July 10, 2016 DESIGN-BUILD ACTIVE PROPOSALS: I-85 REHAB AND WIDENING REHAB FROM MM 77 TO MM 80, PHASE 1 WIDENING FROM EXIT 80 (S- 57) TO EXIT 90 (SC 105) & PHASE 2 WIDENING FROM EXIT 90 (SC 105) TO EXIT 96 (SC 18) SPARTANBURG AND CHEROKEE COUNTIES The project includes an approximate three mile interstate rehabilitation and 16 mile widening of I-85 from 4 to 6 lanes. Project includes improving interchanges at SC 110, S 11 39, S 11 82, SC 18; replacing the railroad crossing at mile marker 80.8 near exit 80; and raising the S 11 131 bridge overpass. Removing local access along interstate ramps and treatment of slip ramps will also be considered during project. RFQ Date: February 5, 2016 Shortlist of DB Teams: March 24, 2016 RFP Industry Review Date: April 13, 2016 Final RFP Date: May 25, 2016 Bid Opening: September 28, 2016 VOLVO INTERCHANGE APPROXIMATE MM 189 BERKELEY COUNTY Construction of a new three-leg directional interchange on I-26 to provide direct access to the proposed Volvo Manufacturing Facility in Berkeley County. The new interchange will be located between Exit 187 (SC 27/Ridgeville Road) and Exit 194 (Jedburg Road) at approximately mile marker 189. RFQ Date: April 29, 2016 Shortlist of DB Teams: June 14, 2016 RFP Industry Review Date: July 1, 2016 Final RFP Date: August 12, 2016 Bid Opening: December 16, 2016 US 21 BRIDGE REPLACEMENT OVER HARBOR RIVER BEAUFORT COUNTY Replace the US 21 moveable bridge over Harbor River with a fixed-span bridge. RFQ Date: January 2017 (Anticipated) Shortlist of DB Teams: March 2017 (Anticipated) RFP Industry Review Date: March 2017 (Anticipated) Final RFP Date: May 2017 (Anticipated) Bid Opening: August 2017 (Anticipated) Page 1 of 15
I-26 WIDENING FROM EXIT 101 (US 176) HEADING WEST TO BE DETERMINED RICHLAND, LEXINGTON, AND NEWBERRY COUNTIES The project includes widening of I-26 from MM 101 (US 176, Exit 101- Irmo) heading west on I-26 with the western termini to be determined. Project includes widening I-26 from 4 to 6 lanes for approximately 16 miles; overpass bridge replacements at S-58 (Koon Road), S-80 (Shady Grove Road), S- 234 (Mt. Vernon Church Road), S-405 (Old Hilton Road), and S-49 (Peak Street); and jacking/rehabilitating overpass bridges at S-39 (Peak Road) and S-167 (Parr Road). RFQ Date: TBD Shortlist of DB Teams: TBD RFP Industry Review Date: TBD Final RFP Date: TBD Bid Opening: TBD Other Information: Preliminary engineering and environmental document will be completed. The project will be developed and awarded as a design-build construction project once construction funding is identified. I-85 WIDENING PHASE 3 FROM EXIT 96 (SC 18) TO EXIT 106 (US 29) CHEROKEE COUNTY The project includes widening I-85 from 4 to 6 lanes for approximately 10 miles. Project includes improving interchanges at S 11 83, SC 5/198, S 11 99, US 29, and potential replacement of the railroad crossing at mile marker 101. Removing local access along interstate ramps and treatment of slip ramps will also be considered during project. RFQ Date: TBD Shortlist of DB Teams: TBD RFP Industry Review Date: TBD Final RFP Date: TBD Bid Opening: Other Information: TBD Preliminary engineering and environmental document will be developed concurrently with phase one and phase two. Phase three will be developed and awarded as a design-build construction project once construction funding is identified. Page 2 of 15
DESIGN-BUILD PROJECTS IN CONSTRUCTION: EMERGENCY BRIDGE REPLACEMENT PACKAGE 6 RICHLAND COUNTY Removal and replacement of three damaged SC 48 bridges and necessary approach work within a 4.5 mile corridor. RFP Industry Review Date: May 13, 2016 Final RFP Date: May 23, 2016 Bid Opening: May 26, 2016 Other Information: This project will follow Emergency Procurement Procedures, such that three teams will be invited to bid. Crowder Construction Company / KCI Technologies, Inc. Award Amount: $5,885,000 Notice of Award: May 26, 2016 Notice to Proceed: May 31, 2016 Crowder Palmetto United Total Cost to Complete (A) $5,885,000 $9,699,149 $7,770,000 PORT ACCESS ROAD FROM I-26 (EXIT 218) TO NEW PORT TERMINAL CHARLESTON COUNTY Modification of Exit 217 and Exit 218 on I-26 and the construction of a new direct access roadway from I-26 to the new port terminal on the former Charleston Naval Complex site. RFQ Date: May 28, 2015 Shortlist of DB Teams: August 3, 2015 RFP Industry Review Date: August 27, 2015 Final RFP Date: November 5, 2015 Bid Opening: April 14, 2016 Fluor-Lane South Carolina, LLC / Johnson, Mirmiran & Thompson, Inc. Award Amount: $220,700,745 Notice of Award: April 18, 2016 Notice to Proceed: June 3, 2016 Traylor-United Fluor-Lane SC Skanska-PCL Total Cost to Complete (A) $235,757,435 $220,700,745 $297,812,467 Page 3 of 15
EMERGENCY BRIDGE REPLACEMENT PACKAGE 5 CLARENDON COUNTY Removal and replacement of damaged US 301 bridges and a culvert, including Tear Coat Branch Bridge, Black River Bridge, 2 Overflow Bridges, and an Overflow Culvert in Clarendon County. RFP Industry Review Date: January 22, 2016 Final RFP Date: February 1, 2016 Bid Opening: February 4, 2016 Other Information: This project will follow Emergency Procurement Procedures, such that three teams will be invited to bid. Award Amount: $12,810,500 Notice of Award: February 4, 2016 Notice to Proceed: February 8, 2016 Lee Construction Company of the Carolinas, Inc. / KCI Technologies, Inc. Carolina Bridge Lee Republic Guaranteed Maximum Cost to Complete (A) $14,967,261 $12,810,500 $17,453,485 Construction Time in Calendar Days (b) 280 280 281 Construction Time Cost (B) $1,400,000 $1,400,000 $1,405,000 Total Bid (A+B) $16,367,261 $14,210,500 $18,858,485 I-20 WIDENING FROM MM 49 TO MM 60 LEXINGTON COUNTY Widening of I-20 from just west of US 378 to west of S-204 (Longs Pond Road). Project also includes the replacement/widening of the eastbound and westbound I-20 mainline bridges over Norfolk Southern Railroad. RFQ Date: January 29, 2015 Shortlist of DB Teams: July 17, 2015 RFP Industry Review Date: September 15, 2015 Final RFP Date: October 27, 2015 Bid Opening: January 29, 2016 Zachry Construction Corporation / STV Incorporated Award Amount: $99,977,718 Notice of Award: February 5, 2015 Notice to Proceed: April 15, 2016 Archer Western Lane Zachry McCarthy Guaranteed Max Cost to $111,500,000 $117,312,993 $99,977,718 $122,300,000 Complete (A) Construction Time in 1,200 1,215 870 1,200 Calendar Days (b) Construction Time Cost (B) $12,000,000 $12,150,000 $8,700,000 $12,000,000 Total Bid (A+B) $123,500,000 $129,462,993 $108,677,718 $134,300,000 Quality Points 46.6 24.8 28.8 28.5 Quality Credit Percentage 2.33% 1.24% 1.44% 1.43% Quality Value $2,599,623 $1,451,748 $1,437,180 $1,742,775 Total Adjusted Bid $120,900,378 $128,011,245 $107,240,538 $132,557,225 Page 4 of 15
EMERGENCY BRIDGE REPLACEMENT PACKAGE 4 RICHLAND / KERSHAW / WILLIAMSBURG COUNTIES Removal and replacement of damaged S-827 bridge over Spring Lake and S-69 (Congress Road) bridge over Jumping Run Creek in Richland County. This project also includes removal and replacement of S-36 (Pine Grove Road) bridge across Twenty Five Mile Creek in Kershaw County and removal and replacement of S-51 (Battery Park Road) bridge across Black Mingo Creek in Williamsburg County. RFP Industry Review Date: December 4, 2015 Final RFP Date: December 10, 2015 Bid Opening: December 15, 2015 Other Information: This project will follow Emergency Procurement Procedures, such that three teams will be invited to bid. United Infrastructure Group, Inc. / Infrastructure Consulting & Engineering, PLLC Award Amount: $11,700,000 Notice of Award: December 15, 2015 Notice to Proceed: December 17, 2015 United Lee Palmetto Crowder Total Cost to Complete (A) $11,700,000 $11,800,000 $12,037,980 $16,757,000 EMERGENCY BRIDGE REPLACEMENT PACKAGE 3 FAIRFIELD / FLORENCE / NEWBERRY COUNTIES Removal and replacement of damaged S-101 (River Road) bridge over Lake Wateree in Fairfield County. This project also includes removal and replacement of S-57 (Old River Road) bridge across Barfield Mill Creek in Florence County and removal and replacement of SC 34 bridge across Hellers Creek in Newberry County. RFP Industry Review Date: November 17, 2015 Final RFP Date: November 25, 2015 Bid Opening: December 2, 2015 Other Information: This project will follow Emergency Procurement Procedures, such that three teams will be invited to bid. Crowder Construction Company / Parrish and Partners, LLC Award Amount: $7,395,000 Notice of Award: December 2, 2015 Notice to Proceed: December 4, 2015 United Crowder Total Cost to Complete (A) $9,270,700 $7,395,000 Page 5 of 15
EMERGENCY BRIDGE REPLACEMENT PACKAGE 2 RICHLAND COUNTY Removal and replacement of damaged SC 48 (Bluff Road) culverts over Toms Creek and SC 769 (Congaree/Air Base Road) culverts over Cedar Creek. RFP Industry Review Date: October 22, 2015 Final RFP Date: October 29, 2015 Bid Opening: November 2, 2015 Other Information: This project will follow Emergency Procurement Procedures, such that three teams will be invited to bid. Award Amount: $3,052,168 Notice of Award: November 2, 2015 Notice to Proceed: November 4, 2015 Lee Construction Company of the Carolinas, Inc. / KCI Technologies, Inc. Lee Crowder Carolina Bridge Guaranteed Maximum Cost to Complete (A) $3,052,168 $4,535,000 $4,710,349 Construction Time in Calendar Days (b) 150 163 163 Construction Time Cost (B) $1,125,000 $1,222,500 $1,222,500 Total Bid (A+B) $4,177,168 $5,757,500 $5,932,849 I-77 WIDENING FROM I-20 TO KILLIAN ROAD RICHLAND COUNTY Widening of I-77 from I-20 to S-52 (Killian Road) and rehabilitation of the southbound lanes of I-77 from S-52 (Killian Road) to S-59 (Blythewood Road). Project also includes the widening of ten mainline bridges. RFQ Date: October 23, 2014 Shortlist of DB Teams: January 8, 2015 RFP Industry Review Date: May 27, 2015 Final RFP Date: July 23, 2015 Bid Opening: October 29, 2015 Archer Western Construction, LLC / Infrastructure Consulting & Engineering, PLLC Award Amount: $88,399,000 Notice of Award: December 18, 2015 Notice to Proceed: March 6, 2016 Archer Western Lane PCL Guaranteed Maximum Cost to Complete (A) $88,399,000 $97,947,000 $117,950,000 Construction Time in Calendar Days (b) 865 869 1300 Construction Time Cost (B) $8,650,000 $8,690,000 $13,000,000 Total Bid (A+B) $97,049,000 $106,637,000 $130,950,000 Quality Points 24.75 36.75 29.38 Quality Credit Percentage 1.24% 1.84% 1.47% Quality Value $1,093,938 $1,799,776 $1,732,686 Total Adjusted Bid $95,955,062 $104,837,224 $129,217,315 Page 6 of 15
EMERGENCY BRIDGE PACKAGE 1 US 176 EMERGENCY BRIDGE REPLACEMENT OVER CANNONS CREEK Removal and replacement of damaged US 176 bridge over Cannons Creek in Newberry County. Final RFP Date: October 12, 2015 Bid Opening: October 19, 2015 Other Information: This project will follow Emergency Procurement Procedures, such that three teams will be invited to bid. United Infrastructure Group, Inc. / Infrastructure Consulting & Engineering, PLLC Award Amount: $4,300,000 Notice of Award: October 19, 2015 Notice to Proceed: October 22, 2015 United Lane Crowder Total Cost to Complete (A) $4,300,000 $5,706,382 $4,555,000 FEDERAL AID BRIDGE REPLACEMENTS PACKAGE E ENGINEERING DISTRICT 4 Replacement of thirteen (13) bridges in Cherokee, Chester, Fairfield, Lancaster, and York Counties. RFQ Date: December 19, 2013 Shortlist of DB Teams: March 14, 2014 RFP Industry Review Date: October 14, 2014 Final RFP Date: November 18, 2014 Bid Opening: January 16, 2015 Award Amount: $52,707,000 Notice of Award: January 27, 2015 Notice to Proceed: February 27, 2015 United Infrastructure Group, Inc. / Infrastructure Consulting & Engineering, PLLC United Crowder Guaranteed Maximum Cost to Complete (A) $52,707,000 $56,253,000 Construction Time in Calendar Days (b) S-12-77 over Fishing Creek 245 240 S-12-141 over Rocky Creek 232 220 SC 200 over Wateree Creek 242 220 SC 9 (EBL) over Catawba River 434 440 SC 200 over Cane Creek 237 200 S-46-22 over Steele Creek 320 220 S-46-64 over Allison Creek 205 140 S-46-347 over Stony Fork Creek 149 125 S-46-732 over Calabash Branch 154 120 S-46-103 over Fishing Creek 269 240 I-85 over Norfolk Southern Railroad 475 525 S-11-41 over Peoples Creek 167 115 Construction Time Cost (B) $7,032,500 $6,442,500 Total Bid (A+B) $59,739,500 $62,695,500 Page 7 of 15
US 701 BRIDGE REPLACEMENT OVER GREAT PEE DEE RIVER GEORGETOWN / HORRY COUNTIES Replacement of three (3) bridges over Great Pee Dee River, Overflow, and Yauhannah Lake in Georgetown and Horry Counties. RFQ Date: February 28, 2014 Shortlist of DB Teams: May 7, 2014 RFP Industry Review Date: June 12, 2014 Final RFP Date: August 5, 2014 Bid Opening: January 6, 2015 PCL Civil Constructors, Inc. / Infrastructure Corporation of America Award Amount: $47,543,200 Notice of Award: January 13, 2015 Notice to Proceed: April 6, 2015 PCL Lane Carolina Bridge-CRJ Flatiron Guaranteed Max Cost to $47,543,200 $59,337,195 $60,755,000 $51,539,194 Complete (A) Construction Time in 850 882 1128 689 Calendar Days (b) Construction Time Cost (B) $3,400,000 $3,528,000 $4,512,000 $2,756,000 Total Bid (A+B) $50,943,200 $62,865,195 $65,267,000 $54,295,194 Quality Points 63.0 35.0 52.0 61.5 Quality Credit Percentage 3.15% 1.75% 2.60% 3.08% Quality Value $1,497,610 $1,038,400 $1,579,630 $1,584,830 Total Adjusted Bid $49,445,589 $61,826,794 $63,687,370 $52,710,363 Page 8 of 15
I-85/385 SYSTEM INTERCHANGE GREENVILLE COUNTY Improvements to the Interstate 85 / Interstate 385 System Interchange. RFQ Date: July 1, 2013 Shortlist of DB Teams: September 9, 2013 RFP Industry Review Date: January 24, 2014 Final RFP Date: March 28, 2014 Bid Opening: August 6, 2014 Flatiron Constructors, Inc. - Zachry Construction Corporation / Civil Engineering Consulting Services, Inc. Award Amount: $231,116,087 Notice of Award: August 12, 2014 Notice to Proceed: December 14, 2015 Flatiron-Zachry Fluor-Lane Skanska Guaranteed Maximum Cost to Complete (A) $231,116,087 $235,325,309 $253,909,000 Construction Time in Calendar Days (b) 1035 880 1034 Construction Time Cost (B) $25,875,000 $22,000,000 $25,850,000 Total Bid (A+B) $256,991,087 $257,325,309 $279,759,000 Quality Points 30.5 22.5 49.0 Quality Credit Percentage 1.22% 0.90% 1.96% Quality Value $2,819,616 $2,117,927 $4,976,616 Total Adjusted Bid $254,171,470 $255,207,381 $274,782,383 SC 41 OVER WANDO RIVER BERKELEY / CHARLESTON COUNTIES Replacement of the SC Route 41 Bridge over the Wando River. RFQ Date: April 25, 2013 Shortlist of DB Teams: June 17, 2013 RFP Industry Review Date: August 7, 2013 Final RFP Date: September 27, 2013 Bid Opening: January 10, 2014 PCL Civil Constructors, Inc. / Florence & Hutcheson, Inc. Award Amount: $30,400,000 Notice of Award: January 21, 2014 Notice to Proceed: May 5, 2014 Archer Western PCL United Guaranteed Maximum Cost $45,845,000 $30,400,000 $32,700,000 to Complete (A) Quality Points 9.5 12.0 9.5 Quality Credit Percentage 1.90% 2.40% 1.90% Quality Value $871,055 $729,600 $621,300 Total Adjusted Bid $44,973,945 $29,670,400 $32,078,700 Page 9 of 15
I-95/US 301 INTECHANGE ORANGEBURG COUNTY Improvements to the Interstate 95 / US Route 301 interchange and construction of the US Route 301 Connector. RFQ Date: October 22, 2012 Shortlist of DB Teams: December 21, 2012 RFP Industry Review Date: February 1, 2013 Final RFP Date: March 15, 2013 Bid Opening: July 10, 2013 Award Amount: $30,925,000 Notice of Award: July 31, 2013 Notice to Proceed: November 7, 2013 McCarthy Improvement Company / Civil Engineering Consulting Services, Inc. McCarthy Superior United Lane CRJ $30,925,000 $35,145,000 $35,950,125 $34,805,000 $34,091,000 Guaranteed Maximum Cost to Complete (A) Construction Time in 440 1000 900 838 595 Calendar Days (b) Construction Time Cost (B) $3,300,000 $7,500,000 $6,750,000 $6,285,000 $4,462,500 Total Bid (A+B) $34,225,000 $42,645,000 $42,700,125 $41,090,000 $38,553,500 Quality Points 12 10 8 8 12 Quality Credit Percentage 3.60% 3.00% 2.40% 2.40% 3.60% Quality Value $1,113,300 $1,054,350 $862,803 $835,320 $1,227,276 Total Adjusted Bid $33,111,700 $41,590,650 $41,837,322 $40,254,680 $37,326,224 Page 10 of 15
I-26 WIDENING/REHABILITATION LEXINGTON/CALHOUN COUNTIES Widening and rehabilitation of Interstate 26 starting at MM 115 to MP 136 on the eastbound side. RFQ Date: August 6, 2012 Shortlist of DB Teams: October 10, 2012 RFP Industry Review Date: October 31, 2012 Final RFP Date: December 19, 2012 Bid Opening: April 19, 2013 Award Amount: $75,750,000 Notice of Award: May 16, 2013 Notice to Proceed: August 12, 2013 Anderson Columbia Co., Inc. - Boggs Paving, a Joint Venture / The LPA Group, Inc. McCarthy Anderson-Boggs United-CRJ Guaranteed Maximum Cost to Complete (A) $78,659,000 $75,750,000 $81,300,000 Construction Time in Calendar Days 530 710 850 Construction Time Cost (B) $5,300,000 $7,100,000 $8,500,000 Total Bid (A+B) $83,959,000 $82,850,000 $89,800,000 Quality Points 24 21 21 Quality Credit Percentage 4.80% 4.20% 4.20% Quality Value $3,775,632 $3,181,500 $3,414,600 Total Adjusted Bid $80,183,368 $79,668,500 $86,385,400 Page 11 of 15
DESIGN-BUILD COMPLETED PROJECTS: South Carolina Department of Transportation S-8-9 (CYPRESS GARDENS RD.) EMERGENCY BRIDGE REPLACEMENT BERKELEY COUNTY Removal and replacement of the S-8-9 (Cypress Gardens Road) bridge over the CSX Railroad. The existing bridge was damaged beyond repair as the result of a train derailment. Final RFP Date: May 21, 2014 Bid Opening: June 3, 2014 Cape Romain Contractors, Inc. / Johnson, Mirmiran & Thompson, Inc. Award Amount: $3,050,000 Notice of Award: June 3, 2014 Notice to Proceed: June 6, 2014 Cape Romain United Crowder Carolina Bridge Total Cost to Complete (A) $3,050,000 $3,750,000 $5,868,000 $8,702,388 Completion Date: October 25, 2014 S-2-182 (LAURENS STREET) EMERGENCY BRIDGE REPLACEMENT AIKEN COUNTY Removal and replacement of damaged Laurens Street bridge over Norfolk Southern Railroad in Aiken County. Final RFP Date: April 27, 2012 Bid Opening: May 15, 2012 Crowder Construction Company / Davis & Floyd, Inc. Award Amount: $2,268,067 Notice of Award: May 15, 2012 Notice to Proceed: May 18, 2012 R.E.A. Crowder Carolina Bridge United Total Cost to Complete (A) $2,505,634 $2,268,067 $2,716,599 $3,885,000 Completion Date: October 4, 2012 Page 12 of 15
FEDERAL-AID BRIDGE REPLACEMENTS (PACKAGE D) DISTRICT 6 Replacement of five (5) structurally deficient bridges located in Charleston, Colleton, and Jasper Counties. RFQ Date: August 29, 2011 Shortlist of DB Teams: November 17, 2011 RFP Industry Review Date: January 5, 2012 Final RFP Date: February 23, 2012 Bid Opening: May 7, 2012 Award Amount: $9,544,500 Notice of Award: May 9, 2012 Notice to Proceed: August 29, 2012 United Infrastructure Group, Inc. / Coleman-Snow Consultants, LLC United Carolina Bridge Crowder Guaranteed Maximum Cost to Complete (A) $9,544,500 $9,457,212 $14,473,000 Construction Time in Calendar Days (b) S-10-967 over Abbopoola Creek 221 350 255 S-15-66 over Calfpen Creek 109 98 105 S-27-17 Zig Zag Creek 101 100 100 S-27-108 Cypress Creek (2 bridges) 99 175 160 Construction Time Cost (B) $943,500 $1,347,000 $1,170,000 Total Adjusted Bid (A+B) $10,488,000 $10,804,212 $15,643,000 Quality Points 9 8 6 Quality Credit Percentage 3% 2.67% 2% Quality Value $286,335 $252,508 $289,460 Total Adjusted Bid $10,201,665 $10,551,705 $15,353,540 Completion Date: September 25, 2014 Page 13 of 15
FEDERAL-AID BRIDGE REPLACEMENTS (PACKAGE C) DISTRICTS 2 AND 4 Replacement of seven (7) structurally deficient bridges located in Lancaster, Laurens, Union, and York Counties. RFQ Date: July 18, 2011 Shortlist of DB Teams: October 17, 2011 RFP Industry Review Date: October 21, 2011 Final RFP Date: December 16, 2011 Bid Opening: February 29, 2012 Award Amount: $14,081,500 Notice of Award: March 15, 2012 Notice to Proceed: May 1, 2012 United Infrastructure Group, Inc. / Triplett-King & Associates, Inc. United Blythe Crowder Guaranteed Maximum Cost to Complete (A) $14,081,500 $15,887,869 $16,520,000 Construction Time in Calendar Days (b) SC 308 over Duncan Creek 127 250 145 S-64 over McAlpine Creek 142 190 338 SC 72 over Cane Creek 96 185 215 S-134 over Buffalo Creek 90 110 155 S-279 over Fair Forest Creek 157 250 229 S-602 over Pinckney Creek 90 130 140 S-816 over Wolf Creek 90 115 152 Construction Time Cost (B) $1,655,000 $2,605,000 $2,773,500 Total Adjusted Bid (A+B) $15,736,500 $18,492,869 $19,293,500 Quality Points 9 5 8 Quality Credit Percentage 3% 1.67% 2.67% Quality Value $422,445 $265,327 $441,084 Total Adjusted Bid $15,314,055 $18,227,542 $18,852,416 Completion Date: May 17, 2014 Page 14 of 15
FEDERAL-AID BRIDGE REPLACEMENTS (PACKAGE A) CHESTERFIELD / HORRY / MARION COUNTIES Replacement of three (3) structurally deficient bridges located in Chesterfield, Horry, and Marion Counties. RFQ Date: February 21, 2008 Shortlist of DB Teams: March 14, 2011 RFP Industry Review Date: August 26, 2011 Final RFP Date: September 23, 2011 Bid Opening: November 17, 2011 Award Amount: $7,743,851 Notice of Award: January 19, 2012 Notice to Proceed: May 2, 2012 HRI, Inc. / STV Incorporated Crowder HRI United Guaranteed Maximum Cost to Complete (A) $8,725,000 $7,743,851 $9,301,200 Construction Time in Calendar Days (b) S-13-22 210 329 220 S-26-24 110 63 80 SC Rte 41 190 193 200 Total Days 510 585 500 Daily Cost for B $2,200 $2,200 $2,200 Construction Time Cost (B) $1,122,000 $1,287,000 $1,100,000 Total Adjusted Bid (A+B) $9,847,000 $9,030,851 $10,401,200 Quality Points 100 7 14 Quality Credit Percentage 3.67% 2.33% 4.67% Quality Value $320,208 $180,432 $434,366 Total Adjusted Bid $9,526,793 $8,850,420 $9,966,834 Completion Date: May 17, 2014 SC 150 EMERGENCY BRIDGE REPLACEMENT CHEROKEE COUNTY Removal and replacement of damaged SC 150 overpass bridge over I-85 in Cherokee County. Final RFP Date: June 10, 2011 Bid Opening: June 28, 2011 United Infrastructure Group, Inc. / Triplett-King & Associates, Inc. Award Amount: $2,947,544 Notice of Award: June 28, 2011 Notice to Proceed: June 30, 2011 Lane Crowder United Total Cost to Complete (A) $4,860,247 $5,109,000 $2,947,544 Completion Date: November 17, 2011 Page 15 of 15