2012 B.C. Plumbing Code



Similar documents
2012 British Columbia Plumbing Code Update

Division A. Compliance, Objectives and Functional Statements

Amendments to the 2012 International Plumbing Code

CHAPTER 11 STORM DRAINAGE

Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

CITY of LOS ANGELES DEPARTMENT of BUILDING and SAFETY

PLBG/GAS SAFETY Information Bulletin

Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

CHAPTER 11 STORM DRAINAGE

WHITE PLAINS PLUMBING CODE PART 1. GENERAL REQUIREMENTS

Oregon Administrative Rules, Chapter Compilation- Building Codes Division DIVISION 695

Licensing & Certification

Introduction to Water Pipe Sizing

Oregon Plumbing Rule and Law RV

PLUMBING ROUGH IN INSPECTION

When Should Examination Preparation Begin?

Dominic i Barbato Dpt. Of Building and Safety (818) domenico.barbato@lacity.org

What to Expect From the Examination. How to Study the Plumbing Codes

Gas Fired Water Heater Installation

REGISTRATION EXAMINATION, JUNE 2009 PLUMBING QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

Excerpts from the Canadian National Building Code (NBC)

2010 Residential Water Heater Replacement Check List

PLUMBING CODE REGULATION

VERMONT PLUMBING RULES The Department of Public Safety & The Plumbers Examining Board

Element D Services Plumbing

Plumbing Apprenticeship Program Curriculum

Isometric Plumbing Drawings

PLAN REVIEW SERVICES CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW

RHODE ISLAND. Downloaded

WELCOME INTERNATIONAL RESIDENTIAL CODE 2009 EDITION PLUMBING SECTION

Top 10+ Mistakes of DWV plumbing design

Georgia State Amendments to the International Plumbing Code

PLAN CHECK CORRECTION SHEET FOR PLUMBING SYSTEMS 2014 LAPC

VERMONT PLUMBING RULES The Department of Public Safety & The Plumbers Examining Board. Effective date July 1, 20135

The Plumbing Pipeline

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012

FIRING RANGE PHASE 1 DESIGN

Page 1 of 51 Exterior Plumbing Quiz Part 1

CHAPTER XIX PLUMBING

Plumbing Code Sections For Commercial Food Facilities

Plumbing Code. City of San Diego 2013 Plumbing Regulations - Proposed Code Changes (revised 5/15/15)

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

ONTARIO PLUMBING INSPECTORS ASSOCIATION INC. In the public service since Wet Venting. Incorporating Stack Venting and NPC Harmonization

CITY OF AUSTIN Uniform Plumbing Code. Changes

Qualification Guide. BPEC 601/2514/7 - Level 1 Diploma in Plumbing Foundation. BPEC 600/9432/1 - Level 2 Diploma in Plumbing Foundation

CITY OF SURREY BY-LAW NO. 6569

CHAPTER 5 WATER HEATERS

A. Accessible Fixture: Emergency plumbing fixture that can be approached, entered, and used by people with disabilities.

CHAPTER 9 VENTS. copper drainage tube Type DWV, Schedule 40 plastic piping, or borosilicate glass.

Chapter PLUMBING CODE

The Plumbing and Drainage Regulations

SECTION THREE CONSTRUCTION CODES

Indirect-Fired Storage Water Heater Models WH-30 through WH-80 INSTALLATION AND OPERATING INSTRUCTIONS

2-1 TITLE 7 CONSTRUCTION REGULATIONS 2-4

PLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations.

Residential Plumbing BCN 1058

Arapahoe County Residential Water Heater Installation and Inspection Guide

C I T Y O F S E L M A F I R E D E P A R T M E N T

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST RESIDENTIAL FIRE SPRINKLERS NFPA 13D

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

2014 British Columbia Building Code Changes

Connecticut Technical High School System Connecticut State Department of Education PLUMBING APPRENTICESHIP INFORMATION PACKET

CHAPTER 10 BOILERS, WATER HEATERS AND PRESSURE VESSELS

ARLINGTON COUNTY CODE. Chapter 18 PLUMBING AND GAS CODES

A. Accessible Fixture: Emergency plumbing fixture that can be approached, entered, and used by people with disabilities.

STANDARD PLUMBING AND DRAINAGE REGULATION 2003

SECTION 5 - COMMERCIAL CONSTRUCTION MECHANICAL, ELECTRICAL, PLUMBING AND SOLAR OTHER TECHNICAL CODES

EMERGENCY PLUMBING FIXTURES

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES

(1) (a) through (1) (e) (iv) Remain the same.

A. Accessible Fixture: Emergency plumbing fixture that can be approached, entered, and used by people with disabilities.

SECTION FACILITY STORM DRAINAGE PIPING

ASPE Seminar Water Heater Piping Strategies. Presented by Joe Kalarickal, EIT Regional Sales Manager AERCO International

Assessment Blueprint PHCC Educational Foundation Plumbing Year 2

City of Elk River BASEMENT Office Use Only

Minimum Housing and Health Standards

PMA ONLINE TRAINING Venting for Plumbing Systems

Province of Alberta SAFETY CODES ACT PERMIT REGULATION. Alberta Regulation 204/2007. With amendments up to and including Alberta Regulation 99/2016

Drainage By-law. WM-4 Consolidated April 18, This by-law is printed under and by authority of the Council of the City of London, Ontario, Canada

One of the fundamental design elements that every

Winnipeg Fire Department Fire Prevention Branch

Chapter 7 Plumbing Connections

Georgia State Amendments to the International Plumbing Code

Home Inspection Report

SANITARY SEWER SPECIFICATIONS

2014 Oregon Plumbing Specialty Code New Oregon Amendments

Does Wall Township require an inspection by the building department on resale of a home?

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL Phone: (708) Fax: (708)

2. What building projects are exempted? (permit not required)

TEXAS STATE BOARD OF PLUMBING EXAMINERS EXAMINATION AND REGISTRATION Endorsement Training Programs

Water Heater Sizing TS Saturday 2:15pm 5:15pm J. Joe Scott CPD, FASPE, LEED

Scope of Work Class I Contractor s Licenses. Putnam County Ordinance Section 17. Types of Authorized Contractor Licenses.

Transcription:

Agenda Introduction Plumbing only changes Code Format On-line version Effective dates Code Changes Fire Blocks & Fire Stopping Changes in Forms, Checklists and Reduced Fees. Question and Answers

Introductions Anthony Haddad Ken Kunka The City team is here to help you: Director of Development Services Anthony Haddad Building & Permitting Manager Ken Kunka

B.C. Codes 2012

2012 B.C. Plumbing Code 2012 B.C. Plumbing Code Published as a separate document, broken down into divisions similar to BCBC. Applies to core concepts of the National Plumbing Code, combined with elements specific to B.C.'s needs Sets out technical provisions for the design and installation of new plumbing systems. Also applies to the extension, alteration, renewal and repair of existing plumbing systems.

2012 B.C. Plumbing Code Broken down into three main divisions Division A Division B Division C 2012 B.C. Plumbing Code Conversion Factors

Online version www.bccodes.ca Updated automatically Search engine easy to use, won awards for functionality. Narrow your search to a specific part of the Code Links to Intent Statements Supplementary info for technical requirement interpretation Volume requires statements to be available online only Hyperlinks to related current B.C. statutes and regulations. View 2006 B.C. Code and historical changes. Reduced pricing!

Effective dates December 20, 2012 All permits applied prior to this date will be reviewed under the 2006 BCBC. Permits applied after this date will fall under the 2012 BC/PC BC, however Three-month grace period given to help industry adjust. Plumbing workshop late January/Feb. Information bulletins: www.penticton.ca/buildingcode

What stays the same Energy efficiency No changes to Part 10 until 2013 10.3.1.2. Fixture Efficiency: code did not include high-efficiency flush water closets, but will be amended to correct oversight. Mechanical Ventilation No significant changes to Part 32 until 2013 Refer to TECA Bulletin

What s new - Administration Administrative Edits and Changes <Angle Brackets> Always means a change from 2006 BC Building Code 2006 2012

What s new - Administration Administrative Edits and Changes Appendix Discussion material, not legally considered part of the Code where referenced indirectly (between parentheses) Information considered legally part of the Code where referenced directly

What s new Plumbing Code layout Numbering harmonized with National Plumbing Code Plumbing relocated from Div B Part 7 BCBC. Only general requirements left. Sentence 7.6.1.3 Shut-off Valves in 2006 BCPC is now Sentence 2.6.1.3 Shut-off Valves in 2012 BCPC

What s new Plumbing Code layout Layout definitions and index Materials Drainage Water pipe sizing & Temperatures Venting Hot water heaters Storm and grey water recycling Combustible penetrations Fire stops and fire blocking

Plumbing Code Division A Division A Part 1 - Compliance Part 2 - Objectives Part 3 Functional Statements Appendix A Division A Refer to on-line version

Division A Part 1 Division A Part 1 Compliance 1.4.1. Definitions of Words and Phrases Auxiliary Water Supply expanded to include: Harvested or recovered rainwater commonly refers to a type of auxiliary water supply that is collected from external surfaces of buildings or other hard-surfaced areas not exposed to vehicular or pedestrian traffic. Auxiliary water supply that meets the definition of potable water can be used to supply potable water systems. Auxiliary water supply that doesn t meet the definition of potable water can be used to supply non-potable water systems.

Division A Division A Part 2 Objective 2.1.1.2. Application of Objectives 1) The objectives described in this Part apply a) to all plumbing systems covered in this Code (see Article 1.1.1.1.), and b) only to the extent that they relate to compliance with this Code as required in Article 1.2.1.1. Example: OS1 Fire Safety OH Health OP Fire and Structural Protection

Division A Division A Part 2 Functional Statements 3.2.1.1. Functional Statements 1) The objectives of this Code are achieved by measures, such as those described in the acceptable solutions in Division B, that are intended to allow the plumbing system to perform the following functions: Examples F70 To provide potable water. F71 To provide facilities for personal hygiene. F72 To provide facilities for the sanitary disposal of human and domestic wastes.

Division B Division B Part 1 General Part 2 Plumbing Systems Appendix Div B

Division B Part 1 Part 1 -General 1.3.1.2. Applicable Editions 1) Where documents are referenced in this Code, they shall be the editions designated in Table 1.3.1.2. (See Appendix A.) Referenced Editions of Documents and Standards have been updated

Division B Referenced Doc. Conformity to Referenced Standards Table 1.3.1.2. Documents Referenced in Book II (Plumbing Systems) of the British Columbia Building Code 2012 Forming part of Sentence 1.3.1.2.(1) Issuing Agency Document Number (1) Title of Document (2) Code Reference ANSI/CSA ANSI Z21.22-1999/ CSA 4.4-M99 (including Addenda 1 and 2) Relief Valves for Hot Water Supply Systems 2.2.10.11.(1)

Division B Referenced Doc. Conformity to Referenced Standards

Division B Part 2 Plumbing Sys Part 2 Plumbing Systems Section 2.1 General Section 2.2 Material and Equipment Section 2.3 Piping Section 2.4 Drainage Systems Section 2.5 Venting Systems Section 2.6 Potable Water Systems Section 2.7 Non-Potable Water Systems Section 2.8 Objectives and Functional Statements Appendix A

Division B Sec 2.1 General 2.1.2.1 Sanitary Drainage Systems 1) Except as provided in Subsection 2.7.4., every sanitary drainage system shall be connected to a public sanitary sewer, a public combined sewer or a private sewage disposal system. 2.7.4.1. Non-potable Water System Design Also applies to Storm drainage and Water Distribution Systems

Division B Sec 2.2 Materials 2.2.5.13. Polyethylene/Aluminum/Polyethylene Composite Pipe and Fittings 2) Except as provided in Sentences (3) and (4), PE/AL/PE pipe and fittings shall not be used in hot water systems. 3) PE/AL/PE pipe with a pressure rating of 690 kpa or greater at 82 C shall be permitted for hot water systems.

Division B Sec 2.2 Materials 2.2.10.6. Supply and Waste Fittings 1) Supply fittings shall conform to a) ASME A112.18.1/CAN/CSA-B125.1 Plumbing Supply fittings or b) CAN/CSA-B125.3 Plumbing Fittings. 2) Waste fittings shall conform to ASME A112.18.2/CAN/CSA-B125.2. Plumbing Waste Fittings.

Division B Sec 2.2 Materials 2.2.10.7. Water Temperature Control (See Appendix A.) 1) Except as provided in Sentence (2), all valves supplying fixed-location shower heads shall be individual pressurebalanced or thermostatic-mixing valves conforming to ASME A112.18.1/CAN/CSA-B125.1, Plumbing Supply Fittings. 2) Individual pressure-balanced or thermostatic-mixing valves shall not be required for showers having a single tempered water supply that is controlled by a master thermostatic-mixing valve conforming to CAN/CSA- B125.3, Plumbing Fittings.

Division B Sec 2.2 Materials 2.2.10.7. Water Temperature Control (cont.) 3) All mixing valves supplying shower heads shall be of the pressure-balanced, thermostatic, or combination pressure-balanced/thermostatic type capable of a) maintaining a water outlet temperature that does not exceed 49 C, and b) limiting thermal shock. 4) The temperature of water discharging into a bathtub shall not exceed 49 C.

Division B Sec 2.2 General A-2.2.10.7. Hot Water Temperature Hot water delivered at 60 C will severely burn human skin in 1 to 5 seconds. At 49 C, the time for a full thickness scald burn to occur is 10 minutes. Children, the elderly and persons with disabilities are particularly at risk of scald burns. Compliance with Article 2.2.10.7. will reduce the risk of scalding in showers and bathtubs, and reduce the risk of thermal shock from wall-mounted shower heads. These requirements apply to all occupancies, not just residential occupancies.

Division B Sec 2.2 Materials 2.2.10.14. Vent Pipe Flashing 1) Flashing fabricated on site for vent pipes must be fabricated from b)aluminum sheet not less than 0.48 mm thick d)lead sheet not less than 1.73 mm thick e)galvanized steel sheet not less than 0.33 mm thick

Division B Sec 2.3 Piping Minor changes 2.3.3.12. Copper Joints Used Underground (split from Copper Tube section (2006) ) 2.3.4.5. Support of Piping 5) Where hangers are used to support nominally horizontal piping, the hangers shall be a) supported by metal rods of not less than

Division B Section 2.4 Drainage 2.4.2.1. Connections to Sanitary Drainage Systems 4) Where a change in direction of more than 45 degrees occurs in a soil-or-waste pipe that serves more than one clothes washer, and in which pressure zones are created by detergent suds, no other soil-or-waste pipe shall be connected to it within a length less than a) 40 times the size of the soil-or-waste pipe or 2.44 m maximum vertical, whichever is less, before changing direction, and b) 10 times the size of the nominally horizontal soil-or-waste pipe after changing direction. (See Appendix A.)

Division B Sec 2.4 Drainage Fig. A-2.4.2.1.(4) Suds Pressure Zones 2.4.2.1. Connections to Sanitary Drainage Systems 5) Where a vent pipe is connected into the suds pressure zone referred to in Sentence (4), no other vent pipe shall be connected to that vent pipe within the height of the suds pressure zone. See A- 7.4.2.1.(4) in Appendix A.

Division B Sec 2.4 Drainage 2.4.10.4. Hydraulic Loads from Roofs or Paved Surfaces 2) Flow control roof drains may be installed provided a) the maximum drain down time does not exceed 24 h, b) the roof structure is designed to carry the load of the stored water, c) one or more scuppers are installed not more than 30 m apart along the perimeter of the building so that i) up to 200% of the 15-minute rainfall intensity can be handled, and ii) the maximum depth of controlled water is limited to 150 mm,

Division B Sec 2.5 Venting 2.5.2.1. Wet Venting 1) A soil-or-waste pipe may serve as a wet vent provided that the hydraulic load is in accordance with Table 2.5.8.1. Table 7.5.2.1. Sizing of Wet Vents in 2006 Code has been removed and all references to Table 7.5.2.1 have been changed to 2.5.8.1

Division B Sec 2.5 Venting 2.5.2.1. Wet Venting 1)A soil-or-waste pipe may serve as a wet vent provided that g) the hydraulic load of separately vented fixtures that drain into the wet vent are not included when sizing the continuous vent serving the wet vent, (Rewording of the clause means the same as before)

Division B Sec 2.5 Venting 2.5.8.3. Branch vents, vent headers, continuous vents and circuit vents 1) Branch vents, vent headers, circuit vents and continuous vents shall be sized in accordance with Table 2.5.8.3., unless they are individual or dual vents. The size of individual vents and dual vents shall be determined using Table 2.5.7.1. based on the largest trap served. *2.5.7.7 Vents for Sewage Pumps 1) Except as provided in Sentences (2) and (3), the minimum size of the vent pipe for a sewage sump or dilution tank shall be one size smaller than the size of the largest branch or fixture drain draining to the sump

Division B Sec 2.6 Potable Water 2.6.1.12. Service Water Heaters 1)Thermostat controls for electric storage-type service water heaters shall be set at a temperature of 60 C. (See Appendix A.) A-2.6.1.12.(1) Service Water Heaters Storing hot water at temperatures below 60 C in the hot water tank or in the delivery system may lead to the growth of legionella bacteria. Contemporary electric water heater tanks experience temperature stratification and thus tend to have legionella bacteria in the lower parts of the tank.

Division B Sec 2.6 Potable Water A-2.6.1.12.(1) Service Water Heaters (continued) Article 2.6.1.12. specifies a thermostat setting of 60 C, which addresses the concern over the growth of legionella bacteria in electric hot water storage tanks and is enforceable without introducing unnecessary complications. The growth of legionella bacteria not a concern for other types of water heaters with different designs that use different fuels.

Division B Sec 2.6 Potable Water 2.6.3. Size and Capacity of Pipes 2.6.3.1. Design, Fabrication and Installation 1)Every water distribution system shall be designed to provide peak demand flow when the flow pressures at the supply openings conform to the plumbing supply fitting manufacturer s specifications. 2) Potable water systems shall be designed, fabricated and installed in accordance with good engineering practice, such as that described in the ASHRAE Handbooks and ASPE Data Books. (See Appendix A.) (see handout)

Division B Sec 2.6 Potable Water A-2.6.3.1.(2) Potable Water Systems The design procedures contained in the following documents are considered good engineering practice in the field of potable water systems: a)ashrae 2003, ASHRAE Handbook of HVAC Applications, chapter on Service Water Heating, b)ashrae 2009, ASHRAE Handbook of Fundamentals, chapter on Pipe Sizing, c)aspe 2005, ASPE Plumbing Engineering Design Handbook, chapter on Cold Water Systems, and d)aspe 2005, ASPE Plumbing Engineering Design Handbook, chapter on Domestic Water Heating Systems.

Division B Sec 2.6 Potable Water A-2.6.3.1.(2) Potable Water Systems (cont.) Alternatively, the following methods, which apply to both public and private water supplies, may be used in determining the size of each section of the water system using Table A-2.6.3.1.(2)A (Small Commercial Building Method) and Table A-2.6.3.1.(2)F (Average Pressure Loss Method). Where these methods are considered an alternative to a detailed engineering design method, the hydraulic loads shall be the sum of the total fixture units given in Tables 2.6.3.2.A, B, C and D.

Division B Sec 2.6 Potable Water Method for Small Commercial Buildings Each table designed for water velocities of 3.0, 2.4 and 1.5m/s. Pressure losses from devices, meters and elevation must be taken into consideration. Doesn t work well for buildings with long developed lengths.

Division B Sec 2.6 Potable Water Table A-2.6.3.1.(2)A. Small Commercial Method Three Pressure Ranges

Division B Sec 2.6 Potable Water 2.6.3.1. Design, Fabrication and Installation 3) In one- and two-family dwelling units and manufactured homes, multi-purpose systems that combine potable water systems and residential fire sprinkler systems shall be designed, fabricated and installed in accordance with NFPA 13D, Installation of Sprinkler Systems in One- and Two-Family Dwellings and Manufactured Homes.

Division B Sec 2.6 Potable Water 1.5 m/s = 5 ft/s 2.4 m/s = 8 ft/s 3.0 m/s = 10 ft/s Table 2.6.3.4. Water Pipe Sizing for Buildings Containing One or Two Dwelling Units or Row Houses with Separate Water Service Pipes Forming part of Sentence 2.6.3.4.(5) Size of Water Pipe, inches Water Velocity, m/s (1) 3.0 2.4 1.5 Hydraulic Load, fixture units ½ 8 7 4 ¾ 21 16 9 1 43 31 18 1¼ 83 57 30

Division B Sec 2.6 Potable Water 2.6.3.5. Velocity 1) The maximum permitted water velocities shall be those recommended by the pipe and fitting manufacturer. New Clause

Division B Sec 2.7 Non Potable Section 2.7. Non-Potable Water Systems 2.7.2.1. Markings Required Location of non-potable water discharge and non-potable water piping shall be identified by markings that are permanent, distinct and easily recognized.

Division B Sec 2.7 Non Potable Section 2.7.4.1. Non-Potable Water System Design 1) Non-potable water systems shall be designed, fabricated and installed in accordance with good engineering practice, such as that described in the ASHRAE Handbooks, ASPE Handbooks and CAN/CSA-B128.1, Design and Installation of Non-Potable Water Systems. City will be working with surrounding jurisdictions to provide a common approach to dealing with non-potable systems.

Division C Part 1 General Part 2 Administrative Provisions Appendix A (Division C) 2.1.1. Application 2.1.1.1. Application 1) This Code is made pursuant to Section 692 of the Local Government Act. (Municipal Authority)

Division C Sec 2.2 Administration 2.2.1.2. Personnel Performing Plumbing Work 1) Personnel performing installation, alteration or repair on a plumbing system shall a) possess a British Columbia tradesman's qualification certification as a plumber, b) be an indentured apprentice supervised by a journeyman possessing a British Columbia tradesman's qualification certification as a plumber, or Reference to British Columbia removed as regulated under the Interprovincial Agreement on Internal Trade. www.ait-aci.ca/index_en/labour.htm

Division C Sec 2.2 Adminstration 2.2.2. PLUMBING DRAWINGS AND RELATED DOCUMENTS 2.2.2.1. Information Required on Plumbing Drawings and Related Documents 1) If the authority having jurisdiction legally requires an application for a permit in respect of plumbing systems, plumbing drawings and related documents submitted with the application for a plumbing permit shall show (greater restrictions on owner permits)

Division C 2.2.2.1.(1) Information Required on Plumbing Drawings and Related Documents (cont.) a) the location and size of every building drain and of every trap and cleanout fitting that is on a building drain, b) the size and location of every soil-or-waste pipe, trap and vent pipe, and c) a layout of the potable water distribution system, including pipe sizes and valves.

Division C Sec 2.3 Alt. Solutions 2.3.1. ALTERNATIVE SOLUTIONS 2.3.1.1. Application For the purposes of Clause 1.2.1.1.(1)(b) of Division A, on written request by the owner of a building or an authorized agent of that owner, the authority having jurisdiction shall accept a measure as an alternative solution to an acceptable solution for the building if satisfied that: a) the measure will achieve at least the level of performance required by Clause 1.2.1.1.(1)(b) of Division A, and b) the acceptable solution does not expressly require conformance to a provincial enactment other than the British Columbia Building Code See City Alternative Solution Application Form - $130.00 Review Fee.

Legend and index Symbols and abbreviations: a table has been added. Conversion factors: this section has been expanded

Combustible penetrations Fire stops Fire blocks

Combustible penetrations Fire stops System consisting of a material component and means of support used to fill gaps between fire separations or between fire separations and other assemblies, or used around items that wholly or partially penetrate a fire separation.

Combustible penetrations Fire blocks Material, component or system that restricts the spread of fire within a concealed space or from a concealed space to an adjacent space.

Combustible penetrations Fire separations vertical horizontal chases/shafts

Combustible penetrations Fire separations 9.10.9.6. Service Equipment Penetrating a Fire Separation See A-3.1.9. in Appendix A. Piping, tubing, ducts, chimneys, wiring, conduit, electrical outlet boxes and other similar service equipment that penetrate a required fire separation shall be tightly fitted or fire stopped to maintain the integrity of the separation.

Fire stop failures Alterations and additions to existing mechanical and plumbing systems requires attention to details at fire separations.

The learning process begins Detailed information can be found at http://www.boabc.org Attend Kelowna workshop Dec. 4. Attend City s BCBC 2012 open house on Dec. 13. Follow news at www.penticton.ca/buildingcode

Plumbing Permit Changes New Application forms and checklists to reflect code changes to be posted prior to Dec 20/12 Review of Sprinkler permits. Overall reduction in Permit Fees with incentive to use certified trades for single family projects.

Thank you Questions? Contact us at any time: Penticton Building Department buildinginfo@penticton.ca 250-490-2501