25.4 The Bunkering Safety Check-List



Similar documents
The Ship/Shore Safety Check-List

TANKER - SHORE SAFETY CHECK-LIST

PRECAUTIONS ON TANKER AND TERMINAL DURING CARGO HANDLING

Ship to Ship Transfer Training (3 days)

Port information and safety regulations for oil terminals in the Port of Aarhus. Revised

FUEL TRANSFERS OIL SPILL PREVENTION WORKSHOP. WAINWRIGHT 9 th July. Shell Exploration & Production Restricted

Good practice steel coils. Cargo stowage. It s your ship and equipment look after them and they will look after you GOOD PRACTICE

Bunkers Regulatory and Practical Considerations. Piraeus, 8 November 2012 Capt. Simon Rapley

MISSISSAUGA MARINE TERMINAL

Technical Bulletin. Oil Record Book entries: Machinery space operations (Part 1) Including January 2011 amendments to Technical Bulletin 24

ST. VINCENT AND THE GRENADINES

HUMAN ELEMENT CONSIDERATIONS

Regulation of 15 September 1992 No. 693 concerning the Form and Keeping of Log Books for Ships and Mobile Offshore Units

Guide for the prevention of shipsourced pollution and for the safe transfer of bunkers in Queensland waters

OVERSEAS MARINE CERTIFICATION SERVICES (OMCS)

VESSEL SAFETY INSPECTION

Building an LNG driven vessel. LNG developments at Meyer Werft Viking Grace 18_09_2013

Syllabus. for. Dangerous Goods Safety Adviser. Examinations

Declaration by the Management Representative (Quality Management System)

Final Sentence in a nocturnal Oil Spill Case

Tanker Officer Training Standards (TOTS) 4B Chemical Tanker Simulator Verification Course

REVISION TO THE PRE-ARRIVAL NOTIFICATION OF SECURITY (PANS) GUIDANCE FOR ESTABLISHING SECURITY MEASURES WHEN VESSELS CALL AT NON-ISPS COMPLIANT PORTS

Port Information and Safety Regulations

Certificate of insurance application form

MARINE FIRE SAFETY POCKET CHECKLIST

APPENDIX O. Spill Prevention and Emergency Response Plan. G3 Terminal Vancouver Port Metro Vancouver Project Permit Application APPENDIX O

IMO WORK PROGRAMME OF THE COMMITTEE AND SUBSIDIARY BODIES

Fire Safety Risk Assessment Checklist for Residential Care Premises

International Maritime Dangerous Goods (IMDG) Special Provision 961 and 962

PORT REGULATIONS EMERGENCY PROCEDURES PORT WASTE MANAGEMENT

GOFREP Master s Guide

Title: Fuel Transport - Tank Truck

Susceptibility of Your Drinking Water Source to Contamination

GENERAL TERMS AND CONDITIONS

SECTION 5. Action for Emergency Response

STORAGE TANK SELECTION AND SIZING (ENGINEERING DESIGN GUIDELINE)

Performance Condition When asked by a qualified assessor, On board ship or in an approved training program,

HAZARDOUS MATERIALS MANAGEMENT ISSUE 2

Good practice. Enclosed lifeboat launching. It s your ship and equipment look after them and they will look after you GOOD PRACTICE

terms and conditions of transport Tank-barge

STATUTORY INSTRUMENT. No. of Merchant Shipping (Safe Ship Management Systems) Regulation ARRANGEMENT OF SECTIONS.

Competency Framework for Marine Engineer Class 6. Competency Framework for Marine Engineer Class 6

Isle of Man Regulations implementing the STCW Manila Amendments

DRY CLEANING PLANTS REQUIREMENTS FOR INSTALLATION AND OPERATION

Independent Contractor Policy

Endofa LLC Terms & Conditions September 1, 2012

A.1 Obligations and reporting of the gaining Society. Plans to be Submitted by the Owner to the Gaining Society

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600

Port of Quintell Beach. First-strike Oil Spill Response Plan. A supplement to the Queensland Coastal Contingency Action Plan

TB-A A. O. SMITH - FVIR INTELLI-VENT TROUBLESHOOTING CHART # LED STATUS PROBLEM SOLUTION

APPLICATION FOR ADR ROAD VEHICLE APPROVAL CERTIFICATE

ANNEX 3. RESOLUTION MSC.339(91) (adopted on 30 November 2012) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE)

INFORMATION BULLETIN No. 145

Backup procedure. Notification Dangerous Goods Port of Rotterdam and Moerdijk. Vessel call. Contact. The Port Community System (PCS) is unavailable

REPUBLIC OF. Marine Notice THE MARSHALL ISLANDS No OFFICE OF THE MARITIME ADMINISTRATOR Rev. 8/06

GUIDELINES FOR THE DRAINAGE OF FIRE-FIGHTING WATER FROM CLOSED VEHICLE AND RO-RO SPACES AND SPECIAL CATEGORY SPACES OF PASSENGER AND CARGO SHIPS

Standards and Guidelines for Natural Gas Fuelled Ship Projects

PETROBRAS MARINE BUNKERING DEPARTMENT GENERAL TERMS AND CONDITIONS OF SALE AND DELIVERY OF MARINE FUELS (GTC)

Fire Risk Assessment Safety Checklist

LNG Fuel Gas Infrastructure from terminal to onboard system The Motorship Gas-fuelled Ships 12 to 14-Sep-2012, Bergen

Name Of Occupancy Date. Yes No Describe

Certification of seafarers

Liberty Mutual Insurance RISK ENGINEERING PROCEDURE. REP 07 Incident Planning For external use

Introduction to the CD ROM Edition of ISGOTT

A RISK ASSESSMENT METHODOLOGY AS A TOOL FOR SCREENING OF SHIP TO SHIP (STS) TRANSFER OPERATIONS.

Flammable and Combustible Liquids. Slide 1 (of 23)

Sampling Solutions. Fuel and Lube Oil sampling Equipment. Convenient, Representative, Approved.

FIRE SAFETY REGISTER. Premises Name: Premises Address: Fire Safety Manager: Contact No. Kerry County Fire Service

M-20.2 SOLAS II-2. The latest IMO Briefing (IMO 29,2000) offered the following description of the 73rd Meeting of the Maritime Safety Committee:

APPENDIX G Materials Storage and Handling Guidelines

WHAT YOU DON T KNOW ABOUT ACCUMULATORS CAN KILL YOU!

INTERNATIONAL STANDARD

Environmental Management System Procedures

Marine pollution prevention pocket checklist Revision 3

SCION FR-S PERFORMANCE AIR INTAKE Preparation 2.0L F-4

FREMANTLE PORTS. A Guide to Our Business

Loading Master Training 2015

TAMPA BAY WATER Supplying Water To The Region

ANNEX 17 DRAFT AMENDMENTS TO SOLAS REGULATIONS II-2/4 AND II-2/16. Part B Prevention of fire and explosion

ENGINE FUEL FUEL FILTER... FUEL HEATER... INJECTOR... SUPPLY PUMP... COMMON RAIL... FUEL PRESSURE LIMITTER...

Department of Environmental Health & Safety. Lock Out/Tag Out Program. Date Effective: November 2010

How To Prevent Over Water Activities

16715 CG-OES Policy Letter No

THE REPUBLIC OF LIBERIA LIBERIA MARITIME A

Terminal Information and Port Regulations BP Texas City Marine Terminal

UDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES

GUIDANCE ON VOLUNTARY SELF-ASSESSMENT BY ADMINISTRATIONS AND FOR SHIP SECURITY

Inspections Standard Operating Procedure 5 Aboveground Storage Tanks

Air Conditioner Water Heater - A Product of HotSpot Energy LLC

ACTIVITY NAME. Training Requirements for Spill Prevention Control and Countermeasures (SPCC) 40 CFR Part 112 Naval Air Station Corpus Christi Texas

PROPULSION AND AUXILIARY SYSTEMS FOR GAS FUELED SHIPS

BP WIND ENERGY POLICIES AND PROCEDURES

LNG BUNKERING LNG AS A SHIP S FUEL GREEN SHIP TECHNOLOGY, OSLO 23-MAR Carriers & Offshore Units. Jürgen Harperscheidt Sales Manager

Economic and Social Council

FIRE PREVENTION PLAN

Pressure Vessels (Air Compressors) and LPG Tanks

An inventory of hazardous materials used in your workplace will prove useful.

LNG Storage and Fuel Gas Systems. LNG: Fuel for Shipping, London 15-Feb Carriers & Offshore Units. Jürgen Harperscheidt Sales Manager

North Carolina State University Emergency Facilities Closure Checklist- Part I

6. GIVE FULL DETAILS OF TYPE OF WORK, OPERATIONS AND ATTACH BROCHURES IF APPLICABLE:

Transcription:

BUNKEING OPEATIONS 25.4 The Bunkering Safety Check-List 25.4.1 General esponsibility and accountability for the safe conduct of operations while a ship is receiving bunkers by barge is shared jointly between the Masters of the tanker and of the barge. The responsibility for the bunkering operation is usually delegated to designated esponsible Officers on the ship and on the barge. Before the bunkering operation commences, the esponsible Officers should: Agree in writing the handling procedures, including the maximum transfer rates. Agree in writing the action to be taken in the event of an emergency during transfer operations. Complete and sign the Bunkering Safety Check-List. The Bunkering Safety Check-List is based upon the Ship/Shore Safety Check-List (see Section 26.3) and the Pre-Transfer Bunkering Check-List contained in the IMO publication ecommendations on the Safe Transport of Dangerous Cargoes and elated Activities in Port Areas. The Check-List is primarily structured for loading bunkers from a barge, but it is also suitable for use when taking bunkers from a jetty or when loading bulk lubricating oil or gas oil from a road tanker. 25.4.2 Guidelines for Use The following guidelines have been produced to assist ship, barge and terminal operators in their joint use of the Bunkering Safety Check-List. The Bunkering Safety Check-List uses statements assigning responsibility and accountability. Ticking or initialling the appropriate box, and finally signing the declaration, confirms the acceptance of obligations. Once signed, it provides the minimum basis for safe operations as agreed through a mutual exchange of critical information. Some of the Check-List statements are directed to considerations for which the ship has sole responsibility and accountability, some for which the barge has sole responsibility and accountability and others which assign joint responsibility and accountability. Shaded boxes are used to identify statements that generally may be applicable to only one party, although the ship or barge may tick or initial such sections if they so wish. The assignment of responsibility and accountability does not mean that the other party is excluded from carrying out checks in order to confirm compliance. The assignment of responsibility and accountability ensures clear identification of the party responsible for initial and continued compliance throughout the transfer activity. The esponsible Officers completing the Check-List should be the people carrying out the bunkering operation. The tanker s esponsible Officer should personally check all considerations lying within the responsibility of the tanker. Similarly, the barge s esponsible Officer should personally check all considerations that are within the responsibility of the barge. In fulfilling their responsibilities, esponsible Officers should assure themselves that the 357

INTENATIONAL SAFETY GUIDE FO OIL TANKES AND TEMINALS standards of safety on both sides of the operation are fully acceptable. This can be achieved by means such as: Confirming that a competent person has satisfactorily completed the Check-List. Sighting appropriate records. By joint inspection, where deemed appropriate. For mutual safety, before the start of operations, and from time to time thereafter, a barge representative and a ship s officer should conduct inspections of the barge and the ship to ensure that their obligations, as accepted in the Check-List, are being effectively managed. The Bunkering Safety Check-List contains the following sections: 1. Bunkers to be Transferred A joint agreement on the quantity and grades of bunkers to be transferred, together with agreed transfer rates and the maximum line back pressures. 2. Bunker tanks to be Loaded An identification of the tanks to be loaded with the aim of ensuring that there is sufficient space to safely accommodate the bunkers to be transferred. Space is provided to record each tank s maximum filling capacity and the available volume. 3. Checks by Barge Prior to Berthing This section provides the checks to be carried out before the barge goes alongside the ship. 4. Checks Prior to Transfer This section provides the checks to be jointly undertaken before transfer activities commence. The numbers in brackets after each of the questions in Sections 3 and 4 relate to the guidance notes for completing the Ship/Shore Safety Check-List in Section 26.4, which should be referred to for additional information. The safety of operations requires that all relevant statements are considered and the associated responsibility and accountability for compliance accepted. Where either party is not prepared to accept an assigned accountability, a comment must be made in the emarks column and due consideration given to whether operations should proceed. Where an item is agreed not to be applicable to the ship, to the barge or to the operation envisaged, a note to that effect should be entered in the emarks column. The presence of the letters A or in the Code column indicates the following: A ( Agreement ). This indicates an agreement or procedure that should be identified in the Check-List or communicated in some other mutually acceptable form. ( e-check ). This indicates items to be re-checked at appropriate intervals, as agreed between both parties and stated in the declaration. The joint declaration should not be signed until all parties have checked and accepted their assigned responsibilities and accountabilities. 358

BUNKEING OPEATIONS 25.4.3 Bunkering Safety Check-List Port Ship Master Date Barge Master 1. Bunkers to be Transferred Grade Tonnes Volume at Loading Maximum Maximum Line Loading Temp Temperature Transfer ate Pressure Fuel Oil Gas Oil/Diesel Lub. Oil in Bulk 2. Bunker Tanks to be Loaded Tank No. Volume of Vol. of Oil in Total Available Volume to Grade Tank @ Tank before Volumes Volume be Loaded % Loading Grade 3. Checks by Barge Prior to Berthing Bunkering Ship Barge Code emarks 1. The barge has obtained the necessary permissions to go alongside receiving ship. 2. The fenders have been checked, are in good order and there is no possibility of metal to metal contact. 3. Adequate electrical insulating means are in place in the barge-to-ship connection. (34) 4. All bunker hoses are in good condition and are appropriate for the service intended. (7) 359

INTENATIONAL SAFETY GUIDE FO OIL TANKES AND TEMINALS 4. Checks Prior to Transfer Bunkering Ship Barge Code emarks 5. The barge is securely moored. (2) 6. There is a safe means of access between the ship and barge. (1) 7. Effective communications have been established between esponsible Officers. (3) A (VHF/UHF Ch...). Primary System: Backup System: Emergency Stop Signal: 8. There is an effective watch on board the barge and on the ship receiving bunkers. (22) 9. Fire hoses and fire-fighting equipment on board the barge and ship are ready for immediate use. (5) 10. All scuppers are effectively plugged. Temporarily removed scupper plugs will be monitored at all times. Drip trays are in position on decks around connections and bunker tank vents. (10) (11) 11. Initial line up has been checked and unused bunker connections are blanked and fully bolted. (13) 12. The transfer hose is properly rigged and fully bolted and secured to manifolds on ship and barge. (7) 13. Overboard valves connected to the cargo system, engine room bilges and bunker lines are closed and sealed. (16) 14. All cargo and bunker tank hatch lids are closed. (15) 15. Bunker tank contents will be monitored at regular intervals. A at intervals not exceeding. minutes 16. There is a supply of oil spill clean-up material readily available for immediate use. 17. The main radio transmitter aerials are earthed and radars are switched off. (42) 18. Fixed VHF/UHF transceivers and AIS equipment are on the correct power mode or switched off. (40) 19. Smoking rooms have been identified and smoking restrictions are being observed. (36) A Nominated Smoking ooms Tanker: Barge: 360

BUNKEING OPEATIONS Bunkering Ship Barge Code emarks 20. Naked light regulations are being observed. (37) 21. All external doors and ports in the accommodation are closed. (17) 22. Material Safety Data Sheets (MSDS) for the bunker transfer have been exchanged where requested. (26) 23. The hazards associated with toxic substances in the bunkers being handled have been identified and understood. (27) H 2 S Content... Benzene Content... 361

INTENATIONAL SAFETY GUIDE FO OIL TANKES AND TEMINALS DECLAATION We have checked, where appropriate jointly, the items of the Check-List in accordance with the instructions and have satisfied ourselves that the entries we have made are correct to the best of our knowledge. We have also made arrangements to carry out repetitive checks as necessary and agreed that those items coded in the Check-List should be re-checked at intervals not exceeding hours. If, to our knowledge, the status of any item changes, we will immediately inform the other party. For Ship For Barge Name ank Signature Date Time Name ank Signature Date Time ecord of repetitive checks: Date: Time: Initials for Ship: Initials for Barge: 362