GPS Machine Control Grading & BIM (Building Information Modeling)



Similar documents
Explore. Analyze. Optimize. AutoCAD. Civil 3d

Explore. Analyze. Optimize. AutoCAD. Civil 3d

TechnicalNotes. Terramodel Software for Construction

Autodesk Solutions for Environmental Engineering. Engineering a better environment

CONSTRUCTION TECHNOLOGY FOR HEAVY AND HIGHWAY CONTRACTORS

Revit MEP. Autodesk Navisworks

GEOGRAPHIC INFORMATION SYSTEMS Lecture 21: The Global Positioning System

Tekla Structures More than a detailing tool. Precast concrete

What's New in Heavy Civil Construction Software. Chris Richardson HCC-6898

MAGNET Field is a powerful and intuitive field

Design without compromise. Autodesk Revit. Architecture 2010

Realizing the Future of Sustainable Design through BIM and Analysis

GPS: A Primer. presented by Jim Pugh, GISP GIS Project Manager. 2007, EMH&T, Inc.

The user forum is an excellent community in which to bounce questions off other professional users, like you.

TRIMBLE ATS TOTAL STATION ADVANCED TRACKING SYSTEMS FOR HIGH-PRECISION CONSTRUCTION APPLICATIONS

PLM PRODUCT INFORMATION

Safety Applications for GPS Systems in the Mining Industry

technical notes trimble realworks software

Trimble Realworks Software

Road Rehabilitation and Reconstruction Using AutoCAD Civil 3D

Trimble Productivity: Making GPS Solutions Simple and Affordable. Trimble Site Positioning Systems:

SURVEYING WITH GPS. GPS has become a standard surveying technique in most surveying practices

Model based quality assurance process in a infra construction. Case Riippa-Eskola RU2 double rail project

INTEGRATING BIM AND GIS FOR ASSET MANAGEMENT

3D Laser Scanning for Manufacturing Facilities Developing the Business Case. By Bill Campbell Founder, Digital Dimensions 360, LLC

GPS Applications in Agriculture. Gary T. Roberson Agricultural Machinery Systems

QUEST The Systems Integration, Process Flow Design and Visualization Solution

Project Portfolio Management Information System

Introduction to Trimble Access. The Next Generation of Survey Controller S-0102

Hexagon Ventures offers the next generation of smart solutions for business verticals.

BIM BASICS AIRAH PRESENTATION SERIES. Mark Jacobson National BIM Operations Manager AE Smith & Son

Certified Instructors & Curriculum

IV. INDUSTRIAL TRACK DESIGN

How To Design A Bim Project

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

Chapter 2 PLAN AND PLAT REVIEW PROCESS

Road Design with AutoCAD Civil 3D

Transition to 3D Fabrication Workflows

Get to know your Autodesk Design and Creation Suites 2014

Request for Proposal Autodesk CAD Support

RELEASE NOTES. Trimble. SPS Series Receivers. Introduction. New features and changes

BIM ACROSS THE DESIGN-BUILD-OPERATE LIFECYCLE

Using Hydraflow Storm Sewers Extension with AutoCAD Civil 3D 2008: A Recommended Workflow

Getting Started with BIM (Building Information Modeling)

How To Use Gss Software In Trimble Business Center

Laser Scanning for an Integrated BIM

BIM Department. BIM Modeling Using Faro Focus3D Laser Scanner

SYSTEM GLOBAL NAVIGATION SATELLITE SYSTEM LANDING TECHNOLOGY/PRODUCT DEVELOPMENT

Improving Service Asset and Configuration Management with CA Process Maps

CFCFA Logistics Management Training Supply Chain Management Technology

Execution Plan Template Design Modeling

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A

Construction Layout for General Contractors

Penmap Surveying for Everyone. Visit us on: A TRIMBLE COMPANY

powered by Leica RedLine Tailor-made Site Solutions

Practical Strategy and Workflow for Large Projects: A Realistic Solution

ARCHITECTURAL DESIGN SOFTWARE SOLUTION

Professional CAD System

Exceptional... Everytime!

Questions and Answers

SURVEY PRO. GPS Quick Start Guide

BIM: FOR PROJECT MANAGERS CSI Southwest Region Conference Program 1B 8:45am 11:00am

and 2010: rprise Increasingly, must ation, es, partners, s intelligence.

720 Contour Grading. General. References. Resources. Definitions

SECTION AS-BUILT DOCUMENTATION

NX for Tooling and Fixture Design Transforming today s processes for designing and manufacturing injection molds, dies and fixtures

reality Revit check Autodesk have long Identify possible Utilize structural Tool Works Building bcg.com

SUPPLEMENTAL SPECIFICATIONS CROSS SLOPE VERIFICATION:

A Construction-Oriented, 5D BIM Environment

Position Classification Standard for Management and Program Clerical and Assistance Series, GS-0344

Building Information Modelling (BIM); How it Improves Building Performance. R.P. Kumanayake Lecturer, Department of Civil Engineering

BIM Pilot Getting Started Guide. For Construction Professionals. next

Specifying Laser Scanning Services. A Quantapoint White Paper

Getting More Value from your BIM Process with Autodesk Collaboration and Data Management Products

Leica icon grade Intelligent grading systems NEW. igd4 SP System. i n telligent COnstruction

Prof. Ludovico Biagi. Satellite Navigation and Monitoring

Mobile 360 Degree Imagery: Cost Effective Rail Network Asset Management October 22nd, Eric McCuaig, Trimble Navigation

3Dcities INDIA. Architecture and Engineering Outsourcing Company since 1999

integrated operational management

d e n v e r a r t m u s e u m

BIM for Interior Designers BIM IN PRACTICE

Leica MC200 Digger The guidance solution for excavators. >Fast >Accurate >Flexible

2 AUTOMATIC GRADE CONTROL SYSTEMS

Streamline your design-to-cost processes with Autodesk Navisworks

BIM An Introduction. 16 th April 2012 Engineers Ireland

Position: HEAVY EQUIPMENT OPERATOR Classification: 3 Highway Personnel Member B & C

Job Management Software. Integrated Job Management Solution for Sage 100 ERP

Questions and Answers

Optimized NC programming for machinery and heavy equipment. Summary NX CAM software redefines manufacturing productivity with a full range of NC

Definition of Tower from the Bradley County Zoning Resolution

CATIA V5R21 - FACT SHEET

BIM and DWF REVIT BUILDING INFORMATION MODELING. About DWF. BIM and DWF

Leica SmartNet UK & Ireland Network RTK User Guide

Autodesk Robot Structural Analysis Professional Break it down before you build it up.

IP-S3 HD1. Compact, High-Density 3D Mobile Mapping System

Address IT costs and streamline operations with IBM service desk and asset management.

A WORKFLOW ANALYSIS FOR BIM SOFTWARE: ARCHITECTURAL AND MECHANICAL ENGINEERING DEPARTMENT OF ARUP TURKEY

Transcription:

GPS Machine Control Grading & BIM (Building Information Modeling) Shawn Herring ProSoft Civil Applications Engineer Training & Support Manager Follow us on any of these media sites Facebook ProSoft Twitter - @ProSoft_AEC YouTube ProSoftCAD http://www.youtube.com/user/prosoftcad LinkedIn Blog ProSoftAEC http://prosoftaec.blogspot.com/ Agenda Industry Trends & s BIM - Building Information Model GPS Machine Control Technology Workflow and process Old vs. New Building the model using Civil 3D Exporting to Trimble SiteVision Office Virtual Grading / Scenarios Q & A 1

Civil Industry Trends - Productivity 1964-2005 Data Creation and Loss Lifecycle Surveying Plan & Analyze Map & Design Drafting Construction Manage Data Creation & Loss Digital Data Planning Preliminary Design Design Development Construction Documents Construction AMOUNT OF RESPONSIBILITY Design Team TIME Construction Team 2

Design iteration / optimization 1 2 Effect / Cost / Effort 3 1 2 3 Ability to impact cost and performance Cost of design changes Drafting-centric design Graphic originated by Preliminary Design Detailed Design Construction Documentation Construction Operation Patrick MacLeamy, AIA / HOK Segregated Delivery Model O D C Construction Safety Electronic Library of Construction Occupational Safety and Health ELCOSH Vehicles and mobile heavy equipment were involved in 469 deaths (37.7%) out of a total of 1,243 construction deaths in 2005. 3

AutoCAD Civil 3D Provides civil engineers, designers, surveyors, and drafters with a comprehensive package for the design, drafting, and management of all types of civil engineering projects. Improve productivity, efficiency, and profitability by: Making design changes quickly and efficiently Providing a higher degree of automated drafting Leveraging AutoCAD experience Using one product for all types of projects BIM for Civil Engineering Construction Data Collection Deliver BUILDING INFORMATION MODELING Create Visualize Analyze Simulate Data Creation and Loss Lifecycle Surveying Plan & Analyze Map & Design Drafting Construction Manage Data Creation & Loss Digital Data 4

Design iteration / optimization with BIM 1 2 Effect / Cost / Effort 4 3 1 2 3 4 Ability to impact cost and performance Cost of design changes Drafting-centric design Model-centric design Graphic originated by Preliminary Design Detailed Design Construction Documentation Construction Operation Patrick MacLeamy, AIA / HOK Planning Preliminary Design Design Development Construction Documents Construction AMOUNT OF RESPONSIBILITY Design Team Information Model Construction Team TIME Improved Project Coordination O Visualize Project Model Simulate Analyze D C Analysis Documentation Digital Fabrication 5

What is GPS Machine Control The use of Global Positioning System (GPS) technology for machine guidance in construction An estimated 85% of all new construction equipment comes equipped for GPS machine guidance. What is Driving Adoption?? Efficiency Accuracy results is less rework Productivity Less machine Hours Health & Safety Keeps workers out of harms way Workforce s More accurate results with less experienced workers www.gpsworld.com What is Driving Adoption? Economic 30% to 80% faster and 70% less rework Environmental Reduced emissions Workplace 40% less LTIF www.gpsworld.com 6

GPS Machine Control is for the Complete Cycle of the Project Dozers GPS Machine Control is for the Complete Cycle of the Project Scrapers GPS Machine Control is for the Complete Cycle of the Project Excavators 7

GPS Machine Control is for the Complete Cycle of the Project Graders GPS Machine Control is for the Complete Cycle of the Project Compactors GPS Machine Control is for the Complete Cycle of the Project Pavers 8

Benefits of GPS Machine Control A faster more accurate process Everyone using the same model Put the design in front of the machine operators Less experienced operators can get it right the 1 st time Project isn t interrupted for staking & grade checking No bumped stakes Reduction in change orders ~ 70% Benefits of GPS Machine Control Better tools to manage jobs Production can be measured Progress can be tracked Deadlines can be met Benefits of GPS Machine Control More Accurate Billings Generate accurate material reports daily Document how much earth was moved and when Never move earth for free again 9

Benefits of GPS Machine Control ROI return on investment One major job of a year and the package pays for itself Increase production 35%-50% Significant materials savings Precise rough grading Grade crown in rough grading www.constructionequipment.com Reduce Environmental Impact Optimize equipment on site Increased productivity Grade once in less time Avoid environmentally sensitive areas Define avoidance zones Accurate representation of design intent Less importing or removal of materials Ensure water runoff is treated properly Only dig in required areas to specified depths Less earth scarification Less sediment in rivers and ponds Satellite Systems GPS (Global Positioning System) GLONASS (Global Navigation Satellite System) GALILEO Coming Soon European Union Compass Coming Soon China Interesting Facts: Orbit the Earth every 12 hours 12,600 miles above the Earth Omit a radio signal at a know wavelength and time Each satellite can be measured to 1/16 th of an inch 10

Planned Launch Schedule www.gpsworld.com GLONASS & GPS Global Navigation Satellite System (GNSS) Using both systems gains access to 33% more satellites Ensure accurate positioning (PDOP) GPS Accuracy PDOP (Positional Dilution of Precision) Need to be locked onto 4 satellites 8 or more for site grading accuracy Z axis calculations more challenging 11

GPS Accuracy Refraction Bending of radio waves by atmosphere GPS units correct for refraction Standard GPS units accurate to 8-10 feet Differential GPS Base stations required for correction RTK Use radio frequency RTK with Laser Permanent VRS Internet and Cell phone technology RTK Base Station RTK - Real Time Kinematics Error correcting for a local site Send error correcting signal 20 times per second Accurate to within a half inch RTK with Millimeter GPS Accuracy w/ Lazer Zone Laser augmentation for vertical accuracy Airport Runways Roadway Grading Site Finish Grading Asphalt Paving & Milling Benefits 3 times more accurate Meet strict requirements 12

Permanent Network Base Station Permanent Base Stations Mining operations Metropolitan areas need to work off same system Companies host base station Broadcast a radio signal over a 20 mile radius Pay a fee to connect to signal Benefits Reduction in equipment cost Equipment setup simplified No need for known points Municipalities confident with data Everyone using same base station Surveyors / Contractors / Inspectors VRS Virtual Reference Station Virtual Reference Stations Many fixed base stations Transmitted via the Internet to a central server Cell phone technology correction out to rovers Broadcast corrections covering the entire network Benefits Accuracy Reduction in equipment cost Equipment setup simplified No need for known points Municipalities confident with data Everyone using same base station Surveyors / Contractors / Inspectors Construction Layout Old Way Tedious staking process Constant grade checking Line of sight Daylight activity 24-48 hours change order 13

Traditional Software With GPS Survey is collected in 3D Engineers design site 2D using traditional methods 2D Plots are submitted to Grading Contractor Contours are digitized off paper plots Contours are used to build a surface Surface is downloaded into GPS equipment BIM Impact on Surveying and Engineering Firms Consulting firms are being asked for electronic deliverables Pressured by owners who are looking to save money BIM is becoming a requirement for Qualification Based Selection Conventional design tools don t produce the necessary models Construction Layout New Way Automated, model-based and GPS-guided grading No staking No delay fog/dust BIM very reactive to change 14

Construction Advances Cost savings in construction is clear GPS Machine Guidance is becoming mainstream Units are affordable Hardware Manufacturers Leica Trimble Topcon SiteSmart SiteVision Office 3D Office Trimble Link Utility 15

Industry Scenarios MANAGE PLAN BUILD DESIGN Planning What if you were able to Aggregate disparate data Accurately evaluate existing conditions Identify problems before breaking ground Communicate potential impact PLAN MANAGE DESIGN BUILD Excessive amounts of data exist but are difficult to assimilate. Specialized expertise is often necessary to use the information that is available. Integrate design data and geospatial data more easily Integrate data from different coordinate systems to maximize usage of readily available data 16

Conceptual design is often disconnected from final design. Processes are often duplicated, wasting time and eating into project schedules. Create infrastructure models that represent the natural and built environment Evaluate multiple conceptual designs for infrastructure projects all in one model Communicate project proposals more effectively Creating powerful visuals that help stakeholders better understand how the project will perform is time-consuming and often disconnected from the design process. Interactively navigate and change data in real time Quickly shift between design alternatives Produce rendered images and video animations Design What if you were able to Make changes without affecting the schedule Integrate analysis and simulation Easily produce more accurate documentation PLAN MANAGE DESIGN BUILD 17

Creating powerful visuals that help stakeholders better understand how the project will perform is time consuming and often disconnected from the design process. Visualization that is a by-product of design so when a design change is made, the visualization can be updated more easily. Ability to more quickly develop 3D renderings that help bring the project to life and convey design intent. Creating detailed 3D intersection models is avoided because it is too time-consuming. Built-in wizard helps streamline timeconsuming tasks, such as laying out intersection geometry and creating corridor regions Intersection geometry becomes part of the model, so when changes are made, the 3D model of the intersection updates Geometry in the intersection model is interrelated Drafting standards differ by customer Standards for typical cross sections differ by client and location Drafting standards Take better control over aspects of display with styles Standards for typical sections Extensive library of customizable cross sectional components Define shapes, input parameters, and target parameters Use geometric relationships to set and control subassembly points, links, and shapes 18

Road and highway designs need to consider drainage, stormwater management, and erosion control Design and analyze stormwater systems with integrated tools Help reduce post-development runoff, and prepare reports to support sustainability requirements for stormwater quantity and quality Prepare more accurate construction documents to assist in evaluating the design and helping to support public safety Bridge engineers and roadway designers do not collaborate on a regular basis, resulting in inconsistency and costly errors. Provide interoperability between structural design software and roadway design software Integrate structural design earlier in the overall roadway design process Accurate construction task sequencing is critical to uncover potential design problems before construction begins. Verify design component locations to help identify and resolve potential construction issues Integrate construction schedules (time) with design models (3D) to create a 4D simulation Simulate what-if scenarios and site logistics to help uncover design problems 19

Creating and delivering construction documentation is one of the most time-consuming, error-prone tasks in any infrastructure project. Dynamically connect construction drawings and reporting to the design so design changes are automatically reflected Built-in wizard helps streamline the time-consuming task of developing sheets and sheet sets Make more of your AutoCAD expertise Quantity takeoff is a manual, errorprone procedure. Pay item lists can be imported Pay items can be assigned to objects in the drawing Pay items can be assigned to features in a corridor Project teams are scattered and need to communicate design changes in a timely and effective manner. Real-time project collaboration Changes made are reflected throughout the model and are more quickly accessible to all team members Multiple teams and team members are better coordinated with one source of information 20

Build What if you were able to Create 3D models for Automated Machine Guidance (AMG) Perform clash detection Identify scheduling conflicts PLAN MANAGE DESIGN BUILD It is difficult to transfer traditional 2D cross-sectional models of roadways to the automated machine guidance systems used in construction. 3D model can be directly exported Updates to the model can be made to the design model in the field, which can be passed directly to contractors Different disciplines working on a roadway project do not always share design models before construction begins. Integrate design elements from different disciplines and automatically check for cross-discipline interferences Support the design development workflow by helping to identify issues early in the design process Help identify and resolve conflicts before construction begins in order to support the reduction or elimination of costly change orders 21

Manage What if you were able to Maintain as-built data reliably Enforce data quality standards Better support future decision making PLAN MANAGE DESIGN BUILD It is difficult to manage project information at every stage of the project in order to use it for decisions made in operations and maintenance. As-built plan data is not stored digitally and tends to be scattered and difficult to use. Store as-built plan data with important attributes Geospatial databases can be created and updated using information extracted from as-built project data Access information via mobile devices 22

23