State of Colorado Oil and Gas Conservation Commission 1120 Lincoln Street, Suite 801, Denver, Colorado 80203 Phone: (303) 894-2100 Fax: (303) 894-2109



Similar documents
INTRODUCTION PURPOSE AND NEED FOR THE ACTION

Drill-Right. best Oil & Gas Development Practices for Texas

Document Control: Created Date: December 17, 2015 Last Updated Date: December 17, 2015

Mine Plan of Operations Reclamation Bond Checklist

number 2) proposed well's type, location, elevation, total depth, etc. 3) site inspection, 2) assess the adequacy of the proposed engineering

Arkansas Natural Gas Severance Marketing Costs

City of Shelbyville Site Inspection Checklist

IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION

Title 27A. Environment and Natural Resources Chapter 1 - Oklahoma Environmental Quality Act Article III - Jurisdiction of Environmental Agencies

Incident Reporting Requirements

While this publication may help residents in other Colorado counties, YOUR LAND,

Carlton Fields Memorandum

OSU Extension FACT SHEET


DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY. August 2012

AESTHETIC AND NOISE CONTROL REGULATIONS

Garry Kaufman Colorado Air Pollution Control Division May 14, 2014

Activity Yes No N/A Notes

Environmental Protection for Onshore Oil and Gas Production Operations and Leases API RECOMMENDED PRACTICE 51R FIRST EDITION, JULY 2009

STATEMENT OF SHARON BUCCINO SENIOR ATTORNEY NATURAL RESOURCES DEFENSE COUNCIL WASHINGTON, DC

Wyoming Idle and Orphan Well Draft Plan. Table of Contents

Remediation Weekly Activity Summary Report Ameren LaSalle Former MGP - Soil Removal Action

Construction Site Inspection Checklist for OHC By making use of some simple Best Management Practices (BMPs) a construction site operator can

SERIES SAFETY REGULATIONS

The WOGCC has 41 full-time employees, an Assistant Attorney General, and a contracted hydrogeologist.

Part 1: Environmental Compliance

CLOSURE/ABANDONMENT OF AN ON-SITE WASTEWATER TREATMENT FACILITY

Inquiring Minds Want to Know: Questions Landowners Should Ask in Negotiations with Companies Seeking Easements

RAILROAD COMMISSION OF TEXAS APPENDIX C LIST OF E&P WASTES: EXEMPT AND NONEXEMPT

COLORADO APCD IR Camera Survey Program Guidance/Protocol (rev. 11/8/11)

Vehicle Tracking Pad

Tax Executives Institute

Appendix C. Municipal Planning and Site Restoration Considerations

Definition of Tower from the Bradley County Zoning Resolution

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

SECTION SELECTIVE DEMOLITION

Highlights of Colorado s New Oil and Gas Hydrocarbon Emission Reduction Rules - Adopted February 2014

GAO OIL AND GAS BONDS. Bonding Requirements and BLM Expenditures to Reclaim Orphaned Wells. Report to Congressional Requesters

Waste Handling & Disposal

RESIDENTIAL ON-SITE WASTEWATER TREATMENT SYSTEM (OWTS) INSTALLATION PERMIT (New or Repair) Instructions and Application Form

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements

Negotiating Pipeline Easements

WATER AND SEWER LINE CONSTRUCTION STANDARDS AND POLICIES

Characterization of Greenhouse Gas Emissions Involved in Oil and Gas Exploration and Production Operations

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

Q 4/17/13: Thank you for your quick response to our dated April 10, In looking over your comments, we have a few clarifying remarks.

We wish to thank the numerous organizations, agencies, companies, and individuals for their contributions to this publication.

BLANKET CERTIFICATE PROGRAM NOTICE TO LANDOWNERS

This Chapter was compiled by GCS (2014) as part of the EMP Consolidation for MP 30/5/1/2/2/133MR and remains pertinent.

SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN. for the PIÑON RIDGE MILL HIGHWAY 90 BEDROCK, COLORADO Prepared by:

Recommended Practices Associated with Hydraulic Fracturing Operations

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

Storm Drain Inlet Protection

UNDERGROUND STORAGE TANK SYSTEM CLOSURE REPORT FORM

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION

Policy Clarifications on the Eligibility of Water and Wastewater Utility Projects for FEMA s Public Assistance and Hazard Mitigation Assistance Grants

Colorado Oil and Gas Emissions Rules

Helen Mercury Mine EE/CA OPINION OF PROBABLE COST

United States Depmiment of the Interior Bureau of Reclamation Western Colorado Area Office Grand Junction, Colorado

NDEP Bureau of Corrective Actions Secondary Containment Regulations Guidance Document April 7, 2010 (Revision)

What Constitutes Environmental Due Diligence?

Environmental Construction Operations Plan (ECO Plan) Framework

Fuel Storage Who to ask: tank farm owners/operators

Spill Plan Reviewer s Guidance

BEST MANAGEMENT PRACTICES (BMPs)... What are They? GOOD HOUSEKEEPING PRACTICES Your Business Should Employ

CONTRACTOR ENVIRONMENTAL LIABILITY 101. Violation of environmental laws may result in fine or imprisonment or both.

ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN

SECTION SITE PREPARATION

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Company Name: City, State, Zip Code: Annual Report Summary

The Pipelines Regulations, 2000

Turning Brownfields into Clean Energy. Today s Discussion

District of Columbia Municipal Regulations UNDERGROUND STORAGE TANKS: GENERAL PROVISIONS 5500 COMPLIANCE WITH OTHER DISTRICT LAWS

Emission Reduction Techniques for Oil and Gas Activities. U.S. Forest Service 2011

SECTION 5. Sediment Control Measures

CHAPTER PETROLEUM CONTACT WATER

V. ENVIRONMENTAL IMPACT ANALYSIS E. Hazardous Materials

Risk Based Inspections Implementation Plan. Operator Outreach August 19, 2014

INFORMATION NOTICE SALES AND USE TAX Natural Gas Mining. Issued: September 22, 2014

APPENDIX 7-B. Hazardous Materials Management Plan

Reclamation Plants, Separation Facilities & Stationary Treatment Facilities

Stormwater Ponds. c ıty of a bı le ne st or m wat e r utı lıty dıv ısı on


Storm Drain Inlet Protection

FLOWBACK & PRODUCTION TESTING SERVICES

Exploration for natural gas

Appendix D CONSTRUCTION MANAGEMENT PLAN

ATTACHMENT F ONSHORE PIPELINES DECOMMISSIONING GUIDELINE 1. INTRODUCTION

Arlington Storage Company, LLC, Docket No. CP Submission of Implementation Plan and Request for Clearance to Commence Construction

Colorado s Recent Efforts to Address Hydrocarbons from Oil and Gas Operations

Instrument Gas to Instrument Air Conversion Protocol October 2009 SPECIFIED GAS EMITTERS REGULATION OCTOBER Version 1.0.

Regulation of Natural Gas Pipelines. June 23, 2008

E&SC Training & Certification

AN OHIO LANDOWNER S GUIDE TO HYDRAULIC FRACTURING

TCEQ TPDES CGP EPA NPDES GCP Inspection of Controls Report

Cabot Oil & Gas Corporation

Storm Water Management Requirements for Construction Projects Less than One Acre

DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY

Outlet stabilization structure

Transcription:

FORM INSP Rev 05/11 State of Colorado Oil and Gas Conservation Commission 1120 Lincoln Street, Suite 801, Denver, Colorado 80203 Phone: (303) 894-2100 Fax: (303) 894-2109 DE ET OE ES Inspection 04/24/2015 Location Identifier Facility ID Operator Information: Loc ID 300322 302713 FIELD INSPECTION FORM Inspector Name: Rains, Bill On-Site Inspection 2A Doc Num: Document Number: 673900933 Overall Inspection: OGCC Operator Number: 100322 THIS IS A FOLLOW UP INSPECTION Name of Operator: NOBLE ENERGY INC FOLLOW UP INSPECTION REQUIRED Address: 1625 BROADWAY STE 2200 City: DENVER State: CO Zip: 80202 NO FOLLOW UP INSPECTION REQUIRED INSPECTOR REQUESTS FORM 42 WHEN CORRECTIVE ACTIONS ARE COMPLETED Contact Information: Contact Name Phone Email Comment HEATHER, FOGEL hfogel@nobleenergyinc.com send all noble inp. to heather Compliance Summary: QtrQtr: SENE Sec: 13 Twp: 5N Range: 63W Insp. Date Doc Num Insp. Type Insp Status Satisfactory /Action PA P/F/I Pas/Fail (P/F) Violation (Y/N) 04/19/2010 200243593 PR PR I No Inspector Related Facilities: Facility ID Type Status Status Date Well Class API Num Facility Name Insp Status 300322 WELL PR 05/29/2009 OW 123-29676 70 RANCH USX BB 13-08 Equipment: Location Inventory SI Special Purpose Pits: Drilling Pits: Wells: Production Pits: Condensate Tanks: Water Tanks: Separators: Electric Motors: Gas or Diesel Mortors: Cavity Pumps: LACT Unit: Pump Jacks: Electric Generators: Gas Pipeline: Oil Pipeline: Water Pipeline: Gas Compressors: VOC Combustor: Oil Tanks: Dehydrator Units: Multi-Well Pits: Pigging Station: Flare: Fuel Tanks: Location Signs/Marker: Type WELLHEAD Satisfactory/Action Comment Corrective Action Emergency Contact Number (S/A/V): Corrective Page 1 of 5

Spills: Type Area Volume Corrective action Fencing/: Type Multilple Spills and Releases? Satisfactory/Action WELLHEAD pipe Equipment: Comment Corrective Action Type # Satisfactory/Action Plunger Lift 1 Comment Corrective Action Venting: Yes/No NO Comment Flaring: Type Satisfactory/Action Comment Corrective Action Page 2 of 5

Location ID: 300322 Site Preparation: Lease Road Adeq.: Pads: Predrill Soil Stockpile: Form 2A COAs: CDP Num.: : Wildlife BMPs: : Stormwater: Staking: On Site Inspection (305): Surface Owner Contact Information: Name: Phone Number: Operator Rep. Contact Information: Landman Name: Address: Cell Phone: Phone Number: Date Onsite Request Received: Date of Rule 306 Consultation: Request LGD Attendance: LGD Contact Information: Name: Phone Number: Agreed to Attend: Summary of Landowner Issues: Summary of Operator Response to Landowner Issues: Onsite Inspection Memorandum Summarizing Discussions at Inspection as Attachment: Facility Facility ID: 300322 Type: WELL API Number: 123-29676 Status: PR Insp. Status: SI Idle Well Purpose: Shut In Temporarily Abandoned Reminder: FLOWLINE AVAILABLE-CONNECTED : Spills/Releases: : Environmental Type of Spill: Description: Estimated Spill Volume: Page 3 of 5

Reportable: Proximity to Surface Water: Water Well: DWR Receipt Num: GPS: Lat Depth to Ground Water: Owner Name: GPS : Lat Long Long Field Parameters: Sample Location: Emission Control Burner (ECB): Pilot: Wildlife Protection Devices (fired vessels): Reclamation - Storm Water - Pit Interim Reclamation: Date Interim Reclamation Started: Date Interim Reclamation Completed: Land Use: 1003a. Debris removed? Waste Material Onsite? Unused or unneeded equipment onsite? Pit, cellars, rat holes and other bores closed? Guy line anchors removed? Guy line anchors marked? 1003b. Area no longer in use? Production areas stabilized? 1003c. Compacted areas have been cross ripped? 1003d. Drilling pit closed? Subsidence over on drill pit? Cuttings management: 1003e. Areas no longer needed for drilling or subsequent operations for have been re-vegetated to 80% of pre-existing? Production areas have been stabilized? Segregated soils have been replaced? RESTORATION AND REVEGETATION Cropland Top soil replaced Recontoured Perennial forage re-established Page 4 of 5

Non-Cropland Top soil replaced Recontoured 80% Revegetation 1003 f. Weeds Noxious weeds? Overall Interim Reclamation Final Reclamation/ Abandoned Location: Date Final Reclamation Started: Date Final Reclamation Completed: Final Land Use: Reminder: Well plugged Pit mouse/rat holes, cellars backfilled Debris removed Access Roads Regraded No disturbance /Location never built Contoured Culverts removed Gravel removed Location and associated production facilities reclaimed Locations, facilities, roads, recontoured Compaction alleviation Non cropland: Revegetated 80% Dust and erosion control Cropland: perennial forage Weeds present Subsidence Overall Final Reclamation Storm Water: Well Release on Active Location Multi-Well Location Date Loc Erosion BMPs BMP Lease Road Erosion BMPs Lease BMP Chemical BMPs Chemical BMP Comment Gravel Gravel SATISFACTOR Y : Corrective Pits: NO SURFACE INDITION OF PIT Page 5 of 5