Overcoming Testing Challenges in SAP Upgrade Projects



Similar documents
SAP CRM Campaign Automation

Step by Step Guide for Language Translation Tool

Reverse Transport Mechanism in SAP BI

Restricting Search Operators in any Search View

BW Performance Monitoring

SAP FI - Automatic Payment Program (Configuration and Run)

Integrated Testing Solution Using SAP Solution Manager, HP-QC/QTP and SAP TAO

Guidelines for Effective Data Migration

Step by Step Procedure to Block and Debug a CIF Queue Flowing from R/3 to APO System

How to Assign Transport Request for Language Translation?

Display Options in Transaction SE16

Direct Subcontracting Process (SAP SD & MM)

Standard SAP Configuration of SMS through HTTP with Third Party SMS Gateway

Creating Transaction and Screen Variants

Data Flow from LBWQ/SMQ1 to RSA7 in ECC and Delta Extraction in BI

Multi Provider Creation Based on Sales and Planning Info Cubes

SPDD & SPAU Adjustments Handbook

Creating New Unit of Measure in SAP BW

ALE Settings, for Communication between a BW System and an SAP System

Working with SAP BI 7.0 Data Transfer Process (DTP)

SAP BW - Excel Pivot Chart and Pivot Table report (Excel)

Step by Step Guide How to Copy Flat File from Other Application Server to BI and Load through Info Package

How to Generate Stack Xml for Ehp4 and Above Upgrade

Release Strategy Enhancement in Purchase Order

Abstract. SAP Upgrade Testing : In A Nutshell Page 2 of 15

Table of Content. SAP Query creation and transport Procedure in ECC6

Quick Viewer: SAP Report Generating Tool

Table of Contents. Passing Data across Components through Component Controller between Two Value Nodes

A Step-by-Step guide on SMTP Configuration and File to Mail Scenario Using Process Integration Scenario in PI 7.1

ABAP Debugging Tips and Tricks

Time Evaluation RPTIME00 Report Prerequisites, Process Flow and Storing results on Cluster B2

Workflow Troubleshooting and Monitoring in SAP ECC 6.0

SAP CRM 7.0 E2C Setup: CRM via Toolset

How to Integrate CRM 2007 WebClient UI with SAP NetWeaver Portal

SAP ERP Upgrade Checklist Project Preparation

How to Modify, Create and Delete Table Entries from SE16

Introduction to COPA and COPA Realignment

Creation and Configuration of Business Partners in SAP CRM

Step by Step Procedures to Load Master Data (Attribute and Text) from FlatFile in BI 7.0

Deleting the User Personalization done on Enterprise Portal

SAP NetWeaver Developer Studio 7.30 Installation Guide

Registration, Evaluation, Authorization and Restriction of Chemicals (REACH) Compliance

Currency Conversion using Variables in SAP BI -Reporting

IDOC Payment Process with SAP

Process Controlled Workflow SRM 7.0 (Using BRF)

Transfer of GL Master from Source SAP System to a Target SAP System through IDOCS

Exposing RFC as Web Service and Consuming Web Service in Interactive Forms in ABAP

Extractor in R/3 and Delta Queue

Training Plan CONTOSO, LTD MICROSOFT DYNAMICS AX SOLUTION

Converting and Exporting Data in XML Format

Deleting the Requests from the PSA and Change Log Tables in Business Intelligence

How to Load Data from Flat Files into BW PSA

Automating Invoice Processing in SAP Accounts Payable

Which Off-Line CRM Solution for Field Force?

How to Create an ecatt?

Configuration and Utilization of the OLAP Cache to Improve the Query Response Time

Deploying Crystal Reports on Top of a SAP BI Query

Middleware Configuration and Monitoring for Master Data Transfer from SRM to ECC

Sales Commission Calculation & Settlement Handling through Order Processing

LSMW: Upload Master Data using Batch Input Recording

Prima Solutions. Overcoming the Challenges of Implementation. In This Issue

Methodology to Implement SAP Process Integration

ABAP Proxy Interfacing

SAP MM: Purchase Requisition with Classification and Workflow Approval

SAP Workflow in Plain English

Case Study of a Segregation of Duties Project

Solution Manager Service Desk an End-to-End Helpdesk Solution

Creating Content Using SO10 Objects and Text Symbols

Compounding in Infoobject and Analyzing the Infoobject in a Query

First step to Understand a Payroll Schema

A GUIDE TO IMPLEMENTING SAP BUSINESS ONE

SAP BW - Generic Datasource Function Module (Multiple Delta Fields)

Creating Web Service from Function Modules/BAPIs & Integrating with SAP Interactive Forms

Web Dynpro: Multiple ALV Grids and Layouts in ALV

Query OLAP Cache Optimization in SAP BW

Configuration of Enterprise Services using SICF and SOA Manager

SAP BW 7.3: Exploring Semantic Partitioning

Tutorial - Creating Pop Up Window Using New Features in WebDynpro Java CE 7.1 Ehp1

Executive summary. Introduction. Table of Contents. How to greatly increase the probability of success and realize the benefit of your investment

Message handling in SAP CRM Web UI

3 Establish a process

Step by Step Procedure to Create Broadcasters, to Schedule and to Enhance of SAP- BI Queries from Query Designer

Embedding Crystal Reports inside ECC ALV Reports

Credit Management in Sales and Distribution

Web Dynpro ABAP: ALV and Table in Popup Window

Business Process Validation: What it is, how to do it, and how to automate it

Step by Step guide of Report-to- Report Interface in BW Reporting

Creating and Scheduling Publications for Dynamic Recipients on SAP Business Objects Enterprise

Order Split Usage in Production Orders

Step By Step Procedure to Create Logical File Path and Logical File Name

Understanding BEx Query Designer: Part-2 Structures, Selections and Formulas

4.13 System Testing. Section 4 Bidder's Products, Methodology, and Approach to the Project System Training

Quality Assurance - Karthik

Multi Level Purchase Order Release Strategy

Organizational Management- Organizational Structure Creation

Create Automatic Mail Notification/ Alert for Process Chain Monitoring

End User Training and Documentation a capability of Solution Implementation. August 2011

Web Application Designer for Beginners

SAP CRM Middleware Configurations

Understanding DSO (DataStore Object) Part 1: Standard DSO

Transcription:

Overcoming Testing Challenges in SAP Upgrade Projects Applies to: SAP Upgrade Projects. For more information, visit the Enterprise Resource Planning homepage. Summary Testing in SAP Upgrade forms the crucial parameter which if not managed well may result in serious doubts over the acceptability of the upgraded SAP system by the Business Users in an Organisation.The article covers the inputs to plan and manage efficiently the Testing scope and effort in an Upgrade project. Author: Deepak Kumar Company: Infosys Technologies Limited, India Created on: 10-Sep-2009 Author Bio Deepak Kumar is Principal Consultant in SAP Practice at Infosys Technologies Ltd. He has over 15 years of experience in Business, IT Consulting, SAP Implementation and Upgrade Projects. He can be reached at Deepak_Kumar02@infosys.com. 2009 SAP AG 1

Table of Contents Overview... 3 Sandbox Testing Pyramid Approach... 3 Testing in SAP Development System... 5 Testing in SAP Quality System... 5 Risk Based Testing Approach... 5 Performance testing... 6 Connectivity Testing... 6 User Acceptance Testing... 6 Conclusion... 7 Related Content... 8 Disclaimer and Liability Notice... 9 2009 SAP AG 2

Overview Organizations having SAP based business solution are involved in SAP upgrade project at one time or another. In the present times, many of them are involved or are planning upgrade to SAP ERP 6 which will form the stable version till 2017. The periodic improvements would be delivered through Enhancement packages which would be installed and activated as per the needs of the Organization. The success of SAP Upgrade projects relies on efficient and comprehensive planning of Testing activities that start from the project kick-off itself and last till few weeks before the project go-live. Organizations involved in SAP Upgrade projects faces the dilemma over the testing of the upgraded and the uncioded SAP based business solution. The question that each organizations faces is over the quantum of testing, how much to test, what should be the scope and the effort involved. It becomes important that optimum Testing approach be defined upfront for the SAP upgrade project and followed. Testing involves substantial effort and has a direct impact on project plan and the project budget. It forms the crucial parameter which if not managed well may result in serious doubts over the acceptability of the upgrade project by the business users. The article covers the inputs to plan and manage efficiently the Testing scope and effort in an Upgrade project. Sandbox Testing Pyramid Approach The objective of the Sandbox testing is to ascertain the potential scope of changes and issues in the upgraded & unicoded SAP system so that Testing Approach can be suitably framed/revised for the project. This will also act as an input to the project effort planning and duration. The scope preparation starts in parallel while Sandbox is being prepared and is finish when it is ready. This helps to initiate Sandbox Testing without any delay.the important aspect is to test the critical and important transactions of the business processes by the various functional teams to ascertain the extent of changes in the new system. A representative set of testing scope (also called Top of the Pyramid ) covering the following is prepared based on the following factors: Critical SAP standard and custom transactions to make sure that frequently used SAP standard and custom transactions are behaving as expected. Transaction usage statistics from last year or a given period provides important inputs. Additionally, less used but critical transactions e.g. Month end, Year end reporting transactions should also be covered. Critical Reports in different languages Both Custom developed and standard reports should be covered in different language that are used in the system Representative set of Critical Interfaces All the critical interfaces should be identified and their connectivity should be established with corresponding test system. It is also of importance that all kinds of interfaces are covered e.g. Inbound, Outbound, file based, Database Connects type are covered. A matrix of Business & IT Contacts for Interfaces should be maintained for faster contact and issue resolution Representative set of Prinouts in different languages All the important printouts that go out to outside entities either electronically or in manual form should be covered. Printouts in different languages should be considered to assure the correctness on layout and characters in the output. Complex enhancements e.g. Custom developed functionality, User exit etc should be included in the scope 2009 SAP AG 3

. If the number and nature of issues are high the testing scope should be suitably increased in the Quality Testing so as to increase the confidence in the quality and stability of the upgraded and unicoded SAP system. In this situation Sandbox Testing scope should also be revised to cover medium impact transactions so as to gain suitable confidence level on the new system behaviour. The possible nature of issues encountered in Sandbox testing is as follows: Nature of Issues Causes Corrections Program Dumps Wrong Characters in the Output (report, printouts) Interfaces Impacted Objects Unicode incompatibility, Reference SAP standard object is changed Unicode incompatibility, Incorrect Vocabulary Program errors, Legacy system compatibility, File systems errors, Connectivity errors Changed technical components in new SAP version Development Correction, SAP Notes Development Corrections, Vocabulary Corrections Development Corrections, Legacy System upgrade/corrections, Basis corrections Development Corrections, The functional experts will perform the Sandbox testing of the identified critical transactions and log the issues encountered The solution providing team i.e. Development, Authorization, Basis and in some cases the functional team (identification & application of OSS Notes) themselves provides the solution to the issues. The Issue log is monitored for faster resolution. It is analyzed by the project management for the possible impacts/corrective actions on subsequent project phases and deliverables. If the types of issues points to dumps in transaction execution than issues are related to upgrade & unicode causes and requires relevant correction by the development team. High number of such issues will also mean that there is potential likelihood that more such issues would be observed if the scope of testing is expanded. This observation should be used by the project management to alter the testing scope in the upgraded and unicoded SAP Quality system. 2009 SAP AG 4

The corrective transports will be applied to upgraded & unicoded SAP Development system as testing duration in Sandbox is of limited time and thereafter the changes/bug-fix will originate from new SAP Development System and will move to SAP Quality system of upgrade landscape. This regulation of changes follows the Transport strategy laid out in the Organisation. The Sandbox testing documentation will involve a) Scope List b) Result List and c) Issue List. The Sandbox testing is peformed in screening mode i.e it is not documented comprehensively in the actual test scripts that may be in use in the Organisation. This saves time for the functional teams as they can focus on performing testing and verify the system behaviour which is the main objective of the Sandbox testing. Testing in SAP Development System In the upgraded & unicoded SAP Development system, no major testing activities are planned as it does not have the robust data to support the Testing and is not fully linked to the legacy systems. In most of the organization, SAP Development system is not or infrequently refreshed from the SAP Production system. The technical testing of the custom tools that are used by the development and the authorization team is performed. This is because these tools are present only in the SAP Development system. Testing in SAP Quality System The bulk of the Testing activities in an upgrade project are performed in the SAP Quality system in the Realisation Phase of the project. The upgraded and unicoded SAP Quality System is created from copy of the SAP Production system and corrections so far from upgraded and unicoded SAP development system are applied to it through transports. The Testing scope preparation poses the challenge to limit it to a manageable scope that should get completed in the allocated time and within planned effort. The Risk Based Testing Approach should be applied to meet this challenge. Risk Based Testing Approach The SAP Upgrade project objective is to deliver the stable system to the Business. One way to achieve is to test the complete business processes and the underlying test scripts. This would mean increase in effort, cost and duration to finish the Testing. Limited functional resources in the organization complicate the situation as the current SAP Production system (old version) would also requires support from them. On the other hand is to test the reduced or limited scope and still deliver a stable system to the Business with additional benefit of reducing the overall toal cost of the project. This is called the Risk based Testing Approach. This means that the focus should be on prioritizing and testing the tasks & functions that are important to the functioning of the business solution. The following forms the important points to prepare the scope: Frequently used Business process steps and underlying transactions Critical rated Business transactions where failure is unacceptable Technically complex transaction or business process steps Regulatory Requirements All Interfaces Important printouts which are sent to outside entities including customers Authorisation Testing Include Impacted developments (Functional changes in existing objects due to Upgrade) Other Priorities that may differ from Organisation to Organisation e.g. GxP scripts etc The Testing scope is based on the prioritization factors as listed above and brings the benefits of manageable scope, streamlines functional efforts and reduced project timeline. It is possible that new risks may emerge during the testing. Project management and functional teams should address the same and stay on the course to finish the testing as per plan. 2009 SAP AG 5

It is assumed in the Risk based Testing Approach that since critical features would be tested, the upgraded SAP system would be stable enough to enable the functioning of the Organization with low or minimum impact. The rest of the issues (low risk) would be dealt with by the project team either before go-live or in the post go-live support / Hypercare phase and would be solved in a short span of time. Additionally, during the Quality Testing of the project, it is beneficial to invite the Business Users for 2-3 days and request them to perform day to day business transactions.any issues reported would be fixed by the project team in this duration. This will further re-inforce the fact that day to day transaction are working as expected in the new upgraded and unicoded SAP system. This not only helps to get the business feedback early in the project cycle about the new system when there is sufficient time to react to the feedback in terms of corrective actions. It also helps in to smoothen the buy-in of the new system. Another way to manage the Testing scope in SAP Quality system is to distribute some of the scope to be executed in Screening mode i.e. without documenting the test results formally in the test scripts. Such scope is managed and tracked through excel lists. It gives more time to functional teams to focus on testing and making sure that scenarios and transactions are working successfully without spending too much time on documentation. Tip: Prepare the complete list of Interfaces and Print outs early in the Blueprint phase. This helps to have the sufficient time to establish the connectivity of partner systems with the upgraded and unicoded SAP Quality system. Tip: Prepare the scope of Testing by the end of Blueprint Phase. This is a time consuming activity and follows iterative steps. Revise it based on the result of Sandbox testing, if required. Testing scope check should be done with respect to the planned Testing duration. Performance testing The stress or performance testing may not be required as the new upgraded SAP system will be of the same hardware specifications as the non-upgraded one. The user base and the system usage by the business would stay the same as it was before the upgrade. It is recommended to size the new hardware for new upgraded SAP system with more (say 25%) processing power to offset any upgrade induced slowness and subsequent deployment of new functionalities that new system may bring in. Performance testing is time consuming activity and it should be evaluated by the project management if it is really required or not. Connectivity Testing Since the new production SAP system would be based on the new hardware, it is beneficial to test the Interface connectivity for the few selected interfaces. Connectivity testing is performed by the Project team and highlights any potential issues that might be there when interface connectivity is maintained on the upgraded and unicoded SAP Production system. This helps to change the IP address, host name etc to the one corresponding to new hardware.it is advisable to use the alias name in the connectivity setting details of the interfaces which makes it independent of the IP addresses of the hardware. User Acceptance Testing User Acceptance Testing will be performed in the SAP Quality system after the completion of the Quality Testing and corresponding issue resolutions by the project team. At this point, all interfaces are connected and critical business processes are tested to be working as expected. Business Users performs their day to day tasks and activities in the SAP system. Issues reported are fixed by the project team. Since this activity is 1 or 2 weeks before go-live certain low risk issues may be marked to be fixed in the post go-live phase. This helps project team to focus on cutover and go-live activities. 2009 SAP AG 6

Conclusion It is important that Testing of upgraded and unicoded SAP system is planned diligently and relevant measures are taken to manage the scope, functional effort and project timeline. Representative Sandbox Testing indicates the quantum, nature of upgrade issues and provides early information on upgraded and unicoded SAP system behavior. It also gives the project team enough reaction time for relevant corrective actions. Test Approach should be suitably modified in light of the results from the Sandbox testing as initially the impact of Upgrade and Unicode may not be known in definite terms on the SAP system. The Testing scope and effort in the upgraded and unicoded SAP Quality system can be effectively managed using the Risk Based Testing Approach. This will help project management to deliver a stable SAP Production system within the budget and timeline. 2009 SAP AG 7

Related Content For more information, visit the Business Process Expert homepage For more information, visit the Enterprise Resource Planning homepage 2009 SAP AG 8

Disclaimer and Liability Notice This document may discuss sample coding or other information that does not include SAP official interfaces and therefore is not supported by SAP. Changes made based on this information are not supported and can be overwritten during an upgrade. SAP will not be held liable for any damages caused by using or misusing the information, code or methods suggested in this document, and anyone using these methods does so at his/her own risk. SAP offers no guarantees and assumes no responsibility or liability of any type with respect to the content of this technical article or code sample, including any liability resulting from incompatibility between the content within this document and the materials and services offered by SAP. You agree that you will not hold, or seek to hold, SAP responsible or liable with respect to the content of this document. 2009 SAP AG 9