SECTION III DIVISIONS 1 AND 2



Similar documents
SECTION III, DIVISIONS 1 AND 2

Supporting New Build and Nuclear Manufacturing in South Africa

SECTION III, DIVISIONS 1 AND 2

SECTION III DIVISIONS 1 AND 2

BODY OF KNOWLEDGE API-570 AUTHORIZED PIPING INSPECTOR CERTIFICATION EXAMINATION

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

Summary of Changes in. ASME Section IX, 2000 Addenda

Subsection A GENERAL REQUIREMENTS

Guide to understanding Welding Procedure Specification (WPS), Procedure Qualification Record (PQR), and Welder Performance Qualification Record (WPQR)

BODY OF KNOWLEDGE API-510 PRESSURE VESSEL INSPECTOR CERTIFICATION EXAMINATION

ASTM A860/A860M-09 Standard Specification for Wrought High Strength. Ferritic Steel Butt Welding Fittings. 1. Scope :- 2. Reference Documents :-

BODY OF KNOWLEDGE API-653 ABOVEGROUND STORAGE TANK INSPECTOR CERTIFICATION EXAMINATION November 2015, March 2016 and July 2016 (Replaces October 2013)

Wilfred C. LaRochelle Principal Nuclear Consultant HSB Global Standards, USA

TABLE OF CONTENT

STATEMENT OF WORK (SOW) On-Call Certified Welding Inspections and Nondestructive Testing

Review for S, A, PP, E, M, H (other than Cast Iron and/or Cast Aluminum), HLW, U, UM, U2, U3, RP, PRT and T Certificates

SUPPLIER QUALITY ASSURANCE REQUIREMENTS

PRESSURE EQUIPMENT SAFETY REGULATION

REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH. REGULATORY GUIDE 1.84 (Draft was issued as DG-1133, dated October 2006)

Section 1. The title of Section of Subchapter A of Chapter 100 of Title 1 of the Rules of the City of New York is amended to read as follows:

SPECIFICATION FOR PIPEWORK WELDING, INSPECTION, SUPPORTING AND TESTING

MS-3/2009 HDPE (High Density Polyethylene) Pipe and Fittings Specification for Buried Potable Water

NDT Procedure for Liquid Penetrant Inspection TRINITY NDT. An ISO 9001:2008 Certified Company

Quality Control System Manual For ASME CODE SECTION VIII (DIVISION I), - U VESSEL FABRICATION. <Your Address Line 1> <Your Address Line 2>

Ventilstandarder ett urval av standarder

Acceptance Codes APPENDIX - A. Acceptance Criteria

ASME B31.3 Process Piping. Scope of B31.3 Course

NORSOK STANDARD M-650 Edition 4. Qualification of manufacturers of special materials

GLOBAL ENGINEERING SPECIFICATION

INDEX. Sec. No. Items Page Nos.

Pressure Piping Construction Requirements

ENGINEERING SPECIFICATIONS FOR CO2 EXTINGUISHING AGENT PRE-ENGINEERED FIRE SUPPRESSION SYSTEMS

Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)

Caps STANDARD WEIGHT Inches / Pounds

ASME Section IX, 2007 Edition, 2009 Addenda. As published in the Welding Journal, October, Prepared by

1 RCNY CHAPTER 100

TABLE OF CONTENT

STANDARD SPECIFICATION FOR STORAGE TANKS

Welding of Boilers, Pressure Vessels and Pressure Piping

Design, Inspection, Testing and Repair of ASME-Coded Pressure Systems and Safety Relief Valves

SAFETY FENCES, SAFETY BARRIERS AND PEDESTRIAN GUARDRAILS

Testing & Consulting Engineering. NDT Industrial Environmental D.O.T, Construction & Mechanical.

Georgia Department of Transportation. Office of Materials and Research. Standard Operating Procedure (SOP) 19

Specification for Rotary Drill Stem Elements

SECTION HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION

DIVISION: PLUMBING SECTION: DOMESTIC WATER PIPING REPORT HOLDER: CURAFLO IP LLC 4035 E. OASIS STREET MESA, AZ 85215

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

TABLE OF CONTENT

James M. Pleasants Company

GAS DISTRIBUTION PRODUCTS STEEL SERVICE TEES

JIS G3472 Electric Resistance Welded Carbon Steel Tubes for Automobile Structural Purposes

ASME/ANSI B Cast Iron Pipe Flanges and Flanged Fittings ASME/ANSI B Malleable Iron Threaded Fittings ASME/ANSI B16.

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta

ADVANCED NDT TECHNIQUES FOR PLASTIC PIPELINE INSPECTION

Premium Tubular Solutions Super Duplex Welded Tubes for Umbilical Applications

Address for Correspondence

TUBE-TO-TUBESHEET JOINTS: THE MANY CHOICES ABSTRACT KEYWORDS. Seal welding, tube-to-tubesheet welds, heat exchanger, mock-up, tube expansion

PLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations.

HAMMER UNIONS HAMMER UNIONS. Figure 100 TxT Figure 200 & 206 TxT Figure 602 TxT. Figure 1002 TxT Figure 1002 BW Figure 1502 TxT Figure 1502 BW

American Petroleum Institute Purchasing Guidelines Purchase API Spec 5CT online at

Seamless stainless tubes for hydraulic and instrumentation systems

BIS Metal Pipe Clamps with Lining

Understanding the Indian Boiler Regulations (1950)

JIS G3445 Carbon steel tubes for machine structural purposes

WELL TEST SYSTEMS GUIDE FOR. MARCH 2010 (Updated August 2013 see next page)

Annex of the Certificate (Page 1/4) Scope of Accreditation

PART QW WELDING ARTICLE I WELDING GENERAL REQUIREMENTS

SECTION WINDOW WASHING SYSTEMS

SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)

POLYURETHANE LINING AND COATING ON PIPE RAW WATER

PLEASE NOTE. For more information concerning the history of this Act, please see the Table of Public Acts.

Application for Approved (Overseas/Local) Third Party Inspection Agency for Lifting Equipment

DESCRIPTION. Stud Bolts for Pressure-Temperature Piping 2-1. General Purpose End-to-End Studs 2-2. Tap End Stud Bolts 2-3. Double End Stud Bolts 2-4

Copper and Copper Alloy Tube, Pipe and Fittings

Standard Pneumatic Test Procedure Requirements for Piping Systems

A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents.

National Board of Boiler and Pressure Vessel Inspectors Application for the Inservice or Owner-User Commission

1.2 For piping systems that operate at hoop stress of 20% or more of the Specified Minimum Yield Strength the following shall apply.

Technical Report Example (1) Chartered (CEng) Membership

Pressure Vessel acc. to PED for Chemical Industry fabricated in China

Application of Welding Standards in Hong Kong. S. K. Babu Laboratory Manager - Foundation Techniques Ltd

Pee Dee Empty Oil Storage Tank at

V47 Series Temperature Actuated Modulating Water Valves

Pressure Control Supplier Quality Requirements Nondestructive Testing Services SQ-10 Rev: 1.1

NRMCA Quality Certification. Ready Mixed Concrete Quality Management System. Certification Criteria Document

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE

North American Stainless

SPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE

EA-04/15. Accreditation. For Non-Destructive. Testing. Publication. Reference. EA - 4/15 Accreditation for Non-Destructive Testing PURPOSE

Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer

PLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations.

SOLDERING PROCEDURE SPECIFICATIONS PROCEDURE QUALIFICATION RECORDS. and SOLDERER PERFORMANCE QUALIFICATION RECORDS

Jim Harris Continuous Improvement Leader

VALVES FOR REFRIGERATING SYSTEMS

Transcription:

SECTION III DIVISIONS 1 AND 2 Subject Interpretation File No. Division 1, NB-3222.4 and Code Case N-792-1... III-1-13-37 13-1824 Division 1, NB-3226, Testing Limits... III-1-13-33 13-894 Division 1, NB-3649 and NB-3681(d) (2010 Edition With the 2011 Addenda)..... III-1-13-35 13-1235 Division 1, NB/NC/ND/NE/NF/NG-2431.1(b)... III-1-13-28 13-773 Division 1, NB/NC/ND/NE/NF/NG/NH-5521, NDE Personnel Certification... III-1-13-38 13-1391 Division 1, NC/ND-3600, Allowable Limits for Hydrostatic Test... III-1-13-32 13-444 Division 1, NCA-3530 (1992 Edition Through the 2013 Edition)... III-1-13-34 13-1238 Division 1, NCA-3862.1.... III-1-13-29 12-896 Division 1, NCA-3862.1... III-1-13-31 13-291 Division 1, NF-2120. III-1-13-30 12-732 Division 1, Subsection NC (2010 Edition With the 2011 Addenda) III-1-13-36 13-1823 Division 2, CC-2131.3.1, Laboratory Accreditation; CC-2131.4, Personnel Qualification; CC-5211, Laboratory Qualification; CC-5132, Personnel Qualification; and Appendices V and VII (1998 Edition Through the 2010 Edition).III-2-13-06 13-1237 Division 2, CC-2612.1.1(b).....III-2-13-04 13-773 Division 2, Table CC-5200-1 and CC-5232.3.2, Evaluation and Acceptance....III-2-13-05 13-1326

Interpretation: III-1-13-28 Subject: Division 1, NB/NC/ND/NE/NF/NG-2431.1(b) Date Issued: July 9, 2013 File: 13-773 Question: Does the requirement that base material conform with the requirements of QW-403.1 of Section IX or QW-403.4 of Section IX, as required by NB/NC/ND/NE/NF/NG-2431.1(b), CC-2612.1.1(b), and WB/WC- 2431.1(b), apply only to electroslag filler metals? NOTE: This interpretation also appears as III-2-13-04 in this document and as III-3-13-02 in Section III, Division 3. Interpretation: III-1-13-29 Subject: Division 1, NCA-3862.1 Date Issued: July 17, 2013 File: 12-896 Question: Is it the intent of NCA 3862.1(g) to allow a Certificate of Compliance to be provided in lieu of a Certified Material Test Report for 1 in. (25 mm) outside diameter and less tubes (except heat exchanger tubes), tube fittings, and materials for valves with tube end connections? Interpretation: III-1-13-30 Subject: Division 1, NF-2120 File: 12-732 Question (1): Is it the intent of NF-2120 to allow the use of nuts suitable for the mating bolt as stated in the bolting specification in applications covered by Subsection NF? Question (2): Is it the intent of NF-2120 to allow the use of SA-194 and SA-563 nuts with compatible bolts in applications covered by Subsection NF?

Interpretation: III-1-13-31 Subject: Division 1, NCA-3862.1 File: 13-291 Question: Is it the intent of NCA 3862.1 that the certification of heat analysis of welding material source material must be furnished as an identified attachment to the Certified Material Test Report when all the tests and chemical analyses required by the applicable welding material SFA Specification (NCA 1221.2/WA 1223) and specific welding material requirements of Section III, Division 1, NB/NC/ND/NE/NF/NG 2400; Division 1, NH 2121(g); Division 2, CC 2600; or Division 3, WB/WC 2400 are performed by the Material Organization or Certificate Holder issuing the Certified Material Test Report? Interpretation: III-1-13-32 Subject: Division 1, NC/ND-3600, Allowable Limits for Hydrostatic Test File: 13-444 Question: Does NC/ND-3600 provide allowable stress limits for piping systems for hydrostatic or pneumatic testing per NC/ND-6220 or NC/ND-6320? Interpretation: III-1-13-33 Subject: Division 1, NB-3226, Testing Limits File: 13-894 Question: Is the intent of NB-3226 to allow the tolerance of 6% for pressure testing without recalculation of resulting stresses for all Class 1 components?

Interpretation: III-1-13-34 Subject: Division 1, NCA-3530 (1992 Edition Through the 2013 Edition) File: 13-1238 Question: May an N Certificate Holder without an NPT certificate provide an N-2 Data Report Form for a replacement disc that has been hardfaced by the fusion welding process when it is to be incorporated into a valve originally stamped by the N Certificate Holder? Reply: Yes, provided the requirements of NCA-3530 are met. Interpretation: III-1-13-35 Subject: Division 1, NB-3649 and NB-3681(d) (2010 Edition With the 2011 Addenda) File: 13-1235 Question (1): For fittings not manufactured in accordance with the standards listed in NCA-7100-1, in accordance with NB-3649, may a burst test in compliance with ASME B16.9, with a minimum test pressure equal to that defined in NB-3649, be used to show compliance with the pressure design requirements of NB-3640? Question (2): For fittings not manufactured in accordance with the standards listed in NCA-7100-1, in accordance with NB-3681(d), may experimental analysis in accordance with Appendix II or theoretical analysis be used to develop stress indices and flexibility factors for use in the piping stress equations in NB-3650, provided the test data or theoretical analysis is included in the Design Report? Question (3): For fittings not manufactured in accordance with the standards listed in NCA-7100-1, in accordance with NB-3649 and NB-3681(d), may the theoretical analysis described in NB-3681(d) be performed in accordance with the design by analysis requirements of NB-3200? Reply (3): Yes.

Interpretation: III-1-13-36 Subject: Division 1, Subsection NC (2010 Edition With the 2011 Addenda) File: 13-1823 Question (1): Does Subsection NC prohibit the construction of plate-type heat exchangers? Reply (1): No. Question (2): Does Subsection NC provide specific design requirements for the construction of plate-type heat exchangers? Reply (2): No. Interpretation: III-1-13-37 Subject: Division 1, NB-3222.4 and Code Case N-792-1 File: 13-1824 Question: Does Code Case N-792-1 require fatigue analysis considering the light water environment to be performed when the conditions of NB-3222.4(d) are satisfied? Interpretation: III-1-13-38 Subject: Division 1, NB/NC/ND/NE/NF/NG/NH-5521, NDE Personnel Certification Date Issued: November 12, 2013 File: 13-1391 Question: In accordance with the requirements of Section III, when the radiographic examination required by Section II, Part C is performed on the welding material test coupon, are the radiography NDE personnel employed by the Material Manufacturer of welding material required to be qualified in accordance with ASNT SNT-TC-1A?

Interpretation: III-2-13-04 Subject: Division 2, CC-2612.1.1(b) Date Issued: July 9, 2013 File: 13-773 Question: Does the requirement that base material conform with the requirements of QW-403.1 or QW-403.4 of Section IX, as required by NB/NC/ND/NE/NF/NG-2431.1(b), CC-2612.1.1(b) and WB/WC-2431.1(b), apply only to electroslag filler metals? NOTE: This interpretation also appears as III-1-13-28 in this document and as III-3-13-02 in Section III, Division 3. Interpretation: III-2-13-05 Subject: Division 2, Table CC-5200-1 and CC-5232.3.2, Evaluation and Acceptance File: 13-1326 Question (1): Does CC-5232.3.2 require that at least five sets of cylinders be made when five or more batches are planned to be produced in a given concrete mix? Question (2): Does CC-5232.3.2 require that a set of cylinders be made from each batch when the concrete mix produces five or fewer batches?

Interpretation: III-2-13-06 Subject: Division 2, CC-2131.3.1, Laboratory Accreditation; CC-2131.4, Personnel Qualification; CC-5211, Laboratory Qualification; CC-5132, Personnel Qualification; and Appendices V and VII (1998 Edition Through the 2010 Edition) File: 13-1237 Question (1): Is it a requirement that a laboratory performing tests required by CC-2200 be an accredited laboratory that complies with ASTM C1077? Question (2): May laboratory testing personnel performing tests required by CC-2000 be qualified using appropriate industry or laboratory standards? Question (3): Is it a requirement that a laboratory performing tests required by CC-5200 be an accredited laboratory that complies with ASTM C1077, except that testing personnel shall be qualified in accordance with CC- 5132? Reply (3): Yes. Question (4): Is it a requirement that laboratories performing tests required by CC-2200 and CC-5200 in accordance with ASTM C1077 be under the full-time technical direction of a registered professional engineer with at least 5-yr experience in construction materials testing? Reply (4): Yes.