Documents for Buildings package of station infrastructure standards New and revised documents Interface between Station Platforms, Track and Trains Document No: GI/RT7016 Issue: 2 Safety in Railway Tunnels Requirements for Lighting Document No: GI/RT7019 Issue: 1 Guidance on Lighting of Railway Premises Document No: GI/GN7520 Issue: 1 Rail Industry Standard for Station Infrastructure Document No: RIS-7700-INS Issue: 1 Documents withdrawn Infrastructure Requirements at Stations Document No: Issue: 1 (February 2004) Interface between Station Platforms, Track and Trains Document No: GI/RT7016 Issue: 1 (February 2004) Lighting of Railway Premises Document No: GI/RT7010 Issue: 1 (October 2002) Fire Safety of Materials at Operational Premises Document No: GE/RT8005 Issue: 1 (April 2001) Recommendations for the Fire Safety of Materials at Operational Premises Document No: GE/RC8505 Issue: 1 (April 2001) Escalators & Passenger Conveyors on Railway Stations Document No: GM/RT1201 Issue: 1 (September 1996) Escalators & Passenger Conveyors Registration & Periodic Examination Details & Records Document No: GM/RT1251 Issue: 1 (December 1994) Standards Committees: Infrastructure (lead) Traffic Operation and Management Rolling Stock Plant Energy Issue/withdrawal date: 01 December 2007 Documents come into force/cease to be in force: 02 February 2008 Page 1 of 6 GIRT7016~iss 2 & GIRT7019~iss 1 & RIS7700INS~iss 1 & GIGN7520~Iss 1 BN
BACKGROUND The Railway Group Standards, Guidance Note and Code of Practice listed above comprise proposal 04/061 which is a suite of standards relating principally to station infrastructure but includes requirements for other operational premises. The standards within this proposal have been reviewed as part of the planned implementation of the Strategy for Standards Management; a copy of which can be found on the RGS website (www.rgsonline.co.uk). The principles of the Strategy for Standards Management have been applied to all the standards listed. This identified: Requirements retained as mandatory in GI/RT7016 issue 2 and GI/RT7019 issue 1 Requirements retained in a non-mandatory Rail Industry Standard RIS-7700-INS Requirements retained as guidance in GI/GN7520 Requirements withdrawn. A broad disposition of requirements is indicated in Annex 1. The requirements that are withdrawn are those that do not meet the risk scope test set out in the Railway Group Standards Code issue two, 2006.. SCOPE The key stakeholders affected by the withdrawal/issue of these documents are infrastructure managers and railway undertakings. KEY CHANGES It should be noted that the scope of the current project, undertaken as part of the implementation of the Strategy for Standards Management, has been, primarily, to remove those requirements that do not satisfy the risk scope test set out in the Railway Group Standards Code. The retained measures are, therefore, largely unchanged from those currently documented. During the course of the project a number of suggestions have been made for enhancement or amendment of the technical requirements set out in GI/RT7016 issue 2, GI/RT7019, GI/GN7520 and RIS-7700-INS. Whilst the scope of the current project did not include a technical review of the requirements set out in the standards, the suggestions made have been documented, to be used at such time as the next review takes place. The changes introduced by the re-distribution of requirements indicated above and in Annex 1 will not require infrastructure managers or railway undertakings to do anything differently. They will continue to comply with the requirements of their safety management systems, internal company standards and procedures and relevant legislation. However, in future, only requirements contained in GI/RT7016 issue 2 and GI/RT7019 will be mandatory on infrastructure managers. In order to bring all requirements for platform lighting into one document, the DOO lighting requirements currently contained in GE/RT8060, Technical Requirements for Dispatch of Trains from Platforms, have been transferred to GI/RT7016 issue 2, with the correction of one value as explained in the impact assessment. When GE/RT8060 is reviewed as part of the Strategy for Standards Management these lighting requirements will be withdrawn from that document. RIS-7700-INS Rail Industry Standard for Station Infrastructure is available should infrastructure managers or railway undertakings wish to mandate the contents on themselves, and adopt the requirements as part of their safety management system. It replaces previously mandatory requirements from GE/RT8005,, GM/RT1201 and GM/RT1251, and recommendations from GE/RC8505. All the new or revised documents are published in the new formats, agreed by Industry Standards Coordination Committee in 2006, for all future Railway Group documents. It should be noted, therefore, that the structure of the documents are different to that of previous Railway Group documents. All withdrawn documents continue to be available on the RSSB website, in the withdrawn documents section, but will not, in future, be maintained by RSSB. Page 2 of 6
COMPLIANCE REQUIREMENTS The documents withdrawn cease to be in force from 02 February 2008. The new/revised documents come into force from the same date, 02 February 2008, as shown in sections 1.3 of GI/RT7016 issue 2 and GI/RT7019 issue 1. IMPACT OF PROPOSED CHANGES ON NOTIFIED NATIONAL TECHNICAL RULES (NNTRs) RGS Clause NNTR Status Reason TSI Clause GE/RT8005 All Withdrawn GE/RT8005 was proposed for notification pending review of technical specifications and European standards. Now considered not necessary to notify GE/RT8005 4.2.3.1.2 GE/RT8005 All Withdrawn No equivalent requirement for fire safety in draft CR INF TSI GE/RT8005 All Withdrawn Review shows scope of GE/RT8005 was not appropriate for notification against SRT TSI as it is not relevant to tunnels. Also, the SRT TSI will be in force within 6 months and no new tunnels are anticipated during this period GE/RT8005 All Withdrawn Review shows scope of GE/RT8005 was not appropriate for notification against SRT TSI as it is not relevant to tunnels. Also, the SRT TSI will be in force within 6 months and no new tunnels are anticipated during this period CR INF SRT SRT Infrastructure Energy D1, D2, D3 and D4 Revised Replaced by GI/RT7016 issue 2 clauses 7.2, 7.4, 7.5 and 7.6 Intermediate Report G6 Revised Replaced by GI/RT7016 issue 2 clause 11.3.3 Intermediate Report M2 and M4 Revised Replaced by GI/RT7016 issue 2 clause 10.2 Intermediate Report All Withdrawn Now covered by GI/RT7016 entries CR INF All Withdrawn Review shows original notification was not appropriate CR PASS PRM E1 and E2 E2 and E4 Revised Replaced by BS8300:2001 PRM 4.1.2.13 Revised Replaced by BS8300:2001 PRM 4.1.2.14 Part M Revised Replaced by GI/RT7016 issue 2 Part 10 G6 Revised Replaced by GI/RT7016 issue 2 clause 11.3.3 PRM 4.1.2.19 PRM 4.1.2.19 Page 3 of 6
RGS Clause NNTR Status Reason TSI Clause GI/RT7016 C4.1 Revised Replaced by GI/RT7016 issue 2 clause 4.1 GI/RT7016 C4.2 Revised Replaced by GI/RT7016 issue 2 clause 4.2 GI/RT7016 C3 Revised Replaced by GI/RT7016 issue 2 Part 8 7.3.6 7.3.6 GI/RT7016 All Revised Replaced by GI/RT7016 issue 2 CR INF GI/RT7016 All Withdrawn Review shows original notification was not appropriate CR PASS Usable width of platform GI/RT7010 Part C Revised Replaced by GI/RT7019 issue 1 SRT Infrastructure PRM GI/RT7010 All Withdrawn Now covered by GI/RT7016 entries CR PASS PRM DEVIATIONS AUTHORISED BY RSSB The status of all authorised deviations, when these documents are introduced/withdrawn, is as follows: Still in force against GI/RT7016 issue 2 Deviation number Original applicant Topic 04/213/DGN Network Rail GI/RT7016 issue 1. C1.1. Wolverhampton platform 4. Noncompliant track curvature. 04/241/DGN Network Rail GI/RT7016 issue 1. C1.1 and C1.2. London Marylebone station platforms 5 & 6. Non-compliant track curvature. 04/244/DGN Network Rail GI/RT7016 issue 1. C1.2. Birmingham New St bay platform 4c. Non-compliant track gradient through platform. 04/245/DGN Network Rail GI/RT7016 issue 1. C3.5. Birmingham New St bay platform 4c. Non-compliant platform width. 04/247/DGN Network Rail GI/RT7016 issue 1. C3.4. Birmingham New St bay platform 4c. Non-compliant platform width. 04/273/DGN Network Rail GI/RT7016 issue 1. C3.4 (b). Wolverton Station platform 2. Noncompliant platform width. 05/072/DGN Network Rail GI/RT7016 issue 1. C5. Certain WCML platforms on fast lines. Non-compliant stepping distances. 05/074/DGN Network Rail GI/RT7016 issue 1. C1.1. Birmingham New St bay platform 4c. Non-compliant track curvature. 01/379/DGN Railtrack GC/RT5161 issue 2. 5.9.1 and 5.9.2. Manchester Airport Station platform 2. Encroachment into overrun risk zone. 04/246/DGN Network Rail issue 1. D7. Birmingham New St bay platform 4c. Encroachment into overrun risk zone. 05/030/DGN Network Rail issue 1. D1. Wembley Central Station. Reduced clearance from staircase to platform edge. Page 4 of 6
Deviation number Original applicant Topic 05/182/DGN Network Rail issue 1. D1 (b). Cannon Street Station. Reduced clearance from columns to platform edge 06/054/DGN Network Rail issue 1. D7. Cannon Street Station. Encroachment into overrun risk zone. Not applicable to GI/RT7010 issue 1 Deviation number Original applicant Topic Reason 03/201/NC Network Rail C7.2.1. Throughout Network Rail s infrastructure. Noncompliant vertical illuminance. Addressed by revised requirement (clause 11.3.4 in GI/RT7016 issue 2). Page 5 of 6
ANNEX 1 Other Premises GE/RT8005 Fire Safety of Materials at Operational Premises WITHDRAW Other Premises GE/RC8505 Recommendations for the Fire Safety of Materials at Operational Premises Stations Stations New RIS (RIS-7700-INS) Rail Industry Standard for Station Infrastructure plus Advisory Annexes GM/RT1201 Escalators & Passenger Conveyors on Railway Stations GM/RT1251 Escalators & Passenger Conveyors - Registration & Periodic Examination Details & Records Infrastructure Requirements at Stations GI/RT7016 Interface between Station Platforms, Track and Trains (up-issue) GE/RT8060 Technical Requirements for Dispatch of Trains from Platforms (clauses C1.5 to C1.8 only) GI/RT7016 Issue 2 Interface between Station Platforms, Track and Trains plus Non-Mandatory Appendices GI/RT7010 Lighting of Railway Premises New RGS (GI/RT7019) Safety in Railway Tunnels - Requirements for Lighting (initially lighting only but to be progressively expanded to match SRT TSI scope) New GN (GI/GN7520) Guidance on Lighting of Railway Premises Page 6 of 6