Zeltbahn tents and shelters



Similar documents
ERECTION INSTRUCTIONS FOR CAMPUS SEATTLE

How to erect a Kelty Grand Mesa 4 tent

BUILDING WITH STONE AND EARTH

LIFE SCIENCE. Hoop House Construction for New Mexico: 12-ft. x 40-ft. Hoop House BRINGING TO YOUR HOME ECONOMICS COLLEGE OF AGRICULTURE AND

Family tent, 16m 2. fact sheet. Planning the response. Background. Saving lives, changing minds.

AMAS Site Setup and Demining Worksite Safety

THE TRIMLINE 10' x 20' CANOPY

Assembly Instructions MDM Products Party Tent

Florida Building Code 2004 SECTION 1009 STAIRWAYS AND HANDRAILS

Chapter 10 - Scaffolding Systems

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

INSTRUCTIONS FOR CHAIN LINK INSTALLATION Chain Link fence & Posts Meshdirect.co.uk

Living in a Tipi. Slave Indian teepees Credit: J. Russell/NWT Archives ArAAArchives. Mîhbàa yìì nàts edè

10 ft x 20 ft / 3 m x 6 m STEEL FRAME CAR CANOPY

Assembly Instructions 14 x 14 Party Canopy. ASSEMBLY INSTRUCTIONS PARTY CANOPY 14x14x9. Congratulations! ASSEMBLY PROCEDURE

How to Install UnderDeck The Original.

You will need Guinevere knot pattern

Standard Operating Procedures 4ft Muscle Wall

Lesson 6: Measuring Trees

Chapter 11 Snow Shelters

Residential Foundations and Basements

Laying the First Course. 1. Excavate the site and construct the footing.

Pole Lathe and Shave Horse Design

Removable Aluminium posts

Standard Operating Procedures 4ft Muscle Wall

BUILD A CARPORT. 2 - Planning the carport. 3 - Designing the carport

Siting and settlement: The most important way to protect shelter from floods is to build in a place that is unlikely to be flooded.

EXCAVATOR SAFETY TRAINING

3D Drawing. Single Point Perspective with Diminishing Spaces

Cedar Cottage Doghouse Plans

POST AND FRAME STRUCTURES (Pole Barns)

Pythagoras Theorem. Page I can identify and label right-angled triangles explain Pythagoras Theorem calculate the hypotenuse

Tessellating with Regular Polygons

Clad Direct Glaze Window Installation Instructions

Residential Roofing Guide

Inductive Reasoning Free Sample Test 1

Base Cabinet with Self-storing Folding Doors and Floor

KITCHENS. Tip PAGE 1 FITTING YOUR KITCHEN GUIDE. How to mark out a kitchen. Tools required for installing a kitchen STEP ONE STEP TWO STEP THREE

Perspective and Space

Tested to BS 6375: Part 1: 1989 and achieved a weathertightness classification of 2000 Pa (Special)

Barewood Octagon and Elongated Windows Installation Instructions

Lightweight, Heavy Duty

Simple Machines. What are simple machines?

VOLUME AND SURFACE AREAS OF SOLIDS

EXTREME COLD WEATHER TENT NSN: INSTRUCTION MANUAL/ MISSION LOG Produced by Eureka!

CHAPTER 4 CHAPPER HOUSE

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.

SolidWorks Tutorial 4 CANDLESTICK

Re-board Accessories

16 Stitches Style Guide

8' W x 8' H or 10' H Peak Style Shelter Assembly Instructions

All seam allowances are 1/2 unless otherwise noted. All pattern pieces include the seam allowance. Please read all instructions before beginning.

Chapter 6 ROOF-CEILING SYSTEMS

Ceiling Mounted Folding Attic Ladders Installation Instructions

10 x 10 FAST SHADE POP UP CANOPY 1 PC. PRODUCT MANUAL

Dish Installation Page

Sun Windows General Information Sun New Construction Window Installation Instructions

Experiment 3: Magnetic Fields of a Bar Magnet and Helmholtz Coil

INSTALLATION OF A BAY WINDOW

DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H

Herringbone Pattern Flooring

Accelerometers: Theory and Operation

Experiment 3: Magnetic Fields of a Bar Magnet and Helmholtz Coil

EMERGENCY SHELTER HAITI

SAMPLE INSTRUCTIONS. Best Barns USA Assembly Book. the Denver. 12'x 12' or 12'x16' Revised November 29, 2010

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

DE Frame with C Series Sidelight

Mounting Tripod Kit Installation Manual

Shingle Installation Guide

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

Planning and Building Hay Barns that Work

Geometry Unit 6 Areas and Perimeters

If you put the same book on a tilted surface the normal force will be less. The magnitude of the normal force will equal: N = W cos θ

THE VIKINGS. bbc.co.uk/handsonhistory

AB Courtyard Collection

4 5/16 Subframe Installation

Network Rail. Presentation to Tower Crane Interest Group Open Meeting. Bob Watts, Outside Parties Manager Network Rail (High Speed) 21 March 2013

Wall braces with a swivel head are included to accommodate all roof pitches.

Mini Wire Jewelry Tutorials for Beginners Created by XQ Designs

Cosmetics Case with Vinyl Interior Skill Level: Intermediate

Corrugated Packaging 101

Plans will call for one of two soffit/fascia details:

SUPER SHED. Indoor shelter for your outdoor tools.

Create a Camera Obscura

Portable Ladder Safety

Dell P Series Monitor VESA Mounting Bracket Installation Instructions

An introduction to selling blinds

XPULT INSTRUCTIONS BASIC VERSION

Guidance on Householder permitted development rights

14 th Kildare Scouts Section

BUILDING CONTROL GUIDANCE SHEET USE OF BREATHABLE ROOFING FELTS.

DIY CABINET REFACING INSTALLATION GUIDE

Fire is the rapid oxidation of a combustible material, releasing heat, light, smoke, and various toxic gases

3D Drawing. Single Point Perspective with Diminishing Spaces

Making a Rain Barrel at Home

GENERAL RUBBER LINING PRINCIPLES

Kings of War (2015) - Official Errata

RESPONSIBILITIES IN MOBILE CRANE OPERATIONS CONSTRUCTION SAFETY ASSOCIATION OF ONTARIO

Transcription:

Zeltbahn tents and shelters Zeltbahn shelter A single Zeltbahn could be used to provide protection against wind and rain by arranging the shelter quarter at an angle with the tip attached to a tree, post or similar object at breast height and the lower edge pegged to the ground. The same method could be used against walls, slopes, trenches, etc., with the wide edge at the top, if necessary. The top could be attached using a guy rope, hook or something similar. Tent half Two Zeltbahnen buttoned together on a long side could be used to provide cover against wind and weather from behind and the side for 2 or 3 men. The tent half could be supported by a tent pole (made of 4 pole sections) and a guy rope. It could also be attached to a tree, wall, etc., as described above.

Shelters and tents as described above could be erected very quickly and used when there were not enough shelter quarters available to make a complete tent or when special circumstances, such the vicinity of the enemy, required a high level of readiness or to hide small outposts from view in suitable terrain. Typical examples of this were for positions such as sentry and observation posts, machine gun crews and weapons pits, signals troops, command posts, etc. Four-man tent This is the basic enclosed tent that nominally offered space for at least four men. To build the tent, four shelter quarters were buttoned together leaving one side open. This tent skin was then laid out in the shape of a square and pegged at the two corners of one side. The tent was then lifted from below with a pole made of four sections and the other two corners were pegged. The unbuttoned side served as the entrance. A canopy could be made by undoing the buttons on both sides of one section and supporting it with two poles, each made of four sections, and securing it with two guy ropes. The sides were also pegged at the bottom using rope loops attached to the middle eyes.

Eight-man tent These were made of eight quarter sections and nominally offered space for at least eight men. The long sides of the tent were each made of three sections in such a way that the centre section was buttoned together with the others with its tip at the bottom. The ends of the tent were made of single sections buttoned to the sides. The finished skin was then stretched out until the outside edges of the long sides were parallel. The two corners of one long side were then pegged to the ground. One four-section tent pole was then used to support the tent at one end. The roof of the tent was then formed by buttoning the two side together at the top. The other four-section tent pole was then fitted at the opposite end and the rest of the tent pegged into place. One section remained open to form the entrance. A canopy could be formed by undoing the buttons of s side section and supporting it with a pole and guy rope. In this case, the two adjacent sections could be folded back to provide a wider opening.

Extended eight-man tent An eight-man tent could be extended by adding tent sections to the long sides. This always required four additional sections, with two added to each side. House tent A large and spacious tent could be erected for special purposes using 16 tent sections. It covered some 25 square meters of ground, was approximately 2.8 meters high and nominally offered space for at least 16 men. It was particularly suitable as accommodation for staff units, improvised offices and dressing stations, or for storing food and ammunition, etc. Four side sections were initially made of three sections each, as described for the eight-man tent above. These four sides were then buttoned together leaving a centre section of one side only connected at the top, thus providing an entrance for the finished tent. This tent skin was then laid out and stretched into a square on the ground and pegged into place at the corners and along the sides. The inner corners were then raised and each supported by four-section tent poles. A four-man tent, as described above, was then buttoned onto this base and supported in the middle by an improvised pole measuring some 3 meters in length. The section left open as an entrance could be supported by a pole and the adjacent sections folded back to provide a wider opening, in the same way as for an eight-man tent.

Tent construction Tents were meant to be erected in such a way that they offered the smallest possible surface of attack for the wind. The tent sections were to be buttoned together on the ground to form the skin before the tent was erected. The edges were to be buttoned in such a way that the overlap pointed away from the wind to prevent rain and snow from being blown between the edges of the tent sections. All sections with the tip at the bottom (eight-man and house tents) had to be arranged to overlap. Regulations recommended that a stone or piece of wood be placed under poles to prevent them from sinking into soft ground. Improvised pegs or poles were to be used if there were not enough. The slit at the centre of a tent section could be held open using a suitable stick for observation or ventilation purposes. A small trench could be dug around the edge of the tent to help rain water drain away. The spoil from the trench could be used to cover the edge of the tent on the ground to make the tent as wind and waterproof as possible.