Minimum Propulsion Power for ship safe Operation under adverse Weather Conditions



Similar documents
Performance Monitoring and Analysis for Operational Improvements

How holistic performance management minimizes excess fuel consumption.

IMO REQUIREMENTS FROM JULY 2015 TO JULY 2018 INCLUSIVE

Ballast Water Management

Merchant Marine Circular No. 152

M. Dogliani Energy Efficiency Design Index (EEDI): norme IMO ed aspetti tecnici. PORT&SHIPPING TEC Green - Shipping Summit - Novembre 2011

Safety of Life at Sea, 1974 (SOLAS)

How To Reduce Energy Efficiency On Ships

Energy Efficiency of Ships: what are we talking about?

Trends in the Development of Container Vessels

ANNEX 5 RESOLUTION MEPC.127(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER MANAGEMENT AND DEVELOPMENT OF BALLAST WATER MANAGEMENT PLANS (G4)

What is the scope of application of CSR Rules for Oil Tankers as regard to the type of cargoes?

Implementing a Ship Energy Efficiency Management Plan (SEEMP) Guidance for shipowners and operators

SURVEY and CERTIFICATION RULES on ENERGY EFFICIENCY of SHIPS (MARPOL 73/78 ANNEX VI, CHAPTER 4)

SURVEY and CERTIFICATION RULES on ENERGY EFFICIENCY of SHIPS (MARPOL 73/78 ANNEX VI, CHAPTER 4) SEPTEMBER 2015

Bollard Pull. Bollard Pull is, the tractive force of a tug, expressed in metric tonnes (t) or kn.

Cost optimization of marine fuels consumption as important factor of control ship s sulfur and nitrogen oxides emissions

Design and Operation of Fuel Efficient Ships. Jan de Kat Director, Energy Efficiency Operational and Environmental Performance Copenhagen

of Presentation Performance Management

GUIDELINES FOR VOLUNTARY USE OF THE SHIP ENERGY EFFICIENCY OPERATIONAL INDICATOR (EEOI)

2008 DK GROUP NETHERLANDS BV ALL RIGHTS RESERVED

Ship Structure Committee Case Study. BULK CARRIERS: Design, Operation, and Maintenance Concerns for Structural Safety of Bulk Carriers

Fleet Performance Management and Benchmarking Against Peers

Stena S ,200 DWT Product/Chemical Tanker CONQUEST CONQUEROR CONCORD CONCEPT CONSUL CONTEST

Energy efficient operation what matters

IMO Rules for gas as ship fuel BLG-15 MSC-88 BLG-16 MSC-89. SOLAS 2010 SOLAS 2014 IGF-Iterim-Guideline (IMO) BMVBS GL-IGF Guideline

ANNEX 10. RESOLUTION MEPC.214(63) Adopted on 2 March GUIDELINES ON SURVEY AND CERTIFICATION OF THE ENERGY EFFICIENCY DESIGN INDEX (EEDI)

Horn of Africa: Threat Factors for Commercial Shipping and Forecast of Pirate Activity Through 2009

VLCC Structural Design - Past, Present and Future

ST. VINCENT AND THE GRENADINES

INTERPRETATIONS OF, AND AMENDMENTS TO, MARPOL AND RELATED INSTRUMENTS. Management of boiler/economizer washdown water

lng conversion (General)

REVISED GUIDELINES FOR THE PREPARATION OF THE CARGO SECURING MANUAL

Smarter operations. Discover how intelligent data can help you implement and reap the rewards of smarter, streamlined operations. bmtsmart.

The influence of ship operational parameters on fuel consumption

Design methodology and numerical analysis of a cable ferry

Scorpio Tankers, Inc. Q Conference Call. April 29, 2013

Green Ship of the Future

CALCULATING WHEEL-OVER POINT

Fee tariff for services of Port of Gdansk Authority SA

Emission support system for calculation of energy demand and emissions of ships. Hans Otto Kristensen

THE ABC MARITIME GROUP

Hydrostatically Balanced Loading

Intershield 300 The industry benchmark in corrosion protection

Safe carriage of oil in extreme environments

PROPULSION SHAFTING ALIGNMENT

THE NEXT REVOLT 18 BATTERY COASTAL TRAFFIC REVOLT IN BRIEF

FKAB is and has been an independent marine consultancy since 1961, this makes us an innovative and reliable partner for the Marine and Shipbuilding

Procedural Requirements for ISPS Code Certification

REVISED CONSOLIDATED FORMAT FOR REPORTING ALLEGED INADEQUACIES OF PORT RECEPTION FACILITIES

The Effects of Length on the Powering of Large Slender Hull Forms

INVESTIGATION OF THE GROUNDING OF MV FULL CITY IMO No AT SASTEIN JULY 31st 2009

Shipping, World Trade and the Reduction of CO 2 Emissions

IMO activities on control of

Periodical Newsletter

Dry Bulk Carriers Vessel: Bulk Americas

REPUBLIC OF LIBERIA BUREAU OF MARITIME AFFAIRS

Wind influence on container handling, equipment and stacking

S&P Market Trends during March: Secondhand Newbuilding Demolition

SAFER, SMARTER, GREENER

Alfa Laval Slide 3

Gaussian Process Regression for Vessel Performance Monitoring

EEOI Monitoring Tool. User s Manual

GUIDELINES ON THE DESIGN AND USE OF PORTABLE PILOT UNITS

Oregon Ballast Water Program

Procedural Requirements for ISM Code Certification

Grain Capacity: No Hold name Hold C.B.M. ULUSOY-11

Shaft Alignment. Powertrain Vibration

How To Optimise A Boat'S Hull

Resistance & Propulsion (1) MAR Presentation of ships wake

EMISSIONS FROM MARINE ENGINES VERSUS IMO CERTIFICATION AND REQUIREMENTS OF TIER 3

OPEX THE SHIP MANAGEMENT VIEW. V.Ships

Passenger Terminal Amsterdam

SIMPLIFIED MEASUREMENT

Ballast Water Management Regulations and Challenges

INTEGRATED SYSTEM FOR DATA ACQUISITION AND NUMERICAL ANALYSIS OF THE SHIP RESISTANCE PERFORMANCE IN THE TOWING TANK OF GALAÞI UNIVERSITY

Operability of Ferries in the Aegean Sea The Limiting Case of Weather Dependent (Official) Sailing Restrictions

Retrofit Opportunities for Existing Fleet

> Capital Markets Day 2011

IMO. MSC/Circ October Ref. T1/2.04 GUIDANCE TO THE MASTER FOR AVOIDING DANGEROUS SITUATIONS IN FOLLOWING AND QUARTERING SEAS

GUIDELINES AND CRITERIA FOR VESSEL TRAFFIC SERVICES ON INLAND WATERWAYS (VTS Guidelines 2006)

Approach Channels A Guide for Design. Progress of MarCom Working Group 49/121 Dr Mark McBride HR Wallingford Ltd

Bulk Cargo Liquefaction

Sperry Marine Fleet Management Enterprise Solution

Jeppesen is a Boeing company

Building an LNG driven vessel. LNG developments at Meyer Werft Viking Grace 18_09_2013

A RISK ASSESSMENT METHODOLOGY AS A TOOL FOR SCREENING OF SHIP TO SHIP (STS) TRANSFER OPERATIONS.

12 November 2008 *** I:\CIRC\MEPC\01\642.DOC INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR

Pilot on the Bridge Role, Authority and Responsibility. Necessity of Bridge Team Management.

OIL & MARINE PRODUCT RANGE. Dock & onshore Floating roof tank drain Mooring Rig supply

New Ferries for Gedser - Rostock. Development of a transport concept GR12. Ferry Conference in Copenhagen 22 nd November 2010

A Contribution to the Analysis of Maritime Accidents with Catastrophic Consequence

Evaluating ship collision risks

PANAMA MARITIME AUTHORITY General Directorate of Merchant Marine. Merchant Marine Circular No. 193

M/V Eleranta IMO Water Ballast Tank Inspection Report. China Shipping International Shipyard Co. Ltd (CSIS), Changxing Island, Shanghai

Corrosion protection of crude oil cargo tanks new IMO regulations

ELECTRIC SHIP EDUCATION. 9 May 2006

Historical trends in ship design efficiency

GOFREP Master s Guide

Transcription:

NATIONAL TECHNICAL UNIVERSITY OF ATHENS LABORATORY FOR SHIP & MARINE HYDRODYNAMICS (member of ITTC, HELLAS LAB., ISO 9001 Certified) Minimum Propulsion Power for ship safe Operation under adverse Weather Conditions by G.J. Grigoropoulos, Professor NTUA 1

SCOPE OF THE STUDY The study aimed at the assessment of the seakeeping performance including added resistance in wind and waves for four (4) Bulk Carriers. The ship speed and the sea conditions were derived on the basis of IMO MSC MSC-MEPC.2/Circ.11 issued on December 2012. On the basis of these results, some conclusions are drawn with respect to the required installed power to propel the ship at a specified speed in head waves (worst case) defined in the above Circular, as well as in those specified by ISC Code 2008. The selected ships are: BC HANDY DWT 30000 T BC SUPER-HANDY-MAX 57000 T BC KAMSAR-MAX 79000 T BC CAPE SIZE 176000 T MT VLCC 306000 T 2

BC DWT 30000 T Full Load Draft Ballast Draft MAIN DIMENSIONS L BP = 168.00 B M = 26.00 m T BAL = 5.06 m και T SCAN = 9.89 m Minimum Power Line = 6015 kw Installed Power = 6480 kw 3

BC DWT 57000 T antling Draft llast Draft MAIN DIMENSIONS L BP = 185.00 B M = 32.26 m T BAL = 5.87 m και T SCAN = 12.8 m Minimum Power Line = 7635 kw Installed Power = 9480 kw 4

BC DWT 79000 T MAIN DIMENSIONS L BP = 222.00 B M = 32.26 m T HB = 8.209 m και T FL = 14.619 m Minimum Power Line = 8983 kw Installed Power = 11060 kw (+23%) 5

BC DWT 176000 T MAIN DIMENSIONS L BP = 282.20 B M = 45.00 m T HB = 9.267 m και T FL = 18.250 m Minimum Power Line = 14861 kw Installed Power = 16860 kw (+13.5%) 6

BC DWT 176000 T MAIN DIMENSIONS L BP = 320.00 B M = 58.00 m T HB = 11.570 m και T FL = 20.430 m Minimum Power Line = 23917 kw Installed Power = 29340 kw (+23%) 7

SIMPLIFIED METHOD (BULK CARRIERS) 8

SIMPLIFIED METHOD (TANKER) 9

SIMPLIFIED METHOD (BC DWT 30000, 57000 & 79000 Τ) BC DWT 30000 T LOADING CONDITION 06: Heavy Ballast Condition at Arrival (Displ. = 26029 mt) LOADING CONDITION 27: Homo. Loading with Dens=3T/m 3, Short Voyage (50% Bunker) Departure (Displ. = 37760 mt) BC DWT 57000 T LOADING CONDITION 09: Heavy Ballast Condition Arrival (Displ. = 43858 mt) LOADING CONDITION 23: Multi-Port 2 ND Port Homo. Loading, Departure (Displ. =67680 mt) BC DWT 79000 T LOADING CONDITION 44: Multi-Port 2nd Port Ore Loading (3.0 t/m3) Condition at Departure (Displ. = 93377 mt) LOADING CONDITION 10: Heavy Ballast Condition at Arrival (Displ. = 49388 mt) 10

SIMPLIFIED METHOD (BC DWT 176000 T & VLCC DWT 306000 T) BC DWT 176000 T LOADING CONDITION 39: 6A Homogeneous Heavy Loading Condition at Departure (SF = 11.97 ft 3 /lt) (Displ. = 202617 mt) LOADING CONDITION 23: 2G Heavy Ballast Condition at Arrival, without AP, WBT10, WBT6P/S (Displ. = 96734 mt) VLCC DWT 306000 T LOADING CONDITION 10: Homogeneous Design Load, 40% Bunker Condition (S.G. = 0.7884) LOADING CONDITION 07: Gale Ballast Condition at Arrival (No. 3 C.C.O.TK) 11

Resistance [N] SIMPLIFIED METHOD (BC DWT 79000 Τ) BC79K_Full Load_Vwind = 19 m/s 2000000 1800000 1600000 1400000 Rbare Rcalm Rwind Rair (w/o wind) Radded Rapp Rwave Rtotal 1200000 1000000 800000 600000 400000 200000 0 2 4 6 8 10 12 14 16 Vs [kn] 12

Resistance [N] SIMPLIFIED METHOD (BC DWT 79000 Τ) BC79K_Heavy Ballast_Vwind = 19 m/s 1800000 1600000 1400000 1200000 Rbare Rcalm Rwind Rair (w/o wind) Radded Rapp Rtotal 1000000 800000 600000 400000 200000 0 2 4 6 8 10 12 14 16 Vs [kn] 13

Resistance [N] SIMPLIFIED METHOD (BC DWT 79000 Τ) BC79K_Full Load_Vwind = 26 m/s 2800000 2600000 2400000 2200000 2000000 1800000 Rbare Rcalm Rwind Rair (w/o wind) Radded Rapp Rwave Rtotal 1600000 1400000 1200000 1000000 800000 600000 400000 200000 0 2 4 6 8 10 12 14 16 Vs [kn] 14

Resistance [N] SIMPLIFIED METHOD (BC DWT 79000 Τ) BC79K_Heavy Ballast_Vwind = 26 m/s 2400000 2200000 2000000 1800000 1600000 1400000 1200000 1000000 800000 600000 400000 Rbare Rcalm Rwind Rair (w/o wind) Radded Rapp Rtotal 200000 0 2 4 6 8 10 12 14 16 Vs [kn] 15

Resistance [N] SIMPLIFIED METHOD (BC DWT 176000 Τ) BC176_Full Load_Vwind = 19 m/s 2600000 2400000 2200000 2000000 1800000 Rbare Rcalm Rwind Rair (w/o wind) Radded Rapp Rtotal 1600000 1400000 1200000 1000000 800000 600000 400000 200000 0 2 4 6 8 10 12 14 16 Vs [kn] 16

Resistance [N] SIMPLIFIED METHOD (BC DWT 176000 Τ) BC176_Heavy Ballast_Vwind = 19 m/s 2600000 2400000 2200000 2000000 1800000 1600000 Rbare Rcalm Rwind Rair (w/o wind) Radded Rapp Rwave Rtotal 1400000 1200000 1000000 800000 600000 400000 200000 0 2 4 6 8 10 12 14 16 Vs [kn] 21 st May 2014 Minimum Power for safe Operation in adverse Weather Conditions 17

Resistance [N] SIMPLIFIED METHOD (BC DWT 176000 Τ) 3400000 BC176_Full Load_Vwind = 26 m/s 3200000 3000000 2800000 2600000 2400000 2200000 Rbare Rcalm Rwind Rair (w/o wind) Radded Rapp Rtotal 2000000 1800000 1600000 1400000 1200000 1000000 800000 600000 400000 200000 0 2 4 6 8 10 12 14 16 Vs [kn] 18

Resistance [N] Resistance [N] SIMPLIFIED METHOD (BC DWT 176000 Τ) 3600000 2000000 3400000 BC176_Heavy BC57_Ballast_Vwind= Ballast_Vwind 26 = m/s 26 m/s 3200000 1800000 3000000 2800000 1600000 2600000 1400000 2400000 2200000 1200000 2000000 1800000 1000000 1600000 1400000 800000 1200000 1000000 600000 800000 400000 600000 Rbare Rcalm Rair Rair (w/o wind) Rbare Radded Rcalm Rapp Rwind Rwind Rair (w/o wind) Rtotal Radded Rapp Rwave Rtotal 400000 200000 200000 0 2 4 6 88 10 10 12 12 14 14 16 16 Vs [kn] 19

SIMPLIFIED METHOD FULL LOAD (BC DWT 30000 Τ) L1 L2 L3 L4 RPM up RPM low 6480 kw 5190 kw 5490 kw 4380 kw 136 RPM 115 RPM 20

7/11/06 Συνάντηση Μελών ΕΝΘΥ 21

7/11/06 Συνάντηση Μελών ΕΝΘΥ 22

7/11/06 Συνάντηση Μελών ΕΝΘΥ 23

SIMPLIFIED METHOD FULL LOAD (VLCC DWT 306000 Τ) L1 L2 L3 L4 RPM up RPM low 29340 kw 23520 kw 23580 kw 18840 kw 76 RPM 61 RPM 24

CONCLUSIONS - 1 1. All five ships studied, very easily satisfy level 1 requirements, while some of them satisfy the requirements of level 2 simplified assessment with more difficulty. This constitutes a major failure of rationalism, dictating that level 1 should be the strictest one. Since either level is sufficient to comply with the requirement, it follows that the simplest level 1 should not also be the easiest to fulfill. 2. Submerged lateral area of the hull, corrected for breadth effect, based on IACS formulation and incorporated in MSC-MEPC.2/Circ.11 is 55-70% higher than the actual one, both at the full load and the heavy ballast conditions and in the case of the VLCC more than 80% higher. This affects the minimum speed for manoeuvrability. 3. Estimated power requirements on the basis of MSC-MEPC.2 / Circ.11 deviate form calculated results more in the heavy ballast conditions than in the full load ones. This may be due to the fact that, following IACS supporting document, approximate formulae are based on full load condition, while the heavy ballast one is more critical in this respect, due to higher vertical dynamic responses contributing to excessive added resistance in head waves. 25

CONCLUSIONS - 2 4. Level 1 Minimum Power Lines are easily exceeded in all five cases. Installed power of the small (30000T) and the large (176000T) BC exceeds regression line by 8% and 13.5%, respectively. Margin for the two intermediate BCs is >20% and for the VLCC >23%. This shows that the bar was set quite low to allow a free pass for all designs. 5. Level 2 Simplified Assessment power requirements are met only marginally in one of the tested conditions for the investigated BCs. Taking into account the fouling and the aging of ships, this criterion may be violated. On the contrary, they are well satisfied for the VLCC, where required minimum speed is too low for the installed main engine propeller configuration. Oceangoing ships regardless of their size encounter similar weather and sea conditions, which affect more the smaller ones, their power margin must be increased. Instead, Res. MEPC. 232(65) - 2013 reduced sea conditions for all ships and more so for ships below 250 m to levels equivalent to Beaufort 7. 6. Minimum power requirement ignores increase of calm water resistance due to hull & propeller fouling, as well as due to aging. Commercial ships are neither new-buildings nor just launched from the dry dock. 26

CONCLUSIONS - 3 7. The vessels were evaluated also for the sea and weather conditions specified by ISC 2008 (equivalent to Beaufort 10). Under these conditions, assuming the required minimum speed of MSC-MEPC.2 / Circ.11, none of them satisfies minimum power requirement, although some came very close. This indicates that there is much room to set stricter requirements than those set by resolution MEPC. 232(65). 8. Level 1 power line is satisfied by 90% of plotted sample, implying that required minimum installed power is substantially lower than actual current designs for BCs. The same holds true for tankers. It does not seem appropriate, nor conservative, to now provide an effective IMO stamp of safety to all ships as long as they are not within the worst 10% of data wrt engine size (underpowered ships). 9. Level 1 power line method, adopted by resolution MEPC.232 (65) as the first level of a two or three-level assessment approach should be of the most stringent and conservative, as a matter of principle. 10. Harmonization of sea & weather environment of MSC-MEPC.2 / Circ.11 to those of the mandatory ISC 2008 is reasonable and should be attempted. A ship that can t manoeuvre in the latter conditions is prone to grounding or to be driven against a nearby rocky shore. 27