Recycling of Mineral Wool Composite Panels Into New Raw Materials



Similar documents
Procurement requirements for reducing waste and using resources efficiently

Compactable Construction Waste Collection from Developments with Limited Storage Space

Modern Methods of Construction (MMC)

Definitions. Definition of Bulky Waste Bulky waste can be defined by type, by weight and by volume.

ARID (Accelerating Reprocessing Infrastructure Development) External Programme Evaluation: Summary Report (February 2015)

Sustainable procurement of mobile phone service contract

Choosing the right recycling collection system

Department of Public Works. Recycling policy for buildings and civil infrastructure

Comparing the cost of alternative waste treatment options

Material bulk densities

Reducing waste through efficient procurement can help reduce the costs of civil engineering and infrastructure projects; this guidance provides

Manchester United Old Trafford Stadium

Site waste it s criminal A simple guide to Site Waste Management Plans

Presentation Overview. Site Waste Management Plans: A missed opportunity?

Oldham Council innovates with dual-use compostable carrier bags

Benefits of reusing & recycling bulky waste

A guide to solid recovered fuel. Putting waste to good use and producing a sustainable alternative to fossil fuels

Collecting food waste from small businesses and

Resource efficiency in the UK whisky sector

Rockwool Cladding Roll

Building a sustainable future together

Recycling of end-of-life building glass

ecycling o create esource

Waste management and disposal:

Building Material Reuse Centres Business Plan

Achieve increasing levels of energy performance beyond the prerequisite standard to

The Designing out Waste Tool for Civil Engineering Projects

Planning waste management for events in Trafalgar Square

Designing out Waste: a design team guide for buildings

Foam Recycling is Viable. A Profitable Industry in the Making

6 CONSIDERATION OF ALTERNATIVES

Beyond Regulation. Head of Environment and Business Partnerships

Waste Management. Background

EU F-Gas Regulation Guidance Information Sheet 14: Refrigeration, Air-Conditioning and Heat Pump Contractors

Introduction to Waste Treatment Technologies. Contents. Household waste

Because sustainability matters

Construction Resources and Waste Roadmap

4 R Guide Reduce Reuse Recycle Recover

Review of contract practice in construction waste management

Avoiding the Landfill: The Recycling of Vinyl Roof Membranes

SAMI Microstar (SAMI MM, MD, MS)

Slide 1. Enviros Consulting Ltd

Developing a Strategic Approach to Construction Waste - Interim Report: Construction Products Materials and Waste Data

2.0 NEED FOR THE DEVELOPMENT & CONSIDERATION OF ALTERNATIVES

Waste Infrastructure Requirements for England. Centre for Environmental Policy Imperial College London

Strategic approach to the selection and procurement of construction materials and products

Composite Panel Firewall Systems

The London Waste and Recycling Board business plan November London Waste and Recycling Board 169 Union Street London SE1 0LL

Safe management of healthcare waste

A performance assessment of domestic fridge thermometers

Communications guidance. Indicative costs for communications

Living & Working Managing Natural Resources and Waste

WASTE STORAGE AND COLLECTION GUIDANCE FOR NEW DEVELOPMENTS

Paragraph 9 Exemption The reclamation or improvement of land

How To Boost Your Cash Flow With The Enhanced Capital Allowance Scheme

sustainable construction Simple ways to make it happen

Implementation of a Quality Management System (QMS) within the MRF Industry

The circular revolution

European Insulation Business

Use of Vehicle Routing and Scheduling Software in CDE Waste Collection

Literature Review - Relationship between Household. Food Waste Collection and Food Waste Prevention

The potential benefits Calculate your potential savings based on raw materials losses:

MATERIAL HANDLING FOR A TRIPLE BOTTOM LINE OUR STRATEGY FOR INNOVATION

ModuSec. Secure and efficient IT room solutions Composite Panel Systems Compared. Panel Systems are not all the same!

Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in

EU F-Gas Regulation Guidance Information Sheet 15: Fire Protection System Contractors

Phoenix Manufacturing Services

An environmental comparison of paper and plastic labels. Chris Edwards & Gary Parker Intertek Expert Services

Energise your waste! EU legislation pushes for a reliable alternative to landfilling for residual waste. 13 th September 2011, Birmingham

Swallow Street recycling facts and figures in partnership with Bywaters

Undercover storage requirements for waste/recycling depots

IT Trading UK Ltd Computer & IT Equipment Disposal Specialists

Pellet Process - Uses and Exposures

March Because sustainability matters

How To Write A Sustainable Resource Management Framework

Oman Environmental Services Holding Company

Estimated emissions and CO2 savings deriving from adoption of in-place recycling techniques for road pavements

Resource efficiency in the UK brewing sector

The Composition of a Tyre: Typical Components

Management of Asbestos. Darren Arkins Senior Inspector Occupational Hygiene Unit Chemical Business Services Division

Sustainability in construction at Creighton

The EC Ozone Regulation. Legislative Update and Strategies for HCFC Phase-out

Waste Management Policy

CABINET 26 JULY 2011 PROCUREMENT OF LONG TERM WASTE TREATMENT FACILITIES REPORT OF THE DIRECTOR OF ENVIRONMENT AND TRANSPORT

Guidance on applying the waste hierarchy to hazardous waste November 2011

Our Environmental Protection Plan RECYCLING CAPABILITIES AND ENVIRONMENTAL ACCOMPLISHMENTS

A clean energy solution from cradle to grave

Chapter 15 Managing Reverse Flows in the Supply Chain

Designing Closed-loop Supply Chains: Implementation of the WEEE directive in the UK 1

NORTH LONDON HEAT AND POWER PROJECT DESIGN OF PLANT, NUMBER OF PLANT LINES

San Francisco Zero Waste Policies & Programs. Jack Macy Department of the Environment City and County of San Francisco

Co-op Brand Packaging Policy

Transcription:

Case Study: Mineral Wool/Steel Composite Panel Recycling Recycling of Mineral Wool Composite Panels Into New Raw Materials Eurobond have developed a method for recycling mineral wool composite panels. By segregating the panel into constituent materials (mineral wool and steel), these can be fully and independently recycled so that new complete panels can be made and waste diverted from landfill. Project code: EMR002-000 Research date: 15 Feb 2007 28 March 2008 Date: 28 March 2008

WRAP helps individuals, businesses and local authorities to reduce waste and recycle more, making better use of resources and helping to tackle climate change. Written by: BRE/Eurobond Front cover photography: Composite panel being fed into a composite panel recycling machine (Eurobond) WRAP and BRE believe the content of this report to be correct as at the date of writing. However, factors such as prices, levels of recycled content and regulatory requirements are subject to change and users of the report should check with their suppliers to confirm the current situation. In addition, care should be taken in using any of the cost information provided as it is based upon numerous project-specific assumptions (such as scale, location, tender context, etc.). The report does not claim to be exhaustive, nor does it claim to cover all relevant products and specifications available on the market. While steps have been taken to ensure accuracy, WRAP cannot accept responsibility or be held liable to any person for any loss or damage arising out of or in connection with this information being inaccurate, incomplete or misleading. It is the responsibility of the potential user of a material or product to consult with the supplier or manufacturer and ascertain whether a particular product will satisfy their specific requirements. The listing or featuring of a particular product or company does not constitute an endorsement by WRAP and WRAP cannot guarantee the performance of individual products or materials. This material is copyrighted. It may be reproduced free of charge subject to the material being accurate and not used in a misleading context. The source of the material must be identified and the copyright status acknowledged. This material must not be used to endorse or used to suggest WRAP s endorsement of a commercial product or service. For more detail, please refer to WRAP s Terms & Conditions on its web site: www.wrap.org.uk.

Executive summary This case study describes the recycling of composite sandwich panels, comprising mineral wool and steel facings, following the refurbishment of a computer data centre for Goldman Sachs Investment Bank. 17000m 2 of wall and ceiling composite panels were installed on the data centre in East Grinstead, Sussex. The composite, derived from door way cut-outs, off-cuts and site-damaged panels, comprised of approximately 1,800m 2 which was reprocessed into new raw materials (steel and mineral wool). Recycling of Mineral Wool Composite Panels Into New Raw Materials 1

Contents 1.0 Background... 3 1.1 General information on the recycling project...3 1.2 Description of the recycling project...3 1.3 Cost benefits...4 1.4 Environmental benefits...4 2.0 Specific Details of the Recycling Methodology... 5 2.1 Overview...5 2.2 Segregation...5 2.3 Delivery to the recycling site...5 2.4 Recycling...6 3.0 End Use... 9 3.1 Reprocessing back into steel/mineral wool product...9 4.0 3.2 Reprocessing panels back into mineral wool and steel...9 Conclusions... 9 5.0 References... 10 Recycling of Mineral Wool Composite Panels Into New Raw Materials 2

1.0 Background 1.1 General information on the recycling project Name: Data Centre for Goldman Sachs Investment Bank. Region: East Grinstead, Sussex, England. Type of recycling activity: Mineral wool composite panels collected, shredded and separated for re-entering into the manufacturing process to make new products (steel and mineral wool). Whether new build, refurbishment or demolition: Refurbishment of data centre. Type of material accepted: The recycling process accepts mineral wool composite panels from site demolition or refurbishment waste, site waste from new build and waste from manufacturing processes. Use/application(s) of the material(s): Scrap steel and mineral wool raw materials are produced which are suitable for a range of products including, potentially, new composite panels. Timescale: During 2008. Client for the trial: Eurobond Laminates Limited. Contractor: Laing O Rourke (main contractor); CPS (panel sub-contractor). Strategic partners: GD Environmental Services Ltd, Rockwool International and Corus. 1.2 Description of the recycling project 1,800 m 2 of Eurobond s Firemaster wall and ceiling composite panels (100mm and 150mm thickness), which are faced with Corus steel Performa product, were removed from Goldman Sachs data centre in East Grinstead, Sussex. The recyclate, derived from door way cut-outs, off-cuts and site-damaged panels were re-processed into new raw materials (steel and mineral wool). Construction generates more than one third of waste materials going to landfill in the UK but only half of construction and demolition waste is reused or recycled within the sector 1. There is a growing realisation that the current model of development is unsustainable; habits must change and progress made if growth is to be sustainable. The Government recognises this and is committed to achieving sustainable development in the United Kingdom through its Sustainable Construction Strategy. Government and industry have proposed halving the amount of construction, demolition and excavation waste sent to landfill by 2012 2. One way to tackle waste of construction materials is to use them again at the end of their life. An example of this is the approach adopted with the mineral wool/steel composite structural panels manufactured by Eurobond. Eurobond advocates a cradle to cradle approach to recycling where materials are recycled in a closed loop. Maintaining materials in closed loops maximizes material value, allowing materials to be used, recycled, and used again, often without any deterioration in material quality. For mineral wool composite panels, this is a win-win situation. There are no expensive disposal costs and there is also a reduction in the need for primary natural resources. A composite panel can be considered as part of a closed loop recycling process as both steel and mineral wool can be used to make new product. After processing, 100% of the separated mineral wool and steel facings is reentered into the manufacturing process to make virgin products. No material is required to go to landfill. All parts of the composite panels are recycled. Eurobond s approach, in collaboration with its strategic partners GD Environmental (a waste management company), Rockwool (a mineral wool insulation manufacturer) and Corus (a manufacturer of coated steels), is to manage the recycling of the composite panels and ensure delivery of all recycled material to the relevant manufacturer for transformation into new product. Recycling of Mineral Wool Composite Panels Into New Raw Materials 3

1.3 Cost benefits The recovered steel has an increasing value and, in some projects, this could result in a recycling process approaching cost neutrality. Transport has a significant impact on the recycling costs and therefore cost benefits are calculated on a project-by-project basis. However, through the use of readily available machinery and careful project management, Eurobond is able to offer a cost-effective, closed-loop recycling capability for end-of life composite panels. 1.4 Environmental benefits Total recyclability. Steel and mineral wool returned and recycled into new product. Zero waste to landfill. Recycling of Mineral Wool Composite Panels Into New Raw Materials 4

2.0 Specific Details of the Recycling Methodology 2.1 Overview Managing the recycling of the composite panels and ensuring delivery of all recycled material to the relevant manufacturer for transformation into new product has several key system components : Segregation (with acceptable levels of contamination). Delivery to recycling site. Recycling. Reprocessing back into steel/mineral wool products. 2.2 Segregation Amendments to The Landfill (England & Wales) Regulations 2002 implemented Council Directive 99/31/EC on the landfilling of waste impose more strict controls on waste being sent to landfill. Traditional co-disposal methods can no longer be used. From 30 October 2007, all waste has had to be pre-treated (physically, chemically or thermally), before acceptance to landfill. Physical treatments include segregation and volume reduction. At this stage it is practicable to separate steel faced composite panels. From 6 April 2008, construction projects in England over 300,000 in value were required to have a Site Waste Management Plan (SWMP). The SWMP must include a forecast of wastage as well as a record of types of waste and their destinations (recycling, landfill etc). Projects over 500,000 must estimate the cost savings from waste management. 2.3 Delivery to the recycling site Once the accumulated volume of waste mineral wool composite panel has been identified and segregated, the material can be delivered to GD Environmental Services in Newport, South Wales. The strategic partners (Eurobond, GD Environmental, Rockwool and Corus) are all located in a similar geographical area within South Wales. Depending on the volume of mineral wool composite panel generated via demolition, delivery can be staged over several days. Delivery can use a variety of haulage options although, in the case of the data centre refurbishment, was via two articulated lorries. The cost per tonne of recycling is considerably lower than the cost of disposal of waste to landfill. Figure 1 shows the recovery and recycling processes in a schematic form. Recycling of Mineral Wool Composite Panels Into New Raw Materials 5

Figure 1: Flow chart illustrating the segregation and recycling process Cut-outs Off-cuts Site-damaged composite panels Old panels Panels segregated on site GD Environmental Shredder Mineral wool (Rockwool) Steel (Corus) Rockwool Insulation Steel New Composite Panels 2.4 Recycling The recycling location of Newport, South Wales, was deliberately chosen as the recycled mineral wool and steel need to be transported only a few miles (25 miles or less) to the respective manufacturers for new material production (both of which are based in South Wales). The recycling unit itself is a Doppstadt DW-2560K. Although the unit itself is mobile, it is predominantly used in a fixed, elevated position to ensure ease of capture of the recycled material. Recycling of Mineral Wool Composite Panels Into New Raw Materials 6

Figure 2: A recycling unit for composite panels (Eurobond) Figure 3: Composite panel being fed into a composite panel recycling machine (Eurobond) Recycling of Mineral Wool Composite Panels Into New Raw Materials 7

Composite panels of all sizes can be fed into the shredding machine shown in Figure 3. All mineral wool composite panel waste can be handled using this system, which allows for a more flexible range of geometry of the panels as they do not need to be cut down in size. The shredder separates the steel from the mineral wool and deposits it into individual containers for compression prior to delivery to Rockwool or Corus. This process ensures that the minimum amount of transport is required, leading to an environmental and financial benefit. Mineral wool and steel are separated via a magnetic belt. The current capacity of the facility for recycling is approximately 2,000,000m 2 of panels per year. Figure 4: Separation of mineral wool from steel fraction (Eurobond) Recycling of Mineral Wool Composite Panels Into New Raw Materials 8

3.0 End Use 3.1 Reprocessing back into steel/mineral wool product Both Rockwool and Corus have their own acceptance criteria for recycled materials. Eurobond has worked closely with both parties during recycling trials and has established that the material quality post-processing is not only acceptable but, in the case of the steel, prime quality for re-entering into the manufacturing process. The shredded steel from the facing of the panels will be returned to the Corus site at Port Talbot, where it will be consumed in the steel making process. As a result of the high quality of the steel, the temperature in the blastfurnace at Corus Port Talbot plant can be lower than normal. This is due to the introduction of already processed steel, which results in lower energy input and CO 2 production. Rockwool have their own stringent screening process at their manufacturing base in Pencoed, South Wales. The recovered wool resulting from Eurobond trials is of sufficient quality to be re-entered into the manufacturing process without further processing. 3.2 Reprocessing panels back into mineral wool and steel GD Environmental transports recycled material back to the Corus and Rockwool facilities. There is no need to landfill of any element of the mineral wool composite panel, unlike plastic foam composites which can see a portion of the panel (the plastic foam core) being landfilled after processing. The recycling of Eurobond product leaves virtually no mineral wool on the steel. There is a small amount present upon the adhesive lines but this is well within the tolerances that are acceptable to Corus. Rockwool has set targets to continuously improve its environmental impacts and has been able to substantially improve the recycling of waste on site at its Pencoed manufacturing plant. This has resulted in a decline in the volume and costs associated with waste disposal over a six-year period. Improved recycling has also resulted in product being generated from waste, increasing production efficiency and diverting waste from landfill. To further expand its capacity to recycle waste stone wool, Rockwool is due to open a new recycling facility in the autumn of 2008 at a cost of more than 7 million. This new facility is capable of satisfying the growing demands of Rockwool s customers for recycling over the foreseeable future and also demonstrates Rockwool s commitment to recycling on a larger scale. 4.0 Conclusions Composite sandwich panels, comprising mineral wool and steel facings have been successfully re-processed following the refurbishment of a computer data centre for Goldman Sachs Investment Bank. The composite, derived from door way cut-outs, off-cuts and site-damaged panels, comprised approximately 1,800m 2 which was re-processed into new raw materials (steel and mineral wool). The current capacity of the facility for recycling is approximately 2,000,000m 2 of panels per year. The quality of the recovered steel and mineral wool recovered is sufficiently high for re-introduction into the relevant production processes. There is no need to landfill any element of the composite panel. Recycling of Mineral Wool Composite Panels Into New Raw Materials 9

5.0 References 1 Setting a requirement for recycled content in building projects WRAP http://www.wrap.org.uk/downloads/setting_sequirements_for_rc_in_building_projects1.30bed810.pdf [access date 28/03/08] 2 Waste Strategy for England, DEFRA 2007. http://www.defra.gov.uk/environment/waste/strategy/index.htm [access date 28/03/08] www.wrap.org.uk/construction