URGENT FENCING NOTICE



Similar documents
FENCING LAW IN VICTORIA: WHAT ARE MY RESPONSIBILITIES?

Fence By-law. PS-6 Consolidated May 14, This by-law is printed under and by authority of the Council of the City of London, Ontario, Canada

17 East Main Street Cuba,NewYork Code Enforcement

Building Report & Consent

BUILDING A FENCE? THE CITY OF CAMBRIDGE REQUIRES THAT ALL FENCES WITHIN THE CITY CONFORM TO THE REGULATIONS OF FENCE BY-LAW

Case 1:01-cv BLW Document Filed 01/18/11 Page 111 of 152 EXHIBIT H TELECOMMUNICATIONS CABLE SYSTEM EASEMENT DEED

MAGISTRATES COURT OF WESTERN

BUILDER ELIGIBILITY PROFILE CHANGE APPLICATION

ORDINANCE NOW, THEREFORE, BE IT ORDAINED BY THE CITY OF BRENTWOOD, TENNESSEE, AS FOLLOWS:

TABLE OF CONTENTS. City of Mitcham Page 1 of 9

Description of the RICS Building Survey Service

November General Notes. Tree Protection. Tree Protection and New Development Guidance Note

I would like to apply for an Occupation Certificate now. I will apply for an Occupation Certificate at a later date.

Rural dwellings including bed and breakfast accommodation

TENANT S RIGHTS IN THE RETAIL AND COMMERCIAL LEASES ACT (S.A.) PART 1

%&'!&()%&' &*! "!!& &+,! "#+ + &- ' &!&.'(%&'! %&%+ &+&&*-/" ' &+&+ '-0

OWNER/TENANT LETTER OF AUTHORIZATION & INDEMNITY (This form is available online via

TITLE XV: LAND USAGE 150. BUILDING CODE 151. FLOOD DAMAGE PREVENTION 153. SUBDIVISION REGULATIONS 154. ZONING CODE

Repair of Fences Damaged by Bushfire and Fire Control Line Rehabilitation Policy

Consolidated implied terms in park home pitch agreements

Residential tenancy agreement

TEMPORARY CONSTRUCTION AND PERMANENT UTILITY EASEMENT AGREEMENT RECITALS

FREQUENTLY ASKED QUESTIONS: 1) Q: When is a building permit required?

Standard terms and conditions

BUILDING AND DEVELOPMENT TRIBUNAL - DECISION

Building Permit Application

MODEL BEEKEEPING ORDINANCE

Practice Note

Application for Erection of Crane - Section 169 Highways Act 1980-

MOBILE HOME LAW. Revised November 2001

THE TOWN AND COUNTRY PLANNING ACT 1990 Grant of Planning Permission

Number 34 of 2013 CONSTRUCTION CONTRACTS ACT 2013 ARRANGEMENT OF SECTIONS. 6. Right to refer payment disputes to adjudication.

City Code of ANN ARBOR, MICHIGAN Chapter 55 Zoning

Article 20. Nonconformities

TORONTO MUNICIPAL CODE CHAPTER 910, PARKING MACHINES AND METERS. Chapter 910 PARKING MACHINES AND METERS 1. ARTICLE I Parking Machines

Building Permits Permit Counter

City of Fort Smith Building Permit Process Frequently Asked Questions

RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002

HOUSE SITTING AGREEMENT

MISSION VIEJO ENVIRONMENTAL ASSOCIATION PAINTING APPLICATION

TEMPORARY TRAFFIC MANAGEMENT Operate as a Traffic Controller (TC) for low volume and Level 1 roads

Township of Georgian Bluffs POLICY USE OF UNOPENED ROAD ALLOWANCES

Introduction to SOP. Background. Background. Principles of SOP Act. Objectives of SOP Act

Definition of Tower from the Bradley County Zoning Resolution

How to fill in the Non-resident Company Tax Return

General Conditions of Danske Havnevirksomheder 2007

STANDARD SITE LICENCE CONDITIONS FOR RESIDENTIAL PARK HOME SITES IN GUILDFORD CARAVAN SITES AND CONTROL OF DEVELOPMENT ACT 1960 (AS AMENDED)

How to fill in the Non-resident Company Tax Return

Town of Creston. Bylaw No. 1813

Parrish Park Homeowners Association. Architecture Committee Guidelines for Property & Home Improvements. June 2002

BUILDING INSPECTION DEPARTMENT FEE SCHEDULE CHAPTER 30 ARTICLE XV. Effective October 1, 2011

Botetourt County, Virginia. Frequently Asked Questions

Independent environmental examination of the Moscow- St.Petersburg motorway project, section kilometres. Summary

EAST LINDSEY DISTRICT COUNCIL ~ RESIDENTIAL CARAVAN SITES CONDITIONS OF SITE LICENCE

A Guide for Residents. Sutton Garden Suburb Conservation Area

South East Region Leakage Code of Practice. Affinity Water Limited CODE OF PRACTICE ON LEAKAGE

Construction and Civil Work Management

REGULATIONS FOR CELLULAR ANTENNA TOWERS AND CELLULAR TELECOMMUNICATIONS SERVICES

For purposes of this chapter the following words and phrases shall have the meanings ascribed herein unless the context clearly indicates otherwise:

Town of Surf City Community Development. General Permit Information

HOME WARRANTY INSURANCE ELIGIBILITY APPLICATION

Guide to Procedure for Competitive Tendering March 2003

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY

What is covered by EQC and Southern Response

Right-Of-Way Acquisition Information

Terms of Agreement. A Consumer Guide to Home Improvement Contracts CONTRACTORS STATE LICENSE BOARD. California Department of Consumer Affairs

Steadfast Client Broker Agreement (Wholesale Broker) [Steadfast member] and GSA Insurance Brokers Pty Ltd

CONSERVATION AREAS. Residential Planning Guidelines DO I NEED PLANNING PERMISSION? Examples of Development that require Planning Permission

General Insurance. AMP Landlord Plan Policy

CITY OF WEST PALM BEACH HISTORIC PRESERVATION AD VALOREM TAX EXEMPTION APPLICATION

Development Services Guidelines

The Pipelines Regulations, 2000

Tree Work on District of West Vancouver Property

Fence Application Package

ARTICLE 22: FEE SCHEDULE

Council Policy for New Telecommunication Facilities

Independent Contractor Policy

Please describe the proposal accurately and concisely. State the number of storeys proposed and the position of any extensions.

Building in the ACT. A consumer guide to the building process OCTOBER 2014

Your home insurance policy Features and benefits HMP FAB V1.0. FBD Insurance plc is regulated by the Central Bank of Ireland

7. Do you perform any out of state work?... If yes, in what states and provide details of work performed

General Advice. 2 rear single storey

PENNSYLVANIA BUILDERS ASSOCIATION INSTRUCTIONS TO HOME IMPROVEMENT MODEL CONTRACT STANDARD FORM Introduction

OWNER BUILDER AS AN WHAT ARE MY RESPONSIBILITIES UNDER THE DEVELOPMENT ACT 1993

WINDOW AND DOOR REPLACEMENT REQUIREMENTS

Transcription:

1 URGENT FENCING NOTICE Date of this notice: Name of person(s) giving urgent fencing notice: Address of person(s) giving urgent fencing notice (for response): Telephone number of person(s) giving urgent fencing notice: Email address of person(s) giving urgent fencing notice (if any): 1. I carried out urgent fencing works and/or other associated works** between your property, which is located at: [Include description of land e.g. street address, lot number and/or identifying particulars] and my adjoining property, which is located at: [Include description of land e.g. street address, lot number and/or other identifying particulars] 1 URGENT FENCING NOTICE - Section 24 Fences Act 1968 (Vic)

2 2. Fencing works and other associated works** needed to be carried out urgently because: [ one option only] the dividing fence between our properties was damaged the dividing fence between our properties was destroyed AND it was impracticable to give you a fencing notice. 3. The reason that fencing works and/or other associated works** needed to be carried out urgently was: [Give reasons e.g. animals escaping, unfenced swimming pool etc] 4. The following fencing works and/or other associated works** were carried out: [you may more than one option] repair or maintenance of the whole or part* of the existing dividing fence [Specify nature of the repair or maintenance that was undertaken e.g. replacement of palings, painting, etc] demolition of the whole or part* of the existing dividing fence removal of the whole or part* of the existing dividing fence construction of the whole or part* of a new dividing fence replacement of the whole or part* of the existing dividing fence (including demolition and removal of the whole or part* of the existing dividing fence and construction of the whole or part* of a new dividing fence) planting, replanting, repair or maintenance* of a hedge or similar vegetative barrier that is the whole or part* of a dividing fence cleaning, deepening, enlargement, repair or alteration* of a ditch or embankment* that is the whole or part* of a dividing fence * strike out whichever does not apply 2 URGENT FENCING NOTICE - Section 24 Fences Act 1968 (Vic)

3 other associated works** [Specify other associated works e.g. design of dividing fence, preparation or clearing of land, surveying and marking of common boundary or other proposed line of fence, using temporary barriers etc] 5. The fencing works and any other associated works** at 4 were carried out on: [ and complete one option only] the boundary line, described as follows: [Describe e.g. the line of a waterway, around an obstruction] another line, described below, because it was impracticable to carry out the fencing works and any other associated works** on the common boundary because a waterway or obstruction (whether natural or manmade) is on or forms the common boundary [Describe e.g. the line of a waterway, around an obstruction or along a line marked on the ground. Give reasons] 6. If a new dividing fence was constructed or the existing dividing fence was replaced the height(s) of the new or replacement dividing fence is: [Specify height(s) of new/replacement dividing fence e.g. same as existing dividing fence or specify other height(s)] 3 URGENT FENCING NOTICE - Section 24 Fences Act 1968 (Vic)

4 7. If a new dividing fence was constructed or the existing dividing fence was replaced the type of dividing fence and construction material is: [Specify type of dividing fence and construction material e.g. same as existing dividing fence, paling fence, Colorbond fence] 8. If a new dividing fence was constructed or the existing dividing fence was replaced with a dividing fence that has rails and framing the rails and framing were placed on the side of the dividing fence facing into: [ one option only] your property, described at 1 my property, described at 1 9. The cost of the fencing works and any other associated works** described at 4 was: $ [Attach a copy of the receipt for the works] 10. I propose that the cost should be shared as follows: I pay % being $ you pay % being $ If contributions other than in equal proportions are proposed, give reasons: [Give reasons e.g. one party requires a dividing fence that is of a standard greater than a sufficient dividing fence] Although not required by the Fences Act, it would assist negotiations if you complete the attached Response to urgent fencing notice and return it to me at address at the beginning of this urgent fencing notice within 30 days of the date this notice is given to you 4 URGENT FENCING NOTICE - Section 24 Fences Act 1968 (Vic)

5 RESPONSE TO URGENT FENCING NOTICE I/we the owner/s who received the urgent fencing notice acknowledge receipt of the urgent AND fencing notice dated I/we the owner/s who received the urgent fencing notice agree with the proposal in the urgent fencing notice about urgent fencing works and other associated works** and contributions OR I/we the owner/s who received the urgent fencing notice do not agree with the proposal contained in the urgent fencing notice about urgent fencing works and other associated works** and contributions If you do not agree with the matters in the urgent fencing notice, you may wish to give reasons e.g. you do not agree with the proposed contribution proportions or consider that the works were not urgent or that further works should be carried out: Owner who received urgent fencing notice Name: Signature: Date: Owner who received urgent fencing notice Name: Signature: Date: 5 URGENT FENCING NOTICE - Section 24 Fences Act 1968 (Vic)

6 PAGE INTENTIONALLY LEFT BLANK 6 URGENT FENCING NOTICE - Section 24 Fences Act 1968 (Vic)

7 IMPORTANT INFORMATION ABOUT THIS URGENT FENCING NOTICE 1. The owner who gives an urgent fencing notice requires the owner who receives it to contribute to the fencing works and any subsidiary works* for a sufficient dividing fence that were carried out urgently in accordance with the Fences Act 1968. 2. If, within 30 days from the day this urgent fencing notice is given, the owner who receives it responds to the notice but does not agree to one or more of the matters specified in the notice, either owner may commence proceedings in the Magistrates Court for orders about: the line that is the common boundary; whether or not a dividing fence is required and whether or not fencing works and any subsidiary works should be carried out; the nature of any fencing works and subsidiary works* to be carried out; the nature of the fence that constitutes a sufficient dividing fence; the way in which contributions for the fencing works and any subsidiary works should be apportioned; and other matters. 3. If, within 30 days from the day this urgent fencing notice is given, the owner who received it has not responded to the notice, the owner who gave the urgent fencing notice may commence proceedings in the Magistrates Court for orders about the urgent fencing works and subsidiary works or contributions. 4. Section 32 of the Fences Act 1968 provides for the placement of rails and framing for a dividing fence that has rails and framing. Owners may agree about the side of the dividing fence on which the rails and framing are to be placed. However, if an agreement between owners or an order of the Magistrates Court does not specify the side on which rails and framing are to be placed, the Fences Act 1968 provides for the side on which rails and framing must be placed. For a dividing fence between residential or commercial land and land over which the public has general access or over which there is a right of way, the rails and framing must be placed on the side of the dividing fence facing into the residential or commercial land. For a dividing fence between residential and commercial land, the rails and framing must be placed on the side of the dividing fence facing into the residential land. In all other cases, the rails and framing must be placed on the same side as the previous dividing fence (if a dividing fence is being replaced by a similar dividing fence) or on the side least subject to weathering (if a dividing fence is being replaced by a different type of dividing fence or if there was no previous dividing fence). * subsidiary works are other necessary works to allow the fencing works to take place, including design of a dividing fence, preparation or clearing of land, surveying and marking of common boundary or other proposed line of fence, obtaining approval and using temporary barriers 7 URGENT FENCING NOTICE - Section 24 Fences Act 1968 (Vic)