Firm Flow Entitlement on M2M Flowgates Readers' Guide. Last Updated: February 01, 2016 Version: 4.0



Similar documents
PJM Seams Update: Day-Ahead M2M Revisions to MISO- PJM Joint Operating Agreement

PJM LMP Market Overview

Nodal Exchange Contract Specifications

Market Solutions to Loop Flow

Generation and Transmission Interconnection Process

Presentation for The National Commission for Energy State Regulation of Ukraine

Electronic Remittance Advice (ERA) Processor

153 FERC 61,221 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER DIRECTING REPORTS. (Issued November 20, 2015) TABLE OF CONTENTS

PJM Overview of Markets. Georgian Delegation PUCO Office April 11, 2013

Convergence Bidding Tutorial & Panel Discussion

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) ) )

MISO Schedule 41 Charge to Recover Costs of Entergy Storm Securitization SCHEDULES SCHEDULE 41

Generate Electronic Payments in Accounts Payable

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

The Power Market: E-Commerce for All Electricity Products By Edward G. Cazalet, Ph.D., and Ralph D. Samuelson, Ph.D.

124 FERC 61,317 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. Communication Protocols for Public Utilities ORDER NO.

Revised KYC Text File Structure 2.0

PAYLINE USER GUIDE. 1 Logging into Payline. 2 - Processing a Purchase

BUSINESS RULES FOR CHAPTER VII DAILY IMBALANCE CHARGES

Microsoft Dynamics GP. Payroll Connect

Contents. 4 Welcome to ATBOnline Business. 5 How to Use This Guide

enicq 5 External Data Interface User s Guide

Wireless Guest Server User Provisioning Instructions

Financial Processing Journal Voucher (JV)

Two Settlement - Virtual Bidding and Transactions

Opportunity Cost Calculator v2: Energy Market Opportunity Costs Non-Regulatory Opportunity Costs

Job Descriptions. Job Title Reports To Job Description TRANSMISSION SERVICES Manager, Transmission Services. VP Compliance & Standards

Responsibility for Outage Coordination is designated by 4 key artifacts: 1. FERC Order 2000 FERC Order 2000 (Docket No. RM ; Order No.

Health Savings Account Contribution Guide Version 7.0

Leica DISTO with Bluetooth Smart usage on Android 4.3 or higher. V 1.1 April 2014

Operator Initiated Commitments in RTO and ISO Markets

Ms. Rae McQuade President & COO, North American Energy Standards Board

How Do I Upload Multiple Trucks?

Using Format Manager For Creating Format Files

Multi-Faceted Solution for Managing Flexibility with High Penetration of Renewable Resources

User Manual - Sales Lead Tracking Software

Issue 1.1, February agreed-upon by EDI Working Group of ECR Poland

Revised KYC Text File Structure

Appendix A. Glossary. For Request For Proposals For Long-Term Renewable Generation Resources for Entergy Louisiana, LLC

COMMERCIAL BANKING CHASE COMMERCIAL ONLINE SM FRAUD PROTECTION SERVICES DASHBOARD

Wellnomics Risk Management Software 2.7.1

UPK Content Development Rel 12.1

Employee Termination Report (NWREMPT) + How to Import into Excel

New York State Department of Financial Services

McAfee Endpoint Encryption Reporting Tool

CIP Cyber Security Configuration Change Management and Vulnerability Assessments

Business Internet Banking System Customers User Guide

PERSHING STANDARD FILE LAYOUTS

- 1 - Guidance for the use of the WEB-tool for UWWTD reporting

How To Import A File Into The Raise S Edge

Oracle Communications Network Charging and Control. Session Initiation Protocol (SIP) Protocol Implementation Conformance Statement Release 5.0.

Instructions for use:

Virtual Terminal Credit Card

Messaging Dashboard Quick Reference Guide

UPK Content Development Rel 11.1

J E F I S THE NJ JEFIS SERVICES APPLICATION FOR DC CASES

Approved forms for payments and reports

Call Management Detail Call Report

Microsoft Dynamics GP. Electronic Banking

Road Sensor Control Software for Retroreflectometer LTL - XL

PJM Overview and Wholesale Power Markets. John Gdowik PJM Member Relations

PHI Audit Us er Guide

Preliminary Project Description

Table of Contents. 2 Copyright 2009 Bank of American Fork. All Rights Reserved.

Priority Dispatch in Real Time Operation. Marie Hayden

ERCOT Monthly Operational Overview (March 2014) ERCOT Public April 15, 2014

Invoice Quotation and Purchase Orders Maker

PPL Electric Utilities Corporation Estimated Price-to-Compare Sample Calculation For Illustrative Purposes Only

Platts M2MS Market Data IMSFTP Channel Delivery Specification

Administrator Operations Guide

Transcription:

Firm Flow Entitlement on M2M Flowgates Readers' Guide Last Updated: February 01, 2016 Version: 4.0

1 Table of Contents 1 DISCLAIMER...3 2 INTRODUCTION...3 3 GLOSSARY OF TERMS...3 4 FFE FILE...3 4.1 DESCRIPTION... 3 4.2 REPORT AVAILABILITY TIME... 3 4.3 HOW TO USE THIS REPORT... 3 4.4 REPORT LAYOUT... 3 4.5 DATA DEFINITIONS... 4 5 REFERENCES...5 6 REVISION HISTORY...5 2 Table of Figures Figure 1 - Output Example...3

1 Disclaimer The information in this Readers Guide is provided for informational purposes only and does not contain information related to the settlement of the MISO-PJM or MISO-SPP Market-to-Market (M2M) and shall not be relied upon for such purpose. Any party relying on the data provided in this report is doing so at its own risk. The MISO shall not be liable for any consequences or damages to any party relying on the data provided herein. 2Introduction The document provides an explanation or Readers Guide in understanding the data file containing the Firm Flow Entitlement and its adjustments on M2M Flowgates. The Firm Flow Entitlement (FFE) represents a market entity s (net) firm rights on a M2M Flowgate based on its historical impacts. It is calculated using procedures defined in the Congestion Management Process (CMP) of the MISO JOA. FFE adjustment reflects agreed-upon exchange of FFE between MISO and counter party RTO per Day Ahead Coordination Process defined in JOA. FFE and its adjustments are used in the Real Time and Day Ahead market-to-market (M2M) settlement process. For questions or comments regarding the report please contact Client Relations at 866-296-6476 or email at clientrelations@misoenergy.org. 3Glossary of Terms Item CSV EST ID 4FFE File 4.1 Description Description Comma Separated Value Eastern Standard Time. Identifier A comma separated value file containing Non Monitoring Entity FFE and its adjustments, if exist, on M2M Flowgates for the previous operating day is posted to MISO public website. The data in the file is ordered by Flowgate ID and Hour Beginning. 4.2 Report Availability Time The daily data file is available by 10:00 AM EST. 4.3 How to use this Report The guide includes an example of the FFE and its adjustment file. The column headers are defined in the Data Definitions sections of the document. 4.4 Report Layout Figure 1 - Output Example

4.5 Data Definitions Column Name Hour Ending NERC Flowgate ID Monitoring RTO Non Monitoring RTO Flowgate Description Non Monitoring RTO FFE Non Monitoring RTO FFE Adjustment Definition / Description / Calculation Hour Ending Flowgate identifier as defined in the NERC Book of Flowgate (BOF). A Flowgate is a pre-identified constraint, comprising of one or more monitored transmission facilities and optionally one or more contingency facilities, used to analyze the impact of power flows upon the bulk electric system. The RTO that has functional control the Flowgate for market to market purposes. The RTO does not have functional control of the flowgate but coordinates with Monitoring RTO during a market to market event. The name of the flowgate Non Monitoring Entity s FFE. Negative FFE represents that an entity used to have net impacts in reverse direction of the flowgate on a historical basis. Non Monitoring Entity s FFE adjustment as result of Day Ahead coordination. A positive value means Non Monitoring RTO is requesting RTO in the DA FFE exchange (FFE increase). A negative value means Non Monitoring RTO is responding RTO in the DA FFE exchange (FFE reduction)

5 References BMP 100 - Business Practices Manual for Definitions JOA Settlement Agreement 2011-01-04 Docket Nos. ER10-45-000 et al 6Revision History Version Date Description 1.0 08/18/2011 Initial Version 2.0 03/13/2013 Changed the report content from MISO FFE on PJM owned flowgates to Non Monitoring RTO FFE on M2M flowgates 3.0 02/24/2015 Updated the Reader s guide for SPP Data Exchange. 4.0 02/01/2016 New column added for DA FFE adjustment