GUIDE TO SETTLEMENT OF CANTERBURY FLAT LAND CLAIMS



Similar documents
Land claims are now being settled in Canterbury.

FOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012

Technical categories and your property

Development of Guidance Information for the Repair and Rebuilding of Houses Following the Canterbury Earthquake Series

Permeable Pavement Construction Guide

3. Given the geographic extent of the area, amendments have been made to the following regional planning documents

8.1 Insurance requirements Regulatory requirements Seismicity considerations Flood risk and floor levels... 8.

SUSTAINABLE URBAN DRAINAGE SYSTEMS

Date, Time and Place: Presented by: Presented to: 22 August 2013, 0900 hrs, Pier 1 The Embarcadero, San Francisco

Permeable Pavement Operation & Maintanence Guide

Part C: Assessing, repairing and rebuilding foundations in TC3 Contents

Residential Ground Improvement. Findings from trials to manage liquefaction vulnerability

Tree Pits Operation & Maintenance Guide

How To Build A Foundation For A Building Site In Creeper Island

Town of Beaumont. Lot Grading Guidelines

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS

Homeowner s Guide Foundation Water PenetrationTips TIPS TO IDENTIFY WATER PENETRATION PROBLEMS / CRACKING BASEMENTS

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES

Rivers Group. Effect of Canterbury Earthquakes on Waimakariri, Kaiapoi, & Halswell Rivers. Flooding & Drainage Perspectives

Rainwater is directed away from walls at surface. Any water infiltrating is captured in drains below foundation

Protect Your Home From Flooding. A guide for Lethbridge Residents

Outlet stabilization structure

Diminution of Value Methodology for Increased Flooding Vulnerability. APRIL 2014 (updated with Guidance notes and minor amendments as at March 2015)

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED

3. QUALITY ASSURANCE REQUIREMENTS

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES

Lisgar District Basement Water Infiltration Investigation Answers to Residents Written Questions Received by Councillors Ward 10 Office

Definition of Tower from the Bradley County Zoning Resolution

Repairing and rebuilding multi-unit residential buildings

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

Construction Site Inspection Checklist for OHC By making use of some simple Best Management Practices (BMPs) a construction site operator can

Property Inspection. 83A Ascot Avenue North New Brighton Christchurch STRUCTURAL REPORT

CITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is

4.1 General Local repairs (TC1 and TC2) Re-levelling floors (TC1 and TC2)...4.6

SE-10 STORM DRAIN INLET PROTECTION. Objectives

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes

Emergency Spillways (Sediment basins)

VEHICLE CROSSOVER INFORMATION PACK

Document type: Practice Note Title: External and internal membranes Document number: AC2234 Version: Purpose

Proposed Construction of Basement Flood Risk Assessment. 35 Edwardes Square London W8 6HH

Your home: the next steps

REPORT. Earthquake Commission. Christchurch Earthquake Recovery Geotechnical Factual Report Merivale

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

NEUPAVE. Permeable Pavers. A Permeable Eco-Friendly Beauty

SANITARY SEWER BACKUP. Causes & Prevention

Homeowner s Guide to Drainage

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY. a guide to PREVENTING SEWER BACKUPS AND FLOODING

Preventing water damage in the basement

19.1 Overview Repair or replace Relevelling

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Downspout Disconnection Program FAQs

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.

Does your new building

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.

A guide to preventing structural damage

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

APPLICATION PROCESS FOR LAND DISTURBING PERMIT

City of Edmonton Page 1 of 5 Foundation Drain Discharge Collection System Guideline November, 2005

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Table 4.9 Storm Drain Inlet Protetion Applicable for

DESIGNERS GUIDE TO DOMESTIC CONSERVATORIES

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

ASSET MANAGEMENT GUIDE FOR PROJECT DESIGN FORMAT

Vital Earth Composting Facility Flood Risk and Drainage Statement

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

minimum deductible may be increased significantly.

C. Section TESTING LABORATORY SERVICE.

Ontario Electrical Safety Code - Info Sheet

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09

rescue and relief efforts in the aftermath of flooding, (iii) repair of flood damaged public facilities and utilities, and

Chapter 9 Remedial Measures

Storm Drain Inlet Protection

Liquid Effluent Treatment Plant (LETP) Land Clean-Up

Property Care White Papers. Site Drainage: Monitor and Maintain

Lighthouse Engineering, L.L.C.

4.11 Geologic and Soil Resources

Protect your. home from. basement. have you done everything you can?

Homeowner s Guide to Maintaining a Sewage Treatment System

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section:

RISKSCAPE TUTORIAL 4: 200 YEAR ANNUAL RETURN INTERVAL (ARI) HEATHCOTE RIVER FLOOD EVENT: MITIGATING IMPACTS ON CHRISTCHURCH BUILDINGS

Floodplain Development Land Use Review

To prevent increased stormwater runoff entering Council s drainage system and causing overloading of the system that in turn might cause flooding.

Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills.

Earthquake damage in wastewater systems and postearthquake repair methods; limitation and practice

9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES. Hunter Underground Systems

CASS COUNTY COMMISSION POLICY MANUAL ADOPTED DATE: FEBRUARY 2, 1998 PAGE 1 OF 9

SECTION SUPPORT OF EXCAVATION

Local Road Assessment and Improvement Drainage Manual

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

SECTION 1 GENERAL REQUIREMENTS

Storm Drain Inlet Protection for Construction Sites (1060)

FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY

Transcription:

GUIDE TO SETTLEMENT OF CANTERBURY FLAT LAND CLAIMS April 2013 i

Introduction This guide focuses on repair methods for some of the types of land damage that occurred on flat residential land as a result of the Canterbury earthquakes. EQC costs land repair for the purposes of calculating the land settlement. For these costings, EQC will often use the potential land repair methods that are described generally in this guide. EQC will not in most cases be carrying out, or arranging to carry out, the land repair. Land damage claims will mainly be settled by EQC with a cash settlement to the homeowner or mortgagee. This will enable you to undertake or arrange the work yourself. The repair methods in this guide are general in nature. The actual repair methods used on your insured land need to be considered on a caseby-case basis, appropriate for your specific site and the nature of the land damage. In some cases there will be other methods not covered in this guide that may be more appropriate or practical for your land. This guide should not be read as implying that any particular repair method must be undertaken or that a particular repair method is suitable in every case. You will need to take appropriate advice before starting repairs on your insured land. This guide does not provide engineering or design documentation for repair purposes. Any such documentation (if required) will need to be drawn up for your specific situation. Detailed provisions on EQC land cover can be found in the Earthquake Commission Act 1993 at www.legislation.govt.nz. The provisions of that Act will be applied by EQC at all times. This guide is a summary only. ii 1

Land damage Potential repair methods Types of land damage There is land damage where the land has been materially physically changed as a direct result of an earthquake, and that change has materially affected the physical use of the land. Nine types of land damage have been identified on the flat residential land in Canterbury. The table below describes the land damage types in general terms. Type Land cracking caused by lateral spreading. Land cracking caused by oscillation movements. Undulating land. Local ponding. Local settlement causing drainage issues. Groundwater springs. Inundation by ejected sand and silt. Increased liquefaction vulnerability. Increased flooding vulnerability. Seven types identify physical damage that can be seen by looking at the land. Two types involve physical changes to the land that are not easily seen, but which have increased the future vulnerability to liquefaction or to flooding. Description DAMAGE THAT CAN BE SEEN Lateral spreading is the sideways movement of land, typically toward watercourses. Blocks of the earth crust move sideways over liquefied soils toward a lower area. Surface damage can include minor or major cracks in the land and tilting of ground crust blocks. Cracks to land can result from both lateral spreading (see above) and oscillation (backwards and forwards ground movement during earthquake shaking). Cracks resulting from oscillation are typically minor and isolated. Undulating land is caused by the uneven settlement of the ground surface as a result of the ejection of sand and silt, and, to a lesser extent, the uneven settlement of liquefied soils below ground. Local settlement or lowering of the land resulting in water forming ponds on the ground surface for extended periods in locations where it did not pond before the earthquake. In some areas residential land has settled more than the adjacent land beneath which public services are located (and vice-versa). This results in drains now flowing the opposite way. New groundwater springs have emerged and are now flowing over the ground surface where this was not happening before the earthquake. The spring usually occurs at a specific location on residential land. Sand and silt is ejected to the ground surface from the zone below the water table through cracks in the crust. The ejected sand and silt may be deposited in isolated mounds, under houses, or over large areas. DAMAGE INVOLVING AN INCREASED VULNERABILITY In some areas the ground surface has subsided and the groundwater table has typically remained at a constant level. Therefore the ground surface is closer to the water table than prior to the earthquake. This generally reduces the non-liquefying ground crust thickness. As a result there has been an increase in the future vulnerability to the liquefaction hazard of some sites. In some areas, the ground surface has subsided. As a result, there has been an increase in the future vulnerability to flooding of some sites situated near waterways. Further information can be found in the Earthquake Commission: Canterbury Earthquakes 2010 and 2011 Land Report as at 29 February 2012 (July 2012). This Report can be found on the EQC website at www.eqc.govt.nz/land. About the repair methods This guide sets out some potential repair methods for the seven types of observable land damage. The repair methods for reinstating land: for one type of land damage may also repair other land damage types at the same time. For example, the repair of undulating land may fully or partially repair local ponding generally comprise earthworks and/or drainage works focus on the repair of individual sites only not area wide solutions. Consents and other statutory approvals You may need local authority resource or building consents before undertaking repairs. We recommend that you contact your local authority to confirm: the site specific requirements of the property, and whether there is a global consent which authorises the repair. In some instances, you may need to apply for additional resource consents. Engineering or drainage advice may be required to assist in the repair. Environment Canterbury and your local authority have worked together to streamline the consent process. If you live in the Christchurch City Council area, visit the land repair page on the website, www.ccc.govt.nz/landrepair to find out more about the process and to understand what may, or may not be, required as you continue with your land repair. If you live in the Waimakariri District Council or Selwyn District Council areas then you will need to contact them directly for more information. Before you contact your local authority, you ll need to talk to your private insurer, mortgagee and also, where necessary, the contractor you will engage to make the repairs. When you contact the local authority, please have the information about the type of land damage and the way it is proposed to repair it. 2 3

Land cracking caused by lateral spreading The insured land has an open crack that is wider than 5mm or a crack that has a vertical separation of more than 5mm that is caused by lateral spreading. The lateral spreading is the sideways movement of blocks of land crust that tilt toward an open channel or dip (eg. a river) which is reasonably close by. The land is considered damaged because a crack wider than 5mm: is a potential pathway for future sand ejection is a tripping hazard can restrict the normal maintenance to the property (e.g. lawn mowing). If a crack is more than 5mm wide, then the crack needs repair. This is unless the crack is under a drive or other paving where it does not affect physical use of the land. Potential repair methods Crack open more than 10mm wide or more than 10mm vertical separation. Crack open between 5mm to 10mm wide or between 5mm to 10mm vertical separation. METHOD: Earthworks to fill crack Outside any structure: Excavate to 600mm depth (600mm wide trench) and re-compact Under any structure: For house with timber floors Fill with bentonite/cement slurry. If house is removed for other reasons then excavate to 600mm depth (600mm wide trench) and re-compact For house with concrete floors No repair required if the concrete slab is not being removed. If the slab is being removed for other reasons, excavate to 600mm depth (600mm wide trench) and re-compact Fill with a bentonite/cement slurry 4 5

Land cracking caused by oscillation movements The insured land has a crack more than 5mm wide caused by ground oscillation (backwards and forwards ground movement) as a direct result of the earthquake. This land is considered damaged because a crack wider than 5mm: is a potential pathway for future sand ejection is a tripping hazard can restrict the normal maintenance to the property (e.g. lawn mowing). If a crack is more than 5mm wide, then the crack needs repair. This is unless the crack is under a drive or other paving where it does not affect physical use of the land. Crack more than METHOD: Earthworks to fill crack 5mm wide. Outside any structure: Fill with bentonite/cement slurry Under any structure: For house with timber floors Fill with bentonite/cement slurry For house with concrete floors No repair required if the concrete slab is not being removed. If the slab is removed, then fill with bentonite/cement slurry 6 7

Undulating land Undulating land is caused by the uneven settlement of the ground surface as a result of the ejection of sand and silt, and to a lesser extent the uneven settlement of liquefied soils below ground. This is considered damaged because undulations: are tripping hazards restrict the normal maintenance to the property (eg. lawn mowing). Undulations under lawns will generally affect the physical use of land less than undulations under paths/patios/access areas. Undulation more than METHOD: Earthworks to re-level ground 50mm high (if on lawn) Earthworks for unpaved areas: Undulation more than Remove topsoil and raise the land to the same level as the surrounding ground with 25mm high (if under compacted sand, topsoil and grass. path/patio). Earthworks for paved areas: Remove paved surface. Place compacted sand to re-level ground. The pavement (including basecourse) if damaged by the earthquake may be covered by your private insurer. We recommend that you contact your private insurer to check. 8 9

Local ponding The local settlement of the ground has occurred as a direct result of the earthquake. The ground lowering has resulted in water ponding on the ground surface in locations where it did not pond previously. If water now ponds in a depression in the ground surface, and this affects the physical use of the land, then the land is considered to be damaged. Local ponding on ground METHOD 1: Earthworks to re-level ground surface for extended Earthworks for unpaved areas: periods following rainfall Remove topsoil and raise the land to the same level as the surrounding land with compacted where the land is lower sand, topsoil and grass. than pre-earthquake level. Earthworks for paved areas: The surface will need to be removed above areas with local ponding and built up with compacted soil. The pavement (including basecourse) if damaged by the earthquake may be covered by your private insurer. We recommend that you contact your private insurer to check. METHOD 2: Install drainage This may comprise a sump with an outlet pipe discharging to the nearest public stormwater system. Locate the sump at the lowest point of the damaged land to ensure all surface water flows to the sump. 10 11

Local settlement causing drainage issues If insured land has settled as a direct result of the earthquake so that the land is no longer high enough to provide sufficient fall for drainage services, then the physical use of the land has been compromised. Local settlement results METHOD 1: Re-lay private drains Not covered in this Guide in drains now flowing the Re-laying the private site drains to public services could be considered but note that this opposite way. approach would be part of the residential building cover and not costed as a residential land repair. METHOD 2: Earthworks to raise the land Covered in this Guide As an alternative, raise the level of the insured land to allow the installation of drainage with fall to the existing public service network. Note that this reinstatement may require the removal/ relocation of the residential building. 12 13

Groundwater springs If, as a direct result of the earthquake, a new groundwater spring is flowing water onto insured land, then the land located at the spring and the land covered by water flowing from the spring is considered to be damaged. Groundwater spring has METHOD: Install drainage emerged and is now This may comprise a sump with an outlet pipe discharging to the nearest public flowing over the ground stormwater system. The outlet pipe should be detailed to ensure it does not block where this was not and it can be maintained. happening before the earthquake. 14 15

Inundation by ejected sand and silt The land is considered damaged if sand and silt has been deposited on the ground surface which affects the physical use of the land. Inundation by ejected METHOD: Earthworks to remove sand and silt offsite sand and silt where a significant volume has been deposited to the ground surface. Remove the ejected material (by hand or using an excavator) and dispose of it offsite if not required to fill undulations. Silt and sand that is required to be removed from beneath the house will likely need to be excavated by hand. 16 17

For further information about your settlement If you have further queries about your settlement, please email info@eqc.govt.nz or call 0800 DAMAGE (0800 32 62 43). The international number is +64 4 978 6400. For further information about land repair If you need further information about land repair, please contact your local authority: Christchurch City Council, Waimakiriri District Council or Selwyn District Council. The Earthquake Commission Level 20 Majestic Centre 100 Willis Street Wellington Email info@eqc.govt.nz Web www.eqc.govt.nz 0800 DAMAGE (0800 32 62 43) EQC0034-2 18