put forward: Maximum use of the current runway A close parallel runway: see Map 1 A wide-spaced runway: see Map 2 Two new runways: see Map 3 (page 8) The table (above) summarises the capacity of with and without new runways and Government forecasts of air traffic in 2030. Maximum Use of the Current Runway With no new runway or new terminal but with larger planes and more off-peak flights, the theoretical capacity of the airport might increase to 46.5 million passengers a year. The options which exclude from new runway development, however, predict a slightly more modest range of passengers between 38 million passengers a year to 42 million passengers a year by 2030. North Spur Widening HORLEY J9a J9 The options include the possibility of an additional runway being open by 2011. This would be before the expiry of a legal agreement between the operator of the airport (BAA) and West Sussex County Council. This agreement was signed in 1979 and prevents any additional runways before 2019. To enable a runway to be built before 2019, the agreement would have to be overturned either by the agreement of the two parties or by the Government through legislation. In terms of immediate environmental impact, this development would result in: The development of the airport required to achieve maximum use of the single runway can be accommodated within the existing airport boundary without loss of property or agricultural land New environmental legislation and improvements in technology are likely to result in significant reductions in the area affected by noise and the number of Lowfield Heath A23 Re-alignment CRAWLEY BOROUGH Existing Airport Boundaries Option Boundaries Additional Runway Junction s Highway Schemes

Widening J8 to J9 Existing Airport Boundaries Option Boundaries Norwood Hill Additional Runways HORLEY Junction s Highway Schemes Airport Access to New North Spur Widening J9a J9 Widening J10 to J9 7 properties affected by air pollution by 2030. In terms of new urban development it would No additional housing requirement beyond that already planned for in Regional Planning Guidance. In terms of the local economy it would Airport related employment will decline from 43,000 jobs in 1998 to 38,000 in 2015 and 33,000 in 2030 as a result of productivity improvements and transfer of services to airports where new runway capacity is provided. Loss of countryside including: - 130 hectares of high grade agricultural land - reduction of Green Belt by 120 hectares Loss of 3 Grade II* and 4 Grade II listed buildings. Air Quality 3,800 residents exposed to nitrogen dioxide (NO2) levels exceeding EU limits by 2030. (NB The Department for Transport [DfT] has indicated that the number of residents affected by excessive levels of NO2 could be significantly reduced by technological improvements to aircraft engines, restrictions on road traffic and agreements to fully fund the purchase of affected properties). Langley Green A23 Re-alignment (In Tunnel) CRAWLEY BOROUGH Map 3: Two New Runways Map 4: NOISE - Close Parallel Runway DORKING M25 REIGATE A272 Redhill A22 J10 Oxted Godstone Improvment Edenbridge 8 Close Parallel Runway A close parallel runway would enable the airport to grow to around 66 million passengers per annum, approximately the same number as Heathrow handles now. It involves building a new runway quite close to the existing runway so that one can be used for landing while the other is used for take-offs. In terms of its immediate environmental impact, the development would result in: Land/Heritage Compulsory purchase of 50 residential properties Noise Map 4 shows the areas predicted to be affected by aircraft noise in excess of 57 decibels (dba) which is considered to be the level at which community disturbance starts to occur. In terms of new surface transport provision it would Rail Enhancements to track, signalling and Gatwick station to allow more trains at peak times Possible work to improve capacity for airport-related passengers elsewhere along the London-Brighton line. Cranleigh A29 Strood Green A24 Beare Green Capel Kingsfold HORSHAM A23 Horley J9 CRAWLEY Lingfield EAST GRINSTEAD Crawley Down 57 dba Line: Existing Use (2000) 57 dba Line: New Close Parallel Runway (2030) 57 dba Line: Maximum Use (2030) Two New Runways Residential Area

DORKING M25 REIGATE Redhill Oxted Godstone Holmwood A272 A23 A22 Lingfield Edenbridge Cranleigh A29 A24 Beare Green Capel Kingsfold Horley J9 CRAWLEY Crawley Down EAST GRINSTEAD 9 Road Local road closures and widening of airport spur and A23 access road to airport Diversion of the A23 to south of airport. In terms of new urban development it would An additional 3,000 houses would be needed within the south London to south coasts area beyond that already planned for, with the likelihood of some Green Belt land used for new housing within the Crawley/Gatwick area. In terms of the local economy it would An additional 8,000 airport-related jobs by 2030 based on the assumption that the runway was built by 2011, fewer if it was built later. Wide-spaced runway A wide spaced runway to the south of the airport would take the capacity to 83 million passengers per annum, approximately one third more than Heathrow as it is now. This would allow for two runways, both used for take-off and landing. In terms of its immediate environmental impact it would Land/heritage Compulsory purchase of 300 residential properties Loss of countryside including: - 200 hectares of high grade agricultural land - reduction of Green Belt by 240 hectares Loss of 5 Grade II* and 12 Grade II listed buildings Air Quality 3,800 residents exposed to NO2 levels exceeding EU limits by 2030 Noise Map 5 shows the areas predicted to be affected by aircraft noise in excess of 57 decibels (dba) which is considered to be the level at which community disturbance starts to occur. In terms of new surface transport provision it would Rail Additional trains to encourage airport users away from peak services Improve rail infrastructure between Coulsdon and Selhurst/Norwood Junction Possible tunnelled underpass at East Croydon Strood Green HORSHAM Map 5: NOISE - Wide-Spaced Runway Map 6: NOISE - Two New Runways Cranleigh A29 Strood Green DORKING A24 Beare Green Capel Holmwood Kingsfold HORSHAM M25 REIGATE A272 A23 Redhill Horley CRAWLEY J9 A22 57 dba Line: Existing Use (2000) 57 dba Line: New Wide-Spaced Runways (2030) 57 dba Line: Maximum Use (2030) Two New Runways Residential Area Oxted Godstone Lingfield Crawley Down EAST GRINSTEAD Edenbridge 57 dba Line: Existing Use (2000) 57 dba Line: Maximum Use (2030) 57 dba Line: Two New Runways (2030) Two New Runways Residential Area 10

11 Road Increased capacity at London terminals Local road closures and widening of airport spur and A23 access road to airport Divert A23 to south of airport and place in tunnel. In terms of urban development it would An additional 9,000 houses needed within the south London to south coast area beyond that already planned for, with the likelihood of some significant Green Belt land used for new housing within the Crawley/Gatwick area. In terms of the economy it would An additional 21,000 airport-related jobs by 2030 on the assumption that the runway was built in 2011), some of which could be met by labour market surpluses on the south coast and Croydon. Two new runways Land/heritage Compulsory purchase of 430 residential properties Loss of countryside including: - 260 hectares of high grade agricultural land - reduction of Green Belt by 530 hectares Loss of 12 Grade II* and 18 Grade II listed buildings Impact on several sites including 3 Sites of Nature Conservation Interest and the Glovers Wood Site of Special Scientific Interest (SSSI) Loss of a part of the Conservation Area at Village. Air Quality 7,000 residents exposed to NO2 levels exceeding EU limits by 2030 Noise Map 6 (page 10) shows the areas predicted to be affected by aircraft noise in excess of 57 decibels (dba) which is considered to be the level at which community disturbance starts to occur. Improve rail infrastructure between Coulsdon and Selhurst/Norwood Junction Possible tunnelled underpass at East Croydon Increased capacity at London terminals Road Local road closures and widening of airport spur and A23 access road to airport Divert A23 to south of airport and place in tunnel Widening of between Junctions 8 and 10. In terms of urban development it would An additional 21,000 houses beyond those already planned for needed between south London and the south coast. Providing houses in the core catchment area would be difficult to achieve as the area is already approaching its environmental capacity. There may be scope for meeting some of the employment need by locating suitable businesses in areas such as Brighton, within the designated Priority Area for Economic Regeneration. Summary The issues around the Government s options for are highly complex. The environmental impacts vary from option to option. Without any additional runways, some of the environmental impacts will be less than today for example with technological advances air noise should decrease. As suggested capacity increases, so do the impacts. The economic impacts also vary. Gatwick will not stay the same even if it is decided that it should have no additional runway. After it reaches its capacity, employment numbers will start to fall and its role in the local and regional economy will change. 12 Two new runways would take the capacity of the airport to 115 mppa, just less than twice the number at Heathrow as it is now. In terms of its immediate environmental impact it would In terms of new surface transport provision it would Surface transport Rail Additional trains to encourage airport users away from peak services In terms of the economy it would An additional 49,000 airport-related jobs by 2030 assuming that the first runway was built in 2011 and the second runway in 2021.