NexGen Commences Largest Drill Program at Arrow and Expands Site Infrastructure at Rook I

Similar documents
NexGen Commences 35,000 m Summer Drill Program at Rook I and Advances Project Development Activities

TSXV-ASC July 2015 AthabascaNuclear.com

SAVANT LAKE GOLD PROJECT. May 24,

NEWS RELEASE NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO U.S. WIRE SERVICES

Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM

FORM 7 MONTHLY PROGRESS REPORT

FORWARD LOOKING STATEMENTS

Highlights of selected high-grade mineralized zones exposed in drift tunnels include:

Golden Band Resources Inc.

Barkerville Gold Mines Investor presentation q The last great Canadian gold mining camp controlled by a junior mining company.

SILVERCORP REPORTS RESULTS FROM ITS 2012 EXPLORATION PROGRAM AT THE SGX MINE, YING MINING DISTRICT, CHINA

Miocene Metals and Carube Resources Announce Start of Drilling on Bellas Gate Copper- Gold Joint Venture Project in Jamaica

Ivanhoe Mines announces an accelerated infill drilling program at the Kamoa copper project s Kakula Discovery in the D.R. Congo

FORWARD LOOKING STATEMENT

SILVERCORP INTERCEPTS 18.8 METRES TRUE WIDTH GRADING 368 G/T SILVER AND 1.78 PERCENT LEAD AT THE LM MINE WEST, YING MINING DISTRICT, CHINA

San Gold Launches Timmins Exploration Subsidiary

BUILDING VALUE THROUGH DISCOVERY. Nickel Exploration in Labrador

YAMANA GOLD ANNOUNCES SIGNIFICANT NEW DISCOVERIES AT CHAPADA AND EL PEÑÓN IMPROVE OPERATIONAL OUTLOOK

Enhanced Oil Resources Inc. Provides 2012 Activity Update

NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS

LUPAKA GOLD ANNOUNCES JOSNITORO GOLD PROJECT OPTION WITH HOCHSCHILD MINING PLC

MANAGEMENT S DISCUSSION AND ANALYSIS U308 CORP. (A DEVELOPMENT STAGE COMPANY) THREE AND SIX MONTHS ENDED JUNE 30, 2007 (UNAUDITED)

PRESS RELEASE SEMAFO FOR IMMEDIATE RELEASE. SEMAFO Reports 2011 Cash Flow from Operations of $172 Million

FORM 7 MONTHLY PROGRESS REPORT

For Immediate Release Date: February 3, 2016 # Orvana Announces New Mineral Resources at El Valle Mine, Villar Zone and at La Brueva

AVINO SILVER & GOLD MINES LTD.

GEOLOGICAL REINTERPETATION LEADS TO MAJOR DRILL PROGRAM AT JUPITER

Lalor Project Base Metal Zones and Gold Mineralization January 2009

FALCO COMPLETES HORNE 5 CONFIRMATION DRILLING PROGRAM AND ANNOUNCES FINAL RESULTS

CRESCENT POINT ENERGY ANNOUNCES $1.45 BILLION CAPITAL EXPENDITURES BUDGET FOR 2015

FORM F1 MANAGEMENT S DISCUSSION & ANALYSIS DECLAN RESOURCES INC. ( DECLAN OR THE COMPANY )

News Release. n j. NovaCopper Releases Year End Results and Continues to Focus on Adding Long Term Value

Core : CXO. and. Uranium Session SAREIC Conference Adelaide 13th April 2015

Canadian Spirit Resources Inc.

NEWS RELEASE New York - AG Toronto FR May 10, 2016 Frankfurt FMV Mexico - AG. First Majestic Reports First Quarter Financial Results

WILLAMAX PROJECT. TSX-V: DVN Reach us at Developing B.C. mining assets to create profitable gold production.

NIGHTINGALE REPORTS FISCAL 2014 RESULTS

Reservoir Minerals Reports Further High Grade Copper-Gold Drill Intercepts from the Upper Zone of the Cukaru Peki Deposit, Serbia

K+S CANADA HOLDINGS INC. K+S AKTIENGESELLSCHAFT POTASH ONE INC.

Mining Indaba Presentation. Capetown, South Africa 8 th 10 th February 2016

CREAM MINERALS LTD. Suite Granville Street Vancouver, B.C. V6C 3P1

CIM DEFINITION STANDARDS - For Mineral Resources and Mineral Reserves

December 8, Visit for pictures of the drill core and maps and sections of the new discovery.

NOVEMBER January 2013

(NYSE-MKT:XRA, TSX:XRC,

ANNUAL GENERAL MEETING. Investor Presentation 24 November 2015

TIMIA CAPITAL CORP. (the Company ) (FORMERLY GREENANGEL ENERGY CORP.) MANAGEMENT DISCUSSION AND ANALYSIS in Form F1 ( MD&A )

Cummins Range Rare Earths Project

Avion will host a conference call at 10:30 AM (EST) on Monday, April 2, 2011 to discuss the results. To participate in the call please dial:

Pasinex Resources Limited Reports Large New Area of Surface Copper Mineralisation on its Golcuk Property in Turkey

Aurvista Gold Plans Significant Exploration Program at Douay

Dragon Mining A Growing Nordic Gold Producer. RMG Helsinki Mining Summit October 2012

Bellhaven Expands the La Garrucha Discovery at the La Mina Project, Colombia

TSX-V: CDA WKN: A0M6U5

CENTURY ENERGY LTD. FORM F1 MANAGEMENT DISCUSSION AND ANALYSIS FOR THE YEAR ENDED AUGUST 31, 2014

Strategic Metals Ltd.

Unprecedented Opportunities in Final Frontier of B.C. s Golden Triangle. Exploration and mineral resource development

FORWARD-LOOKING STATEMENTS

Process safety in Shell

How To Know If Goldcorp Is A Successful Company

Corporate Presentation October 2015

Barkly Phosphate Project Tenement Granted

Technical Presentation The Star-Orion South Diamond Project George Read P.Geo. Senior VP Exploration & Development. 16 June 2015

PETRONAS to Acquire Progress Energy Companies agree to $5.5 Billion Acquisition

Coeur Reports Fourth Quarter and Full-Year 2015 Production and Provides 2016 Production Guidance

SPARTAN ENERGY CORP. ANNOUNCES TWO CONSOLIDATING SOUTHEAST SASKATCHEWAN LIGHT OIL ACQUISITIONS AND BANK LINE REDETERMINATION

BACANORA MINERALS ANNOUNCES SONORA LITHIUM PROJECT UPDATE, FILING OF PRE-FEASIBILITY STUDY AND AMENDED MINERAL RESOURCE ESTIMATE

A Global Resource Investment Corporation and Merchant Bank

2015 Third Quarter Results Webcast October 29, 2015

REDISHRED CAPITAL CORP. ( REDISHRED ) ANNOUNCES FOURTH QUARTER AND YEAR-END 2014 RESULTS

HISTORIC INTERSECTIONS INCLUDE 19.8 G/T AU OVER 8.9 METRES AND 24.4 GT AU OVER 9 METRES

GOLD RESOURCE CORPORATION INTERCEPTS ADDITIONAL MULTIPLE HIGH-GRADE PARALLEL VEINS AT SWITCHBACK INCLUDING 6.32 METERS OF 5.

MAJOR NEW COPPER EXPLORATION PROGRAM UNDERWAY IN NORTH QUEENSLAND

SPARTAN ENERGY CORP. ANNOUNCES THIRD QUARTER FINANCIAL AND OPERATING RESULTS

Economical Insurance reports financial results for Second Quarter and Year-todate

Arctic HSE seminar 1. Ice behavior in northern regions, availability and need for metocean & ice data. Paul Verlaan 24 th March 2014

ROME RESOURCES LTD Fraser Highway Surrey, B.C. V4N 0G2

Galahad Gold plc (Galahad)

Positioned for Production: Exploring for Growth

Innovators in Authentication, Verification and Certification Technologies. January 2016

Exploration. Exploration methods

Interview with Paul Atherley, Managing Director of Berkeley Energia (911733, ASX: BKY, London: BKY)

Condensed Interim Consolidated Financial Statements

Suite West Georgia St. Vancouver, BC V6E 4M3 PRESS RELEASE

MacDonald Mines VMS Discovery Leads Exploration Program to Larger Target and Provides Exploration Summary

Focusing on Near Term Production and Exploration in Quebec

Financial and Operating Highlights through and subsequent to March 31, 2016: Completion of Flow-Through Share Financing

Building a well-funded, full-cycle, exploration led E&P company

Sabina Gold & Silver Corp.

FIJI GOLD LION ONE METALS

How To Mine And Treat Ore From Castle Hill Stage 1

FOR IMMEDIATE RELEASE NR15-19 November 10, 2015 RENAISSANCE GOLD REPORTS FIRST QUARTER 2016 RESULTS

PRESS RELEASE CANADIAN ZINC REPORTS RESULTS FOR THIRD QUARTER 2015

Transcription:

NexGen Commences Largest Drill Program at Arrow and Expands Site Infrastructure at Rook I Vancouver, BC, January 7, 2016 NexGen Energy Ltd. ( NexGen or the Company ) (TSXV:NXE, OTCQX:NXGEF) is pleased to announce the winter 2016 drill program has now commenced at the 100% owned, Rook I Property, Athabasca Basin, Saskatchewan. In addition, the Rook I camp has undergone significant improvements leading into this year s program to facilitate an increase in the number of rigs, improve logistical support and the continued optimization of operations. The winter 2016 drill program will comprise of 30,000 m of drilling and an increase to six diamond drill rigs making it the most number of rigs ever operated at Arrow. The Company has cash on hand of approximately $34M as at January 1, 2016. There are three primary objectives of the winter 2016 drill program budgeted at $12M; 1. Core drilling at Arrow Zone; a. Delineating the higher grade A2 sub-zone (the Sub-Zone ), b. Drill testing extensions of the A2 and A3 high-grade shears further southwest, c. Testing for flat lying mineralization at the basement unconformity further northeast. 2. Step-out drilling along strike from the Arrow zone along the 9 km Patterson corridor on Rook I. 3. Drill the Bow discovery. Leigh Curyer, Chief Executive Officer, commented: Given the successful 2015 results at Arrow, it has clearly justified expanding the drilling program and improving camp infrastructure at Rook I to support the continued optimization of the project. The addition of a sixth rig makes this winter s program the largest ever at Arrow. Moreover, we have initiated baseline environmental monitoring studies, metallurgical and geotechnical studies for 2016. It is going to be a very exciting year for the Company and shareholders. Core Drilling at Arrow Zone: Three rigs have commenced drilling at the Arrow zone with all three using Devico directional drilling technology with the assistance of TECH Directional Services Inc. Two of the rigs are focused on delineating the Sub-Zone which was discovered during the summer 2015 drill program and is a zone of continuous higher grade uranium mineralization spanning 203 m in strike length that begins at less than 400 m below surface and remains open in all directions. The third rig is focused on expanding high-grade uranium mineralization within the A2 and A3 shears further to the southwest.

A fourth rig scheduled to commence on January 14 th will initially focus in and around hole AR-15-36 where uranium mineralization was intersected just 4.0 m below the Athabasca Sandstone and basement unconformity. These holes will be testing for flat-lying mineralization at the unconformity in an area that is up-plunge from known basement mineralization. Drilling Along Strike of Arrow Zone and Patterson Corridor: A fifth rig, scheduled to commence late January, will systematically test along strike of the VTEM conductor that hosts the Arrow zone both to the southwest and northeast where there are numerous target areas with similar geophysical characteristics as Arrow. This will incorporate NexGen s drilling philosophy of aggressive step-outs to test the aerial extent of mineralization which would then be followed by delineation. Drilling Bow Discovery and Prospective Anomalies on Patterson Lake: A sixth rig is scheduled to commence in early February to further test the Bow discovery and other highly prospective radon, VTEM, magnetic and gravity anomalies on Patterson Lake. Drilling at Bow will commence when ice conditions permit and will begin with step-out drilling from known mineralization in hole BO-15-10 which returned 9.5m at 0.20% U3O8 including 1.0m at 1.44% U3O8 (see News Release dated June 30, 2015). Further drilling will test coincident VTEM and radon-in-lake water anomalies and structural traps interpreted from previous drilling and geophysical surveys. Other Activities in 2016: Beyond this large winter 2016 drill campaign, the Company will continue baseline environmental monitoring as well as initiate multiple geotechnical and metallurgical testing during 2016 which will form the basis of future studies. Additionally, the Company will continue active engagement with local stakeholders and has applied for permits to build an all-weather access road to the Rook I camp to facilitate improved site logistics, efficiency, safety and support to the project. The technical information in this news release has been prepared in accordance with the Canadian regulatory requirements set out in National Instrument 43-101 and reviewed on behalf of NexGen Energy Ltd., by Garrett Ainsworth, P.Geo., Vice President Exploration & Development, a qualified person.

Figure 1: Arrow Zone Drill Hole Locations

About NexGen NexGen is a British Columbia corporation with a focus on the acquisition, exploration and development of Canadian uranium projects. NexGen has a highly experienced team of uranium industry professionals with a successful track record in the discovery of uranium deposits and in developing projects through discovery to production. NexGen owns a portfolio of highly prospective uranium exploration assets in the Athabasca Basin, Saskatchewan, Canada, including a 100% interest in Rook I, location of the Arrow Discovery in February 2014 and Bow Discovery in March 2015. Leigh Curyer Chief Executive Officer NexGen Energy Ltd. +1 604 428 4112 lcuryer@nexgenenergy.ca www.nexgenenergy.ca Travis McPherson Corporate Development Manager NexGen Energy Ltd. +1 604 816 2686 tmcpherson@nexgenenergy.ca http://www.nexgenenergy.ca The TSXV has neither approved nor disapproved the contents of this press release. Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this release. Forward-Looking Information This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation. Forward-looking information includes, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future, including, without limitation, the proposed use of proceeds and planned exploration activities. Generally, but not always, forward-looking information and statements can be identified by the use of words such as plans, expects, is expected, budget, scheduled, estimates, forecasts, intends, anticipates, or believes or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results may, could, would, might or will be taken, occur or be achieved or the negative connation thereof. Such forward-looking information and statements are based on numerous assumptions, including among others, that the results of planned exploration activities are as anticipated, the price of uranium, the anticipated cost of planned exploration activities, that general business and economic conditions will not change in a material adverse manner, that financing will be available if and when needed and on reasonable terms, and that third party contractors, equipment and supplies and governmental and other approvals required to conduct the Company s planned exploration activities will be available on reasonable terms and in a timely manner. Although the assumptions made by the Company in providing forward-looking information

or making forward-looking statements are considered reasonable by management at the time, there can be no assurance that such assumptions will prove to be accurate. Forward-looking information and statements also involve known and unknown risks and uncertainties and other factors, which may cause actual events or results in future periods to differ materially from any projections of future events or results expressed or implied by such forward-looking information or statements, including, among others: negative operating cash flow and dependence on third party financing, uncertainty of additional financing, no known mineral reserves or resources, pending assay results may not be consistent with preliminary results, discretion in the use of proceeds, alternative sources of energy, aboriginal title and consultation issues, reliance on key management and other personnel, potential downturns in economic conditions, actual results of exploration activities being different than anticipated, changes in exploration programs based upon results, availability of third party contractors, availability of equipment and supplies, failure of equipment to operate as anticipated; accidents, effects of weather and other natural phenomena and other risks associated with the mineral exploration industry, environmental risks, changes in laws and regulations, community relations and delays in obtaining governmental or other approvals. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information. The Company undertakes no obligation to update or reissue forward-looking information as a result of new information or events except as required by applicable securities laws.