Gap Filler project Line 5 Parisian subway



Similar documents
Handicap regulations for lift. Points related to the remote alarm on passenger and goods passenger lifts

Planning for Learning - Record of Validation

Hotel Accessibility Pack

INSTRUCTIONS FOR INSTALLATION AND USE OF CONTROL UNIT EP095CM WiFi

Quick start: Panic Watch EU

Body Fat Scale Instructions for use

Functional safety. Essential to overall safety

Accessibility Design Advice

INTANGIBLES. Big-League Stories and Strategies for Winning the Mental Game in Baseball and in Life

Spatially Enabling an Asset Management Database

Using your LED Plus keypad

The risk of derailment and collision, and safety systems to prevent the risk

Year 9 mathematics: holiday revision. 2 How many nines are there in fifty-four?

Youth Football Drills

1st CONFERENCE IN ETHNOMUSICOLOGY AND ANTHROPOLOGY OF MUSIC Methods, approaches and perspectives for the study of music within culture

Truck Automation for the Ready Mixed Concrete Industry. Michael J. Hoagland (205) ext

BTS Backhaul by Satellite

V1504 Vertical Platform Lift OWNER S MANUAL

The Fastest Breaking Fogging Systems

Weather Direct Displays show Lost Forecast (blank boxes in the picture icons)

August 21, :00 3:00 pm. Presented by: Barbara Zortman, Center for Traffic Safety Fritzi Schreffler, PennDOT District 8 Safety Press Office

SCHOOL BUS TRANSPORTATION Frequently Asked Ques ons

SECTION A OFFICIAL EVENTS

Think Remote Monitoring Think Concept Pro Think VXM4B

Wireless AUTODIAL GSM SMS Home Alarm Security System 900/ 1800/ 1900Mhz(CK-GSM-9003)

Average producers can easily increase their production in a larger office with more market share.

Security GSM Alarm System

The Drake Hotel, Where the Magnificent Mile Begins. Guests of the hotel can choose from the following options.

93% Contents. Unrivalled reach. Contact us T +44 (0) E careers@bmj.com W careers.bmj.com. Print advertising 04. Digital advertising 05-08

MAGICAR M871A. Car alarm with two-way remote User s guide

Electronic Power Control

ARCHITECTURE OF INDUSTRIAL AUTOMATION SYSTEMS

EdExcel Decision Mathematics 1

Lecture #4: Engineering as Social Experimentation

Horizontal Sterilizer MU 012.B / I (09/07) Page 2/46. 1 Index... 2

Rolling Meadows, Illinois: Code of Ordinances

Staying alert A guide to passenger security

JPSeries. 7-inch Touchscreen Intercom. Distributed by : JP(E)1411A. Printed in Japan (E) MA57036AJZ

User Manual CN2HK LIMITED. Complete Wireless Home Alarm Security System (CK-8806) ENG. Please read this manual before operating this product.

Tutorial 1. Introduction to robot

hockeyplayerdeveloper.com

LESSON 12 ALL SAVINGS CHOICES INVOLVE RISK: GRANDMA S GIFT

A Guide to Community Alarm and Telecare Equipment

FLOW CALCULATOR INSTRUCTION MANUAL MESURES BAMOPHOX M1 02 E MES FLOW CALCULATOR /1

FOR MORE INFORMATION or from a non-telstra phone and say pre-paid telstra.com/ppmbb visit a telstra store or partner

OpenTrack simulation for suburban tunnel in Paris (RER B & D)

Jabra FREEWAY. User manual.

Automatic Sliding Door Systems

imc FAMOS 6.3 visualization signal analysis data processing test reporting Comprehensive data analysis and documentation imc productive testing

Awning Instructions. Standard Manual 1.5m to 4.5m

Improving the Healthcare Experience

Guelph Driving School. 246 WOOLWICH ST. Unit C Guelph, Ontario N1H 3V9. Office: Cell: info@guelphdrivingschool.

Messac Base Information

Curriculum Multimedia Designer

Electro-Pneumatic Bus Door Control Mechanism

The Shanghai Maglev Route

CONSTRUCTION TRAFFIC MANAGEMENT PLAN V11, 26/09/12

FIVE STEPS TO MANAGE THE CUSTOMER JOURNEY FOR B2B SUCCESS. ebook

UNITED STATES OF AMERICA BEFORE THE FEDERAL TRADE COMMISSION. Julie Brill Maureen K. Ohlhausen Joshua D. Wright Terrell McSweeny COMPLAINT

Group TRAFFIC MANAGEMENT SPECIALIST ACCESS WAY SOLUTIONS CREATIVE SOLUTIONS TO COMMON CHALLENGES. Products

Hockey IQ Quiz. player by answering a few multiple choice questions.

Omnichannel Customer Support for the B2B Organization

Fire Fighter Survival

ALERTS! From Warning Signs to Academic Success

La Plaine Saint-Denis. A strategic area for the Île-de-France Region development

EMStat Electronic PCR for Desktop & Mobile Computing

Fettling the most ignored operation in Foundries

How to Use Google Docs

12 Techniques to receive more enquires from your website

LW A. Wireless Auto Dial Alarm System. Sentry Plus User Manual By Global Gadgets

Safety signs and symbols

USEFUL TERMS Crowdfunding getfunding.com.au Rewards Keep It All Campaigns All or Nothing Campaigns

AUSTRALIAN HUMAN RIGHTS COMMISSION NOTICE OF DECISION ON APPLICATION FOR TEMPORARY EXEMPTIONS: AUSTRALASIAN RAILWAY ASSOCIATION

Management Information System Prof. Biswajit Mahanty Department of Industrial Engineering & Management Indian Institute of Technology, Kharagpur

O DU CANADIAN DISTRIBUTOR FOR INHOUSE PAGING SYSTEM DISTRIBUTEUR CANADIEN DE SYSTÈME DE PAGETTE INTERNE.

Exercises for Design of Test Cases

Fire Resisting Rolling Shutters & Doors

MarketPlace Staff. Welcome to MarketPlace!

ALARM SYSTEM INSTALLATION GUIDE

Current as of 11/10/08 1 of 1

MOBILE CALL GSM alarm system

V1504 Vertical Platform Lift OWNER S MANUAL

System Tel (Telephones) Ltd Fax Web

Home alarm system. User s manual. Profile To better understand this product, please read the user s manual carefully before using.

FURBOT : un nouveau système de transport de marchandises en ville. Evangeline Pollard INRIA-RITS

Lille.Projects. Gare de Lille-Europe Lille, France. Tour de Lille. Espace Piranesien. EuraLille masterplan. EuraLille shopping mall.

Integrated Skills in English ISE II

WMATA S Automated Track Analysis Technology & Data Leveraging for Maintenance Decisions

PeopleGIS Leica RTK GPS Instructions

«Cultural challenges, Branding and E-business: how to optimize your e-commerce website in China?»

PC control for flexible packaging

Better Recycling - Less Waste Your Sustainable Campus Initiative

Accuracy of Geometric Geoid Model of Singapore using RTK Heighting

BENEFIT OF DYNAMIC USE CASES TO EARLY DESIGN A DRIVING ASSISTANCE SYSTEM FOR PEDESTRIAN/TRUCK COLLISION AVOIDANCE

Transcription:

Gap Filler project Line 5 Parisian subway EMTA MEETING Place d Italie station D. EVESQUE, B. LAUNAY / January 20th, 2010 Zone libre pour une image, une illustration ou un aplat couleur Smqf0705 Version 2 du 31/01/06

Gap Filler project line 5 of parisian subway 01 Contents 1- Context and need 2- System description 3- Feedback on the experiment 4- First results of running

1- Context and need 02 1.1 French law (2005-102) «Equality of rights and chances, participation and citizenship of handicapped people» In February 2008 the STIF adopted 7 priority orientations to allow people with reduce mobility to use the Public Transportation. These orientations will then serve as base to define the Master Plan for accessibility in Paris and in the surrounding area. One of these orientations was : Provide accessibility to the most important stations of the railway network (90% of the trafic in 2015 for the RER and the train) This programm is scheduled to finish in 2014.

1- Context and need 03 Espace Train 1.2 Accessibility problem (platform/train) 1. Height difference between platform and train : «We go up into the train» 2. Horizontal Gap 3. Problem with stations in a curve L Extra height of the platform, total or partial. Fusible strip if possible Require to install a retractable device filling the Gap between the platform and the train during travellers access.

1- Context and need 04 1.3 Existing platform / train device Today : access to the train is possible with a footbridge Will to have access to the train in full autonomy Strong request of associations Necessary to test an automatic device : => Gap Filler Project financed by the STIF and the RIF

1 Context and need 05 1.4 The choice : Line 5 - Italie Loop Initial gap of 65 cm -> access closed Recharging the platform with concrete has been necessary. It was possible to install the prototype in the same time

2 System description 06 1.5 Benchmarking 1. Existing gap fillers were designed for dangerous gap, but not to answer to accessibility requirements. 2. After sollicitation of different companies design and installation have been realised by a French engineering consulting firm : Bigorre Ingenierie

2- System description 09 2.2 How does it work?: An easy use : When the train arrive the mobile part goes out. No button or system to be activated A facilitated access : The device fill the gap between the platfom and the train The opening is fully automatic, it s possible to walk on the mobile part. A sound and a visual signal (a blue light appears when the train stops, but before the opening of the doors). This device is called Gap Attentiveness system. Some important points :

2 System description 10 2.3 Main functions and performances : Duration of the opening and closing : less than two seconds for 450 mm. Constant residual gap whatever is the position of the rolling stock : 3 cm Can resist to a load of 700kg/m2 People detection in case somebody stay on the mobile part during the withdrawal -> Alarm transmitted to an operator who has a video image of the Gap Filler High reliability

2 System description 11 2.4 Components Automatic system to command the Gap Filler : Activates the opening of the Gap filler, after detection that a rolling stock is alongside the platform. The mobile part is deployed before the complete stop of the train. RATP signalling system : - Allows the movment of the mobile part - Decides the withdrawal of the G.F. after the train starts Gap Filler system : Attentivness system to survey the gap: - Independant from the GF system - When a train is alongside the platform anf if the GP is not deployed it warns the travellers that there is a GAP. As soon as all conditions are completed the G. F. puts its mobile part out or in.

2 System description 12 2.5 Gap Filler functioning (particular cases) When a train does t stop at the station - If the train speed is more then 10 km per hour then the computer doesn t order to deploy the mobile part. - If the train speed is less then 10 km per hour then the GF goes out and back ; When a maintenance train cross the station - If the length of the train is different from the standard one the computer doesn t order to deploy the mobile part.

2 System description 13 2.6 Requirements for safety The system has been designed to be safe : Functions handled in a Safety Way : - If something obstruct the opening : the obstacle is detected and then the force limited. If somebody is on the mobile part : he his detected Insurance that the mobile part will nt go back during traveller access. No inopportune opening

3 Expérience feedback 14 3.1 Schedule of the Project - Project initialization in 2006 - Factory aging tests conducted from November 2006 to August 2007. - GF installation at Place d Italie station : January 2007 - Protototype tests during the day without travelers without the mobile part : from Mai to June 2007 - Prototype tests (again) during the day without travelers : January 2009 - Acceptance test : February 2009 - Starting of the system with travelers : March 2009 With the mobile part : from Mai to September 2008

3 Experience Feedback 15 3.2 Factory Tests A specific test bench has been created allowing 1 000 000 of cycle (in and out), with a load of 280 kilos distributed on six cylinders pushing on the deployed mobile part. Duration of the tests (From November 2006 to August 2007) 1000000 cycles, 8 month of testing, 30 days each month, 19 hours a day(*) => 240 days of testing Description of a cycle Opening : 2 s, Deployed position : 7 s maxi Load application : 3 s maxi The Gap filler throw was 450 mm and the test cycle was the following one : (*) The tests were not conducted all day long in order to collect the measurements and also to do the maintenance on the system.

Essais d'endurance

3 Experience Feedback 16 3.3 On-site installation

3- Experience feedback 17 On-site installation (continued)

4 First results of running 18 4.1 The experiment : first results The system works since March 23rd, 2009 The analysis can be done for the last six month GP running GF sollicitation GP stopped 12000 8000 number of trains 10000 6000 4000 2000 0 1 2 3 4 Period 5 6

19 4 First results of running 4.1 The experiment : first results (continued) Availability : 99% (calculated on 21674 trains) Availibility Not available Available 7000 5000 4000 3000 2000 1000 0 1 2 3 4 Period 5 6 Numbe r of trains 6000

4 First results of running 20 4.2 The futur The experiment on the Parisian subway will stop in 2011 and a new one will start on RER (Regional Express Network) - Noisy-le- Grand station was chosen on RER line A. - With the same Gap Filler - Final objective : Equip the line A stations when necessary to improve accessibility of handicapped people.