Agricultural & Farm Development - The Planning Issues



Similar documents
Exempted Development - Frequently Asked Questions

CORK COUNTY COUNCIL APPLICATION FOR PLANNING PERMISSION

The following should be seen only as general guidelines;

CIRCULAR ircular PLANNING SERIES

Updated Guidance for Farmers on Requirements for the Storage and Spreading of Poultry Litter to 31 December 2014

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013

EAST LINDSEY DISTRICT COUNCIL ~ RESIDENTIAL CARAVAN SITES CONDITIONS OF SITE LICENCE

Designed and produced by geo-graphicsdesign.com DP 300 3/02

CHAPTER 9 PERMITTING. 9.2 Scotland Exemption Waste management licence PPC permit 102

Drainage. Information for those with problem drains

Environmental Impact Assessment of Forestry Projects

National Directorate for Fire and Emergency Management

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document

Caravan Sites and Control of Development Act Permanent Residential Mobile Home Sites Licence Conditions

THE TOWN AND COUNTRY PLANNING ACT 1990 Grant of Planning Permission

MINERALS AND ASSOCIATED WASTE APPLICATIONS APPLICATION FORM

There are several options you can use to pay for your Planning and Building Control Fees or documents.

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP LAWS OF SARAWAK, 1958 Ed.)

A Guide to the Fees for Planning Applications in England

STANDARD SITE LICENCE CONDITIONS FOR RESIDENTIAL PARK HOME SITES IN GUILDFORD CARAVAN SITES AND CONTROL OF DEVELOPMENT ACT 1960 (AS AMENDED)

A Guide to the Fees for Planning Applications in England

Standard terms and conditions

EXPLANATORY NOTES & CONDITIONS

TAMS II Frequently Answered Questions

Abstracting water. A guide to getting your licence. managing all our water needs

SUBDIVISION AND DEVELOPMENT REGULATION

66 REFERRAL AND NOTICE PROVISIONS. Scope

Advice can also be sought from specific specialist officers in the Council.

Basements and Deep Building Construction Policy 2014

MOBILE HOME LAW. Revised November 2001

Agricultural and Forestry Activities

Practice Note

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Sewers and Drains A GUIDE TO MAINTENANCE RESPONSIBILITIES

Application for electricity connections Business premises. Electricity. Send your completed application form with supporting documentation to:

STATUTORY INSTRUMENTS. S.I. No. 497 of BUILDING REGULATIONS, (Pn. 4753)

SEPTIC TANKS AND SOAKAWAYS TO HOUSES AND THE BUILDING REGULATIONS

My Farm, My Plan - Planning for my Future

FLOOD PLAIN DESIGNATION AND PROTECTION

CONSERVATION AREAS. Residential Planning Guidelines DO I NEED PLANNING PERMISSION? Examples of Development that require Planning Permission

Please describe the proposal accurately and concisely. State the number of storeys proposed and the position of any extensions.

1. Purpose and scope. 2. SEPA's role in hydropower and planning

Title 27A. Environment and Natural Resources Chapter 1 - Oklahoma Environmental Quality Act Article III - Jurisdiction of Environmental Agencies

Walsall Council Validation Guide for submitting a Householder Planning Application

Fact sheet 6: for farmers

GUIDE TO THE MINE APPROVAL PROCESS IN NEW BRUNSWICK

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers

PLANNING SERVICES UNIT

STATUTORY INSTRUMENTS. S.I. No. 600 of PLANNING AND DEVELOPMENT REGULATIONS, Dublin Published by the Stationery Office.

K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name

Improving the physical condition of Scotland s water environment. A supplementary plan for the river basin management plans

APPLICATION FORM. Targeted Agricultural Modernisation Scheme (TAMS) SHEEP FENCING/MOBILE HANDLING EQUIPMENT SCHEME

Regulations relating to building applications

PERIMETER nonhuman primates, marine FENCE mammals, wild/exotics mammals Species Specific Nonhuman Primates not Marine Mammals for polar bears

Development Variance Permit Application Package

TO AGREE FEE SCALES IN RELATION TO THE COUNCIL S NEW STATUTORY OBLIGATION

Consultation on integrating flood defence consents into the Environmental Permitting regime in England and Wales

Rural dwellings including bed and breakfast accommodation

SECTION III. LEACHING AREA REQUIREMENTS Residential square footage requirements are based on sidewall area only: Minimum square feet per bedroom

Building over or close to a public sewer

ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost :

PRE-APPLICATION ADVICE FOR LOCAL DEVELOPMENTS COMHAIRLE RO-IARRTAIS DO LEASACHAIDHEAN IONADAIL

agricultural economy agriculture CALIFORNIA EDUCATION AND THE ENVIRONMENT INITIATIVE I Unit I Cultivating California I Word Wall Cards 426WWC

1 Introduction. 1.1 Key objective. 1.2 Why the South Esk

ZONING INFORMATION LIVESTOCK AND PASTURE MAINTENANCE STANDARDS

Vital Earth Composting Facility Flood Risk and Drainage Statement

Guidance Note on the Need for Planning Permission for the Development of Existing Houses and Flats (effective from 6 February 2012)

National and Major Developments

Paragraph 9 Exemption The reclamation or improvement of land

2-Party Shared Well Users Agreement (If Applicable)

2015 No. 595 TOWN AND COUNTRY PLANNING, ENGLAND. The Town and Country Planning (Development Management Procedure) (England) Order 2015

THE CORPORATION OF THE CITY OF GUELPH. THEREFORE the council of the Corporation of the City of Guelph enacts as follows:

Spill Prevention Control & Countermeasure (SPCC) for Farms

Newbiggin House Farm,

Water resources. The main problems of pollution that need to be addressed in the country are the following:

16. Storm water drainage

2016 No. 000 ENVIRONMENTAL PROTECTION, ENGLAND AND WALES FLOOD RISK MANAGEMENT, ENGLAND AND WALES

CITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is

DEVELOPMENT DESCRIPTION AND LOCATION

Welcome to the Inland Wetlands Commission Town of Barkhamsted, CT

TABLE OF CONTENTS 2 WHAT CAN A PLANNING OBLIGATION DO? 2 3 FORMALITIES 3 4 GOVERNMENT POLICY 3 5 PLANNING OBLIGATIONS AND CIL 5 6 COMMON PROVISIONS 5

17 East Main Street Cuba,NewYork Code Enforcement

Sundaysight Farm Highgreen, Tarset

Guide to agrichemical use in Resource Management Plans Northland Region as at October 2011

CHAPTER 17. Sewers and Sewage

Water Quality and Water Usage Surveys

CERTIFYING DRAINLAYER

Stormwater harvesting

Kings Road, Beith. Development Brief. Part 1: Site Specific Information

Application for Planning Permission and conservation area consent for demolition in a conservation area. Town and Country Planning Act 1990

Fence By-law. PS-6 Consolidated May 14, This by-law is printed under and by authority of the Council of the City of London, Ontario, Canada

MDS. Implementation Guidelines. Minimum Distance Separation (MDS) Formulae. Publication 707. Ministry of Agriculture, Food and Rural Affairs

On Site Sewage System Maintenance Inspections. March Building and Development Branch Ministry of Municipal Affairs and Housing

5. Specific Use Regulations

Permit with introductory note

Spill Prevention Control and Countermeasure (SPCC) Regulations Fact Sheet

National Environment Awareness Campaign(NEAC) Theme

Crown Land Management

THE COUNTY BOARD OF SUPERVISORS OF THE COUNTY OF DOUGLAS DOES HEREBY ORDAIN AS FOLLOWS:

Foul Drainage, systems and responsibility. Environmental Protection

Transcription:

Agricultural & Farm Development - The Planning Issues Generally, smaller developments of an agricultural or forestry nature are exempt, however, larger developments do require planning permission. In addition, any development for which an Environmental Impact Assessment (EIA) is required needs planning permission. This leaflet is a simple guide for farmers outlining the main features of the planning system they are likely to encounter. This leaflet is intended as a practical guide. It is not a definitive legal interpretation of planning law. For more information you should consult your local planning authority. 1. Do I need planning permission? Generally, you need planning permission for any development of land or property unless it is specifically exempted from this need. The term development includes the carrying out of any works (ie. building, demolition or alteration) on any land or buildings and includes the making of a material (i.e. significant) change of use of structures or land. 2. What is exempted development? Exempted development is development for which planning permission is not required. Categories of exempted development are set out in planning law. Much agricultural development, especially uses of land for agricultural purposes, is exempted. In other cases, there are usually certain thresholds relating to, for example, size or height,. where these thresholds are exceeded, the exemptions no longer apply. The purpose of exemption is to avoid controls on developments of a minor nature, the main exemptions are set out in the next paragraph. 3. What are the exemptions from planning permission? The following are exempted development : * the use of land for agriculture or forestry (but see EIA requirements at Question 4 below), * the use of farm buildings or forestry buildings for these purposes (but see conditions below), * the maintenance of land for agricultural processes, * the erection of a wall or fence, up to 2 metres high (3 metres for deer farms), but not one of sheet metal or one bounding a garden or in front of a dwelling house (there are separate exemption arrangements for houses). * temporary use of land (for 10 days or less) for camping or mooring of a boat. Conditions and restrictions apply ie. a distance of 50m from the public road and within 100m proximity to each other; * temporary use of land by scouting organisations for a period of 30 days or less a year; * works involving the construction of or maintenance of a gully, drain, pit or water-course; * works involving minerals and petroleum prospecting under the terms of a licence for either purpose issued by the Minister for Communications Marine and Natural Resources. Buildings and Structures The provision of the following types of agricultural buildings and structures is exempted development : Type 1 A roofed structure housing cattle, sheep, donkeys, horses, deer or rabbits, provided that its floor area does not exceed 200 square metres and that the total floor area of all Type 1 structures within the farmyard complex (or 100 metres of it) does not exceed 300 square metres; Type 2 A roofed structure housing pigs, mink or poultry provided that its floor area does not exceed 75 square metres and that the total floor area of all Type 2 structures within the farmyard complex (or 100 metres of it) does not exceed 100 square metres. In addition boundary fencing of a mink

holding must be escape proof for mink; Type 3 Roofless cubicles, open loose yards, self feed silo or silage areas, feeding aprons, assembly yards, milking parlours and silage making/storage structures, provided that the floor area of any new structures does not exceed 200 square metres and that the total floor area of all Type 3 structures within the farmyard complex (or 10 metres of it) does not exceed 300 square metres; Type 4 A store, barn, shed, glasshouse etc not exceeding 300 square metres in floor area and not used for housing animals or storing effluent provided that the total floor area of all Type 3 structures within the farmyard complex (or 100 metres of it) does not exceed 900 square metres; Type 5 An unroofed fenced area for exercising and training horses with an all weather surface, provided the structure is not more than 2 metres high. The structure must not be used for staging public events and the entrance should not be directly off a public road. Type 6 A roofed structure for housing greyhounds, provided that the floor space does not exceed 50 square metres and that the total floor area of all Type 6 structures within the same complex (or 100 metres of it) does not exceed 150 square metres. Type 7 A roofless hard-surfaced yard or enclosed area (in connection with the keeping of horses, ponies or greyhounds), provided that the total floor area does not exceed 100 square metres and that the total floor area of all Type 6 structures within the same complex (or 100 metres of it) does not exceed 150 square metres. However these exemptions are subject to the following conditions: * They may only be built in rural areas ( all 7 Types) - rural areas are those outside urban and council boundaries. They must be used for the purpose of agriculture only; *Distance from a public road must be at least 10 metres (all 7 Types); *The distance from houses, schools, churches or public assembly buildings must be at least 100 metres unless the owners and occupiers give their consent in writing to lesser distances (all 7Types); *Height above ground level cannot exceed 8 metres within 100 metres of a public road (all Types except Type 5 and 7); *no unpainted metal sheeting shall be used for roofing or on the external finish (except for Type 5, 6 and 7); * effluent storage facilities must be in line with Department of Agriculture and Food requirements and be adequate to ensure no water pollution (all Types except Types 4,5, 6 and 7) *they must be used for agricultural purposes only (Types One to Five) and for the breeding and keeping of greyhounds, as appropriate (Types 6 and 7). The exemptions do not apply if the development would involve interference with sites, features, etc. listed for preservation in the development plan or draft plan. 4. Other Exempted Activities: Certain types of other activities are exempted development for the purpose of the Regulations including:

* land reclamation (including field drainage, removal of fences, improving existing fences, improvement of hill grazing or reclamation of estuarine marsh land or callows); * intensive agriculture, provided the land involved is less than 100 hectares; * initial afforestation. The European Community (Environmental Impact Assessment) (Amendment) Regulations, 2001 provided for the introduction of a new statutory consent system for forestry which is operated by the Minister for Communications, Marine and Natural Resources; * replacement of broadleaf high forest by conifer species provided the area involved is less than 10 hectares; *peat extraction provided where the area is less than 10 hectares, or where the area is more than 10 hectares, the drainage of the bogland must have already commenced. 5. What about Environmental Impact Assessment (EIA)? The following agricultural and forestry developments must be subjected to EIA as part of the planning process. An application for planning permission, including an Environmental Impact Statement (EIS), must be submitted in such cases: (a) The restructuring of land holdings, where the area is greater than 100 hectares, (b) the use of uncultivated land or semi-natural areas for intensive agricultural purposes, where the area involved would be greater than 100 hectares; (c) water management projects for agriculture; - where the catchment area involved would be greater than 1,000 hectares, or - where more than 20 hectares of wetlands would be affected; (d) initial afforestation which involves an area of 50 hectares or more (e) replacement of broadleaf high forest by conifer species, where the area involved would be greater than 10 hectares; (f) deforestation for conversion to other land use, provided the area deforested is greater than 10 hectares of natural woodland or 70 hectares of conifer forest; (g) land reclamation from sea where the area reclaimed would be greater than 10 hectares; (h) peat extraction which would involve a new or extended area of 30 hectares or more; (i) intensive poultry- rearing installations with more than 40,000 places; (j) pig-rearing installations, with more than 2,000 places for production pigs ( over 30 Kgs.) in a finishing unit, more than 00 places for sows in a breeding unit or more than 200 places for sows in an integrated unit; (k) seawater fish breeding installations, provided the output exceeds 100 tonnes per annum; (l) fish breeding installations upstream of drinking water intakes and other freshwater fish breeding installations exceeding 1 million smolts with less than 1 cubic metre per second per 1 million smolts low flow diluting water. EIA will be required for projects in the above-mentioned categories even where the listed thresholds are not exceeded, if the planning authority considers that there are likely to be significant effects on the environment.

6. Where can I get further information on EIA? The leaflet PL.9 - Environmental Impact Assessment explains the EIA process and what an Environmental Impact Statement (EIS) is. The planning authority will explain which development proposals require EIA and you are strongly advised to contact the planning authority for pre-application consultations if your proposal may involve the preparation of an EIS. 7. How much will a planning application cost? Planning application fees vary depending on the nature and size of the proposed development. Full details are set out in the explanatory notes to the application form. The planning authority cannot decide on an application until the correct fee is paid. Fees are subject to revision. Details of fees are available from your local planning authority or An Bord Pleanala. 8. What documentation do I need to submit? PL.2 - "Making a Planning Application" sets out the documents needed with all planning applications. The additional documents needed for agricultural development include: * Schedules of proposed and existing buildings with floor areas, numbers of animals presently housed and to be housed; *Schedules of proposed and existing effluent storage and spreading methods, capacities, arrangements for ensuring effluent is not diluted with clean water and for ensuring effluent does not cause pollution, etc.; *Where appropriate, signed agreement with other landowners for spreading effluent on their lands. 9. What should a location map or plan show? In addition to the details indicated in leaflet PL.2 - Making a Planning Application, the following information will normally be needed: * the applicant's farm and the farmyard development, watercourses, drains, houses, schools, churches or public assembly buildings in the vicinity; * other land in the vicinity in the ownership of the applicant or landowner marked or coloured separately and; *land both on and off the applicant's farm, available for effluent spreading, together with any watercourses, drains, dwelling houses, schools, churches or public assembly buildings within 100 metres of such land. 10. What should a site or layout plan show? In addition to the detail indicated in leaflet PL.2 - Making a Planning Application, the following information will normally be needed: * existing farm buildings and structures, surfaced and unsurfaced yards, directions of falls, soiled yards, silage pits, etc.; * proposed farm building and structures, as above; * all yard gates and walls; * existing and proposed effluent storage tanks marked or coloured separately., * effluent and soiled water drainage layouts and roof water and other clean water collection and disposal systems. All underground water channels, drains and pipes should be shown; * all adjoining watercourses, wells, water supplies, etc.; * any existing and proposed septic tanks; * roads and site boundaries and distances to these.

11. Where can I get advice on effluent storage and disposal? You are advised to design effluent storage facilities in accordance with "Guidelines and Recommendations on control of Pollution from Farmyard Waste" (Revised Edition 1985) issued by the Department of Agriculture, Food and Forestry. Advice on farm development generally is available from your local Teagasc office and the Farm Development Service (FDS) of the Department of Agriculture, Food and Forestry. 12. Do I need any other type of permission? You will not be entitled solely by reason of a grant of permission or approval to carry out your proposed development. You may have to apply for a licence under the Local Government (Water Pollution) Acts, 1977 and 1990 for the discharge of effluent or other wastes to a sewer, or to lakes, rivers, groundwaters, etc. Certain intensive pig and poultry rearing activities (i.e. those above specified thresholds) require an integrated pollution control (IPC) licence from the Environmental Protection Agency: details may be obtained from the Agency's Licensing Division, telephone 053-60600. You will need permission if you are making a connection to a public or group water main or sewer. If you are installing a septic tank in an unserviced area, you may need to submit trial hole and percolation results. The planning authority will give advice on design, finishing and siting of developments. You are advised to check the local development plan. You can obtain details of all the statutory requirements which must be met before development can commence from the planning authority. 13. Are there any dangers from power lines? You should contact your local ESB office if your works are near existing electricity lines, if there are dangers with clearance heights under power lines or if the construction work will bring anyone within reach of the electricity supply to your farm. In fact, you must do so where any overhead lines come within 25 yards of the construction works. As with farm machinery. construction work can bring you into contact with live electricity and lead to severe injury or death. The law governing the planning system is set out in the local Government (Planning and Development) Acts, 1963 to 1993 and the Local Government (Planning and Development) Regulations, 1994 and 1995. These may be purchased from the Government Publications Sales Office, Sun Alliance House, Molesworth Street, Dublin 2, Telephone (01) 661 3111.