Finding our Pot of Gold in Patient Access through e-signature. March, 2016

Similar documents
Improving Safety, Quality & Efficiency with an Ambulatory EMR: Can it be done?

Carts, Wall Mounts or Both? Exploring the Best Criteria when Implementing EMR Equipment

Clinical Informatics Agents (CIA s): Engaged bedside clinicians promoting best practices and increased end user communication.

MEDICAL MANAGEMENT PROGRAM LAKELAND REGIONAL MEDICAL CENTER

New Student Orientation & Campus Tours 2012 Orientation Leader Information Packet

Sample Patient Payment Policy

Dissecting Electronic Signatures for the Life Sciences

BUSINESS PRACTICE BULLETIN The School Board of Broward County, Florida

District Grants Scholarships

Critical Success Factors of Project Management Planning

VIRGINIA ENA 2015 SCHOLARSHIP APPLICATION

Clifford A. Selsky, PhD, M.D. Fouad Hajjar, M.D. Ada de la Osa, ARNP-BC Shari Feinberg, CPON, CPOP Kourtnie Ramirez, MSN, CPNP

Barcode Scanning and Infusion Pumps: The Journey to Safety with Wireless Devices

Nursing Student Loan Forgiveness Program Renewal Packet

Good Shepherd Medical Center Device Connectivity Case Study

Is It Time for a Clinical Help Desk?

Unified Medical Solutions

How a Pre-Service Center at MetroHealth System Improved Satisfaction, Efficiency, and Revenue

Using Technology to Achieve Clinically-Driven Staffing Effectiveness

Paperless Lending Made Easy: Streamlining the Loan Management Process. Presented by: David Geddes Manager, Sales Operations

Electronic Medical Record (EMR) Request for Proposal (RFP)

Collaboration of Houston Community College (HCC) School of Continuing Education (SCE) and Health Information Technology

Frequently Asked Questions regarding Nurse Practitioners and Protocol Agreements

Adoption and Meaningful Use of EHR Technology in a Hospital

Sentara Healthcare EMR: Our Journey. Bert Reese, CIO and Senior Vice President

W. Cary Edwards School of Nursing Practicum Packet

Successful Implementation of Electronic Health Records In Your Community: From Vendor Selection, Training of Staff To Full Streamlined Execution

Workflow Redesign Templates

Registration Policy. Policy Number: R 13. New Policy X

Regulatory Compliance Policy No. COMP-RCC 4.17 Title:

Jim Hoelz, MS, MBA, RN, CEN, FAEN Chief Nurse Executive Blue Jay Consulting, LLC

Instructional Program Management

Save paper, save trees, save storage, save money.

Go With The Flow- From Charge Nurse to Patient Flow Coordinator. Donna Ojanen Thomas, RN, MSN Cynthia J. Royall, RN, BSN

Office Efficiency. Barbara Tauscher, MHA, FACMPE Director of Operations The Oregon Clinic GI South Portland, Oregon

UC Davis - RFP Questions for Perioperative Services Supply Chain Redesign Services. 1. How long is the project implementation estimated to be?

Lean Six Sigma Process Results in Lean Approach to Inventory Management, Driving Nursing Satisfaction and Supply Cost Reduction

EVENT PLANNING MANUAL

Pharmacy and Nursing Collaborate to Improve the Patient Experience Communication about Medications

NHA Certified Medical Administrative Assistant (CMAA) Test Plan (Detailed)* 110 scored items, 20 pretest items Exam Time: 2 hours 10 minutes

Certified Nurse Assistant (CNA)

Early Intervention Central Billing Office. Provider Insurance Billing Procedures

Integration for your Health Information System

Jonathan Siff, MD, MBA, FACEP MetroHealth Medical Center

Solution Title: Predicting Care Using Informatics/MEWS (Modified Early Warning System)

Solution Series. Electronic Medical Records. Patient Portal

Marion County School of Radiologic Technology 2015 Program Application Information

Revenue Cycle Management Transformation

INNOVATION TITLE: HOSPITAL: Innovation Category: select all that apply

The Healthcare Provider Industry Short List: Inpatient Electronic Medical Records Judy Hanover Research Manager, Healthcare Provider IT Strategies

STATE OF MICHIGAN DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS BUREAU OF HEALTH CARE SERVICES MEMORANDUM

Associated Student Activities The student organization finance office

Implementation of EMR

APPLICATION INSTRUCTIONS FOR INITIAL LICENSURE BY EXAMINATION FOR REGISTERED NURSES GENERAL INFORMATION

Grant Opportunities. Providence Hood River Memorial Hospital Oregon Rural Healthcare Quality Network OREGON S EXPERIENCE

Collaborative Capacity Building for Nurses in Haiti

UAB HEALTH SYSTEM AMBULATORY EHR IMPLEMENTATION

EMR Implementation In Community Hospitals:

UNIVERSITY OF NORTH DAKOTA COLLEGE OF NURSING AND PROFESSIONAL DISCIPLINES

Hahnemann University Hospital Implementing Five Level ESI Triage

STATE OF OHIO DEPARTMENT OF REHABILITATION AND CORRECTION I. AUTHORITY

A Discussion on Automating Patient Flow

Services. Hospital Solutions: Integrated Healthcare IT and Business Process Solutions that Achieve Breakthrough Results

MindGent Healthcare Services. Addressing the Issues of Nursing Shortages and Patient Safety through Bio-Medical Device Integration (BMDI)

maintaining revenue cycle health during IT change

REDUCING THE RISKS INHERENT IN EMERGENCY MEDICAL CONTACT AND UNBLINDING

Checklists in the Revenue Cycle

Sylectus and Omnitracs Integration

Daniliz Ortega, Accounting Manager Tera VanDyke, Accountant NW Regional ESD

Applying Technology, Team Approaches to Enhance Patient Experience. July 29, 2015

Nursing Student Loan Forgiveness Program Application Package

NHA Certified Medical Administrative Assistant 2015

The Power of One: The Challenge of Centralized Scheduling. Tamela Dodds, Danielle Stern

Saint Francis Care Patient Care Services Advancement to Clinical Excellence Program (ACE Program) INTRODUCTION

Kalamazoo Valley Community College International Student Application Packet

Transcription:

Finding our Pot of Gold in Patient Access through e-signature March, 2016

Stats: Lakeland Regional Health Medical Center (LRHMC) is a not for profit hospital; Licensed for 851 beds; Level II Trauma Center; Level II NICU; Busiest single site ED in the State of Florida; 5 th largest hospital in Florida.

Introduction LRHMC has embarked on a comprehensive performance improvement effort utilizing Information Technology and Patient Access registration processes to implement electronic Signature (e-signature) throughout the hospital. By analyzing the use and performance of a computer tablet in the ED, an opportunity to improve the registration process was realized to be an important factor in improving access to patient registration in the busiest single site ED in the State of Florida. After the successful trial of the tablet in the ED, it was determined that the use of the tablet alone would not provide the overall successful outcomes to assure that each patient received a true bedside registration without having to print and use paper documents. A collaborative team was formulated consisting of IT, HIMS, Patient Access and Project Management to develop an e-signature platform using our existing Siemens/Cerner Electronic Imaging system. We contacted other hospitals to determine best practices using e-signature with a Cart and tablet. Prior to e-signature implementation all registration forms were paper forms and passed from one area to the next which contained inherent risk for lost paperwork, missed opportunities for patient signatures on important regulatory forms, etc. As a result of the e-signature implementation and process redesign through-out the Patient Access services department, the time interval for patient registration was reduced overall by approximately 10 minutes for the majority of our patients with the most significant improvement being realized in the ED.

Process Improvement Model Objectives Identify LRHMC patient forms that require a signature. Select a vendor for e-signature. Find a cost-effective, easy to use computer tablet that will accommodate the e-signature platform. Find a signature pad solution for those areas that are using a desk-top. Ensure that the e-signature solution will feed documents to the HIMS imaging solution Horizon Patient Folder (HPF). Improve the patient experience through technology.

DYAD PARTNERSHIP/MULTIDISCIPLINARY TEAMS EXECUTIVE SPONSORS: CFO; CIO PROJECT COMMITTEE: IT Leadership; Patient Access Leadership; HIMS Leadership, Quality Management; Project Management PROJECT TEAM Ana Kalman, AVP, Information Solutions; James LaLonde, Manager, Business & Financial Applications/Revenue Cycle; Anthony Schrock, IT Business Analyst; Matt Mahon, HIMS System Administrator; Deborah Newbern, BA, CHAM, CRCE- I; Jane Dyer, CHAM, CRCE-I; Diane Campbell, MSN, RN, CSSBB; Anita Trainer, PharmD, MBA, PMP; Paula Cullins, MBA, RHIT; Deshonda Dobie, Supervisor, HIMS Imaging Services.

E-Signature Timeline Overview Current process defined May, 2014 Registration Observations May July, 2014 Hardware (Tablet) and Software Selection July, 2014 Proof of Concept Design Complete September, 2014 Integrated Testing Completed September, 2015 Tablet Pilot with e- Signature in ED Pod October, 2015

Former Process: Start ED Registration Process Pt Arrives for Registration Pt is Triaged by Nursing Pt is Quick Reg d in System and armband placed on Pt Pt Escorted to ED area for treatment Patient Access Rep checks Cerner Tracking Board for physician notification Pt Access assembles registration packet based upon Financial Class/Payer Pt Access Prints forms for presentation to patient. Pt Access Rep Interviews Pt and documents information on Paper form. Collects Ins. Card for scanning. Pt signs paper registration forms and receives copies as appropriate. Pt Access Rep scans Pt s insurance card into Siemens EDM system and returns card with any additional forms to Pt. Pt Access Rep Quotes Pt Co-Pay amount. Requests payment method. Pt Access processes payment and returns pt s credit card, if obtained, and receipt to pt. Pt Access Rep updates Pt information obtained on paper forms into registration system. Pt Access Rep verifies insurance eligibility using Passport ecare Next System and updates as appropriate. All signed patient forms are scanned into Siemens/Cerner EDM system Registration is complete and Cerner Board is updated. Paper forms are placed into basket for pick-up by HIMS and manual scanning into HPF.

Current Process using e-signature Pt Arrives for Registration Pt is Triaged by Nursing Pt is Quick Reg d in System and armband placed on Pt Pt Escorted to ED area for treatment Patient Access Rep checks Cerner Tracking Board for physician notification Pt Access greets Pt in room with Tablet and Cart Pt Access Rep reviews all information with Pt at bedside using tablet to update registration system Pt signs forms on tablet using Siemens/Cerner EDM Imaging System Insurance card is obtained from pt at bedside and scanned into Imaging using Photosnap application on Tablet Co-payment is received at bedside using on-line process (Your Pay). Registration is complete and Cerner Board is updated. All electronically signed forms are automatically sent to HPF from EDM system for clinical team and HIMS to view.

Prior Bedside Registration Process Prior cart that was used in the ED for the registration process. Carts were bulky, hard to push and battery power limited. Paper registration process in place.

New tablets and carts Top of tablet is removable so that it may be presented to patient to sign directly on the tablet. Pt s insurance card is easily scanned directly on the tablet using Photo Snap Application.

New e-signature Registration Process

E-Signature Project Results Patient registration time savings (~10 min. per reg) Annual estimated paper cost savings (~$33,000) Increased Cash Collections in the ED through efficiencies gained in the registration process FTE efficiencies Patient satisfaction Team member satisfaction Improved clinical processes through real time viewing of documents for nursing and HIMS

Lessons Learned Trial Period Allowed staff to experience using the new tablets and carts with e-signature. Provided staff the opportunity to provide feedback on process prior to full implementation. Allowed a period to work out the kinks in the new process. Collaboration Between Patient Access, IT, HIMS and clinicians to ensure that patients feel cared for treasured Change Team was extremely engaged in the process through early collaboration and training with super users.

Thank You! Questions?