CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS



Similar documents
SECTION PRECAST CONCRETE UTILITY STRUCTURES

Wastewater Capital Projects Management Standard Construction Specification

SECTION PRECAST CONCRETE STRUCTURES

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

SECTION STORM DRAINAGE SYSTEM

SECTION STORM DRAIN SYSTEM

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

STANDARD SPECIFICATIONS SECTION PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

SECTION NONREINFORCED CONCRETE SEWER PIPE

DIVISION 4300 STORM DRAINAGE

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

Guide Specification Precast Concrete Products

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

SECTION STORM DRAINAGE TABLE OF CONTENTS

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

C. Section TESTING LABORATORY SERVICE.

SECTION ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES SITE UTILITIES

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 21

San Antonio Water System Standard Specifications for Construction ITEM NO SLIP-LINING SANITARY SEWERS

SECTION 3 SANITARY SEWER DESIGN

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

INDEX. Sec. No. Items Page Nos.

GUIDE SPECIFICATIONS FOR PRECAST CONCRETE PRODUCTS

Special Specification 7021 Water Main and Sewer Line Replacements

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH Purpose and Application.

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

Section SEWER PIPE INSTALLATION AND TESTING

SECTION ABANDONMENT OF SEWER MAINS

Division 4 Section Concrete Masonry Specifications

SECTION 807 PUMP STATION REHABILITATION

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST

PRE INSTALLATION MANUAL

SANITARY SEWER SPECIFICATIONS

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects

NAPCA BULLETIN APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE

SECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES

How To Install An Overhead Sewer

Stormwater/Wetland Pond Construction Inspection Checklist

Section 8.1 Volume I QUALITY ASSURANCE PROGRAM OF PRECAST PRESTRESSED CONCRETE PRODUCTS

LS 2540 SEWER LATERALS AND INSPECTION TEES

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe

PRECAST CONCRETE MANHOLES

DMS REINFORCED CONCRETE PIPE AND MACHINE-MADE PRECAST CONCRETE BOX CULVERT FABRICATION AND PLANT QUALIFICATION

SECTION REINFORCED CONCRETE PIPE. A. The following is a list of SPECIFICATIONS, which may be related to this section:

SECTION CAST-IN-PLACE CONCRETE

SECTION GROUND WATER STORAGE TANKS

MeltonStone Cast Stone Product Specifications

Specifications for Residential Property Owners Connection to New Public Sewer

SECTION SHEETING, SHORING AND BRACING

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements

SECTION 9.02 BUILDING SUBSURFACE DRAINS (PERIMETER, ETC.)

SECTION GRAVITY SANITARY SEWERS

SECTION PRECAST CONCRETE STRUCTURES

Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer

Rehabilitation of an Aging Concrete Reservoir Adit Tower

FY08 SEWER POINT REPAIRS BID TABULATION

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling

MATERIALS DIVISION MEMORANDUM

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

September 2012 Brunswick County Engineering Department Revision 1.0. Technical Specification GRAVITY SANITARY SEWER SYSTEM

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

SECTION SANITARY SEWER PIPE

SECTION DUCTILE IRON PIPE AND FITTINGS

ASTM C76, Class III, Wall B, except as modified herein. Clean natural sand, ASTM C33. Artificial or manufactured sand will not be permitted.

SECTION 603 SANITARY SEWER FORCE MAINS

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS

City of West Linn Public Works Standard Construction Specifications. Table of Contents

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION

CHAPTER 6 - SANITARY SEWER

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

Beacon Hill Sewer District Standard Specifications

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542

SANITARY GRAVITY SEWER LINE TESTING. B. Section CCTV Inspection of Gravity Sewer Lines

CW GRAVITY SEWERS TABLE OF CONTENTS

Sewer Water Pipeline Replacement with CERTA LOK RESTRAINED JOINT PVC PIPE

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER

See Appendix A for additional information, or contact ASTM directly.

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

SECTION UNDERGROUND ELECTRIC SERVICE

Issue of the Guidelines on Prevention of Water Seepage in New Buildings

SECTION POLYVINYL CHLORIDE (PVC) PIPE

Georgia Department of Transportation. Office of Materials and Research. Standard Operating Procedure (SOP) 19

Transcription:

CCU Engineering Specifications Section 003300 Effective Date: Nov. 1st, 2011 Page 1 of 5 PRECAST CONCRETE PRODUCTS PART 1 - GENERAL The following specification is intended for use for the design, selection of materials, and construction of Charlotte County Utility Projects. 1.1 SCOPE 1.1.1 General This specification addresses the furnishing all labor, materials, equipment and incidentals required for manufacture, installation, coating, and testing of precast manholes, wet wells, valve vaults, wet well top pads and manhole risers with access covers, and appurtenant materials. 1.1.1 Work Included The Contractor shall, unless specified otherwise, furnish all labor, materials, equipment, tools, and all other associated appurtenances necessary to do the work required under the contract. 1.1.2 Location of the Work The location of this work is as shown on the Contract Documents. 1.1.3 Coordination of the Work The Contractor shall be responsible for the satisfactory coordination of delivering Precast Concrete Products with other construction and activities in the area. Delays in work resulting from lack of such harmony shall not in any way be a cause for extra compensation by any of the parties. 1.1.4 Working Hours The work shall be carried out in accordance with local ordinance and not to cause any unreasonable nuisance to affected residents. Under emergency conditions, this limitation may be waived by the consent of Charlotte County Utilities (CCU). 1.2 METHOD OF MEASUREMENT & PAYMENT Measurement and payment of Precast Concrete Products shall be as specified in CCU specification 002320 Gravity Sewer System, 002530 Submersible Sewage Pump Lift Station- Package Design and 002540 Submersible Sewage Pump Lift Station- Standard Design..

1.3 REFERENCED STANDARDS (Latest Revision) AASHTO Standard Specifications for Highway Bridges ACI 318 Building Code Requirements for Reinforced Concrete ACI 350R Concrete Sanitary Engineering Structures ASTM A185 Welded Steel Wire Fabric for Concrete Reinforcement ASTM A615 Deformed and Plain Billet Steel Bars for Concrete Reinforcement ASTM C109 Compressive Strength of Hydraulic Cement Mortars (Using 2-in or 50 mm Cube Specimens) ASTM C827 Early Volume Change of Cementitious Mixtures ASTM C890 Minimum Structural Design Loading for Monolithic or Sectional Precast and Wastewater Structures ASTM C913 Precast Concrete Water and Wastewater Structures ASTM C478 Standard Specification for Precast Reinforced Concrete Manhole Sections 1.4 PARTIAL LISTING OF RELATED SECTIONS 002320 - Gravity Sewer System 002335 - Potable Water and Reclaimed Water Mains 002340 - Valves 002530 - Submersible Sewage Pump Lift Station-Package Design 002540 - Submersible Sewage Pump Lift Station- Standard Design Note: This is only a partial listing of related sections. The Contractor shall be responsible to review the entire contract documents. 1.5 SUBMITTALS 1.5.1 The contractor shall submit four (4) copies of shop drawings in accordance with the contract requirements for Charlotte County Utilities (CCU) review. 1.5.2 Shop drawings shall include as a minimum, material specifications, details of construction, reinforcing, lifting devices, joint details, access openings, pipe penetrations, design calculations, and lifting and buoyancy analysis. 1.5.3 The contractor shall submit manufacturer s product data if available. 1.5.4 The contractor submittals shall include the statement that the submittals have been reviewed and the materials meet the contract specifications and/or design details. 1.5.5 Final approval is at the discretion of CCU. Page 2 of 5

PART 2 - PRODUCTS 2.1 MATERIALS 2.1.1 General The materials used in this work shall be all new and conform to the requirements for class, kind, size and material as specified below. a. Concrete: ACI 318, Portland Cement Type II. b. Reinforcing steel: ASTM A615, Grade 60. c. Welded wire fabric: ASTM A185. 2.1.2 Design Criteria: a. The design of the precast structures shall confirm to ACI 350 R and ASTM C890. b. The precast structures shall withstand AASHTO H-20 loading with 30% soil loading at 130 #/cubic ft., and surcharge and ground water elevations as shown on the engineering drawings without failure or leakage. c. The concrete shall have a minimum compressive strength of 4000 psi for 28 days. 2.1.3 Source Criteria: a. Concrete shall be tested in accordance with ACI 3118. b. The plant records and quality control program used during production of the precast structures shall be retained and such records and test results shall be made available to CCU. c. All sections shall have the date of manufacture indelibly marked on the inside of the wall. 2.1.4 Precast Sections Construction a. All bases shall have a monolithic floor, anti-flotation ring, floor to wall transition wedge, and wall section. b. All items such as sleeves, piping holes, and cover frames shown on the engineering plans shall be cast in. c. The precast concrete structure shall be delivered to the job site with pre-installed elastomeric gasket(s) for all piping. The gasket(s) shall have a stainless steel adjustable strap to seal the gasket to the pipe. An elastomeric gasket(s) with a stainless steel adjustable strap to seal the gasket to the pipe shall be installed in all on site core bored holes. Page 3 of 5

2.1.5 Grout d. Fabrication shall be in accordance with ASTM C890 and C913. a. Grout shall be in accordance with CCU Specification 003600 Grout. 2.1.6 Waterproofing a. All coatings shall be in accordance with CCU Specification 002320 Gravity Sewer System 2.1.7 Acceptable Manufacturers a. Acceptable manufacturers are: Cast Systems L.L.C., Port Charlotte, Florida Oldcastle Precast East Inc, Cape Coral, Florida b. Other manufacturers of the contract precast structures shall provide to CCU documentation of a minimum of five (5) years of manufacturing experience of like products, their manufacturing quality control procedures, testing capability, coating processes, and references. PART 3 - EXECUTION 3.1 INSPECTIONS 3.1.1 CCU shall have access to the quality of all materials, manufacturing processes, coating process, and the product prior to shipment to the project site. Any section shall be subject to rejection due to failure to meeting the engineering drawings and/or CCU specification requirements even if accepted prior to shipping. Sections rejected after delivery shall be marked for identification and removed from the job site. Sections damaged after delivery and/or installation shall be removed and replaced at no cost to CCU. 3.1.2 All sections shall be inspected for general appearance, dimensions, and soundness. The surfaces shall be dense and close-textured and free of blisters, cracks, roughness, and exposed reinforcement. 3.1.3 Repair of imperfections shall be made only with CCU approval of the demonstrated manufacturers repair materials and processes. All repairs shall be approved by CCU prior to acceptance of the project. 3.2 DELIVERY, STORAGE AND HANDLING 3.2.1 Precast sections shall not be shipped until the concrete has attained 4000 psi at 28 days. 3.2.2 Precast sections shall conform to manufacturer s delivery and handling requirements. 3.2.3 The structure s edges shall be protected to prevent shipping and/or spalling damage. Page 4 of 5

3.2.4 The structure shall be lifted and/or supported using lifting points and/or handling devices. 3.3 INSTALLATION 3.3.1 Precast bases shall be placed in a properly dewatered and completely drained sub-grade on a layer of compacted bedding material in accordance with the CCU design details. 3.3.2 Inlet and outlet piping shall be connected and sealed in accordance with the manufacturer s specifications and the engineering drawings. 3.3.3 The exterior waterproofing coat shall be touched up after installation. 3.3.4 Interior concrete fill shall be placed on a clean base slab and against clean walls after the leakage test has been performed and accepted and water used for the test has been completely removed. 3.3.5 The access door and frame shall be placed on the top of the structure or some other means shall be provided to prevent accidental/unauthorized entry until the contractor makes the final adjustments to grade. END OF SECTION Page 5 of 5