TANKER - SHORE SAFETY CHECK-LIST



Similar documents
The Ship/Shore Safety Check-List

25.4 The Bunkering Safety Check-List

PRECAUTIONS ON TANKER AND TERMINAL DURING CARGO HANDLING

ANNEX 17 DRAFT AMENDMENTS TO SOLAS REGULATIONS II-2/4 AND II-2/16. Part B Prevention of fire and explosion

Ship to Ship Transfer Training (3 days)

Port information and safety regulations for oil terminals in the Port of Aarhus. Revised

MISSISSAUGA MARINE TERMINAL

OVERSEAS MARINE CERTIFICATION SERVICES (OMCS)

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal

VESSEL SAFETY INSPECTION

A Job Safety Execution Plan is required. mixtures of the above called, natural gas liquids (NGL's) refined products and their components

COMPRESSED GASES. 1.2 The contents of each cylinder and container must be clearly identified (by tag or stamp) on the cylinder.

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600

Western Plant Health Association DOT MC 330 & 331 NH3 Cargo Tank Inspection Checklist Form

Building an LNG driven vessel. LNG developments at Meyer Werft Viking Grace 18_09_2013

OPERATIONS & MAINTENANCE (O&M) FOR PROPANE STORAGE FACILITIES

WHAT YOU DON T KNOW ABOUT ACCUMULATORS CAN KILL YOU!

Good practice steel coils. Cargo stowage. It s your ship and equipment look after them and they will look after you GOOD PRACTICE

Tanker Officer Training Standards (TOTS) 4B Chemical Tanker Simulator Verification Course

Element D Services Plumbing

How to prevent tanker cargo shortage claims

EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL. EudraLex The Rules Governing Medicinal Products in the European Union.

LIQUEFIED PETROLEUM GASES

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR THE CONTROL OF HAZARDOUS ENERGY (LOCKOUT / TAGOUT) SECTION: 2400

LNG Fuel Gas Infrastructure from terminal to onboard system The Motorship Gas-fuelled Ships 12 to 14-Sep-2012, Bergen

Fire Pump Plan Review March 2010

Recharge Procedure for Telemark TVP-2000 and TVP-3500

Survey Guidelines for MARPOL Annex I under the Harmonized System of Survey and Certification (HSSC), 2011

FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST

Course Title: Safety Issues in Electronics Engineering Technology Number of Credits: 3 B.A. B.S. B.A.S A.A. A.S. Degree Type

ANNEX 3. RESOLUTION MSC.339(91) (adopted on 30 November 2012) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE)

SCBA Frequently Asked Questions

M-20.2 SOLAS II-2. The latest IMO Briefing (IMO 29,2000) offered the following description of the 73rd Meeting of the Maritime Safety Committee:

Liquefied Petroleum Gas Volume 1 : Large Bulk Pressure Storage & Refrigerated LPG

To: All Shipowners, Ship Managers, Ship Masters and Classification Societies

5 OIL TANKER DESIGN AND EQUIPMENT

Druck PV 62x pneumatic/hydraulic pressure stations

1.0 Purpose Definitions Hot Work Operations. 5

GAS FLAWLESS - FORM C

Important Ontario Fire Code Information for Building Owners in the City of Windsor

LNG Storage and Fuel Gas Systems. LNG: Fuel for Shipping, London 15-Feb Carriers & Offshore Units. Jürgen Harperscheidt Sales Manager

GUIDANCE FOR DEVELOPMENT OF SPILL AND SLUG PREVENTION CONTROL PLANS AND FACILITIES FOR THE CITY OF ATTLEBORO SEWER USERS

Bunkers Regulatory and Practical Considerations. Piraeus, 8 November 2012 Capt. Simon Rapley

Labour and Workforce Development. Confined Space Entry

PBX Series Quick Fit Connector Bimetallic Steam Traps

OREGON FIRE CODE Interpretations and Technical Advisories

Compressed Gas Cylinder Program


DRY CLEANING PLANTS REQUIREMENTS FOR INSTALLATION AND OPERATION

NITROUS TRANSFER PUMP INSTRUCTIONS

CARING FOR YOUR WATER HEATER

How To Prevent Over Water Activities

Oil and Coolant Circulating Heating System. Model - OCSM

Boiler Preparation, Start-Up and Shutdown

Guidance for Those Who Use and Store Gas Cylinders

UDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES

Syllabus. for. Dangerous Goods Safety Adviser. Examinations

ENVIRONMENTAL HEALTH AND SAFETY. Fire Protection System Impairment Procedure

Air Conditioner Water Heater - A Product of HotSpot Energy LLC

Work Permits. A Health and Safety Guideline for Your Workplace. When is a Work Permit Needed? What is a Work Permit? Why use a Work Permit?

LNG BUNKERING LNG AS A SHIP S FUEL GREEN SHIP TECHNOLOGY, OSLO 23-MAR Carriers & Offshore Units. Jürgen Harperscheidt Sales Manager

Rules for Classification and Construction Additional Rules and Guidelines 3 Machinery Installations

Guide for the prevention of shipsourced pollution and for the safe transfer of bunkers in Queensland waters

WORKING IN CONFINED SPACES GUIDELINES

National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook

Standard Hydraulic Piping Flushing Procedure

Liberty Mutual Insurance RISK ENGINEERING PROCEDURE. REP 07 Incident Planning For external use

Inspections Standard Operating Procedure 5 Aboveground Storage Tanks

Control of Hazardous Energy (Lockout / Tagout)

Electronic Flow Switches

STATUTORY INSTRUMENT. No. of Merchant Shipping (Safe Ship Management Systems) Regulation ARRANGEMENT OF SECTIONS.

Safety and Health Office WORKPLACE SAFETY CHECKLIST

INTERNATIONAL STANDARD

FILLING AND PURGING THE SYSTEM

Occupational Health Program Safety Training Series. Lockout/Tagout Safety Awareness Training

Introduction to the CD ROM Edition of ISGOTT

PANAMA MARITIME AUTHORITY MERCHANT MARINE CIRCULAR MMC-281

Inspection Location Standards

Fire Protection Systems, Appliances and Compressed Gas Cylinders Periodic Maintenance, Inspection and Testing

SAFETY AND HEALTH PROGRAM

Safety of Life at Sea, 1974 (SOLAS)

PORT REGULATIONS EMERGENCY PROCEDURES PORT WASTE MANAGEMENT

(2) Various fire sections enclosed by various classes of fire divisions; (3) Arrangement of fire detectors and manual fire alarm stations;

FLAMMABLE LIQUIDS COMPLIANCE NOTE

ST. VINCENT AND THE GRENADINES

The following definitions apply with regard to requirements specified in this document:

Pressure Vessels (Air Compressors) and LPG Tanks

Fire & Explosion Risks in Service Stations

Example Confined Space Entry Programs

UNIVERSITY OF WISCONSIN MADISON

ACCUMULATOR INSTALLATION

FIRE SAFETY GUIDANCE NOTE Risk Assessments for Petrol Filling Stations Required Under Fire Safety Legislation

MTBE / ETBE Transport over inland waterways

Recommended Product Specifications Fuel Day Tank System Tramont UTRS Fuel Day Tank

Refrigerant Charging Unit ICOGD. 020AH1000 Operating Manual. FR İ-COLD Rev. 00

Methane in Air % to 2.5%

Competency Framework for Marine Engineer Class 6. Competency Framework for Marine Engineer Class 6

Marine pollution prevention pocket checklist Revision 3

Certification of seafarers

Transcription:

TANKE - SHOE SAFETY CHECK-LIST Part A - Bulk Liquid General - Physical Checks Bulk Liquid - General Tanker Terminal Code emarks 1 There is safe access between the tanker and shore. L1 The fendering arrangements are assessed as being satisfactory. The fender pennants are in order. 2 The tanker is securely moored, considering the conditions locally. 3 The agreed ship/shore communication system is operative. A 4 Emergency towing-off pennants are correctly rigged and positioned, if required by terminal. 5 The tanker's fire hoses and fire-fighting equipment are positioned and ready for immediate use. 6 The terminal's fire-fighting equipment is positioned and ready for immediate use. 7 The tanker's cargo hoses and/or the terminal arms or hoses, pipelines and manifolds are in good condition, properly rigged and appropriate for the service intended. 7.1 All reducers are approved and compatible with cargo lines and the type of cargo. 7.2 All connection flanges are fitted with the appropriate gaskets. 7.3 All flange bolts are properly tightened. 7.4 The loading arms are free to move in all directions and/or the hoses have enough room for easy movement. 7.5 All valves are checked and in the right position. 7.6 Adequate lighting is ensured at the cargo transfer area and emergency escape route. 8 This line has been intentionally left blank. 9 The cargo transfer system is sufficiently isolated and drained to allow safe removal of blank flanges prior to connection. 10 Scuppers and save-alls on board are effectively plugged and drip trays are in position and empty. Edition 1-2010 CCN/OCIMF 2010 Page 1

Part A - Bulk Liquid General - Physical Checks Bulk Liquid - General Tanker Terminal Code emarks 11 Scupper plugs temporarily removed will be monitored constantly. 12 Shore spill containment and sumps are correctly managed. 13 14 15 16 17.1 The tanker's unused cargo, bunker and vapour return connections are properly secured. All connected flanges are fitted with the appropriate gaskets. The terminal's unused cargo, bunker and vapour return connections are properly secured. All connected flanges are fitted with the appropriate gaskets. All sighting, ullaging and sampling ports of the cargo, ballast or bunker tanks have been closed or protected by flame arrestors in good condition, if required. Sea and overboard discharge valves, when not in use, are closed and visibly secured. The removable parts between ballast and overboard discharge lines and cargo lines are removed. All external doors, ports and windows in the accommodation, stores and machinery spaces are closed. Engine room vents may be open. 17.2 The LPG domestic installation is isolated at the main stop valve. 18 The tanker's emergency fire control plans are available. Location: If the tanker is fitted, or is required to be fitted, with an inert gas system (IGS), the following points should be physically checked: Inert Gas System Tanker Terminal Code emarks 19 IGS pressure and oxygen contents measuring equipment are in good working order. 20 All cargo tank atmospheres are at positive pressure with oxygen content of 8% or less by volume. P 20L All inerted tanks are marked or labelled with a warning sign. Edition 1-2010 CCN/OCIMF 2010 Page 2

Part BA - Bulk Liquid General - Verbal Verification Bulk Liquid General Tanker Terminal Code emarks 21 22 22L The tanker is ready to move under its own power. A dumb barge without own propulsion means should be able to move with the help of a designated tug at short notice. There is an effective deck watch in attendance on board and adequate supervision of operations on the tanker and ashore. On the tanker and the shore, a competent person is appointed who is responsible for the planned cargo handling. P 23 There are sufficient personnel on board and ashore to deal with an emergency. 24.1 The procedures for cargo, bunker and ballast handling have been agreed. A 24.2 24.3 25 26 The outlet pressure of the cargo pump of the tanker is regulated to take account of the admissible working pressure of the equipment of the terminal The outlet pressure of the shore's cargo pump is regulated to take account of the admissible working pressure of the equipment on the tanker. The emergency signal and shutdown procedure to be used by the tanker and shore have been explained and understood. Material Safety Data Sheets (MSDS), or equivalent, for the cargo transfer have been exchanged where requested. A A A P 26L The tanker is approved to transport the product to be loaded. 27 The hazards associated with toxic substances in the cargo being handled have been identified and understood. H 2 S content: Benzene content: 28 An International Shore Fire Connection has been provided, if required by legislation. 29 The agreed tank venting system will be used. A Method: 30.1 The requirements for closed operations have been agreed. 30.2 The tanker s vapour return connection, if required, is connected, by means of a vapour return line, to the vapour return connection to the shore. Edition 1-2010 CCN/OCIMF 2010 Page 3

Part BA - Bulk Liquid General - Verbal Verification Bulk Liquid General Tanker Terminal Code emarks 30.3 31 If protection against explosions is required, the vapour return line is equipped with a flame arrestor and/or detonation protection. The operation of the P/V system has been verified. The delivering tanker or shore guarantees that the pumping rate does not exceed the maximum working pressure agreed. Agreed max pumping rate:... (m 3 /h) Agreed max pressure:... (kpa) 32 Where a vapour return line is connected, operating parameters have been agreed. A 33 34 35 Independent high level alarms and/or emergency stops, if fitted, are operational and have been tested. Adequate electrical insulating means are in place in the tanker/shore cargo and, if applicable vapour return line connections. The insulating means is installed either aboard or ashore:... (state where). Shore lines are fitted with a non-return valve, or procedures to avoid back filling have been discussed. A A P 36 Smoking requirements are being observed and have been agreed. A 37 Naked light regulations are being observed and have been agreed. A 38 Portable electronic (e.g. communication) devices requirements are observed. A 39 Hand torches (flashlights) are of an approved type. 40 Fixed VHF/UHF transceivers and AIS equipment are on the correct power mode or switched off. 41 Portable VHF/UHF transceivers are of an approved type. 42 The tanker's main radio transmitter aerials are earthed and radars are disconnected / switched off. Edition 1-2010 CCN/OCIMF 2010 Page 4

Part BA - Bulk Liquid General - Verbal Verification Bulk Liquid General Tanker Terminal Code emarks 43 Electric cables to portable electrical equipment within the hazardous area are disconnected from power. 44 Window type air conditioning units are disconnected, if applicable. 45 Positive pressure is maintained inside the accommodation and/or wheelhouse, if applicable. 46 Measures have been taken to ensure sufficient mechanical ventilation in the pumproom, if applicable. 47 There is provision for an emergency escape. The weather conditions, maximum wind and swell criteria for operations have been agreed. Stop cargo operations at:... 48 Disconnect at:... Unmoor at:... A 49 50 Security protocols have been agreed between the Ship Security Officer and the Port Facility Security Officer, if appropriate. Where appropriate, procedures have been agreed for receiving nitrogen supplied from shore, either for inerting or purging cargo tanks, or for line clearing into the tanker. A A P Edition 1-2010 CCN/OCIMF 2010 Page 5

If the tanker is fitted, or is required to be fitted, with an inert gas system (IGS), the following statements should be addressed: Inert Gas System Tanker Terminal Code emarks 51 The IGS is fully operational and in good working order. P 52 Deck seals, or equivalent, are in good working order. 53 Liquid levels in pressure/vacuum breakers are correct, if applicable. 54 The fixed and portable oxygen analysers have been calibrated and are working properly. 55 All the individual tank IG valves (if fitted) are correctly set and locked. 56 All personnel in charge of cargo operations are aware that, in the event of failure of the inert gas plant, discharge operations should cease and the terminal be advised. If the tanker is fitted with a Crude Oil Washing (COW) system, and intends to crude oil wash, the following statements should be addressed: Crude Oil Washing Tanker Terminal Code emarks 57 N/A 58 N/A If the tanker is planning to tank clean alongside, the following statements should be addressed: Tank Cleaning Tanker Terminal Code emarks 59 Tank cleaning operations are planned during the tanker's stay alongside the shore installation. Yes/No* Yes/No* 60 lf 'yes', the procedures and approvals for tank cleaning have been agreed. 61 Permission has been granted for gas freeing operations by the competent authority. Yes/No* Yes/No* *Delete Yes or No as appropriate Edition 1-2010 CCN/OCIMF 2010 Page 6

Part 'C' Bulk Chemicals - Verbal Verification Bulk Liquid Chemicals Tanker Terminal Code emarks 1 Material Safety Data Sheets, or equivalent, are available giving the necessary data for the safe handling of the cargo. 2 A manufacturer's inhibition certificate, where applicable, has been provided. P 3 Sufficient protective clothing and equipment (including self-contained breathing apparatus) is ready for immediate use and is suitable for the product being handled. 4 Countermeasures in the event of accidental personal contact with the cargo have been agreed. 5 The cargo handling rate is compatible with the automatic shutdown system, if in use. A 6 Cargo system gauges and alarms are correctly set and in good order. 7 Portable vapour detection instruments are readily available for the products being handled. 8 lnformation on fire-fighting equipment and procedures has been exchanged. 9 Transfer hoses and gaskets are of suitable material, resistant to the action of the products being handled. 10 Cargo handling is being performed with the permanent installed pipeline system. P 11 Where appropriate, procedures have been agreed for receiving nitrogen supplied from shore, either for inerting or purging cargo tanks, or for line clearing into the tanker. A P 12 If required, the cargo deck water spray system is ready for immediate use. Edition 1-2010 CCN/OCIMF 2010 Page 7

Part 'D' Bulk Liquefied Gases Verbal Verification Bulk Liquefied Gases Tanker Terminal Code emarks 1 Material Safety Data Sheets, or equivalent, are available giving the necessary data for the safe handling of the cargo. 2 A manufacturer's inhibition certificate, where applicable, has been provided. P 3 The cargo deck water spray system is ready for immediate use. 4 Sufficient protective clothing and equipment (including self-contained breathing apparatus) is ready for immediate use and is suitable for the products being handled. 5 Hold and inter-barrier spaces are properly inerted or filled with dry air, as required. 6 All remote control valves are in working order. 7 The required cargo pumps and compressors are in good order, and the maximum working pressures have been agreed between tanker and shore. A 8 e-liquefaction or boil-off control equipment is in good order. 9 The gas detection equipment has been properly set for the cargo, is calibrated, has been tested and inspected and is in good order. 10 Cargo system gauges and alarms are correctly set and in good order. 11 Emergency shutdown systems have been tested and are working properly. 12 Tanker and shore have informed each other of the closing rate of ESD valves, automatic valves or similar devices. A Ship: Shore: 13 lnformation has been exchanged between tanker and shore on the maximum/minimum temperatures/ pressures of the cargo to be handled. A 14 Cargo tanks are protected against inadvertent overfilling at all times while any cargo operations are in progress. 15 The compressor room is properly ventilated, the electrical motor room is properly pressurised and the alarm system is working. Edition 1-2010 CCN/OCIMF 2010 Page 8

Part 'D' Bulk Liquefied Gases Verbal Verification Bulk Liquefied Gases Tanker Terminal Code emarks 16 17 Cargo tank relief valves are set correctly and actual relief valve settings are clearly and visibly displayed. (ecord settings below.) The operating parameters (opening pressure) of the pressure valves (MAVS) of the tanker have been considered and agreed. 18 The (port) authorities have been notified prior to cargo handling, if required. P emarks Cargo Tank elief Valve Settings: Edition 1-2010 CCN/OCIMF 2010 Page 9

Edition 1-2010 CCN/OCIMF 2010 Page 10

for Inland Navigation Tank-barges and Terminals Tanker Shore Safety Check-List DECLAATION We, the undersigned, have checked the above items in Parts A and B and, where appropriate, Part C or D, in accordance with the instructions and have satisfied ourselves that the entries we have made are correct. We have also made arrangements to carry out repetitive checks as necessary and agreed that those items coded in the Checklist should be re-checked at intervals not exceeding. hours. If, to our knowledge, the status of any item changes, we will immediately inform the other party. For Inland tanker For Shore Name:... Name:... ank:... Position or Title:... Signature:... Signature:... Date:... Date:... Time:... Time:... ecord of repetitive checks: Date: Time: Initials for tanker: Initials for shore: Edition 1-2010 CCN/OCIMF 2010 Page 11

for Inland Navigation Tank-barges and Terminals Tanker Shore Safety Check-List Edition 1-2010 CCN/OCIMF 2010 Page 12