IBM Implementation Services for Power Systems IBM Systems Director



Similar documents
IBM Global Technology Services Statement of Work. for. IBM Infrastructure Security Services - Penetration Testing - Express Penetration Testing

HP 3PAR Peer Persistence Software Installation and Startup Service

Digital Advisory Services Professional Service Description Network Assessment

HP Data Replication Solution Service for 3PAR Virtual Copy

HP Storage Virtual Volume Design and Implementation Service

Service Schedule for CLOUD SERVICES

ediscovery Implementation Services Statement of Work To be Executed under State Blanket Contract ITS53 Cat2B

HP 3PAR Software Installation and Startup Service

Specific Program Documentation ( License SPD )

- 1 - StruxureWare TM Data Center Expert Periodic Maintenance. Software Integration Service. 1.0 Executive Summary. 2.0 Features & Benefits

XO HOSTED SECURITY VPN SERVICES

STATEMENT OF WORK LOS ANGELES COUNTY DEPARTMENT OF REGISTRAR-RECORDER/COUNTY CLERK. System Center Configuration Manager.

Terms and Conditions

Device Management Module (North America)

Support Line for Storage

Customer or you or your means the purchaser of KYOsupport.

ExtremeWorks Remote Monitoring Service

Data Management Policies. Sage ERP Online

HP Enhanced Implementation Service for SANs

APPENDIX 5 TO SCHEDULE 3.3

HP 3PAR 7000 Software Installation and Startup Service

THIS PAGE NOT FOR RELEASE TO CUSTOMER

Using Automated, Detailed Configuration and Change Reporting to Achieve and Maintain PCI Compliance Part 4

SaaS Terms & Conditions

Specific Program Document ( License SPD )

micros MICROS Systems, Inc. Enterprise Information Security Policy (MEIP) August, 2013 Revision 8.0 MICROS Systems, Inc. Version 8.

University of Central Florida Class Specification Administrative and Professional. Information Security Officer

Service Agreement Hosted Dynamics GP

APPENDIX 8 TO SCHEDULE 3.3

Software Maintenance Program Handbook Handbook for Open Text Products

Project Charter and Scope Statement

BUSINESS ASSOCIATE AGREEMENT BETWEEN AND COMMISSION ON ACCREDITATION, AMERICAN PSYCHOLOGICAL ASSOCIATION

DAIMLER GROUP NORTH AMERICAN COMPANIES

Your IT Helpdesk and On-Site and Remote Support Terms and Conditions. Document Revision 1 Sept 09

HP Virtualized Network Protection Service

CA Technologies Solutions for Criminal Justice Information Security Compliance

ensure prompt restart of critical applications and business activities in a timely manner following an emergency or disaster

FIREWALL CHECKLIST. Pre Audit Checklist. 2. Obtain the Internet Policy, Standards, and Procedures relevant to the firewall review.

Information Security Policy

System i and System p. Customer service, support, and troubleshooting

APPENDIX 8 TO SCHEDULE 3.3

OpenText Protect. Software Maintenance Program Handbook. May

HP Insight Capacity Advisor Virtualization Services

Dynamic IP Standard Terms and Conditions

LAMAR STATE COLLEGE - ORANGE INFORMATION RESOURCES SECURITY MANUAL. for INFORMATION RESOURCES

Carahsoft End-User Computing Solutions Services

How To Use Adobe Software For A Business

Oracle Fixed Scope Services Definitions Effective Date: October 14, 2011

Name of Other Party: Address of Other Party: Effective Date: Reference Number as applicable:

Mille Lacs Band of Ojibwe Indians Gaming Regulatory Authority Detailed Gaming Regulations

Appendix : Business Associate Agreement

HOSTING SERVICES AGREEMENT

Supplier IT Security Guide

TASK TDSP Web Portal Project Cyber Security Standards Best Practices

THE BUDAPEST STOCK EXCHANGE LTD.

IBM AIX MANAGED SERVICES:

Connectivity Security White Paper. Electronic Service Agent for AIX and Virtual I/O Server (VIOS)

Hosted Solutions FAQ. Introduction

How To Ensure The C.E.A.S.A

HP Foundation Care Service

PSU Hyland OnBase Document Imaging and Workflow Services Level Memorandum of Understanding

Siebel Installation Guide for UNIX. Siebel Innovation Pack 2013 Version 8.1/8.2, Rev. A April 2014

HP 3PAR StoreServ Data Migration Service

Datacenter Management Optimization with Microsoft System Center

LOUIS: The Louisiana Library Network Annual Report to The Louisiana Board of Regents on LOUIS Backup Site Project

PLEASE READ THIS AGREEMENT CAREFULLY. BY INSTALLING, DOWNLOADING OR OTHERWISE USING THE SOFTWARE, YOU AGREE TO THE TERMS OF THIS AGREEMENT.

Double-Take in a HIPAA Regulated Health Care Industry

HP Technical Phone Support service agreement ( Agreement ) terms and conditions

STATE MODEL CLOUD COMPUTING SERVICES SPECIAL PROVISIONS (Software as a Service)

How To Help Your Hotel With A Guest Room Service

LANDesk Professional Services

MODULE 3 LICENSED SOFTWARE. Page 2 of 9

Installation Guide Identity Manager August 31, 2012

TEMPLE UNIVERSITY POLICIES AND PROCEDURES MANUAL

NYSED DATA DASHBOARD SOLUTIONS RFP ATTACHMENT 6.4 MAINTENANCE AND SUPPORT SERVICES

Sample Career Ladder/Lattice for Information Technology

Information Security Program Management Standard

fdsfdsfdsfdsfsdfdsfsdfdsfsdfsd Square Box Systems Technical Support Agreement

Siebel Installation Guide for Microsoft Windows. Siebel Innovation Pack 2013 Version 8.1/8.2, Rev. A April 2014

Question Name C 1.1 Do all users and administrators have a unique ID and password? Yes

Domain Name Service Service Level Agreement (SLA) Vanderbilt Information Technology Services

Flow Publisher v1.0 Getting Started Guide. Get started with WhatsUp Flow Publisher.

SERVICE SCHEDULE INFRASTRUCTURE AND PLATFORM SERVICES

HP SAN Deployment Service

GENERAL ELECTRIC COMPANY EMPLOYMENT DATA PROTECTION STANDARDS

HP Storage Data Migration Service

EAS End Users Service Maintenance Program Yukon Visual T&D Support Policy Paper Version 1.1, January 2016

The Vital IT Protection- V.I.P. Network Support Program Overview Vital Voice & Data ext 301

MANAGED SECURITY SERVICES RESPONSIBILITIES GUIDE July 2013

HP 3PAR StoreServ 7000 Storage Installation and Startup Service

MDM Zinc 3.0 End User License Agreement (EULA)

ELECTRONIC ARTS SOFTWARE END USER LICENSE AGREEMENT

ThinkPlus Warranty Services Agreement

Retention & Destruction

Connector for CA Unicenter Asset Portfolio Management Product Guide - On Premise. Service Pack

Transcription:

Sample Statement of Work for Services This an example and your Statement of Work may vary given your specific requirements and the related IBM engagement. IBM Implementation Services for Power Systems IBM Systems Director 1. Scope of Work Under the IBM Implementation Services for Power Systems IBM Systems Director ( Services ), IBM will install and configure IBM Systems Director on a designated management server in an AIX environment and configure up to four endpoints to be monitored by IBM Systems Director. IBM will identify the details relating to the Services in the Schedule for IBM Implementation Services for Power Systems IBM Systems Director ( Schedule ) which accompanies this Statement of Work ( SOW ). The Schedule will also identify locations at which the Services will be provided and any applicable optional Services selected. 2. Definitions IBM Systems Director - a platform-management foundation that streamlines the way physical and virtual systems are managed across a heterogeneous environment. Services Recipient means any entities or individuals receiving or using the Services, or the results or products of the Services. 3. Services 3.1 Services Coordination 3.1.1 IBM Responsibilities The purpose of this activity is to provide an IBM Services specialist who will be IBM s focal point during performance of the Services. The IBM Services specialist will: a. review the SOW, and any associated documents, with Customer Point of Contact; b. establish and maintain communications through Customer Point of Contact, as defined in the section entitled Customer Point of Contact Responsibilities below; c. review and administer the Project Change Control Procedure with Customer Point of Contact, as defined in the Schedule; and d. coordinate and manage the technical activities of IBM s assigned personnel. This is an ongoing activity that will be considered complete at the end of the Services. None 3.1.2 Customer Point of Contact Responsibilities Prior to the start of the Services, your will designate a person ("Customer Point of Contact") to whom all communications relative to the Services will be addressed, and who will have the authority to act on Customer s behalf in all matters regarding this SOW. Customer Point of Contact will: a. serve as the interface between IBM s project team and all of your departments participating in the Services; b. attend status meetings; c. obtain and provide applicable information, data, consents, decisions and approvals as required by IBM to perform the Services, within two business days of IBM s request; and d. help resolve Services issues, and escalate issues within Customer s organization, as necessary. 3.1.3 Customer General Responsibilities IBM's performance is dependent upon Customer management and fulfillment of your responsibilities, at no charge to IBM. Any delay in performance of Customer responsibilities may result in additional charges Z125-8381-00 SOW.doc 11-2009 Page 1 of 5

and/or delay of the completion of the Services. Such additional charges and/or delay will be handled in accordance with the Project Change Control Procedure. Customer will: a. make appropriate personnel available to assist IBM in the performance of its responsibilities; b. provide safe access, suitable office space, supplies, furniture, high speed connectivity to the Internet, and other facilities for IBM s personnel while working at the location(s) specified in the applicable Schedule; c. ensure that current maintenance and license agreements are in place with applicable vendors for those products and services upon which IBM is relying to provide the Services described herein; d. allow IBM, at the completion of the Services, to cite Customer s company name and the general nature of the Services to other potential customers; e. authorize International Business Machines Corporation and its subsidiaries (and their successors and assigns, contractors and IBM Business Partners) to store and use Customer s business contact information wherever IBM does business, for use in connection with IBM products and services or in furtherance of IBM s business relationship with Customer; f. obtain any necessary consents and take any other actions required by applicable laws, including but not limited to data privacy laws, prior to disclosing any of its employee information to IBM. Customer also agrees that with respect to data that is transferred or hosted outside of the United States, Customer is responsible for ensuring that all such data transmitted outside of the United States adheres to the laws and regulations governing such data; g. be responsible for the content of any database, the selection and implementation of controls on its access and use, backup and recovery and the security of the stored data. This security will also include any procedures necessary to safeguard the integrity and security of software and data used in the Services from access by unauthorized personnel; h. be responsible for the identification and interpretation of any applicable laws, regulations, and statutes that affect Customer s existing application systems, programs, or data to which IBM will have access during the Services. It is Customer s responsibility to ensure the systems, programs, and data meet the requirements of those laws, regulations and statutes. 3.1.4 Mutual Responsibilities IBM and you will each comply with applicable export and import laws and regulations, including those of the United States that prohibit or limit export for certain uses or to certain end users, and each of us will cooperate with the other by providing all necessary information to the other, as needed for compliance. Each of us shall provide the other with advance written notice prior to providing the other party with access to data requiring an export license. 3.2 IBM Implementation Services for Power Systems IBM Systems Director 3.2.1 IBM Responsibilities Activity 1 - Project Kickoff The purpose of this activity is to facilitate a high-level project kickoff conference call with the Customer for up to two hours on a mutually agreed upon date and time. Task 1 - Conduct Planning Session Conference Call a. define the services team roles and responsibilities; b. review objectives, goals, and critical success factors; c. review completion criteria and critical dates; d. review implementation plans and identify the tasks to be completed; and e. schedule the onsite planning session and installation activities. This activity will be complete when IBM has conducted the remote planning session conference call. None Z125-8381-00 SOW.doc 11-2009 Page 2 of 5

Activity 2 - Planning The purpose of this activity is to collect the IBM Systems Director requirements and create a plan for installation of IBM Systems Director software. Task 1 - Conduct Onsite Planning Session a. IBM will conduct a planning session for up to two hours with your designated personnel, to: (1) discuss your IBM Systems Director requirements; (2) define the detailed IBM Systems Director installation activities; and (3) identify the required AIX operating system upgrades and/or modification requirements. This would include patches or technology level upgrades that are pre-requisites for IBM Systems Director. Task 2 - Document Findings a. document the outcome of the onsite planning session in a IBM Systems Director Installation Plan; and b. prepare IBM Systems Director Implementation Worksheets which detail the platform management design. This activity will be complete when IBM has: conducted the onsite planning session, and delivered the IBM Systems Director Installation Plan and IBM Systems Director Implementation Worksheets to Customer Point of Contact. IBM Systems Director Installation Plan IBM Systems Director Implementation Worksheets Activity 3 - Installation and Configuration The purpose of this activity is to install and configure onsite IBM Systems Director software in accordance with the IBM Systems Director Installation Plan. Task 1 - Prepare for Implementation of IBM Systems Director a. review the IBM Systems Director Installation Plan and IBM Systems Director Planning Worksheets with Customer Point of Contact; b. prepare the AIX logical partitions, up to four, on the IBM Power System by implementing the filesets required for IBM Systems Director management; and c. review the firewall/security settings which may block the ports used by IBM Systems Director. If any ports are found to be blocked which are necessary for IBM Systems Director, unblock the respective ports with the Customer s assistance. Task 2 - Install and Configure IBM Systems Director a. configure the filesets for IBM Systems Director on the designated management server; b. install the filesets for IBM Systems Director on the designated management server; c. perform a system discovery to assign four endpoints which are to be monitored by IBM Systems Director on the designated management server; d. provide basic skills instruction for up to two members of your systems operation staff. This basic skills instruction will be conducted during the Installation and Configuration activity and will not be delivered as a separate education activity. Your systems operation staff members must have basic knowledge of the software products being installed as part of this activity; and e. create and deliver a IBM Systems Director Installation Record that identifies the configuration activities performed as part of this Services; and Z125-8381-00 SOW.doc 11-2009 Page 3 of 5

This activity will be complete when IBM has: installed and configured filesets on the management server as specified in the IBM Systems Director Installation Plan; and delivered the IBM Systems Director Installation Record to Customer Point of Contact. IBM Systems Director Installation Record 3.2.2 Customer Responsibilities Project Kickoff and Planning You agree to: a. ensure your personnel assigned to this project are available for the duration of the planning session; b. provide detailed configuration information for any existing or on order systems to be included as part of the Services; c. provide necessary information for the IBM team to complete the IBM Systems Director Implementation Worksheets; and d. have all the following prerequisite hardware installed and operational at your location prior to the commencement of the Installation and Configuration activity. Installation and Configuration You agree to: identify up to two members of your systems operation staff to receive basic skills instruction. These staff members must have basic knowledge of the software products being installed as part of this activity; e. provide assistance, if any network ports are found to be blocked which are necessary for IBM Systems Director, by unblocking respective ports which will be communicated by the IBM team; and f. provide internet access to the IBM team to download the necessary software packages required for IBM Systems Director, if applicable; g. be responsible for conducting regular backups and maintaining appropriate backup recovery procedures at your location. The Services are not a substitute for regular data backups and standard backup and recovery procedures; and h. specify IBM Systems Director settings ports, filters, traffic direction, rules, and network address translation specifications, if any. 4. Deliverable Materials The Deliverable Materials, identified as Type II Materials, resulting from the completion of these Services will be: IBM Systems Director Installation Plan IBM Systems Director Planning Worksheets IBM Systems Director Installation Record See Appendix A, Deliverable Materials Guidelines, for a description of each deliverable. 5. Completion Criteria IBM will have fulfilled its obligations for the Services described in this SOW when any one of the following first occurs: a. IBM completes the activities described in this SOW, including provision of the deliverable Materials; or b. the Services are terminated in accordance with the provisions of the Agreement identified in the Schedule. 6. Charges The charges for the Services described in this SOW are detailed in the applicable Schedule. Z125-8381-00 SOW.doc 11-2009 Page 4 of 5

Appendix A: Deliverable Materials Guidelines A - 1: IBM Systems Director Installation Plan IBM will provide the IBM Systems Director Installation Plan to detail the topics discussed during the planning session. The IBM Systems Director Implementation Plan will include: a detailed description of the IBM Systems Director management framework design, including hardware and software configurations and managed systems topology diagrams. installation requirements (for example, minimum hardware, software requirements, network requirements). list of activities which will be carried out as a part of these Services. IBM will deliver one copy of the IBM Systems Director Installation Plan, in reproducible format, to Customer Point of Contact within one week after completion of the Planning activity. A - 2: IBM Systems Director Planning Worksheets IBM will provide the IBM Systems Director Planning Worksheets to summarize the configuration defined during the planning session. The IBM Systems Director Planning Worksheets will consist of configuration IBM Systems Director implementation including: management server details managed systems details IBM Systems Director process monitoring details user credentials event automation plan details IBM will deliver one copy of the IBM Systems Director Planning Worksheets, in reproducible format, to Customer Point of Contact within one week after completion of the Planning activity. A - 3: IBM Systems Director Installation Record IBM will provide the IBM Systems Director Installation Record which documents the installation and configuration activities. The IBM Systems Director Installation Record will detail: software products installed as part of these Services. configuration activities performed as part of these Services. monitoring configuration performed as part of these Services. basic skills instruction provided during these Services IBM will deliver one copy of the IBM Systems Director Installation Record, in reproducible format, to Customer Point of Contact within one week after completion of the Installation and Configuration activity. Z125-8381-00 SOW.doc 11-2009 Page 5 of 5