Ex-ante Evaluation - 1 -



Similar documents
1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan)

(1) State of Disaster and Issues Stemming from Tropical Storm Ondoy and Typhoon Pepeng

MACROECONOMIC AND FISCAL ASSESSMENT

Environmental and Social Monitoring Report. SAMOA: Power Sector Expansion Project

Ex-Ante Evaluation (for Japanese ODA Loan)

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

SECTOR ASSESSMENT (SUMMARY): ENERGY

SECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Performance, Problems, and Opportunities

Financing Energy Efficiency and Renewable Energy through the India Renewable Energy Development Agency

Third Quarterly Report 2006.

TERMS OF REFERENCE. ASSIGNMENT INFORMATION Position Title:

Country Operations Business Plan. Project Number: August Samoa

Business and Other Risks

Phakwe group. Growing with Africa

Mr. Chairman, Mr. President, distinguished Governors, ladies and gentlemen,

New JICA Guidelines for Project Evaluation First Edition. Japan International Cooperation Agency (JICA) Evaluation Department

FINANCIAL ANALYSIS. A. Introduction and Methodology

First Quarterly Report 2008.

Independent State of Samoa: Ports Development Master Plan

Energy Productivity & Pricing

Japan s s Contribution to Promoting Sustainable Management of the World s Forests

(Tentative Translation)

SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Performance, Problems, and Opportunities

INFORMATION NOTE. Electricity Market in Hong Kong

The Philippines Leyte-Bohol Interconnection Project

Hong Kong Declaration on Sustainable Development for Cities

JICA s Mid-term Plan/Annual Plan for Business year 2014

SECTOR ASSESSMENT (SUMMARY): MICRO, SMALL AND MEDIUM-SIZED ENTERPRISE DEVELOPMENT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities

As of July 1, Risk Management and Administration

CANADIAN RENEWABLE ENERGY POLICIES. Matthew H. Brown InterEnergy Solutions 2007

Strengthening Project Preparation Capacity in Asia and the Pacific

Papua New Guinea: Microfinance and Employment Project

Guidelines for Currency Conversion of Japanese ODA Loans

Eng.Mostafa. Ibrahim Khamis. Dr. Shaher Anis Mahmoud. Eng.Ehab. Ehab Ismaeel Amin. Acc. Hazem Ahmed Abdelhalim

PROJECT PREPARATORY TECHNICAL ASSISTANCE

POLICY ON COAL-FIRED POWER GENERATION

JASPERS Networking Platform. Training on general State Aid issues in infrastructure projects CASE STUDY

Rural Electrification Workshop February 23-25, 2005 Bangkok

GREEN DEAL Saving money by understanding the Energy Agenda. Dave Princep BSc LLB MCIEH

TARIFF AND GOVERNANCE ASSESSMENT

Tufts Consulting Group: Macedonian Energy

Mongolian power sector:

ii. Project Finance Specialist (national consultant; 9 person-months; intermittent).

United States Department of Commerce International Trade Administration

The Philippines Local Government Units Support Credit Program

Electricity Generation from Renewable Energy in Sri Lanka: Future Directions

Power and Social Infrastructure Business Strategies May 29, 2015 Fuji Electric Co., Ltd. Power and Social Infrastructure Business Group

Closing Announcement of First Quarter of the Fiscal Year Ending March 31, 2009

RENEWABLE ENERGY DEVELOPMENT IN LITHUANIA ACHIEVEMENTS AND DRAWBACKS

Interview with the President

Makita Corporation. Consolidated Financial Results for the nine months ended December 31, 2007 (U.S. GAAP Financial Information)

SEVENTY-SIXTH MEETING WASHINGTON, DC OCTOBER

National Electric Power Regulatory Authority

Distributed Generation: Frequently Asked Questions

SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES Sector Performance, Problems, and Opportunities

Present Status and Future Outlook for Smart Communities

46 63 Foundation for Promoting CSR Management. Providing Stable, Sustainable Power to Meet Rising Electricity Demand

ASIAN DEVELOPMENT BANK

International Solar Energy Arena January 23rd, 2009, Istanbul STEAM (Strategic Technical Economic Research Center)

Loan and Administration of Cofinancing Republic of Uzbekistan: Talimarjan Power Project

1. Project Profile and Japan s ODA Loan

Report and Recommendation of the President to the Board of Directors

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

Laos Project Site. China. Thailand. Vietnam. Cambodia Ho Chi Minh. Malaysia

Revisions of FIT Scheme to promote usage of. Renewable Electric Energy

Establishment of an Action Plan for the Electricity Business for Achieving a Low-Carbon Society

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

Republic of Nauru. Nauru s Submission to the UNFCCC Workstream 2

On-Site Examination Policy for Fiscal Examination Policy for Fiscal 2016" briefly reviews on-site examinations carried out in

Report and Recommendation of the President to the Board of Directors

Bangladesh Bank (Central Bank of Bangladesh) Head Office Motijheel, Dhaka-1000 Bangladesh

Goal 1: Eradicate extreme poverty and hunger. 1. Proportion of population below $1 (PPP) per day a

Sustainable and Renewable Energy Development Authority (SREDA) of Bangladesh Role and Responsibility

Technical Assistance Report. Project Number: December Public Debt and Risk Management Forum

Financing Energy Efficiency and Renewable Energy: Thailand s ENCON Fund

8-5. Engineering and Operations Committee. Board of Directors. 6/9/2015 Board Meeting. Subject. Executive Summary. Details

Green Credit Guidelines

Clean State Energy Actions 2011 Update. nevada

SECTOR ASSESSMENT (SUMMARY): FINANCE

LOAN AGREEMENT (Special Operations) (Power Transmission Rehabilitation Project) between REPUBLIC OF ARMENIA. and ASIAN DEVELOPMENT BANK

LOAN AGREEMENT (Special Operations)

Proposed Administration of Loans and Grants Kingdom of Cambodia: Rural Roads Improvement Project II

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

Regulation for Renewable Energy Development: Lessons from Sri Lanka Experience

Toward Sustainable Regional Development through Renewable Energy

Carbon Management Plan

ROSEAU EDA REVOLVING LOAN FUND LENDING GUIDELINES (CITY/USDA FUNDS)

FIXED CHARGE: This is a cost that goes towards making the service available, including

Consolidated Financial Results for the First Quarter of the Fiscal Year Ending March 31, 2016 (Japan GAAP)

Qualitative information regarding first-quarter settlement of accounts

SHRIRAM TRANSPORT FINANCE COMPANY LIMITED. Business Responsibility Policy

equitable, quality health care and resilient health systems. Manila: 2015.

MICRO/MINI HYDRO POLICIES AND PLANS IN NEPAL

ARTICLE VII (7) ARTICLE VII. MONITORING & SAMPLING. PARAGRAPH SECTION 1. MONITORING FACILITIES. PARAGRAPH

Exploring Feasibility Finding a market, business structure, and incentives

"Project Formulation Survey" under the Governmental Commission on the Projects for ODA Overseas Economic Cooperation in FY2012.

Western Balkans Regional Energy Efficiency Programme (REEP)

Asset Management in Water Utility

Transcription:

Ex-ante Evaluation 1. Name of the Project Country: The Independent State of Samoa Project: Power Sector Expansion Project (Loan Agreement: December 10, 2007; Loan Amount: 4,598 million yen; Borrower: The Government of the Independent State of Samoa) 2. Necessity and Relevance of JBIC s Assistance The total capacity of the electric power facilities in Samoa is 37.2 MW, of which about 90% is produced on Upolu Island, where Apia, the capital, is located, and 10% on Savai i Island. About two-thirds of Samoa s electricity are produced by diesel power; the rest by hydro power. However, Samoa is actually able to produce only two-thirds of its capacity, or about 24 MW, due to, among other things, aged deterioration, power system losses of the transmission/distribution lines, and frequent inspection of the facilities. Additionally, accompanying the steady growth of the Samoan economy, the peak power demand has been increasing at an annual rate of 4% or more in recent years. In fact, by 2008, on Upolu Island, the peak power demand is expected to exceed the power supply. Thus the situation calls for immediate action. Moreover, in response to the recent steep rise in the price of crude oil, in Samoa, which relies heavily on diesel power generation, electricity tariffs are set at around 30 yen per kwh, which is high even by international standards. Under these circumstances, the challenge for Samoa is to find an effective way of utilizing inexpensive renewable energy sources such as hydro power that can be supplied domestically in Samoa. At the same time, there is an urgent need to improve the deteriorating power generation facilities and transmission/distribution lines and to put in place a system for setting electricity tariffs that properly reflect the price of crude oil and other energy sources through establishing a regulatory agency that will ensure independence in the way electricity rates are set. The first priority of Samoa s National Development Plan (2005 2007) is to achieve economic growth through enhancement of the private sector. Utilization of hydro power and establishment of highly efficient power plants are considered as priority issues for Samoa s power sector. In the Assistance Plan (2007 2009), which was announced during the Fourth Pacific Island Summit, held in Okinawa in 2006, sets forth five priority issues, including economic growth and sustainable development. Additionally, in its Medium-Term Strategy for Overseas Economic Cooperation Operations (April 2005), JBIC sets forth foundation for sustainable growth as one of its priority areas, and, while avoiding negative impact on the social and economic front, aims to provide assistance for developing economic and social infrastructure including energy and support for promoting sustainable growth. Furthermore, in the Enhanced Sustainable Development for Asia (ESDA) that the government of Japan announced at the Annual Meeting of the Asian - 1 -

Development Bank (ADB) in May 2007, improvement of investment climate and energy conservation, etc. are regarded as priority areas. Providing support for this project, which aims to reduce power system loss through utilization of renewable energy, construction of efficient diesel power plants and improvement of transmission/distribution lines, is consistent with Japan s Assistance Plan, which the Japanese government announced during the Pacific Island Summit, ESDA and JBIC s Medium-Term Strategy for Overseas Economic Cooperation Operations. Consequently, it is highly necessary and relevant that JBIC should support the project with ODA loans. 3. Project Objectives The objective of this project is to provide a sustainable and reliable power supply through construction and rehabilitation of power plants as well as development and rehabilitation of transmission/distribution lines in Samoa, and thereby contribute to the development of Samoa s private sector and economic growth. 4. Project Description (1) Target Area Upolu Island and Savai i Island (2) Project Outline This project, which is a sector loan, is designed to support the implementation of the Samoa Electric Power Corporation (EPC) s Investment Plan (2008 2015), which includes construction and rehabilitation of power plants as a well as development and rehabilitation of transmission/distribution lines. Additionally, on the basis of the Accelerated Co-Financing Scheme (ACFA) that JBIC concluded with ADB under the ESDA, the project will be co-financed with ADB, and cooperate (by providing grants) with the Australian Agency for International Development (AusAID). (a) Construction and rehabilitation of power generation facilities: Construction of the Upolu diesel power station, refurbishment of Alaoa hydropower station, Tanugamanono diesel power station noise and emission control program, construction of the Vaitai hydroelectric power plant. (b) Development and rehabilitation of transmission/distribution lines (c) Installation of prepayment meters (d) Introduction of System Control and Data Acquisition (SCADA) (e) Consulting services (including the recruitment of the project manager [PM]) (3) Total Project Cost / Loan Amount 12,100 million yen (yen loan amount: 4,598 million yen; amount provided by ADB: 5,082 million yen [of which grants account for 1,862 million yen]; amount provided by AusAID: 968 million yen [grant]) - 2 -

(4) Schedule January 2008 June 2016 (102 months). The definition of project completion is when the implementation of EPC s Investment Plan (2008 2015) is completed. (5) Implementation Structure (a) Borrower: The Government of the Independent State of Samoa (b) Executing Agency: Electric Power Corporation (c) Operation and Maintenance System: Same as (b) (6) Environmental and Social Consideration (a) Environmental Effect / Land Acquisition and Resident Relocation (i) Category: B (ii) Reasons for Categorization This project is not likely to have significant adverse impact on the environment due to the fact that the project does not fall under the category of large scale hydroelectric power generation sector under the Japan Bank for International Cooperation Guidelines for Confirmation of Environmental and Social Considerations (established in April 2002), as well as the fact that project characteristics are not likely to exert impact and the project is not located in a sensitive area under the said Guidelines. Thus this project is classified as Category B. (iii) Environmental Permit The Initial Environmental Examination (IEE) report related to the project was prepared in July 2007 and approved by the Planning and Urban Management Agency (PUMA). Separate IEE reports are scheduled to be prepared for individual subprojects. (iv) Anti-Pollution Measures Since the project involves rehabilitation of existing transmission/distribution lines and the power generating facilities involved are small in scale, no significant adverse impact is foreseen. However, with regard to anti-pollution measures to be taken in the course of construction and after the transmission/distribution lines and power generation facilities are placed in service, the Executing Agency will implement the measures concerning waste, noise and other causes of pollution formulated in the IEE on the basis of instructions issued by the Environmental and Social Unit (ESU) of the Executing Agency. (v) Natural Environment The project site is not located in or around sensitive areas, such as national parks, and so adverse impact on the natural environment is assumed to be minimal. (vi) Social Environment For subprojects included in the project that require land acquisition, land will be - 3 -

acquired in accordance with Samoa s domestic procedures. Resident relocation is not expected. (vii) Other/Monitoring The Executing Agency will, pursuant to the environmental guidelines established by JBIC and ADB, ascertain the environmental and social impact of each subproject with the assistance of the consultant that will be hired under the project. In addition, ADB will, through the progress report to be submitted quarterly, monitor the items that are scheduled to be agreed upon between ADB and the Executing Agency prior to the implementation of each subproject. Both the progress reports and monitoring reports to be submitted to ADB will be shared by JBIC. Thus follow up monitoring of the project will be possible at JBIC. Under this project, loans will not be provided for the subprojects classified as Category A. (b) Promotion of Poverty Reduction None (c) Promotion of Social Development (e.g. Gender Perspective, Measure for Infectious Diseases including AIDS, Participatory Development, Consideration for the Handicapped, etc.) This project intends to require the Executing Agency to tackle the issues of health and safety including programs (1) to spread information targeting construction workers provided by the contractor concerning the risk of sexually transmitted diseases (including HIV/AIDS); and (2) to spread education and information targeting local residents (particularly women) provided by pertinent organizations. Additionally, the contractor is expected to take steps to prevent gender disparities from emerging, for example, in the employment of local residents for construction work of the facilities, in the operation and maintenance of the facilities, and in the payment of wages. (7) Other Important Issues This project is the first ODA loan extended to the Independent State of Samoa. 5. Outcome Targets (1) Evaluation Indicators (Operation and Effect Indicator) Baseline Target Indicator (2008 actual ) (ADB s target year) Average annual outage Measuring scheduled in the 20% reduction (2015) hours per user Average annual outage Measuring scheduled in the 20% reduction (2015) frequency per user Reduction of technical Measuring scheduled in the 20% reduction (2012) systemic loss - 4 -

Installation rate of prepaid type meters 5% of all contractants (2007 actual) 7% of all contractants (2012) (2) Number of Beneficiaries: About 175,000 (95% of total population) (3) Financial Internal Rate of Return (FIRR): 7.0% (Upolu Island); 12.1% (Savai i Island) (a) Cost: Project cost, operation and maintenance expenses, systemic loss, cost of purchasing electricity from independent operators (b) Benefit: Revenue from selling electricity (c) Project Life: 20 years 6. External Risk Factors None 7. Lessons Learned from Findings of Similar Projects Undertaken in the Past Some of the power sector projects that ADB implemented in the past have experienced cost overruns due to schedule delays. Based on this lesson, this project adopts a sector loan approach, which enables it to deal flexibly even in cases where the price of materials and equipment rises each time a subproject is implemented. Moreover, given the urgency of the project, the draft of the bidding document will be prepared before project implementation so that it will be possible to start construction right after the launch of the project. At the same time, the ODA loan may be disbursed retroactively in the case funding is needed prior to the loan agreement date. Furthermore, implementation of the project according to the plan of the Executing Agency will be promoted by adopting a grant incentive scheme that utilizes the grant portion of ADF. 1 8. Plan for Future Evaluation (1) Indicators for Future Evaluation (a) Average annual outage hours per user (hours) (b) Average annual outage frequency per user (times) (c) Reduction of technical systemic loss (%) (d) Installation rate of prepaid type meters (%) (e) Financial Internal Rate of Return (FIRR) (%) (2) Timing of Next Evaluation After project completion (ADB s target year) 1 The ADF Grant, which is onlent from the government of Samoa to EPC under the same conditions as the loan, is structured so that EPC will, up to a 10-million dollar ceiling, be exempt from repayment if the project is completed within the budget and on schedule. - 5 -