BUILDER S GUIDE FOR TERMITE MANAGEMENT



Similar documents
A Guide To The New Termite Standards (revised 09/02/2001)

Termite Management Systems

TERMITE MANAGEMENT SYSTEMS

We re about to build.

INFORMATION SHEET ON TERMITES & TERMITE MANAGEMENT PROCEDURES

Proposed Minimum Subterranean Termite Treatment Standards

What you need to know about. Termite management

Protect your home from termites

Guide to Assessment and Repair of Flood Damaged Timber and Timber Framed Houses

Visual Termite Inspection Report in accordance with AS Important Information

Residential Building Permits Information

Clayton South Report Prepared: 1 February 2015 TIMBER PEST REPORT. Portfolio Includes: Timber Pest Report

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

DRAFT TERMITE PROTECTION IN BUILDINGS

Guide to Assessment and Repair of Flood Damaged Timber and Timber Framed Houses (Revised 19 th Jan 2011)

Visual Termite Inspection Report in accordance with AS

YEAR TRANSFERRABLE TANALISED 25 YEAR TERMITE RESISTANT* STRUCTURAL TIMBER AND WOOD PRODUCTS GUARANTEE

Timber Manual Datafile P5. Protecting Buildings from Subterranean Termites

Guide to Assessment and Repair of Flood Damaged Timber and Timber Framed Houses (Revised 2 nd Feb 2013)

SCHEDULE OF FINISHES AMBLE RIDGE RETIREMENT VILLAGE

Residential Inspection Guidelines

Consumer Aid for Post Construction Contracts and Termite Treatments

WARRANTY CLAIM FORM. The future of TERMITE PROTECTION today

Cost Guide MARKET SUMMARY OVERVIEW REPAIRS AND MAINTENANCE ELECTRICAL ROOFING & ROOF DRAINAGE (UP TO TWO STOREYS; FIXED TO EXISTING ROOF FRAME)

A home owner s guide to rebuilding after a flood

fire separating walls #2

PEST INSPECTION REPORT for: SAMPLE PEST INSPECTION REPORT. Inspected Property: 90 Wentworth Street, SAMPLETON

What Home Builders Need To Know About Termites: Termite-deterring Construction Practices:

Elevating Your House. Introduction CHAPTER 5

Module 3.7. Thermal bridging

~ Tel: ~ Fax: SUBTERRANEAN TERMITE CONTROL SPECIFICATIONS TERMITE PROTECTION AGREEMENT

HEDDERMAN ENGINEERING, INC. Office , Fax

ULTRA MARINE GRADE STAINLESS STEEL MESH TERMITE RESISTANT, POISON-FREE & LONG-LIFE

Energy Company Obligation (ECO): Technical Monitoring Questions

Visual Termite Inspection Report in accord with AS TERMS & CONDITIONS - READ THIS FIRST

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

TechPractices: Home Front Homes:

JINHONG TPB - Installation Manual. Jinhong Australia Pty Ltd Suite 40, L2, Jones Street, Ultimo, NSW 2007 ABN:

TERMITE RESISTANT* TERMIFLOR AND R-FLOR PARTICLEBOARD FLOORING

PLEASE REFER TO YOUR INDIVIDUAL QUOTE

VISUAL TERMITE INSPECTION TO AS 3660 EXECUTIVE SUMMARY

Visual Timber Pest Inspection

SUGGESTED CONSTRUCTION SEQUENCE - Owner Builders

0331 Brick and block construction

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

Visual Termite Inspection Report in accordance with AS H

C I T Y O F P E A R S A L L

Pre-Purchase Timber Pest Report

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

Property Inspection. 83A Ascot Avenue North New Brighton Christchurch STRUCTURAL REPORT

Certification: Building Plans Examiner. Exam ID: B3

COMMONLY USED RESIDENTIAL BUILDING CODES

BUILDING OR RENOVATING

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

UFGS (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW

Contents. 2 Termite Risk Management

(02) Peel Street TAMWORTH STANDARD INCLUSIONS (Residential)

10.ADDITIONAL COMMENTS (ALSO SEE PAGE 2.) See photos and graph addendum Proposal

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

The compliance of a roof to part of a new house at 28D Rata Street, Oxford, Waimakariri

Visual Termite Inspection Report in accordance with AS

Common Problems with Walls

PB301 July Lightweight Building Solutions. Bushfire Protection.

Pest & Building Report

Owner Builder permit. Owner builder application. Company application. Lease agreements. Owner builder course. Build better.

State of Connecticut Department of Public Health RADON PROGRAM

Notice to Property Owners

2014 FLORIDA BUILDING CODE

What Homebuilders Need To Know About Termites

WINDOW AND DOOR REPLACEMENT REQUIREMENTS

DESIGNERS GUIDE TO DOMESTIC CONSERVATORIES

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Protect your most valuable assets

WorkSafe Guidance Document FALL PROTECTION IN RESIDENTIAL CONSTRUCTION

2. DATE OF INSPECTION ARIZONA STRUCTURAL PEST CONTROL COMMISSION 7/17/2007 WOOD-DESTROYING INSECT INSPECTION REPORT 1B.

Termite Control in the Home

EXTERNAL WATERPROOFING MEMBRANES BEST PRACTICE GUIDELINES

Comment Form on Proposed Gut Rehabilitation Alternatives

Lighthouse Engineering, L.L.C.

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012

TIMBER PEST INSPECTION AGREEMENT

National Home Builder - Name Wednesday, August 20, 2014 Regional Customer Care Manager 1234 Main Street Houston, Texas 77067

Pest Management and Green Building Rating Systems

Lighthouse Engineering, L.L.C.

Repairs, Remodeling, Additions, and Retrofitting

City of Fort Smith Building Permit Process Frequently Asked Questions

Termite Inspection Agreement

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE APPLICATION REVIEW

Transcription:

Master Builders Technical TECH01 12/2004 BUILDER S GUIDE FOR TERMITE MANAGEMENT THIS TECHNICAL CIRCULAR HAS BEEN PREPARED TO ASSIST BUILDERS TO UNDERSTAND THE OPTIONS NOW AVAILABLE FOR COMPLIANCE WITH THE PROVISIONS INCORPORATED INTO THE BCA AND AS3660.1-2000 Background Since 1995, following the banning of the potent organochloride chemicals used in termite management systems, there has been a reported 70% increase in termite infestations. The majority of these have been caused by bridging or breaching of perimeter treatments or negligent installation of the barrier, especially where a chemical system was used. The current chemicals used today have a limited effective lifespan. The Australian Standard (AS3660.1) introduced in 1995 did not adequately address this durability issue. Furthermore, the Building Code of Australia (BCA) only required the structural elements of a building to be managed against termite attack and not other timber elements such as architraves, skirtings etc. A new AS3660.1-2000 and a Queensland amendment to the BCA to fi nally address these issues took effect on 1 January 2001. New Australian Standard The AS3660.1-2000 Termite Management Part 1 - New Building Work was introduced on 1 January 2001. The Standard sets out the requirements for the design and construction of subterranean termite management systems for new buildings and ground level extensions or renovations. A range of options is provided so that barriers may be used either singly, or in combination, to provide an integrated termite barrier system. However, the new Standard still does not adequately address problems identifi ed in Queensland. As a result, a Queensland amendment to the BCA overrides the part of AS3660.1 that relates to chemical barriers. It also places additional requirements in the BCA relating to what must be managed from termite attack and how the owner is to be informed of what management system has been installed. The New BCA Requirements On 1 January 2001, the BCA was amended to incorporate new provisions in Queensland. The amendments only apply to buildings addressed in Volume 2 of the BCA, that is, Class 1 and Class 10 buildings (houses and associated sheds, THIS PUBLICATION IS PRODUCED EXCLUSIVELY FOR MEMBERS OF MASTER BUILDERS FOR FURTHER INFORMATION PLEASE CONTACT EVAN WOODRUFFE ON (07) 3404 6427 OR EMAIL TECHNICAL@QMBA.COM.AU Master Builders Master Builders House 417 Wickham Terrace Brisbane Queensland 4000 Telephone (07) 3404 6444 Facsimile (07) 3832 2361 ask@qmba.com.au www.qmba.com.au

garages etc). They DO NOT APPLY to other types of accommodation buildings or commercial or industrial buildings. The amendments are not retrospective. Houses and associated sheds, garages etc. will be able to be built using the termite management provisions in force prior to January 2001 if: Building Approval was received prior to 1 January 2001; or An application for Building Approval was lodged prior to 1 January 2001 New Requirements for Chemical Treatments If chemical treatment under a slab is utilised as a primary management system, it must be via an approved reticulation system to allow replenishment when the life expectancy of the chemical has expired. HAND SPRAY UNDER A SLAB IS NOT AN ACCEPTABLE SOLUTION UNDER THE QUEENSLAND AMENDMENTS. However, provided an approved system is used (e.g. a physical barrier complying with AS3660.1) as the primary system, a hand sprayed chemical barrier may also be used under the slab as an additional precaution, without the need to obtain special approval from the building certifi er. If chemicals are used for an external perimeter treatment the following procedures are to be adopted: The area to be treated must be trenched and all building debris removed (e.g. mortar droppings). The trench is to be 150mm wide and extend 50mm below the top of the footing. Treat the trench by handspray. Backfi ll the trench with a suitable material - e.g. loam, and treat the backfi ll by hand spray or rod injection or a permanent reticulation system. Place a continuous concrete cap (mowing strip) over the treated area. The concrete cap must be continuous, 300mm wide, 50mm thick and 75mm below the weephole. The mowing strip is required even if a reticulated chemical system is used. New Requirements For Durable Notices At least 2 durable advisory notices must be installed in every house. The notice is to contain: The method of termite management The date of installation of the system Where a chemical system is installed, its life expectancy as listed on the NRA label The installer s or manufacturer s recommendations for the scope and frequency of future inspections for termite activity or when replenishment is required in the case of a chemical system. The BCA requires the notices to be installed in a conspicuous location. The amendments do not make it mandatory to place the notices at any specifi c location, however, as a guide it has been suggested that the meter box and kitchen cupboard are appropriate locations. New Requirements On What Must Be Managed From Termite Attack The BCA requires the following Primary Building Elements (PBE s) to be managed from termite attack. A member of a building specifi cally designed to take part of the building loads and includes roof, ceiling, fl oor, stairway or ramp and wall framing members including bracing materials designed for the specifi c purpose of acting as a brace to those members. The Queensland amendment extends this to include Door jambs, window frames and reveals, architraves and skirtings. Appraisal of the Changes Termite Resistant Materials The inclusion of architraves, skirtings, door jambs, window frames and reveals to be managed against termite attack DOES NOT mean that they must be of termite resistant materials. If an underslab and perimeter system (either physical or chemical or a combination) is installed in accordance with AS3660.1 and the additional BCA requirements, nothing further has to be done. Builders who have in the past relied upon using termite resistant materials as the Primary Building Elements (e.g. steel frame or termite resistant timber such as cyprus), without the need to install an underslab or perimeter treatment must now rethink their method of construction. Unless an underslab (including penetrations) and perimeter treatment is installed the architraves, skirting, etc., must be of termite resistant material. If preservative treated timbers are to be used they must achieve a hazard level of H2 when used in the interior of the building above ground, H3 used in the exterior above ground and H4/H5 when used in the exterior and in contact with the ground. Wood products such as particleboard, MDF board etc. should not be considered as termite resistant unless the manufacturer of the product can demonstrate that they are termite resistant. Chemical Treatments The requirement to trench when installing a chemical perimeter system ensures that all building debris is removed and provides a greater level of assurance that the perimeter barrier will be installed correctly. PAGE 2 OF 8 MASTER BUILDERS TECH01-12/2004 - BUILDERS GUIDE FOR TERMITE MANAGEMENT

Available evidence suggests that termite infestation is more predominant via the perimeter of the building. This may be as a result of inadequate treatment or by an unsuspecting homeowner or contractor inadvertently breaching or bridging the barrier, e.g. placing a new garden bed or turf over the barrier. The requirement for a concrete mowing strip will reduce the likelihood of inadvertent bridging or breaching of the chemical barrier. The use of a reticulated system under the slab will negate the requirement and additional costs for the homeowner to drill through the slab for retreatment when the life expectancy of the chemical has expired. The new requirements associated with chemical management systems will add signifi cant costs to the traditional hand spray method. The vast price differential between physical barrier systems and traditional hand spray methods is negated and provides for a level playing fi eld. Impact On Alterations/Additions/Renovations / A building certifi er must decide if any new building work involving an alteration or addition to an existing building can comply with the previous provisions of the BCA or whether the new work must comply with the new provisions. For example, it may be proposed to add a new slab-on-ground bedroom extension to an existing slab-on-ground house. If the existing house was treated using a hand sprayed chemical system under the slab, the building certifi er may allow the same treatment to be used on the extension provided it can be shown that the structural standards of the building will not be at risk by complying with the previous requirements. When making the decision, a simple yes or no answer is not adequate. The building certifi er must give reasons for the decision that will demonstrate how the proposal will meet the relevant regulations. Reasons for the decision should also be properly documented by the building certifi er and attached to the development application. Master Builders recommend that the new provisions be applied to all alterations/additions as a matter of course. New Paths, Driveways etc. If a new path, driveway, fi xture or landscaping which may bridge or damage an existing barrier installed prior to the new laws coming into force is proposed, then the existing termite barrier must be reinstated. Installation in accordance with the new requirements is recommended. If contractors are carrying out the new work, they should recommend to the homeowner that they seek the advice of a licensed pest control applicator before the new work commences. If the homeowner chooses not to seek this advice, the contractor should inform the homeowner that reinstatement of the barrier is required and ongoing treatment may be diffi cult unless adequate provision is made to do so before the work is completed. The contractor should document all recommendations made to the homeowner and ask for responses from the homeowner to be in writing. PAGE 3 OF 8 MASTER BUILDERS TECH01-12/2004 - BUILDERS GUIDE FOR TERMITE MANAGEMENT

Typical Termite Management Options Available To The Builder (Note: Not all options are illustrated in this circular. Additional options are illustrated in AS3660.1 or should be discussed with the Pest Control Installer). Penetrations To Slab Can be protected by: Collars, or Stainless steel mesh, or Graded stone, or Fully reticulated chemical system under slab Attachments To Buildings Attachments to buildings such as downpipes and service pipes and structures such as steps, verandahs, access ramps, hot water systems or similar must be provided with a barrier system or be separated from the building by at least 25 mm to allow clear and uninterrupted visual inspection of the inspection zone. Termite Resistant Materials If the perimeter, underslab or penetrations to the slab are not protected, then all PBEs must be of termite resistant materials. This includes architraves, skirting, door jambs, window frames and reveals. It should also be noted that bracing, roof battens and all structural elements must also be of termite resistant materials. If no physical or chemical management system is installed and the builder relies totally on termite resistant PBES, termites can still easily gain access and cause signifi cant damage to carpets, built in cupboards and vanity units, furniture, books, electrical wiring and even paper from plasterboard products. Any product containing cellulose is susceptible to attack. Perimeter Barrier - Brick Veneer Slab On Ground For monolithic slabs, only the perimeter and slab penetrations need a management system installed. The slab can be relied upon as a barrier in its own right. However, any construction joints/control joints must also be protected. Flashing X X Weephole STAINLESS STEEL MESH Slab on Ground 75mm minimum Concrete Cap 300mm x 50mm Footing 50mm min. below top of footing 80mm minimum CHEMICAL PAGE 4 OF 8 MASTER BUILDERS TECH01-12/2004 - BUILDERS GUIDE FOR TERMITE MANAGEMENT

Perimeter Barrier - Brick Veneer separate footing For monolithic slabs where edge beams, stiffening beams, footing beams and retaining walls form part of the slab construction and they are: Placed as an integral component of the slab, or Tied together in accordance with AS2870, and the surface of the footing is cleaned prior to placing the slab, and The concrete is compacted to eliminate voids at the joint Then termite treatment of the joint is not required. Where a non-monolithic slab is constructed, termites can still gain entry via the inside slab/ footing joint. Suitable management systems must be used to prevent termite entry via this point. Note: The DPC is to be set a minimum of 20mm below top of slab as per AS2870. Joints In Slabs All construction joints and control joints must be protected. If a chemical system is installed, it must be via a reticulation system. STAINLESS STEEL RETICULATED CHEMICAL STAINLESS STEEL MESH CHEMICAL PAGE 5 OF 8 MASTER BUILDERS TECH01-12/2004 - BUILDERS GUIDE FOR TERMITE MANAGEMENT

Perimeter - Core Filled Blockwork Specifi c advice should be obtained from a licenced pest control installer. Chemicals used under a slab must be via a reticulated system. Change in Levels of Slabs All construction joints must be managed to prevent termite entry. Chemical treatment must be via a reticulated system. STAINLESS STEEL STAINLESS STEEL RETICULATED CHEMICAL CHEMICAL PAGE 6 OF 8 MASTER BUILDERS TECH01-12/2004 - BUILDERS GUIDE FOR TERMITE MANAGEMENT

Perimeter Barrier - Slab Edge Exposure This can only be used for monolithic slabs. A builder cannot simply hand over a site with 75 mm exposed slab edge having been formed by running a bobcat around the perimeter of the slab. The exposed edge must be 75mm above fi nished ground, landscaping or paving level. If the provision of landscaping, paving etc is not part of the builders contract, the builder should make allowance when fi nalising site levels to enable future work to occur so that 75 mm exposed slab edge will always be maintained. Penetrations to the slab must still be protected. Strip Shielding - Suspended Floors A whole of house management system can be provided by the use of termite shielding in certain types of construction. Alternatively, stainless steel mesh can be utilized.for suspended fl oors, a minimum clearance of 400mm must be maintained above fi nished ground level. On a sloping site the minimum clearance may be reduced to 150mm provided that the area generally slopes to 400mm clearance at not more than 2m from the area providing 150mm clearance. Combination of Methods A combination of methods may be used depending upon the method of construction and characteristics of the site. Step by Step Guide for Builders Pre-contract Stage Issue Master Builders Home Owner s Guide for Termite Management to client. Discuss contents focusing on Systems available - (physical / chemical) Indicative costs of options Ongoing homeowner s responsibilities regarding landscaping, maintenance, inspections and if chemicals are used, replenishment. Builder and owner agree which Termite Management System is to be adopted. Homeowner signs the Declaration by Owner and Builder retains a copy for job records. Contract Stage Detailed description of the system to be shown on plans by designer. A statement Termite management in accordance with AS3660.1 is not considered to be an acceptable description. Discuss management system with selected licensed pest controller. Obtain Certifi cate of Installation from pest controller. Ensure two (2) durable notices are permanently fi xed PAGE 7 OF 8 MASTER BUILDERS TECH01-12/2004 - BUILDERS GUIDE FOR TERMITE MANAGEMENT

in two (2) prominent locations eg. meter box and inside kitchen cupboard. Practical Completion Describe the Termite Management System installed to the owner. Highlight Owner s on going responsibilities (it is advisable to physically point out weepholes to the owner). Post Contract A reputable pest control company should maintain contact with the homeowner to ensure regular inspections are conducted at the required intervals. The builder should also maintain contact with the homeowner encouraging that regular inspections by a pestcontroller are maintained. If the Builder can clearly demonstrate that termite management systems have been installed in accordance with AS3660.1-2000 and the Queensland BCA amendments, and the home owner has been made aware of their obligations, then in the event of a subsequent termite infestation it is unlikely the BSA will hold the Builder liable. This document only provides guidance on some of the methods which can be used. Builders should rely on AS3660.1-2000 and the Queensland amendments to the BCA. PAGE 8 OF 8 MASTER BUILDERS TECH01-12/2004 - BUILDERS GUIDE FOR TERMITE MANAGEMENT