Contents. 1. Foreword 1. 2. Common accidents in lifting operations 2. 3. Legislative requirements and code of practice of lifting operations 2



Similar documents
What should you check for when inspecting a crane before maintenance?

How To Ensure Safety Of Lifting Equipment

SAFE HANDLING OF PRECAST CONCRETE PRODUCTS

UNIT 7 Crane safety. Engineering CASE STUDY. Cambridge English for. Professional English. Part 1. Part 2

RIGGING HARDWARE ASME B Addresses detachable lifting hardware for lifting purposes

INTERNATIONAL LABOUR ORGANISATION. REGISTER OF LIFTING APPLIANCES and ITEMS OF LOOSE GEAR

Owner s Manual Gantry Cranes

Slings, Rigging and Lifting Equipment

Guidebook for Lifting Supervisors

A Guide to the Factories and Industrial Undertakings (Lifting Appliances and Lifting Gear) Regulations

Owner s Manual & Safety Instructions

CONSTRUCTION SAFETY SERIES: Crane Safety

STANDARD PRACTICE INSTRUCTION

OSHA Remove impacted systems and components. Inspect systems prior to use.

Safety Manual For Overhead Crane Operators

POTENTIAL HEALTH & SAFETY HAZARDS

02805 Printed in China

Savard Labor & Marine Staffing, Inc. Rigging Safety Rev3/14 Rigging Safety

GUIDE TO TOWER CRANES 1

1 TON FOLDING CRANE CFC1000

SAFE USE OF LIFTING EQUIPMENT

Mobile (Truck) Cranes

A36. Lorry Loader. Cleraune Plant Training June 09 1

EXCAVATOR SAFETY TRAINING

Product Information Report Rigging Techniques

EMPLOYEE FALL PROTECTION

Guidance on Lifting Operations in Construction When Using Excavators

SCAFFOLDING RUNWAY SYSTEM

Cranes and Lifting Equipment

Owner s Manual Read and keep this manual. Patents World Wide

Technical Advisory for Safe Operation of Lifting Equipment. Programme-Based Engagement

Wire rope slings, the hazards surrounding

METHOD STATEMENT CRANE HIRE PROVIDING A CONTRACT LIFT SERVICE IN COMPLIANCE WITH BS7121 PARTS 1 & 3 AND LOLER REGULATIONS

Level 1 Award in Health and Safety in a Construction Environment

INSPECTION, THOROUGH EXAMINATION and TESTING

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager

RATCHET RELEASE SHACKLE

Cable Hoist. Operating, Maintenance & Parts Manual. Follow all instructions and warnings for LMCA680. Americrane & Hoist Corp.

WOLFFKRAN. 1 Schedule drawing. 1.1 Schedule drawing, WOLFF clear. max. hook height above ground. Data WOLFF clear

STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13

HOW HYDRAULIC TRUCK CRANES WORK

Installation guide for the SafeLine type anchorage device. Tested in compliance with EN 795: No.: SE-...

1000-LB. TRAILER JACK OWNER S MANUAL

Operator s Manual EVENTER 20 / 25 Series Lifts

HYDRAULIC LIFT TABLE CART 2200-LB.

Safety and Analysis in Material Handling of Construction Industry

Boom and fly capacities for this machine are listed by the following sections:

Awning Instructions. Standard Manual 1.5m to 4.5m

I BEAM TRACK INSTALLATION

10 TON HYDRAULIC PRESS

D-Ring. Fixed Arm. 1.2 LIMITATIONS: The following application limitations must be recognized and considered before using this product:

Operations and Instruction Manual Might Swivel - Part # Concrete and Steel Anchorage Connector ANSI Z ,000 lbs / 44kn

Fall Protection and Fall Prevention. San José State University Environmental Health and Safety Facilities Development & Operations

2. Crane standing on firm, horizontal ground.

PLASTIMO JIB REEFING SYSTEMS S-SERIES 406-S 608-S 810-S

Rating when used as a weight carrying hitch without spring bars:

Lifting equipment at work

ELEVATED WORK POLICY

Operation of Fork Lift Trucks Procedure

Portable Ladder Safety

SITE SPECIFIC FALL PROTECTION PLAN

LiftAlloy Chain Slings

Elkhorn Construction, Inc. Safety Manual Title: Fall Protection Policy Effective Date:

INSTRUCTION MANUAL. FOR Air Balance Jib Lifter MODELS COVERED:DSL-300 & DSL-300-P

RZ Guardrail System Installation Manual

Front axle components, overview

tirfor lifting and pulling machines operating and maintenance instructions

ladder Safety Types of Ladders

In-Track Repair of Concrete Ties. Deland Humpherys, Director Track Mtce

A Casebook of Fatal Accidents Related to Work-at-Height

How To Make A Fall Arrest Anchor System

FJ2. 2 Ton Trolley Floor Jack Assembly & Operating Instructions

M_004 Basic Rigging Safety Lecture

SELF-STEERING AXLE TABLE OF CONTENTS

Assembly and Usage Instructions

OPERATION MANUAL SAFETY PRINCIPLES, OPERATION AND MAINTENANCE FOR BRICKLAYER S PULLEY

WIRE ROPE LIFTING SLINGS. Suitable for lifting heavier weights with round shapes

SAFE USE OF LADDERS AND STEP LADDERS

INSTRUCTIONS FOR CHAIN LINK INSTALLATION Chain Link fence & Posts Meshdirect.co.uk

Section 14. Forklift Safety Contents 14.1 Operator Safety

THE FLYING SCOT A BASIC GUIDE TUNING AND SAIL TRIM By Harry Carpenter

Operating Instructions Drill rig DRU160

MATERIAL HANDLING PROGRAM (Section 10)

Fall Protection Susan Harwood Grant Training Program 2013 Fall Arrest. OSHA Susan Harwood Training - AGC

Checking Wheel Brakes Wear

TABLE OF CONTENTS PART 5 - CRANES, HOISTING AND LIFTING

3047 FORKLIFT OPERATOR TRAINING

Survey and Examination of Ships Lifting Appliances. In conjunction with:

Appendix 6145-T1 Forklift Use Practices

HT-0095 Mini PV Receptacles AWG Crimping Hand Tool. Tool P/N HT-0095

Auto-belay Cable Replacement Process

Sling Safety. Importance of the Operator

27th session 20 December Resolution A.1045(27) Adopted on 30 November 2011 (Agenda item 9) PILOT TRANSFER ARRANGEMENTS

Walking and Working Surface Checklist:

LADDER SAFETY (Reviewed 9/27/207)

Patient Lifts SAFETY GUIDE

RESPONSIBILITIES IN MOBILE CRANE OPERATIONS CONSTRUCTION SAFETY ASSOCIATION OF ONTARIO

Chicago Crane Operators Examination Study Guide

FORKLIFT SAFETY TIPS

Transcription:

Contents 1. Foreword 1 2. Common accidents in lifting operations 2 3. Legislative requirements and code of practice of lifting operations 2 4. People 3 5. Machinery 5 5.1 Cranes 6 5.1.1 Mobile crane 7 5.1.2 Tower crane 8 5.2 Lifting gears 9 5.2.1 Wire rope slings 9 5.2.2 Wire rope slings cable clip 10 5.2.3 Chain slings 11 5.2.4 Shackles 12 5.2.5 Eye bolts 13 5.2.6 Hooks 14 5.2.7 Rings, links, swivels 15 5.2.8 Spreader beams 15 5.2.9 Chain mesh slings and fibre slings 15 6. Load 16 7. Method 17 8. Environment 18 * This booklet is also available in Chinese version 19

1. Foreword The lifting of objects generally occurs on construction sites, in factories and other industrial situations. Correct lifting can move large objects efficiently and reduce manual handling operations. Incorrect lifting however, can lead to disastrous accidents. Every year, incorrect lifting procedures cause injuries, loss of work time and property. People, machinery, loads, methods and the work environment, are all important factors for correct lifting. Provided that enough safety measures are fully implemented, lifting accidents can be reduced. 1

2. Common accidents in lifting operations Overturning of the crane Falling objects Breaking the boom sling Touching overhead power lines Collision with obstacles 3. Legislative requirements and code of practice of lifting operations Local legislative requirements that apply to lifting operations include Factories and Industrial Undertakings (Lifting Appliances and Lifting Gear) Regulations enforced by the Labour Department, and Shipping and Port Control (Cargo Handling) Regulations enforced by the Marine Department. The Labour Department also published the code of practice for "Safe Use of Mobile Crane and Tower Crane" in 1998, and provides the trade with guidance for the safe use of cranes. Code of practice 2

4. People Personnel related to the lifting operation include "competent examiner", "competent person", "crane operator", "slinger", "signaler" and others working nearby. The "competent examiner" is responsible for regular examinations of the lifting appliances or lifting gears. He shall be: appointed by the employer or the owner of the lifting appliances/lifting gears; a registered professional engineer within a relevant discipline; properly trained with relevant practical experience. The "competent person" is responsible for regular inspections of lifting appliances or lifting gears. He shall be: appointed by the employer or the owner of the lifting appliances/lifting gears; properly trained with relevant practical experience. The "crane operator" is responsible for operating the crane correctly and safely. He shall: be at least 18 years of age and hold a valid crane operation certificate; be physically fit; be familiar with hand signals for communication. 3

The "slinger" is responsible for attaching and detaching the load to and from the crane. He shall: have received appropriate training on general safe lifting operations; be capable of selectings lifting gears suitable for the loads; liaise with the operator and direct the movement of the crane safely. The "signaller" is responsible for relaying the signal from the slinger to the crane operator. He shall: have received appropriate training on general safe lifting operations; be able to direct the movement of the crane and loads. Suggested hand signals Emergency stop Stop Ready to move Move away from the signalman Move towards the signalman Move slowly by indicating distance Move towards the hand stretched direction Move towards the hand stretched direction Swing towards the hand stretched direction Swing towards the hand stretched direction Raise the boom Raise the boom slowly Lower the boom Lower the boom slowly Raise the boom and lower the load Lower the boom and raise the load Extent the boom Retract the boom Use the main hoist Use whip line Lower the hoist Lower the hoist slowly Raise the hoist Raise the hoist slowly Stop every thing 4 Note: During the lifting operation, either the slinger or signaller shall communicate with the operator. Other communication methods (e.g., wireless walkie-talkies, telephones, etc.) may also be used.

5. Machinery Machinery refers to lifting appliances and all lifting gears. The lifting appliance includes a crab, winch, teagle, pulley block, gin wheel, crane, shearleg, excavator, pile driver, pile extractor, dragline, aerial rope way, aerial cableway transporter or overhead runway, etc. The lifting gears includes a chain sling, rope sling, ring or similar gear, link, hook, plate clamp, shackle, swivel or eyebolt. 5

5.1 Cranes Selection of cranes For the correct selection of cranes, the following factors shall be considered: Weights and dimensions of loads Height of lift and distances/areas of movement of loads Number and frequency of lifts Period of time for the lifting operation Ground conditions Other factors Testing, examination and inspection All testing and examination of cranes must be carried out by competent examiners and the regular inspections completed by competent personnel. All testing, examination and inspection reports and certificates shall be properly kept. Safe Working Loads The Safe Working Load (SWL) for operating the crane shall be specified according to the results of test and examination certificates, and such loads must not be exceeded during the lifting operation. Repair and maintenance All cranes shall have regular maintenance, to ensure they always kept in good operating conditions. 6

5.1.1 Mobile crane Operation points: The mobile crane shall only be operated on a firm, level ground that adequately supports the weight of the crane and loads. Before lifting, fully extend outriggers and ensure their stability on the ground. The weight of the load shall not exceed the Safe Working Load. Never abruptly swing or stop the crane. Loads shall not be dragged on the ground. Move the load at a safe speed - use low speeds within several metres of the load's destination. Operation radius a. Level ground Correct operation radius. b. Uphill position The load moves toward the crane and reduces the operation radius that may cause the crane to tip over backwards. Adjust the boom length to ensure the crane is operating within the extent of the safe operation radius. When moving uphill or downhill, the boom angle shall be adjusted to the safe working condition. Avoid working on a slope Decrease in operation radius c. Downhill position The load moves away from the crane and this may overloads the crane and cause the crane to tip over forwards. Increase in operation radius 7

5.1.2 Tower crane Operation points: Ensure that the automatic safe load indicator is installed. Provide safe means of access and egress. Ensure that the lifting routes do not collide with any object. Lifting routes shall not come across any building or pass over any person. Travel speed shall be as slow as possible, to ensure the load's stability. Be aware of the height of lifting, the length of the crane's trolley and refer to the load chart. When the tower crane is not in operation, the crane's trolley must be positioned near the tower at minimum radius, with the hook raised to its highest position. Load Radius During typhoons, the jib shall be set to the typhoon's leeward side with the brake released allowing the jib to swing freely. 8

5.2 Lifting gears Lifting gears play an important part in the lifting operation. Their function is to tie the objects tightly and hang them on the crane. There is a great variety of lifting gears. If there is insufficient knowledge or a wrong choice is made, lifting may fail and accidents may result. All lifting gears shall be tested by qualified examiners and suitably marked with a Safe Working Load (SWL). 5.2.1 Wire rope slings Wire rope consists of individual wires laid into a number of strands, which are then wrapped around a central core. Different number of wires in the strands and various methods of arrangement may affect the Thimble Core characteristics of the wire rope sling. The wire rope shall be equipped with a thimble and with pressed metal sleeve and marked with a Safe Working Load Wire rope sling Strand (SWL). Wire Inspection points: The wire rope sling shall not be used and shall be disposed if they are: Broken wires Bird cages Kinks Normal Normal diameter Reduced diameter Abnormal Surface wires are worn by 1/3 or more Change of diameter of wire rope sling Points for attention: Use only suitable wire rope slings. Never use damaged wire rope slings. During lifting, the Safe Working Load must not be exceeded. Sudden elevation is not allowed If more than one wire rope sling is used in lifting, pay attention to the angle between the slings. Regular inspections shall be conducted 9

5.2.2 Wire rope slings - cable clip The cable clip shall be properly installed according to the following points: The wire rope sling is equipped with thimble. There is a minimum of 3 cable clips. Thimble The direction of installation shall be correct. The distance between the cable clips shall be the same. Method of connecting the wire rope slings: 10

5.2.3 Chain slings Chain slings are made up of chain rings. The advantage of chain slings is that they deteriorate and corrode less. Chain slings are made of alloys. They can maintain their Safe Working Loads under temperatures of 50 o F. However, the entire chain becomes unsafe if problems arise in any section. A damaged chain sling will suddenly break and the damage is not as easily detectable as compared to rope slings. Therefore, a rope sling must be selected wherever possible for lifting. Inspection points: The chain sling shall be not be used under the following conditions: Stretched Bend Cuts, cracks Wear Extreme wear at bearing surfaces Points for attention: No ordinary chains shall be used for lifting. The Safe Working Load (SWL) shall not be exceeded. No knots or bolts that shorten the chain length shall be used. Chain slings have no flexibility, so striking objects must be avoided while lifting. Do not use hammers to reshape a deformed chain sling. When purchasing chain slings, those marked "A" should be selected as they are of premium for normal use. Regular inspections shall be conducted. 11

5.2.4 Shackles Hook rings are divided into two main categories: Chain ("D" type) shackle and anchor (bow) type shackle. Both are available with screw pins or round pins. Check for wear Anchor shackle Check for wear and straightness Check that pin is always seated Chain shackle Check that shackle is not "opening up" Points for attention: Never replace the shackle pin with a bolt. Ensure the pin is totally locked. Do not use screw pin shackles if the pin can roll and unscrew. Shackle pins must always be attached to the hook. Washers may be used to centre the shackle. During lifting, shackles shall not lean to one side. Washer Hook If the load shifts, the sling will unscrew the shackle pin 12

5.2.5 Eye bolts Eye bolts are mainly classified into plain (shoulderless) eye bolts and shoulder type eye bolts. The bolt length shall be 1-1.5 times the diameter of the bolt and totally drilled on the load. The bolt hole shall fit into the bolt >45 Safety points: The hook shall not be directly fixed on to the eye bolt. Plain eye bolts only apply to the vertical lifting. The angle of lifting of shoulder eye bolts shall not be less than 45 o. Washers may be used to ensure that the shoulder is firmly in contact with the surface. Never use a sling through a pair of eye bolts. Washers 13

5.2.6 Hooks Hooks are a vital part of lifting gear. A variety of them cater for different lifting purposes. Check for signs of "opening up" Check for wear and deformation Check for cracks and twisting Check for wear and cracks All hooks shall be installed with safety latches (other than the specially designed hooks). Hooks can be installed with swivels to allow the load to revolve. Points for attention: Select hooks of the right size. Do not tie or remove the safety latches. Maintain the hook in a vertical position. If the hook is eccentrically loaded, the Safe Working Load will be reduced. Center Center Center Center Center Load Load Load Load Load Can carry 100% of Rated Load Can carry approx. 86% of Rated Load Can carry approx. 80% of Rated Load Can carry approx. 70% of Rated Load Can carry approx. 40% of Rated Load 14

5.2.7 Rings, links, swivels Most of the rings, links and swivels are marked with Safe Working Loads (SWL). If no SWL is marked, the SWL tables shall be checked according to their diameters. 5.2.8 Spreader beams Spreader beams are commonly used for lifting long loads. The weight of spreader beams shall be included as part of the lifting load. Each of the contacted points shall not exceed the SWL. 5.2.9 Chain mesh slings and fibre slings These are used for lifting special materials. 15

6. Load Know the weight and shape of the load. Loose loads shall be packed or placed in suitable containers before lifting. The containers must be structurally sound and 4 slings must be used to avoid inclining. SWL : 1T The containers shall be examined and marked with Safe Working Loads (SWL). Pay attention to the load's centre of gravity - ensure that it is kept directly under the main hook. Corner pads shall be used for loads with sharp edges. When lifting large or heavy loads, wind and operator visibility must be considered. 16

7. Method Plan a suitable lifting route, to avoid collision with any persons, objects or overhead power lines. Do not drag loads. Move the loads as near to the ground level as possible. Stop people from standing in the lifting area. Do not ride on a load that is being lifted. When the crane is in operation, it must maintain a distance of at least 600 mm from any barriers or buildings. minimum 600mm When visibility is blocked, the signal man shall render assistance. Lifting the load at a low speed so that the sling tightens slowly and maintains a balanced position. 17

8. Environment Safe lifting can be affected by rain, thunderstorms, strong winds, ground conditions and overhead power lines. Rains Rains creates wet and slippery ground, loose soil and landslides, etc. Depending on the situation, the operator shall decide whether to continue working or not. When the soil is loose and could cause danger to the crane's stability, lifting work must be stopped. Thunderstorms During thunderstorms, stop lifting operations immediately. Strong winds In strong winds, decrease the weight of the Safe Working Load to improve safety. If the wind intensifies, work must be stopped. Ground situation Loose soil - use firmer, larger wooden planks to distribute the load and reduce the weight on the soil. When on a slope, adjust the outriggers to keep the crane horizontal. If there are excavations near the lifting appliances - strengthen excavations' supports. 6 metre Overhead power lines Stay well clear of overhead power lines. The safety margin must be the jib's distance + 6 metres, or the distance suggested by the electricity suppliers. 18 Instruction from the signalman is required for safety operation

ISBN 962-968-122-6 9 789629 681227 Copyright 2002 Occupational Safety & Health Council 11/02 (01)