RESIDENTIAL WOOD DECKS



Similar documents
The Homeowner s Building Application Checklist for Constructing a Residential Sundeck

Wood Decks Zoning and construction requirements for open non-sheltered wood decks for residential dwellings.

Residential Decks. Planning and Development Services Department

Residential Deck Safety, Construction, and Repair

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

Uncovered Decks & Porches

Sample Drawing Package for One and Two Family Dwelling Applications

TOWNSHIP OF TOMS RIVER ZONING OFFICE DECK CONSTRUCTION

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

Development Services Department Building Permit & Inspection Services Shed and Garage Construction Guide for Detached and Semi-Detached Dwellings

BUILDING PERMIT SPECIFICATIONS

A HOMEOWNERS GUIDE TO BUILDING IN GREY HIGHLANDS

General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and guards.

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

H:\forms\handouts\bldg049 1 of 11 Revised Mar 2/15/dh

Basic Requirements for Residential Plan Review _

BUILDING A FENCE? THE CITY OF CAMBRIDGE REQUIRES THAT ALL FENCES WITHIN THE CITY CONFORM TO THE REGULATIONS OF FENCE BY-LAW

A Guide to Detached Residential Garages and Residential Workshops (based on 2006 BCBC)

Solar Water Heating and Solar Electric Generators Installed on One or Two Family Dwellings

APPLICANT / CONTACT:_

A Guide for the Homeowner/Builder

STANDARD OPEN PATIO COVER

Florida Building Code 2004 SECTION 1009 STAIRWAYS AND HANDRAILS

A Homeowner s Guide to Building Permits

Charter Township of Shelby Harry Reese Building Director

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

Attached/Detached Patio Cover/Carport

Bureau Veritas Contact Information

Development Variance Permit Application Package

Mobile Home Pre-Inspection Checklist

Timber Decks. Technical Note. March 2007

Building Information Packet

TYPICAL PATIO COVERS 111

Residential Plan Routing Information

Residential Building Permits

Residential Building Permit Process

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

4. ANCHOR BOLTS AND STRAPS a. ½" anchor bolts shall be embedded 7" into concrete a maximum of 6' on center and 12" from corners and ends of plates.

Patio Covers / Carports

Number of Sides Required to Have a Handrail

Estimated Cost of Repair

Certification: Building Plans Examiner. Exam ID: B3

WINDOW AND DOOR REPLACEMENT REQUIREMENTS

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

Single Family Residential Building Permit Questions & Answers

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

Section 13 Urban Residential Zones

Chapter 3 Pre-Installation, Foundations and Piers

RESIDENTIAL BUILDING PERMITS

MANUFACTURED HOUSING USED AS DWELLINGS

CITY OF FAIRFAX CODE ADMINISTRATION / FAX

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

A Guide to Building Permits for Home Owners / Renovators. Address: 1 Carden Street Guelph, Ontario N1H 3A1

POST AND FRAME STRUCTURES (Pole Barns)

Residential Foundations and Basements

Site Development Information Worksheet for single family residential development

COMMONLY USED RESIDENTIAL BUILDING CODES

COMMONLY USED RESIDENTIAL BUILDING CODES

Single Family Residential Basement Finish

Adult Family Home (AFH) LOCAL BUILDING INSPECTION CHECKLIST Code References: 2012 IRC Section R325 (WAC 51-51) APPLICATION NUMBER:

2. What building projects are exempted? (permit not required)

MAJOR 2015 MN RESIDENTIAL CODE CHANGES Effective Date: January 24 th, 2015

The replacement or modification of existing windows shall comply with the following requirements:

Basement Development Construction requirements for the development of basements in residential dwellings.

How To Protect A Swimming Pool

CITY OF TORONTO. BY-LAW No

HATFIELD TOWNSHIP DEMOLITION PERMIT APPLICATION PROCEDURES

Building Permit, Fire Inspection and Operating Permit Fee Schedule

I N T E R N A T I O N A L R E S I D E N T I A L CO D E

Requirement checklist to obtain a building permit for a: RESIDENTIAL RE-ROOF

GENERAL BUILDING PERMIT INFORMATION FOR: RESIDENTIAL ALTERATIONS & ADDITIONS

City of Peterborough

TOWN OF SPENCER Office of Development & Inspectional Services

Do I need planning permission?

Residential Adjustments. Overview 4.1

How To Build A Basement House

St. Louis County Department of Public Works Division of Code Enforcement. When is a Building Permit required for Residential Projects?

SWIMMING POOL, SPA, & HOT TUB GUIDELINES

A HOMEOWNERS GUIDE TO BUILDING PERMITS

NY Rising Housing Recovery Program

New Ontario Building Code Highlights

PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY ELECTRICAL PLUMBING HEATING DEMOLITION SIGN MOBILE HOME

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

EL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013

RESIDENTIAL WOOD DECK CONSTRUCTION GUIDE

dpd 316 Seattle Permits Tip Subject-to-Field-Inspection (STFI) Permits Projects that Qualify as STFI

Requirements for Building Application Submission

Wood Projects Outdoors. Post Hole Specifications. Deck Span Tables. Eakes.com

ORDINANCE NO

Town of Beaumont. Lot Grading Guidelines

Page & Turnbull imagining change in historic environments through design, research, and technology

SECTION COLD-FORMED METAL DECK FRAMING Elevations Steel Deck Framing by Trex

Fixed Access Ladders. Table of Contents. 1. Legislative Requirements


LOWEST FLOOR GUIDE I. LOWEST FLOOR DETERMINATION

NON-RESIDENTIAL BUILDING PERMIT PROCEDURES

Does Wall Township require an inspection by the building department on resale of a home?

INFORMATION BULLETIN NO.

Footing and Temporary Power Inspection

Facility Assessment for East Main Street, Huntley, IL

Transcription:

RESIDENTIAL WOOD DECKS 1

A Building Permit is required for the construction of a wood deck where the deck is more than 600 mm above grade at any point. Definition: For the purposes of this pamphlet, a wood deck is a flat structure elevated above the ground but no higher than the first storey floor level, by any type of foundation system and may or may not be attached to the house. This pamphlet is for open wood decks only. Decks of other materials may require the signature and seal of a Professional Engineer licensed to practice in the province of Alberta. WHERE CAN YOU APPLY? Application for a Building Permit can be made between the hours of 8:00 a.m. and 4:30 p.m. at: The City of Calgary Development &Building Approvals Customer Service Counter 3 Floor, Calgary Municipal Building 800 Macleod Trail SE Calgary, Alberta T2P 2M5 For inquiries call (403) 268-5311 APPLICATION PROCEDURE You are required to submit: Two copies of the site plan of the property. For detailed information on site plans, see our sample drawings in this pamphlet. It may be necessary to submit two copies of a Real Property Report, prepared by an Alberta Land Surveyor. Two sets of building plans that conform to the Alberta Building Code. These plans must be complete, legible, drawn to scale and contain the information outlined in General Information. 2

Preferable Scale: Imperial 1/4" = 1'-0" Metric 1:50 Minimum Scale: 3/16" = 1'-0" Plans may be drawn in metric units or imperial units but not a combination of both. PROCESSING YOUR APPLICATION Most applications for decks can be processed on a same day basis at the counter. After entering your application and ensuring the information complies with the Land Use Bylaw, the Customer Service Techician will refer you to a Plans Examiner to ensure your application complies with the Alberta Building Code. Providing you have brought all the information required, and it is correct, the only delay may be having to wait your turn if there are other customers ahead of you. FEES A schedule of permit fees is available at the Customer Service counter. GENERAL INFORMATION A. Plan 1. Piles - show types of piles, dimensions of piles and the spacing of piles. 2. Wood beams - show location, span as well as size, grade and species of beam (e.g., 3-38 x 235 No. 1 Douglas Fir). The following are examples of acceptable foundation systems. a. Concrete Piles b. Wood Piles c. Concrete Brackets d. Masonry Piers 3. Wood joists - show size, grade, and species of joists, as well as span between supports and direction of span of joists, e.g., 38 x 235 (2" x 10") No. 1 spruce joists @ 400 mm (16") O.C. 3

4. Stairs (if any) - give details, e.g., width, rise, run, number of risers, handrails, etc. B. Structural Cross-Section 1. Show dimensions and depth of piles below grade. Minimum 1.2 m (4'-0") below grade and 150 mm (6") above grade. (See General Note No. 2). 2. Show decking material to be used, e.g., 38 x 89 (2" x 4") No. 2 spruce on flat with 12.5 mm (1/2") space between boards. 3. Show guard rails - decks that are 600 mm (24") or more above grade require guards that must meet the following requirements: C. General all open sides must be protected guard must be a minimum of 900 mm (36") in height, measured from top of deck to top of guard where the deck is not more than 1.8 m above grade where the deck is greater than 1.8 m above grade the guard must be a minimum of 1070 mm (42") maximum opening of 100 mm (4") between vertical members no member, attachment or opening which would facilitate climbing can be located between 100 mm (4") and 900 mm (36") above the deck floor. 1. Decks should be designed to carry 1.9 kpa (40 lb/sq.ft.) live load and where pier foundations are used, the piers shall be designed to support the applied loads from the superstructure. 2. Footings are not required under piers if the safe loadbearing capacity of the soil is not exceeded. In some instances, the signature and seal of a Professional Engineer registered to practice in the province of Alberta may be required to verify loadbearing capacity of the soil. 3. Wood piles shall be treated with an acceptable preservative to a point at least 300 mm (12") above adjacent ground level. 4. A minimum depth of 1.2 m (4'-0") below grade is required for a foundation system. 5. An outdoor swimming pool heater shall not be installed beneath any structure, including a deck. 4

6. In an Established Community, if a lot has a width of 9.14 metres (30 feet) or less, a development permit is required for any deck. 7. In an Established Community, the surface of a deck cannot exceed 1.2 metres above grade, unless the basement has at grade entry. 8. A deck must be 1.2 metres from a side property line, unless the deck is on a street side of a corner lot, then 3.0 metres is required for lots subdivided after March 31, 1980. 9. For semi-detached dwellings a deck can go to the party wall side property line between the units if the deck provides a privacy wall. 10. A deck must be 3.0 metres from the front property line and 6.0 metres from the rear property line. 11. A landing is an uncovered platform providing direct access to a building entry. A landing must be 2.22 square metres or less in area. 12. If your deck does not meet the Land Use Bylaw requirements (such as height, setbacks, etc.) you must apply for a Development Permit prior to making an application for a Building Permit. The above list is not a complete list of the requirements of the Land Use Bylaw (2P80) or the Alberta Building Code. Please contact the Customer Service Call Centre at (403)268-5311 for more information. SAMPLE PLANS The following sample plans are for information and guidance only and will not be accepted as plans for a Building Permit Application. Do not scale these plans because they have been reduced in size to fit into the pamphlet format. Please ensure that your plans contain all the necessary information as outlined above so that delays in processing can be reduced and issuance of your Building Permit can be expedited. 5

WARNING! It is the responsibility of the applicant to ensure that the work being carried out does not contravene the requirements of restrictive covenants, caveats, or any other restrictions that are registered against the property. 100mm (4") max. spacing 900mm (3'-0") Min. OR 1070mm (3'-6") Ledger - Lag bolted to House Specify Decking Specify Beam Size Specify Joist Size Joist Hanger 1.2 m (4'-0") Min. Concrete Pier 6 m 0.6m CANT 1.95 m 0.9 m 1.95 m STAIRS 0.6m CANT 3 m 0.6m CANT SPECIFY BEAM SIZE 2.4 m DECKING 2.4 m SPECIFY JOIST SIZE AND SPACING 2.4 m NEW PATIO DOOR EXISTING HOUSE 6

7

FURTHER INFORMATION If you require further information, the Customer Advisory Services Division of Development & Building Approvals is located on the third floor of the Municipal Building at 800 Macleod Trail SE. We can be reached at: (403) 268-5311 or Web site: www.calgary.ca/planning The City of Calgary Development & Building Approvals Customer Service Counter 3rd Floor, Calgary Municipal Building 800 Macleod Trail SE Calgary, Alberta T2P 2M5 Inspections: Building (North) Building (South) Electrical Heating & Ventilation Plumbing & Gas 311 This series is published by The City of Calgary, Development & Building Approvals, as part of a public information service. These pamphlets have no legal status and cannot be used as an official interpretation of the various bylaws, codes and regulations currently in effect. The City of Calgary accepts no responsibility to persons relying solely on this information. Pamphlets are updated periodically. Contact the Customer Service Call Centre at (403) 268-5311 to determine if you have the most recent edition. Revised 2005 May 1406_wood_decks.pmd 8