ISO 9001:2015 QUALITY MANAGEMENT SYSTEM ***** ISO 14001:2015 ENVIRONMENTAL MANAGEMENT SYSTEM



Similar documents
ISO 13485:2003 U.S. QSR (21 CFR 820) Quality Systems Manual

ISO 9001:2008 ISO 14001:2004

Row Manufacturing Inc. Quality Manual ISO 9001:2008

Micro Plastics, Inc. Quality Manual

Quality Manual ISO 9001:2015 Quality Management System

ISO 9001 Quality Systems Manual

ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR

The following paragraphs, identified to coincide with the OHSAS 18001:2007 numbering system, provide a clause-by-clause summary of the standard.

Correlation matrices between 9100:2009 and 9100:2016

ISO 9001:2000 Gap Analysis Checklist

Preparation for ISO OH&S Management Systems

DNV GL Assessment Checklist ISO 9001:2015

Table of Contents INTEGRATED MANAGEMENT SYSTEM MANUAL

ISO 9001: A Quality Manual for the Transition Period and Beyond

Quality Manual. UK Wide Security Solutions Ltd. 1 QM-001 Quality Manual Issue 1. January 1, 2011

Quality Management System Manual

ISO 9001:2008 Quality Systems Manual

Quality & Safety Manual

ISO 9001:2008 Audit Checklist

ISO 9001 : 2008 QUALITY MANAGEMENT SYSTEM AUDIT CHECK LIST INTRODUCTION

Camar Aircraft Products Co. QUALITY MANUAL Revision D

Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization

ISO 9001:2008 Requirements Explained - An Adobe PDF File for Use on a Network System

ISO 9001:2000 AUDIT CHECKLIST

ISO 9001:2015 vs. ISO 9001:2008

Correspondence between ISO 9001:2008 and 14001:2004, OHSAS 18001:2007, ISM and the SeaBird Management System

ISO 9001:2008 Quality Management System Requirements (Third Revision)

Comparison between FDA QSR and ISO 13485

CENTRIS CONSULTING. Quality Control Manual

Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL

QUALITY MANUAL ISO 9001:2015

Cartel Electronics. AS 9100 Quality Systems Manual

ISO-9001:2000 Quality Management Systems

ISO 9001:2008 Internal Audit Guidance

QW Enterprises, LLP. Quality Manual

Business Management System Manual. Context, Scope and Responsibilities

LinkTech LLC 3000 Bunsen Ave. #A Ventura, CA 93003

ISO 13485: INTERNAL AUDIT CHECKLIST

ISO 9001:2015 Overview of the Revised International Standard

Quality Management System Manual ISO9001:2008

QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements. Documentation Requirements. General. Quality Manual. Control of Documents

The President of Inductors Inc. is the senior executive responsible for operations.

QUALITY MANAGEMENT SYSTEM REVIEW AND APPROVAL TEMPLATE (DOE G A, Appendix A, )

Quality System Manual

ISO 14001:2015 Client Transition Checklist

Process Mapping and Process- Based Internal Audits

ISO 9001: 2008 Boosting quality to differentiate yourself from the competition. xxxx November 2008

ALL PRODUCTS MFG & SUPPLY

ISO 14001:2004 Environmental Management System Manual

Supplier Quality Management System Audit Checklist (ISO 9000:2000, TS 16949:2002)

QUALITY MANAGEMENT SYSTEM Corporate

QUALITY MANUAL REVISION RECORD

AS9100 B to C Revision

Contents of the ISO 9001:2000 Quality System Checklist

FINE LOGISTICS. Quality Manual. Document No.: Revision: A

Quality, Environmental, Health and Safety Manual Toshiba International Corporation

ISO 9001:2015 Internal Audit Checklist

AUDITOR GUIDELINES. Responsibilities Supporting Inputs. Receive AAA, Sign and return to IMS with audit report. Document Review required?

NORTH AMERICA OPERATIONS. (Fairmont and Montreal Facilities) QUALITY MANUAL. Prepared to comply with the requirements of ISO 9001:2008

AS9100:2016 Transition Guide

UNCONTROLLED COPY FOR REFERENCE ONLY

Quality Manual TABLE OF CONTENTS APPROVAL SIGNATURE PAGE AMENDMENT RECORD SCOPE EXCLUSIONS 2.1 3

Control No: QQM-02 Title: Quality Management Systems Manual Revision 10 07/08/2010 ISO 9001:2008 Page: 1 of 22

INTEGRATED MANAGEMENT SYSTEM MANUAL IMS. Based on ISO 9001:2008 and ISO 14001:2004 Standards

This Business Management System Manual is based on ISO 9001:2008 requirements

ISO 9001:2015 Transition Guide

Quality Systems Manual

ABC COMPANY INC ISO 9001:2000 QUALITY MANUAL

ISO 14001:2004 EMS Internal Audit Checklist & Gap Analysis

Quality Management System Manual

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual

Chapter 2 ISO 9001:2008 QMS

QMS Manual 2350 Helen Street, N. St. Paul, MN Page 1 of 5. Quality Management System Manual

ISO 14001:2004 EMS Internal Audit Guidance

White paper: How to implement a Quality Management System

TRANSPORT CANADA MARINE SAFETY PLEASURE CRAFT OPERATOR COMPETENCY PROGRAM QUALITY MANAGEMENT SYSTEM FOR ACCREDITATION

QUALITY MANUAL ISO Quality Management System

Understanding Principles and Concepts of Quality, Safety and Environmental Management System Graham Caddies

Quality Manual. DuraTech Industries, Inc Commerce Street La Crosse, WI MANUAL SERIAL NUMBER 1

This procedure applies to the following categories of documents:

QUALITY MANAGEMENT SYSTEM MANUAL

QUALITY MANUAL 3 KENDRICK ROAD WAREHAM, MA FAX

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature

AS9100 Quality Manual

QUALITY OPERATING PROCEDURE QOP QUALITY ASSURANCE SYSTEM MANUAL

Summary of Requirements for ISO 14001:2004 February 24, 2005

WHAT MAKES YOUR OCCUPATIONAL HEALTH AND SAFETY SYSTEMS STANDARD BEST-IN-CLASS?

ISO 9000 Introduction and Support Package: Guidance on the Documentation Requirements of ISO 9001:2008

The Prophotonix (UK) Ltd Quality manual

ISO 9001:2008 Quality Manual Clause 3.7.4

Suburban Manufacturing Inc Dalton Avenue NE Monticello, MN (800) Quality Manual

Rev: Issue 4 Rev 4 Quality Manual AOP0101 Date: 10/07/13. Quality Manual. CBT Technology, Inc. 358 North Street Randolph, MA 02368

The Gap Analysis Checklist

Food Safety and Quality Management System

ISO 9001:2008 Quality Management System QMS Manual

Quality Management System Manual

Briefing on ISO 9001, ISO. requirements

ISO 13485:201x What is in the new standard?

Transcription:

ISO 9001:2015 QUALITY MANAGEMENT SYSTEM ***** ISO 14001:2015 ENVIRONMENTAL MANAGEMENT SYSTEM ***** OHSAS 18001:2007 OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEM ***** QMS-EMS-OHS MANUAL Your Company Name Street Address City, State Zip

Quality, Environmental, and Occupational Health and Safety Manual Instructions: This manual is to be used as a template in developing your Manual for the integrated ISO 9001 Quality, ISO 14001 Environmental, and OHSAS 18001:2007 Health and Safety management systems. Methods and systems used in the development and operation of management systems vary widely from company to company. The blue text and suggestions displayed in the manual are intended to offer some options and to highlight the areas that need attention / update / replacement. Review the text and suggestions and at a minimum replace or update them to reflect the unique / customized information of your integrated system requirements. Delete the blue text after each task is completed. Use replace function enter Your Company in find space, enter your company name in replace space system should make changes throughout the entire document. In the header, replace the generic logo with your company name and logo. To help with the identification of the documented information as it applies to the IMS, the QMS, the EMS, and the OHS, the Documentation Master Lists form F-750-003 and the IMS-Docs Flow Down Matrix are color coded to highlight the documents where: Common to the QMS, the EMS and the OHS in Yellow Highlight, Specific to the QMS in Blue Highlight, Specific to the EMS In Green Highlight. Specific to the OHS in Beige Highlight Common to the EMS and the OHS in Green and Beige Highlight, Quality, Environmental, and Occupational Health and Safety Manual Page 2 of 21 IMS-002 Rev A Approved by: Date:

Quality, Environmental, and Occupational Health and Safety Manual Introduction Your Company developed and implemented an integrated Quality, Environmental and Occupational Health and Safety Management System in order to document the company s best business practices, better satisfy the requirements and expectations of its customers, enhance its environmental performance, support and promote good health and safety practices and improve the overall management of the company. To fully understand the organization and its context, Your Company determined the external and internal issues that are relevant and that affect its ability to achieve the intended results of the Integrated Management System (IMS). Your Company meets the requirements of the international standard ISO 9001:2015. The system addresses the design, development, production, installation, and servicing of the company s products. It incorporates the process approach where consistent and predictable results are achieved more effectively and efficiently when activities are understood and managed as interrelated processes. Your Company meets the requirements of the international standard ISO 14001:2015. The system addresses the management of environmental aspects, compliance obligations, the actions to address risks and opportunities. The management of the interactive processes provides for the achievement of continual improvement and focus on efforts leading to the prevention of undesirable outcomes. Your Company meets the requirements of the international standard OHSAS 18001:2007. It addresses the OH&S policy commitments to comply with applicable legal requirements, to the prevention of injury and ill health and to continual improvement. A process approach provides for the management of the integrated management system and its processes through the application of a Plan-Do-Check-Act methodology and a focus on Risk-Based-Thinking leading to the prevention of undesirable outcomes. The manual is divided into sections that correlate to the clauses of ISO 9001:2015 and ISO 14001:2015 and incorporate the requirements of OHSAS 18001:2007. The manual describes the Integrated Management System, delineates authorities, inter relationships and responsibilities of the personnel responsible within the system. The manual also provides the documented information with procedures or references for all activities comprising the management system that ensures the compliance to the requirements of the standards. This manual is used internally to guide the company s employees through the various requirements of the quality, environmental, and health and safety standards that must be met and maintained in order to ensure good health and safety, environmental performance, customer satisfaction, and continual improvement and provide the necessary instructions that create an empowered work force. This manual is used externally to introduce our Integrated Management System to our customers and other external organizations or interested parties. The manual is also used to Quality, Environmental, and Occupational Health and Safety Manual Page 4 of 21 IMS-002 Rev A Approved by: Date:

Quality, Environmental, and Occupational Health and Safety Manual Section 01 Scope or the Integrated Management System General To determine and establish the scope of the Integrated Management System (IMS) Your Company determined the boundaries and applicability of the quality and environmental systems and considered the external and internal issues, the requirements of relevant interested parties, and the products and services of the company. The scope is available and maintained as documented information stating the products and services covered by the IMS. Scope of the Quality and Environmental and Occupational Health and Safety Management System. Your Company applies all the requirements of ISO 9001:2015, ISO 14001:2015, and OHSAS 18001:2007 when they are applicable within the determined scope of the IMS. As developed with procedure P-400 for Organizational context, include the scope of your IMS here: For example, if you are a manufacturer of toys, the scope may be: The scope of the Quality and Environmental Management System includes the major product and service categories associated with the primary functions of manufacturing wooden toys at the North Pole location and distributing the product to children of all ages. Conformity to the international standards may only be claimed if the requirements determined as not being applicable do not affect the organization s ability or responsibility to meet requirements. In the event that any requirement is not applicable at Your Company, justification for any instance where a requirement cannot be applied is documented. Your Company has determined that the following requirement(s) is/are not applicable to the operations at this site:. As determined with procedure P-400, identify the requirement(s) that do not apply and document the justification here: For example, if you are a manufacturer of toys, a requirement that does not apply may be: Clause 8.5.5 for post-delivery activities does not apply to the company. Customer feedback has shown that conformity to post-delivery services is achieved with the initial delivery. Section 02 Normative References There are no normative references. Section 03 Definitions Applicable definitions are included in documented procedures and instructions at par 3.0 to enhance the understanding of the process. Quality, Environmental, and Occupational Health and Safety Manual Page 6 of 21 IMS-002 Rev A Approved by: Date:

Quality, Environmental, and Occupational Health and Safety Manual c. Quality Policy Attachment A-520-001 As developed with the Leadership procedure P-500, include the information here: QUALITY POLICY -------------------------------------------------------------------------------------------------------------------- QUALITY OBJECTIVE -------------------------------------------------------------------------------------------------------------------- STRATEGIC DIRECTION VISION -------------------------------------------------------------------------------------------------------------------- MISSION -------------------------------------------------------------------------------------------------------------------- GOALS -------------------------------------------------------------------------------------------------------------------- Top Management Approvals: Title: ---------------------------------------- Name --------------------------, Date ------------- Title: ---------------------------------------- Name --------------------------, Date ------------- Title: ---------------------------------------- Name --------------------------, Date ------------- Title: ---------------------------------------- Name --------------------------, Date ------------- Title: ---------------------------------------- Name --------------------------, Date ------------- Quality, Environmental, and Occupational Health and Safety Manual Page 9 of 21 IMS-002 Rev A Approved by: Date:

Quality, Environmental, and Occupational Health and Safety Manual f. Organization chart Attachment A-530-001 As developed with the Leadership procedure P-500, insert Your Company s Organization Chart in this page. ORGANIZATION CHART for YOUR COMPANY PRESIDENT - OWNER IMS TEAM LEADER Quality, Environmental, and Occupational Health and Safety Manual Page 12 of 21 IMS-002 Rev A Approved by: Date:

Quality and Environmental Manual Section 04 Documented information Form F-750-001 List of Documented Information for IMS Manual Section 04 This master list for Procedures provides the responsibility, approval date, and revision status for the documents. A latest copy of each Procedure and Instruction is included in the applicable section of the manual. The IMS designation indicates an Integrated Management System Manual. The P designation indicates Procedures. The WI designation indicates Work Instructions. The number following the document numbers listed in the Document column below identifies the section of the standard that the document is associated with. Doc. # Description Responsibility Approve date Quality Management System IMS-002 QMS-EMS-OHS Manual Document Information President Manual Section 04 Context of the Organization P-400 Organizational context President Manual Section 05 Leadership P-500 Leadership President Manual Section 06 Planning P-600 Planning for the IMS IMS team leader P-610 QMS Risk management planning Quality team leader P-612 EMS Risk management planning Environmental team leader P-631 OHS Risk management planning Health and safety team leader WI-622-001 Environmental program Water Technical services manager WI-622-002 Environmental program Air Technical services manager IMS-001-A Quality and Environmental Manual Page 14 of 14 Approved by: Date: Revise date Revise date

Quality and Environmental Manual F-851-005 Service projects log P-851 F-851-006 External property control log P-851 F-851-007 Project inspection / report P-851 F-852-001 Identification tag P-715 / WI-810-050 / P-851 / P-852 / P-870 F-852-002 Traceability serial number log P-852 F-852-003 Traceability label P-852 / P-854 F-854-001 Storage inspection report P-854 F-870-001 Nonconforming output report WI-810-050 / P-870 F-910-001 Product Realization-Monitoring, measuring & analysis P-810 / P-830 / P-840 / P-851 / P-852 / P-910 / P-1010 F-910-002 QMS-Monitoring, measuring & analysis table P-810 / P-910 / P-1010 F-910-004 Inspection report P-851 / P-852 / P-910 F-911-001 EMS-Monitoring, measuring & analysis table P-815 / P-830 / P-840 / P-851 / P-911 / P-830 / P-1010 F-912-001 Customer survey and analysis P-912 F-915-001 Evaluation of compliance obligations plan P-915 F-920-001 Procedure by work area P-920 F-920-002 Internal audit checklist P-920 F-920-003 Audit plan P-920 F-920-004 Audit report P-920 F-930-001 QMS-Management review agenda P-930 F-930-002 QMS-Management review output report P-930 F-930-003 EMS-Management review agenda P-930 F-930-004 EMS-Management review output report P-930 IMS-001-A Quality and Environmental Manual Page 20 of 20 Approved by: Date:

INSERT YOUR COMPANY LOGO/NAME HERE 1.0 Purpose/Scope P-715-A Control of Monitoring and Measuring Equipment 1.1 The purpose of this procedure is to outline the requirements for control of measuring and monitoring equipment at Your Company. 1.2 The procedure applies to the measuring and monitoring resources required to meet the objectives of the Quality Management System (QMS), the Environmental Management System (EMS), and the Occupational Health and Safety Management System (OHS) as an integrated management system (IMS). 2.0 Responsibilities and Authorities 2.1 The IMS team leader has the prime responsibility and approval authority for this procedure. 2.2 In support of the IMS team leader, the IMS team leader is responsible for determining the monitoring and measuring resources needed. 2.3 The IMS team leader is responsible to designate the Equipment coordinator, and to assign responsibility for calibration and maintenance of the equipment. 3.0 References and Definitions 3.1 This document addresses clause 7.1.5 of ISO 9001:2015 covering monitoring and measuring resources and the part of clause 9.1.1 of the ISO 14001:2015 standard dealing with the calibration and verification of monitoring and measuring equipment. 3.2 This document considers clause 8 of OHSAS 18001:2007 where operational controls include the calibration and verification of monitoring and measuring equipment. 3.3 No definitions 4.0 Resources 4.1 None, (unless an electronic equipment calibration tracking system is used). 5.0 Instructions 5.1 The IMS team determines and provides the resources needed to ensure valid and reliable results when monitoring and measuring is used to verify conformity to requirements and to enhance environmental and health and safety performance and controls. 5.1.1 With procedures P-810, P-815, P-846 for QMS, EMS, and OHS Operational planning and control, P-851 for Control of production and service provision, P-910, P-911, and P-951 for QMS, EMS and OHS Monitoring, measurement, analysis and evaluation, consideration is given to monitoring and measuring resources to ensure that they are: Control of monitoring and measuring equipment Page 1 of 5 Date printed 4/8/16 1:57 pasdite

INSERT YOUR COMPANY LOGO/NAME HERE FD-810-001 Process Flow Diagram The FD-810-001 Process Flow Diagram represents each step in the manufacturing process and includes other relevant factors associated with the steps. Process Flow Relevant Factors 1 Sources of Materials Raw materials, products and other components are purchased and i d Approved suppliers, Incoming inspections 2 Hauling, Transportation Personnel - Manpower Equipment -Trucks 3 - Existing Operations and Production Manpower Laborers Machines Automation Quality control Operator self-inspect 3.a - New Production (x) New Machines Manpower Laborers Training machines, maintenance Operator self-inspect, 4. Products, services for delivery Products, Subassemblies, Components, Servicing Sales and Marketing 5. Deliveries to customers Manpower - Drivers Equipment Trucks Permits 6. Income - Invoice for products/services delivered

IMS PROCESS IDENTIFICATION WORKSHEET - INTEGRATION of OHSAS 18001:2007 in IMS ISO 9001:2015 / ISO 14001:2015 F-440-001 1 This worksheet is used to identify the processes required for the Integrated Management System (IMS). It is designed to ensure that all the requirements of both the ISO 9001:2015 and ISO 14001:2015 and OHSAS 18001:2007 standards are addressed and documented information available. In addition, the worksheet can be used as a training tool to help interested parties, such as employees, customers, auditors, and registrar understand your IMS.. IMS - PROCESS INPUTS ISO 9001:2015 / ISO 14001:2015 and OHSAS 18001:2007 PROCESS OUTPUTS Key Processes DOCUMENTED INFORMATION for Processes RESPONSIBILITY for Processes Application Integrated Management Systems - Requirements 1 Scope 2 Normative references 3 Terms and definitions --------------------------------------------------------------- 1 Scope 2 Reference publications 3 Terms and definitions 4 OH&S management system requirements QMS-EMS-OHS Manual IMS-002 Manual p. President QMS-EMS-OHS 4 Context of the organization Context of the organization IMS-Section 4 ----- 4.1 Understanding the organization and its context 4.2 Understanding the needs and expectations of interested Organizational context Context Needs and expectations P-400 P-400 par 5.1 P-400 par 5.2 President QMS-EMS-OHS 4.3 Determining the scope of the quality management system 4.3 Determining the scope of the environmental management system 4.1 General requirements -- define and document the scope of the OH&S management system Scope of the IMS P-400 par 5.4 4.4 Quality management system and its processes. Process interactions P-400 par 5.5 4.4 Environmental management system and its processes IMS Processes - this form F-440-001 IMS team leader Input-Output worksheet 1

IMS PROCESS IDENTIFICATION WORKSHEET - INTEGRATION of OHSAS 18001:2007 in IMS ISO 9001:2015 / ISO 14001:2015 F-440-001 4 4.3 Planning OH&S Planning 4.3.1 Hazard identification, risk assessment and determining controls OHS Risk management planning P-631 IMS team leader OH&S 4.3.2 Legal and other requirements Legal and other requirements P-631 par 5.3 4.3.3 Objectives and programs OH&S Objectives & Targets P-631 par 5.4 Health & safety programs P-631 par 5.5 Injury prevention WI-631-001 Technical services Ill health prevention WI-631-002 Technical services Hazard reduction WI-631-003 Technical services 7 Support Support IMS-Section-7 ----- 7.1 Resources Resource management P-710 Operations manager QMS-EMS-OHS 7.1.1 General Provision of resources P-710, par 5.1 4.4.1 Resources, roles, responsibility, accountability and authority Resources 7.1.2 People Personnel P-710, par 5.2 7.1.3 Infrastructure Infrastructure P-710, par 5.3 7.1.4 Environment for the operation of processes Environment P-710, par 5.3. 7.1.5 Monitoring and measuring resources 9.1.1 Calibration and verification 4.5.1 Calibration and maintenance. Control of monitoring and measuring equipment P-715 IMS team leader QMS-EMS-OHS 7.1.5.1 General General P-715, par 5.1 7.1.5.2 Measurement traceability Traceability P-715, par 5.2 Input-Output worksheet 4

IMS PROCESS IDENTIFICATION WORKSHEET - INTEGRATION of OHSAS 18001:2007 in IMS ISO 9001:2015 / ISO 14001:2015 F-440-001 6 7.5.3.1 Documented information ISO standards is controlled Address distribution access, etc P-750. par 5.1.2 7.5.3.2 For the control P-750. par 5.1.3 8 Operation Operation IMS-Section-8 ----- 8.1 Operational planning and control QMS QMS - Operational planning and control P-810 Operations manager QMS Typical -- Operational control instruction Incoming inspection WI-810-050 IMS team leader QMS-EMS-OHS 8.1 Operational planning and control - EMS EMS - Operational planning and control P-815 Operations manager EMS 4.4 Implementation and operation Operations 4.4.6 Operational control OHS - Operational planning and control P-846 OH&S 8.2 Requirements for products and services 8.2.1 Customer communication Customer related processes Communication P-820 P-820, par 5.2, 5.6 Sales & marketing manager QMS-EMS-OHS 8.2.2 Determining the requirements related to products and services 4.2 Understanding the needs and expectations of interested parties Determine requirements Needs of customers as interested parties P-820, par 5.3 P-820 par 1.3, 5.3.4 8.2.3 Review of requirements related to products and services Review requirements P-820, par 5.4 8.2.3.1 The organization shall ensure Ensure ability P-820, par 5.4.1 8.2.3.2 The organization shall retain Documented information P-820, par 5.4.3 8.2.4 Changes to requirements for products and services Changes P-820, par 5.5.6 Input-Output worksheet 6