SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM



Similar documents
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

AT&T Global Network Client for Windows Product Support Matrix January 29, 2015

WATER / WASTEWATER & POWER PROJECTS LAST 5 YEARS. No of Staff Provided by BCE. Overall Project Value (SR)

Case 2:08-cv ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8

Analysis One Code Desc. Transaction Amount. Fiscal Period

Enhanced Vessel Traffic Management System Booking Slots Available and Vessels Booked per Day From 12-JAN-2016 To 30-JUN-2017

Examples of Eligible Projects. Project Category Description Examples

Monthly Report on the Corporate Services Price Index ( Preliminary Figures for February 2011 ) Index

Sea Water Heat Pump Project

DAWEI Sea PROJECT Port Project DAWEI AND THE REGION

Ashley Institute of Training Schedule of VET Tuition Fees 2015

Permitting of Development and Infrastructure Projects in Abu Dhabi

Oman Environmental Services Holding Company

Marina Bay Sands. George Tanasijevich President and CEO of Marina Bay Sands

Government Projects (as Prime Contractor)

MLD: Domestic Maritime Transport Project

Find job and training opportunities at SteadyGrowth.ca

Ownership and Management of Port Administration

Larnaca Urban Sustainable Development Strategy

APPENDICES G) DETAILED BACKBONE INFRASTRUCTURE CONSTRUCTION COST ESTIMATE SUMMARY

Oman s Oil & GAS Industry

Student Seminar Building climate resilient cities: Exploring theories, practices and prospects Feb 2015

General Rules of the Japan Standard Industrial Classification

DIVISION D ELECTRICITY, GAS, WATER AND WASTE SERVICES

Natural Gas Diversification Strategy for PREPA GOVERNMENT DEVELOPMENT BANK FOR PUERTO RICO

Professional Liability Division, Indianapolis, IN Holly Casey or Mike Gray Architects / Engineers

COASTAL APPLICATION FOR A MAJOR SITING PERMIT

Oil market in Serbia and Montenegro

HURRICANE WORKFORCE ANALYSIS HURRICANES ANDREW AND OPAL

Next Stage of ITS Development in Taiwan

CENTERPOINT ENERGY TEXARKANA SERVICE AREA GAS SUPPLY RATE (GSR) JULY Small Commercial Service (SCS-1) GSR

''The construction of the Public Urban Centre in Sikorskiego St. and Legionów Ave. in Łomża

PUBLIC RIGHT-OF-WAY ACCESSIBILITY TRANSITION PLAN

Training Program on Urban Climate Change Resilience April, 2015 Database Management System for coastal cities

WATERWAYS in Finland

CIRCULAR ircular PLANNING SERIES

Impacts of Government Jobs in Lake County Oregon

Port of Narvik. The Gateway to the Arctic PORT LOGISTICS: RAIL-ROAD-SEA-AIR. No draft restrictions. Sheltered waters. Ice-free all year round

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk

The LYNX Transit Master Plan. METROPLAN Orlando Presentation

STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL

TANZANIA HARBOURS AUTHORITY PO Box 9184 DAR-ES-SALAAM TANZANIA

Introduction of the Project

Every Student I Every Day I Every Possibility

Jeff Haby, P.E. Director Sewer System Improvements. September 15, Agenda

MEDIA STATEMENT - FOR RELEASE ON 01 APRIL 2016 RELEASED BY CEF (SOC) LTD ON BEHALF OF THE DEPARTMENT OF ENERGY ENQUIRIES: MR J MOKOBANE

Private sector wage and salary workers 2 Government workers 3 Self-employed workers 4. Number Percent Number Percent Number Percent Number Percent

Bay Park Sewage Treatment Plant Super Storm Sandy Recovery

Boston Traffic Management Center Activity Report for FY 2013 Real-time Traffic Signal Adjustments

Waste Management Action Plan

Appendix Table 1. NAICS based Definition of Coast Industries: List of Industry Sectors Considered to Be Coast Industries

ESTIMATES OF EXPENDITURE ON DEVELOPMENT ACCOUNT 2012/2013

Commercial Opportunities Furniture, Fixtures and Equipment

Multi-Modal Logistics Hub (MMLH) in Yanbu

Dallas/Fort Worth International Airport District Energy Plant Upgrades Project Making More with Less Sustainable Communities Conference Dallas, TX

Oman 20/20 vision 16 Deloitte A Middle East Point of View Fall 2013

cardno Phu My Bridge Queensland s first light rail system Creative Village Redevelopment Marine Corps environmental reviews

2016 Examina on dates

Port of Rotterdam International

GENERAL INFORMATION FORM -- AUTHORIZATION APPLICATION NAICS CODES GENERAL INFORMATION

Future Megacities in Balance Low Carbon Cities in Making: Masdar City Tobias Fiedler, TRANSSOLAR Energietechnik, Stuttgart

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

2015 Examination dates

Reconstruction & Renewal of Bhuj City

DIVISION OF FACILITIES AND CONSTRUCTION MANAGEMENT ARCHITECTURAL/ENGINEER FEES EFFECTIVE DATE: April 18, 2016

REPORT ON CONSULTANTS ENGAGED BY GOVERNMENT

The Follo Line Project

STRATEGIC BUSINESS PLAN QUARTERLY KPI REPORT FOR: FISCAL YEAR 2015, QUARTER 2 (JULY THROUGH DECEMBER 2014)

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP LAWS OF SARAWAK, 1958 Ed.)

APPENDIX 2 Economic Development Strategy Project Schedule

ETIHAD RAIL. Corporate Presentation

Sydney Airport District

RETICULATED RECYCLED WATER SCHEMES OPERATIONAL CONSIDERATIONS. Duncan Wallis. RM Consulting Group

MBOMBELA WC2010 STADIUM PRESENTATION TO PARLIAMENTARY PORTFOLIO COMMITTEE ALLEGED FUNDING CRISIS

Natural Gas / Electricity and the Industrial Sector. The Dismantling of US Manufacturing

GAC Oman Fully integrated shipping and logistics services nationwide

Professor Dimitrios Tsamboulas National Technical University of Athens, Greece Expert

Annual Treasury And Investment Portfolio Update for 2015

How To Understand The Benefits Of An Industrial Symbiosis

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

PLANNING - APPLICATION TRACKING RPT (In-house) Page: 1. Sep 11, :20:06 PM. Applications From: Jan 1, 2013 To: Dec 31, 2013 Completed From: To:

REHABILITATION AND EXTENSION PROJECT FOR PORT OF LOBITO

Stouffville Corridor Rail Service Expansion

Climate Change and Infrastructure Planning Ahead

CIVIL ENGINEERING ASSOCIATE, 7246

Rapid City Downtown Area Master Plan. Draft Plan Concepts April 2016

Transcription:

SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM www.duqm.gov.om

1. INTRODUCTION 2. ACCESSIBILITY TO DUQM 3. SEZAD PREVIOUS MASTERPLAN 4. DUQM URBAN PLANNING 5. SPECIAL ECONOMIC ZONE DISTRICTS 6. SEZAD PROJECT TENDERING PROCESSES 7. SEZAD S PROJECTS 8. PROJECT DISTRIBUTION 9. ROAD NETWORKS 10. DUQM RENEWABLE ENERGY 11. OMAN RAIL WAY TO DUQM 12. DUQM AIRPORT ZONE 2

Duqm Special Economic Zone Authority (SEZAD) was established by Royal Decree No. (119/2011) in 2011 to: - Manage, regulate, and develop all economic activities in Duqm. - Plan, design, and implements long-term strategies for infrastructural development. - Attract investments to promote a wide spectrum of economic activities. - Oversee the urban expansion of the modern Duqm city while protecting the environment, thereby ensuring Duqm its rightful place as the best location to visit, live, work, and invest in the Middle East. 3

ACCESSIBILITY TO DUQM Duqm is appx. (550 km) from Muscat (the capital) and almost same distance from Salalah. Duqm is accessible through: Muscat Salalah Road via Hayima (by Road) Muscat - Sinaw Mahout Duqm (by Road) Muscat - Sur Mahout Duqm (by Coastal Road) Via Port of Duqm (by Sea) Planned Oman Railway Network 4

SEZAD PREVIOUS MASTERPAN 2 1 7 8 10 3 4 5 6 9

SEZAD have recently completed the urban planning study for the Zone at Duqm by as specialized consultant Services & Utilities Logistics Waste treatment Land use 6

MASTERPLAN LAND USE

Total area: 1745km2 Seafront: 60km 8

SPECIAL ECONOMIC ZONE DISTRICTS Rock Garden District City Center District Coastal District Airport district Civic District Light & medium Industry Heavy Industry

SEZAD PROJECT TENDERING PROCESSES SEZAD Tender process and procedures are transparent. SEZAD Tender Committee (STC) is authorized party to run the tendering processes Tender Document Tender Announce Tender Opening Tender Evaluation Tender Award Scope of work Evaluation criteria Newspaper (L&I) SEZAD website STC Decision SEZAD Website Technical Financial STC Approval Award 12

SEZAD S PROJECTS Projects Status Projects Planned for 2015 to 2020 Completed Projects 25% 28% Projects under Scope of Works & Tender Document Preparation 26% 3% 3% 15% On-going Projects Projects under Evaluation & Award Process Projects under Tender Process 13

SEZAD S PROJECTS Number of Projects 0 5 10 15 20 25 30 35 COMPLETED PROJECTS 29 ONGOING PROJECTS 15 PROJECTS UNDER EVALUATION AND AWARDING PROCESS 3 PROJECTS UNDER TENDERING PROCESS 3 PROJECTS UNDER SCOPE OF WORKS PREPARATION 26 PROJECTS PLANNED FOR 2015 TO 2020 25 14

SEZAD S PROJECTS MAIN COMPLETED PROJECTS Duqm Dry Dock (Super Structures, Civil and Marine Works) Port of Duqm (Marine Works) Frontier Town Project (phase1) Crown Plaza Hotel Duqm City Hotel Temporary Fishing Facilities (Building) Temporary Fishing Facilities (Ice Factory) Rock Garden Fencing

SEZAD S PROJECTS MAIN COMPLETED PROJECTS Expansion of Duqm Hospital Jalowni Airport Duqm Airport (P1 & P2) Water Supply Network (Phase1) Desalination and Power Plant (temporary) Electricity Supply Network (Phase 1) Sewage Treatment Plant Internal Roads (Roads 2 and 3)

SEZAD S PROJECTS MAIN COMPLETED PROJECTS Nafun Road Street Light of Road 2 & 3 At New DUQM Town The Urban Design Master Plan for Duqm Town Conducting Topographic Survey, and Soil Investigation, Sampling and Testing for the Industrial Zones at Duqm DUQM Survey Monuments Land Marking for SEZAD Sub-division Plan Services to Provide a 3-D Physical Model of Special Economic Zone at Duqm SUPPLY OF AERIAL PHOTOS OR SATELLITE IMAGERY FOR SEZAD PROJECTS

ON-GOING SEZAD S PROJECTS ON-GOING S.N. PROJECT TITLE Actual Start Target Finish 1 2 3 4 T3/2013 - Consultancy Services for Design and Supervision of Main Road Improvement at Duqm Center 9-Dec-13 14-Sep-14 T2/2013 - Consultancy Services for Design & Supervision of Roads & Infrastructure in Town of Duqm-Package 1 16-Dec-13 22-Sep-14 Provision of Consultancy Services (Design Only Without Construction Supervision) for the Proposed Grading Works at the 13-Apr-14 28-Aug-14 Heavy Industrial Zone in Duqm T23/2013-Consultancy Design of the Shoreline & Coastal Protection Project for the Duqm Special Economic Zone 24-Apr-14 29-May-15 5 6 T1/2013 -Consultancy Services For Feasibility Study, Detailed Design And Construction Supervision Of Duqm Development Drainage Network And Protection Schemes Phase 1 T13/2013-Consultancy FEED, Feasibility Study Supply and Disposal of Seawater to the Industrial Zone at Duqm Tender 9-Dec-13 7-Apr-14 8-Sep-14 21-Sep-15 7 T9/2013 - Construction of 150 Housing Units 23-Jan-14 23-Aug-15 8 T2/2014-Consultancy Services for Design & Supervision of the New Municipal Market Project at Duqm 21-May-14 28-Jan-15

SEZAD S PROJECTS ON-GOING 9 T4/2014-Consultancy Services for Design & Supervision of Interface Roadway Projects in Duqm (4 SECT) 15-Jun-14 20-Oct-14 10 T14/2013-Airport Project Phase 3 (Buildings) 30-Jun-14 29-Jun-16 11 T3/2014-SEZAD Headquarter Building at Duqm 9-Jul-14 12-Oct-15 12 T7/2013-Consultancy Services For Planning, Feasibility Study, Preliminary And Final Design, And Preparation Of Tender Documents For The Development Of The Northern And Central Industrial Zones At Duqm 24-Aug-14 27-Dec-15 13 T152/2012-Construction of Water Network Supply to Port of Duqm PAEW Concept 9-Jul-14 31-Dec-15 14 T9/2014-Consultancy Services for Project Definition, FEED and Supervision of the New Liquid Bulk Berths in the Port of Duqm 17-Aug-14 15-Jul-18 15 Consultancy Services for Design & Supervision of Roads & Infrastructure for 150 Housing Project 23-Jan-14 30-Oct-14

SEZAD S PROJECTS PROJECTS UNDER TENDER PROPOSAL EVALUATION & AWARD PROCESS PROJECTS UNDER TENDER PROPOSAL EVALUATION & AWARD PROCESS S.N. PROJECT TITLE Start Finish 1 T82/2013-Consultancy Supervision of Water Network Supply to Port of Duqm PAEW Concept) 28-Jul-13 31-Dec-15 3 T1/2014-Consultancy for Design of SEZAD Staff Accommodation & Recreation at Duqm 1-Jul-14 30-Aug-14 4 T6/2014 Design, Fabricate & Install SEZAD Directional Sign Boards around the Sultanate of Oman 25-Mar-14 13-Sep-14

SEZAD S PROJECTS PROJECTS UNDER TENDERING PROCESS PROJECTS UNDER TENDERING PROCESS S.N. PROJECT TITLE Start Finish 1 T10/2014 EPC for the Airport Access Street Lightings System 12-Jun-14 28-Aug-14 2 T11/2014 Consultancy Services for Construction Supervision of IP4 at Port of Duqm 15-Jul-14 19-Sep-14 3 T18/2013 Construction of Duqm Port Package IP4 (Government Berth) 10-Aug-14 19-Sep-14

12 Consultancy for Design of Integrated Landfill for Duqm 15-Dec-13 30-Sep-14 SEZAD S PROJECTS PROJECTS UNDER SCOPE OF WORK &TENDER DOCUMENTS PREPARATION PROJECTS UNDER SCOPE OF WORK & TENDER DOCUMENTS PREPARATION S.N. PROJECT TITLE Start Finish 1 T13/2014-Consultancy Services for Const. Supervision of IP2 at Port of Duqm 1-Jul-14 31-Aug-14 2 T16/2013-Construction of Duqm Port Package IP2 (Commercial Berth-Zone 3 & 4) 30-Sep-13 29-Sep-14 3 T12/2014-Consultancy Services for Const. Supervision of IP3 at Port of Duqm 1-Jul-14 31-Aug-14 4 T17/2013-Construction of Duqm Port Package IP3 (Commercial Berth-Zone 1 & 2) 30-Sep-13 29-Sep-14 5 T19/2013-Duqm Port Package IP5 (Main Port Admin. Bldg. & Fencing) 30-Sep-13 20-Sep-14 6 T20/2013-Duqm Port Package IP6 (Storage Area) 10-Feb-13 20-Sep-14 7 Consultancy for Design of Industrial Fisheries Hub 30-Sep-13 30-Sep-14 8 9 Consultancy Services for Design & Supervision of the Service Corridor for Duqm Refinery Consultancy Services for Design & Supervision of the Service Corridor for Oil, Gas & Petrochemical Pipeline Project 17-Nov-13 17-Nov-13 31-Aug-14 27-Aug-14 10 Consultancy for Design of Rock Garden Development Project 26-Dec-13 20-Sep-14 11 T6/2013-Landscaping Project for Road # 2 and Road # 3 at Duqm 1-Jul-13 20-Sep-14

SEZAD S PROJECTS PROJECTS UNDER SCOPE OF WORK &TENDER DOCUMENTS PREPARATION 13 T8/2014-Consultancy Services for Planning, Feasibility Study, Preliminary and Final Design and Preparation of Tender Documents for the Development of the Commercial and Residential Zones at Duqm 14-Feb-14 28-Aug-14 14 Consultancy for Design of the Sewerage Network System & Sewage Treatment Plant (Residential & Commercial Zone) 17-Nov-13 9-Sep-14 15 T5/2014 Consultancy Services for the Design & Supervision of Roads No. 1 & 5 and Drainage Systems Construction at Duqm Port 1-Apr-14 26-Sep-14 16 T7/2014 Consultancy for Design of Utilities (Electricity, Water & Sewerage) Network at the Industrial Zone, Duqm 27-Mar-14 14-Sep-14 17 T14/2014 Consultancy Services for Design and Supervision of SEZAD Branch Building in Muscat 19-Jun-14 31-Aug-14 18 Construction of Channel Dangert 1 in SEZ Duqm 29-Jun-14 28-Aug-14 19 Consultancy Services for the Design & Supervision of Grading Works @ Light Industrial Zone (100 Hectares) 28-Aug-14 27-Oct-16 20 Consultancy Services for Design & Surpervision of Duqm Private School 28-Aug-14 23-Mar-17 21 Training Center 28-Aug-14 23-Mar-17 22 Consultancy Services for Design & Surpervision of Duqm Public Parking 28-Aug-14 23-Mar-17

SEZAD S PROJECTS PROJECTS UNDER SCOPE OF WORK &TENDER DOCUMENTS PREPARATION 23 Consultancy Services for Design & Surpervision of Duqm Main Mosque 28-Aug-14 23-Sep-17 24 Consultancy Services for Design & Surpervision of Civil Defense Unit in Duqm 28-Aug-14 23-Mar-17 25 Consultancy Services for Design & Surpervision of Bus and Taxi Station in Duqm 28-Aug-14 23-Mar- 2017 26 Consultancy Services for Supervision for construction of fishery harbor 01-Oct-14 01-Oct-16

SEZAD S PROJECTS PROJECTS SCHEDULED FOR 2015-2020 SEZAD PROJECTS SCHEDULED FOR (2015 to 2020) S.N. PROJECT TITLE Planned Start Planned Finish 1 Coastal Development 2-May-15 10-Apr-19 2 Roads Network System & Rail Road Project (Phase 2 ~ N ) 12-Jul-15 19-Aug-20 3 Marina Project 17-Jul-15 28-Aug-18 4 Sewage Treatment Plant (Medium / Light Industrial Zone) 20-Jul-15 22-Mar-18 5 Communication Supply Network System (Industrial Zone) 20-Jul-15 15-Jun-18 6 Custom Checkpoint Facilities 29-Sep-15 13-Jul-18 7 Town Center / Retail Phase 1 29-Oct-15 30-Sep-20 8 Street Light 15-Nov-15 11-Apr-19 9 Commercial Center Building 13-Dec-15 27-May-20 10 Water Supply Network for Commercial & Residential 13-Dec-15 27-Aug-19 11 Communication Network System for Commercial & Residential 13-Dec-15 7-Nov-19 12 Electrical Supply Network for Commercial & Residential 13-Dec-15 19-Dec-19 13 Construction of Gas Supply Networks 13-Dec-15 19-Aug-20 14 Road Markings & Signs and Traffic Signals 7-Feb-16 4-Jul-19 15 Store Buildings & Small Industrial Buildings 3-Mar-16 23-Oct-18 16 Pedestrian Crossing & Safety Barriers 12-Jun-16 7-Nov-19

SEZAD S PROJECTS PROJECTS SCHEDULED FOR 2015-2020 17 Boundary Security Fencing for Special Economic Zone at Duqm 30-Jun-16 5-Aug-19 18 Construction of Solid Waste Facilities / Landfill for Solid Waste 30-Jun-16 12-Jul-20 19 Hospital / Clinic 30-Jun-16 27-Jul-20 20 Slope Protection 16-Oct-16 19-Aug-19 21 Landscaping (Phase 2 ~ N ) 8-Jan-17 4-Jun-20 22 Drainage Network System-Phase 2 22-Oct-17 21-Oct-20 23 Integrated Sports Center 10-Nov-16 22-Jul-19 24 Social Community Center 20-Jul-17 10-Mar-20 25 Recreational Facilities 23-Nov-17 14-Jul-20

SEZAD S PROJECTS RELATED PROJECTS Fish Processing Industries Port of Duqm Infrastructure Projects Duqm Airport Services Drydock Subcontracting and Supply O&M of Duqm STP Logistics (warehouse, stores, transport services, etc) Minerals Exploration and Processing

PROJECTS DISTRIBUTIONS Projects for Industrial & Petrochemical Zones Projects for Commercial and Residential Zones Projects for Services, Utilities and Drainage systems Projects for Logistics and Storages Projects for Community (Local) Development Projects for Tourism Development Projects for Environmental Monitoring 28

SEZAD will provide services for the industries including the petrochemicals through Central Utilities Companies (CUC) Electricity Industrial water Cooling water Sewage Communication Gas Waste Steam 29

= 30

CONECTIVITY PORT FROM/TO AIRPORT PORT FISHERIES PORT Port to Airport 33 Km Dual carriage way 3 lanes each way Medium Industry Light Industry/ Logistics AIRPORT Port Road No. 1 & Road 2 north to Commercial Berth 11.5 Km SAAY VILLAGE Dual carriage way 3 lanes each way Exceptional Vehicles (15 X 15)

Maximum capacity at Phase 5 coming from renewable is approx. 400MW DUQM RENEWABLE ENERGY AREA 32

OMAN RAILWAY TO DUQM Offering services for: Freight transport Passenger transport (long-distance and suburban) Intermodal services 33

DUQM AIRPORT Package 3: Buildings Passenger terminal Building for 500,000 Pax., Air traffic Control complex of 39m High, Cargo Terminal with 25,000tons Capacity, GSE maintenance centre and Fire Training Area & Related Civil Works EARLY OPERATION Early operation of Duqm Airport started on 23 July, 2014 Package 3 was awarded to specialized contractor

THANK YOU www.duqm.gov.om