VIE: Second Upper Secondary Education Development Project (USEDP II) - Ha Giang Province



Similar documents
EBRD Performance Requirement 7

Performance Standard 8:

Semi Annual Environmental Monitoring Report. July 2013 L2557/2558. SRI: Greater Colombo Wastewater Management Project

LOAN AGREEMENT (Special Operations)

Environmental & Social Assessment Procedures Basics

Ex-Ante Evaluation (for Japanese ODA Loan)

Updated Resettlement Plan/Corrective Action Plan

NEWMONT GHANA GOLD LTD. AHAFO SOUTH PROJECT COMPLETION AUDIT TERMS OF REFERENCE RESETTLEMENT ACTION PLAN

Free Prior Informed Consent: Is it Required and What s the Standard?

1) Stakeholder participation in ER-PIN planning and ERP design

Second Quarterly Report for the period January March 2011

Salavanh Province SAL/PR/04: Sustainable Livestock Health Management System for Salavanh Province

Building Capacity to Make Transport Work for Women and Men in Vietnam

ANNEX 7.1 Guide to Land Acquisition and Compensation (GLAC) LAND ACQUISITION

ELECTRICITY CORPORATION OF VIETNAM (EVN) Inception Report INDEPENDENT RESETTLEMENT MONITORING

Environmental Assessment

REVOLVING LOAN PROGRAMME

Understanding the Asian Development Bank's Safeguard Policy

Pre-Feasibility Study Bhopal Solid Waste Management. May 2015 Executive Summary

SCHOLARSHIP PROJECT PROPOSAL

PR 5: Land Acquisition, Involuntary Resettlement and Economic Displacement

Programme Manager/Procurement Specialist. Suva. Capital Works Manager. As soon as possible. As follows

The trend of Vietnamese household size in recent years

Environmental Compliance Audit Report. MFF 0054-VIE: Water Sector Investment Program Tranche 2

Guiding principles on security of tenure for the urban poor

SECTOR ASSESMENT (SUMMARY): EDUCATION 1

Advisory Note: Due Diligence for Land Acquisition and Resettlement - New Manufacturing Facilities, Myanmar

V-1 Reference Material for Social Analysis

Year Growth rate 6.9% 7.08% 7.34% 7.69% 8.4% GDP/capita US$ 410 US$441 US$482 US$514 US$638

Term of Reference for Project Management Consulting Service

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROCEDURES FOR ENVIRONMENTAL AND SOCIAL APPRAISAL AND MONITORING OF INVESTMENT PROJECTS

Resettlement Policy Framework

VOLUNTARY GUIDELINES ON THE GOVERNANCE OF TENURE. At a glance

NEP: Kathmandu Valley Water Supply Improvement Project (Additional Financing) Small Works Package No 01/21

F i r s t N a t i o n a n d M é t i s Consultation Policy Framework. June 2010

People s Republic of China: Strategy and Transport Policy Study on Promoting Logistics Development in Rural Areas

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Report No.: Project Name

Principles for Responsible Investment in Farmland

THE REFLECTIONS ON PEASANT EDUCATION FOR RURAL DEVELOPMENT IN VIETNAM

Country Operations Business Plan. Project Number: August Samoa

Socialist Republic of Viet Nam: Greater Mekong Subregion Corridor Towns Development Project

THE ETHNIC MINORITIES DEVELOPMENT PLAN OF AN GIANG PROVINCE

LIST OF HOSPITALS/FAMILY MEDICAL CENTRES Last updated: October 2014 ORGANISATION ADDRESS REMARKS

Islamic Republic of Afghanistan, Post Disaster Need Assessment (PDNA) Training Manual

ACTION RESEARCH ON MOTHER TONGUE-BASED BILINGUAL EDUCATION: ACHIEVING QUALITY, EQUITABLE EDUCATION. Update March

Resolution from the 2 nd Barents Indigenous Peoples Congress 2012

First Vietnam National Forum for Community Forestry Thai Nguyen, April 2014

Ex-Ante Evaluation (for Japanese ODA Loan)

TEACHER APPLICATION FORM

Proposed Administration of Loans and Grants Kingdom of Cambodia: Rural Roads Improvement Project II

Faster Approach to Small Nonsovereign Transactions

Teacher Questionnaire

BUSINESS DEVELOPMENT LOAN POOL (BDPL) GUIDELINES & APPLICATION MENOMONEE FALLS, WISCONSIN

Two-Year Associate s Degree

Performance Monitoring Tools

Kyrgyz Republic: Women s Entrepreneurship Development Project

DEPARTMENT OF FORESTRY DRAFT REVISED NATIONAL FOREST POLICY OF MALAWI

Presentation on Water Quality Conservation in Community

REPORT OF STUDYTOUR TO HOA BINH PROVINCE. (29 August 2011)

Gender Sensitive Data Gathering Methods

Guidelines for Gender Sensitive Programming Prepared by Brigitte Leduc and Farid Ahmad

LESS FORMAL TOWNSHIP ESTABLISHMENT ACT 113 OF 1991

Climate risk perception and ex-ante mitigation strategies of rural households in Thailand and Vietnam

Rural Business Enterprise Loan Program (RBE)

Mainstreaming Cross-Cutting Outcomes: Gender Equality, Environmental Sustainability, Cultural Respect and Understanding. A Toolkit

RESETTLEMENT POLICY FRAMEWORK (RPF)

LIVING WITH FLOOD IN THE MEKONG DELTA, VIETNAM. Tran Thi Trieu, Nguyen Hieu Trung, Le Anh Tuan

HIV/AIDS AND LIFE SKILLS MONITORING TOOL ASSESSMENT REPORT

Lista rządowych planów rozwoju poszczególnych sektorów i dziedzin w gospodarce Wietnamu 25/02/2011

Operational Directive

A preliminary analysis of flood and storm disaster data in Viet Nam

Progress of Water Environmental Governance/Management and Future Challenges in Vietnam

Investing in rural people in Indonesia

Job Application Form. Name: Position Applied for:

Newsletter Jumbo Glacier Alpine Resort Proposal

Environmental and Social Management System. Environmental Risk Management for the Financial Sector

GCS-Tenure Project. Tenure security and forest-dependent communities

Objective Oriented Planning Module 1. Stakeholder Analysis

Cambodia: Flood Damage Emergency Reconstruction Project

VIETNAM FORUM ON LIFELONG LEARNING: BUILDING A LEARNING SOCIETY. ILO Director Ms. Rie Vejs-Kjeldgaard Hanoi, 6-8 December 2010

Environmental Assessment

Ministry of Education, Science and Sports

www POLICY STATEMENT REGARDING TREATMENT OF BURIAL SITES, HUMAN REMAINS AND FUNERARY OBJECTS

BACKGROUND LEAFLET. SAMI The people, the culture and the languages and the Council of Europe NOVEMBER 2014 INARI, FINLAND

Sunamganj Community Based Resource Management Project (SCBRMP): an approach to sustainable beel fisheries management

C ontents. How Does Culture Change? 17. Hunters and Gatherers 25. Early Agricultural Societies 49. The Industrial Revolution 81

SAHARA AND SAHEL OBSERVATORY IN COLLABORATION WITH GOVERNMENT OF UGANDA (MINISTRY OF WATER AND ENVIRONMENT) AND

Transcription:

Due Diligence Report November 2014 VIE: Second Upper Secondary Education Development Project (USEDP II) - Ha Giang Province Quyet Tien Upper Secondary School Prepared by the Ministry of Education and Training, Socialist Republic of Viet Nam, for Asian Development Bank The Due Diligence Report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

ADB - CPMU - EMs - MOET - RP - USEDP II - USS - ACCRONYMS Asian Development Bank Central Project Management Unit Ethnic Minorities Ministry of Education and Training Resettlement Plan Second Upper Secondary Education Project Upper Secondary School

I. INTRODUCTION 1. The Ministry of Education and Training (MOET) is implementing the Second Upper Secondary Education Development Project (USEDP II, or the Project) in the 33 provinces of Viet Nam, through Loan 2929 VIE (SF) from Asian Development Bank. Under the Project, a total of 135 upper secondary schools (USSs) and six (6) pedagogical centers have been selected for assistance. In the screening and categorization for social safeguards, Category A subprojects are automatically excluded, while Category C subprojects shall be prioritized for financing. The subproject USSs with minor impacts (Category B) may be considered subject to the preparation and implementation of a resettlement plan (RP) acceptable to ADB, as prescribed in 2009 Safeguard Policy Statement (SPS). The RP for Category B subproject shall be approved first by the Bank and disclosed in the ADB website before implementation by MOET. 2. In Ha Giang Province at the Northern Midland and Mountain Areas, Quyet Tien Upper Secondary School is one (1) of the six (6) USSs 1 were selected for assistance under the Project. The school is located in Quan Ba district of Ha Giang province. As screened, the school is Category C subproject both in Involuntary Resettlement and Indigenous Peoples categorization (Attachments 1), since no social impacts are expected inside the schools premise. The Central Project Management Unit (CPMU) of USEDP II has submitted this Due Diligence Report (DDR) for information of ADB and to secure its No Objection for the award of civil works contract for the construction of school facilities. II. APPROACH AND METHODOLOGY IN DUE DILIGENCE 3. The CPMU has applied the selection criteria in evaluating the USSs included in the long list of potential beneficiary schools. The criteria were developed during the PPTA. Given the large number of USSs and their geographic locations, the CPMU sent questionnaires to be filled-up by school officials in which responses were the basis for screening and selection in producing the final shortlist of USSs. The school officials of shortlisted USSs were then given two sets of questionnaires. The first set was used in gathering information on their proposed facilities and statistical data that justify their subproject proposal. Their proposals were then screened and the CPMU made the reasonable distribution of facilities that they urgently needed. The second set was aimed to validate if land acquisition shall be required. National resettlement specialist and CPMU staff 2 conducted site survey and consultation with key officials of the Ha Giang PPMU and proposed school during 09-10 October 2014 to verify information provided by the PPMU. III. THE PROPOSED FACILITIES 4. The Quyet Tien USS shall be provided with fourteen (14) classrooms. The construction of regular classrooms will follow the standard dimension as provided for in Decision 37/2008/QD-BGDDT (July 16, 2008) by MOET. The dimension of each classroom is as follows: length = 7.8 m and width = 9.9 m. Comprising the width is 7.5 m working area and 2.4 m for the corridor. Each classroom shall have a total area of 56.77 m². 1 05 other USSs of Minh Ngoc, Kim Ngoc, Bac Me, Thong Nguyen and Quang Binh have already been endorsed by the MOET and ADB as Category C both in Involuntary Resettlement and Indigenous Peoples categorization. 2 Dr. Nguyen Duong Viet, CPMU Civil Work Assistance and Mr. Nguyen Truong Son, National Resettlement Specialist

IV. BRIEF PROFILE OF THE USS A. Quyet Tien Upper Secondary School 5. The school was established in 2010 and granted as per Land Use Right Certificate N o BT473149 with a total land area of 10,213 m² at Dong Tinh Village, Quyet Tien Commune of Quan Ba District. During the school-year 2013-2014, a total of 227 students were enrolled in the school composed of 114 males and 113 females. Comprising the total were 86 students from Grade 10, 82 in Grade 11 and 59 students in Grade 12. Student population largely come from EMs, at 33.9% of H Mong, 20.7% of Dao, 19.8% of Nung. The Kinh only represent 5.2% of the school population. 6. During the last three years the enrolment of student was 177 in school year 2010-2011; 229 in school year 2011-2012 and 219 in school year 2012-2013. The school proposes for fourteen (14) classroom. It has 24 personnel, five (5) are non-teaching staff and 19 are teachers, 10 males and 09 females, all university graduates and two (2) teachers have master of arts degree. They belong to two (2) ethnic groups, 09 are Kinh and 10 are EMs. V. ASSESSMENT OF SOCIAL IMPACTS 7. Social impacts arising from land acquisition are not expected in the selected Quyet Tien USS in Ha Giang Province. The school premise is enclosed with concrete or wood materials that protect them from encroachers, and neither a house nor structure of private person was allowed by the school administration. Given the total land requirements of the proposed facilities, it was assessed as to their impacts of land in the respective school premises. Quyet Tien Upper Secondary School. This school proposes for fourteen (14) function rooms in a 03-storey building. The land to be used for the construction of this building is 313 m 2 of the school land 10,213 m². The structure will be built within the existing school compound. No land acquisition is required and no thirdparty user will be affected. 8. With the foregoing information, MOET requests for No Objection by ADB for the award of civil works contracts for the construction of fourteen (14) classrooms in Ha Giang Province.

Involuntary Resettlement Impact Categorization Checklist Project: Second Upper Secondary Education Development Project (USEDP II) Subproject: Quyet Tien Upper Secondary School Province: Ha Giang District: Quan Ba (Quyet Tien commune) CATEGORY: C Probable Involuntary Resettlement Effects Involuntary Acquisition of Land 1. Will there be land acquisition? 2. Is the site for land acquisition known? 3. Is the ownership status and current usage of land to be acquired known? 4. Will easement be utilized within an existing Right of Way (ROW)? 5. Will there be loss of shelter and residential land use to land acquisition? 6. Will there be loss of agricultural and other productive assets due to land acquisition? 7. Will there be loss of crops, trees, and fixed assets due to land acquisition? 8. Will there be loss of business or enterprises due to land acquisition? 9. Will there be loss of income sources and means of livelihoods due to land acquisition? Yes No Not Known Attachment - 1 Remarks Civil works and rehabilitation shall be undertaken in school premises.. Land acquisition will only happen if there is an expansion of school premises. But so far, there is no proposal for expansion. This is not applicable to the project since there is no expansion of school premises. The school has already an entrance and will not be touched by the construction of fourteen (14) function rooms at the school premises. Not a house or residential land shall be affected given the wide space of school premises. All civil works shall be undertaken in school premises. Trees or crops of private persons shall not be affected. While there are some trees in school premises, it is unlikely that they shall be affected by the construction. Not a single business will be affected as all civil works and rehabilitation shall be done inside the school premises.. The Project will rather create livelihood or employment in the locality due to construction of school rooms. Involuntary Restrictions on land use or on access to legally designated parks and protected areas 10. Will people lose access to natural resources, communal facilities and services? 11. If land use is changed, will it have an adverse impact on social and economic activities? 12. Will access to land and resources owned by the communally or by the state be restricted? Information on Displaced Persons All civil works and rehabilitation shall be undertaken in school premises.. No current use of land will be changed and therefore there is no impact on the socio-economic activities of the people. Restriction to land resources of the community or by the state is unlikely. Any estimate of the likely number of persons that will be displaced by the Project? No Yes Not applicable If yes, approximately how many? Are any of the poor, female-headed households, or vulnerable to poverty risks? No Yes Not applicable Are any displaced persons from indigenous or ethnic minority groups? No Yes Not applicable

Indigenous Peoples Impact Screening Checklist Project: Second Upper Secondary Education Development Project (USEDP II) Subproject: Quyet Tien Upper Secondary School Province: Ha Giang District: Quan Ba (Quyet Tien commune) CATEGORY: C KEY CONCERNS (Please provide elaborations on the Remarks column) A. Indigenous Peoples Identification 1. Are there socio-cultural group present in or use the project areas who may be considered as tribes (hill tribes, schedules tribes, tribal peoples), minorities (ethnic or national minorities) or indigenous communities in the project area? 2. Are there national or local laws or policies as well as anthropological researches/studies that consider these groups present in or using the project area as belonging to ethnic minorities, scheduled tribes, tribal peoples, national minorities, or cultural communities? 3. Do such groups self-identity as taking part of a distinct social and cultural group? 4. Do such groups maintain collective attachments to distinct habitats or ancestral territories and/or to the natural resources in these habitats and territories? 5. Do such groups maintain cultural, economic, social, and political institutions distinct from the dominant society and culture? 6. Do such groups speak a distinct language or dialect? 7. Has such groups been historically, socially and economically marginalized, disempowered, excluded, and/or discriminated against? YES NO NOT KNOWN Remarks The land is allocated solely for the school. If there are ethnic minorities, they are among students of the school pursuing their upper secondary education. Some students are children of ethnic minorities in Vietnam who are recognized by the Government. Their rights are embodied in the 2013 Constitution. They belong to the 54 different ethnic minorities in the country. The land being used by the school is exclusively for education purposes where the ethnic minorities has no collective attachments. Such groups maintain cultural, economic, social, and political institutions distinct from the dominant society and culture. Ethnic minority students and ethnic minority teachers speak dialects distinct from the mainstream society. Such groups are socially and economically marginalized due to their geographic location. 8. Are such groups represented as Indigenous Peoples or as ethnic minorities or scheduled tribes or tribal populations in any formal decisionmaking bodies at the national or local levels? B. Identification of Potential Impacts 9. Will the project directly or indirectly benefit or target Indigenous Peoples? 10. Will the project directly or indirectly affect Indigenous Peoples traditional socio-cultural and belief practices? (e.g. child-rearing, health, education, arts, and governance? 11. Will the project affect the livelihood systems of Indigenous Peoples? (e.g. food production system, natural resource management, crafts and trade, employment status) 12. Are there socio-cultural group present in or use the project areas who may be considered as tribes (hill tribes, schedules tribes, tribal peoples), minorities (ethnic or national minorities) or indigenous communities in the project area? Outside of the school, such groups are represented as ethnic minorities in formal decision-making bodies at the national or local levels. The students from indigenous communities will directly benefit from the Project in terms of improved quality of education. The project shall only deliver quality education but will not impose changes in sociocultural practices of ethnic minorities. The construction of classrooms will be done in school premises. The sub-project area is inside the school premises.

KEY CONCERNS (Please provide elaborations on the remarks column) C. Identification of Special Requirements Will the project activities include: 13. Commercial development of the cultural resources and knowledge of Indigenous Peoples? 14. Physical displacements from traditional or customary lands? 15. Commercial development of natural resources (such as minerals, hydrocarbons, forest, water, hunting or fishing ground) within customary lands under use that would impact the livelihoods or the cultural ceremonial, spiritual uses that define the identity and community of Indigenous Peoples? 16. Establishing legal recognition of rights to lands and territories that are traditionally owned or customarily used, occupied or claimed by indigenous peoples? 17. Acquisition of lands that are traditionally owned or customarily used, occupied or claimed by indigenous peoples? YES NO NOT KNOWN Remarks There is no commercial development of cultural resources as the subproject involves the construction of classrooms. Physical displacement from traditional or customary lands will not happen in the sub-project area. The activities in the sub-project area will involve only the construction of three (3) function rooms at the school premises. The sub-project will only involve the construction of classrooms. There is no acquisition of lands. D. Anticipated Project Impacts on Indigenous Peoples Project component/ activity/output 18. Construction of fourteen (14) class-rooms in the school premises. It will follow the standard dimension as provided for in Decision 37/2008/QD-BGDDT (July 16, 2008). Anticipated positive effects The provisions of new classrooms will accommodate the increasing number of upper secondary education students. It will also facilitate in providing quality upper secondary education to them. Anticipated negative effects None