NREL Job Task Analysis: Crew Leader

Similar documents
Early Fuel Cell Market Deployments: ARRA and Combined (IAA, DLA, ARRA)

Schedule of Work Experience (OJL) and Training considered necessary to develop a skilled and productive worker.

Weatherization COURSE CATALOG. Contents Weatherization Courses Energy Efficiency Courses

Energy Systems Integration

Optical Blade Position Tracking System Test

Elastomer Compatibility Testing of Renewable Diesel Fuels

A New Empirical Relationship between Thrust Coefficient and Induction Factor for the Turbulent Windmill State

Regional Field Verification Operational Results from Four Small Wind Turbines in the Pacific Northwest

Before You Start an Energy Efficiency Retrofit The Building Envelope

Contract for Weatherization Management Address City & State

Laser Safety Audit and Inventory System Database

Rate Analysis of Two Photovoltaic Systems in San Diego

System Advisor Model, SAM : General Description

Candidates Guide. for. Certified Ventilation Consultant (CVC)

Small PV Systems Performance Evaluation at NREL's Outdoor Test Facility Using the PVUSA Power Rating Method

Wind Forecasting stlljectives for Utility Schedule and Energy Traders

SAFETY AND HEALTH PROGRAM

BPI Air Conditioning & Heat Pump Professional Training Sample Slides ( ) Agenda

Chapter Seven RESNET Standards

Second Line of Defense Virtual Private Network Guidance for Deployed and New CAS Systems

Measurement of BET Surface Area on Silica Nanosprings

Method to Calculate Uncertainties in Measuring Shortwave Solar Irradiance Using Thermopile and Semiconductor Solar Radiometers

Drupal Automated Testing: Using Behat and Gherkin

TRAINING CENTER LOCATION: 10 COLVIN AVE, ALBANY, NY

OSHA Compliance Checklist ASC

Table of Contents Introduction How to Use This Manual How to Do a Facility Audit

Air Conditioning Systems DOE, DOE ARRA, LIHEAP WX, RMP. Heating Systems DOE, DOE ARRA, LIHEAP WX, LIHEAP Crisis, Questar

W. C. Reinig. Savannah River Laboratory E. I. du Pent de Nemours and Company Aiken, South Carolina 298o1

Dynamic Vulnerability Assessment

APPENDIX A BUILDING MAINTENANCE MECHANIC D.O.T. CODE O*NET CODE

Penetration Testing of Industrial Control Systems

Introduction to Energy Codes & Green Building Programs

Attachment #23 Health Safety Table. Client Education Inform issue and document. How to clean & maintain gutters. How to adjust sprinklers

Residential Contractor Partnership Program Application EnergySmart and Denver Energy Challenge Programs

Be SMART Home Application

SAFETY TRAINED SUPERVISOR CONSTRUCTION (STSC) CERTIFICATION SELF-STUDY GUIDE

PERFORMANCE OF SIDE-BY-SIDE SOUTH TEXAS HOMES Isolating the Contribution of Spray Polyurethane Foam Insulation

RESIDENTIAL PROPERTY DISCLOSURE FORM

Fire Alarm Systems Certification

Maintenance Matters. Window and Door Replacement

Asbestos Frequently Asked Questions

Construction Technologies Career Field Pathways and Course Structure

Heating, Ventilation, Air Conditioning, Refrigeration Engineering Technology

Summary of Georgia s Lead-Based Paint (LBP) Renovation, Repair and Painting (RRP) Rules For Contractors, Property Managers, and Maintenance Personnel

Training course catalog

WET BULB GLOBE TEMPERATURE MEASUREMENT AT THE Y-12 NATIONAL SECURITY COMPLEX

ENVIRONMENT, HEALTH & SAFETY

March Get The Mold Out: Mold Clean-Up Guidance for Residences. Introduction

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600

ASBESTOS MANAGEMENT PROGRAM

UBC Plant Operations Asbestos Work Procedures April 2004

Monthly Warehouse Inspection Checklist

This document was prepared in conjunction with work accomplished under Contract No. DE-AC09-96SR18500 with the U. S. Department of Energy.

PENNSYLVANIA HOUSING FINANCE AGENCY (2015 UNDERWRITING APPLICATION) Tab 34 Physical/Capital Needs Assessment & Energy Audit

Protect Your Family From Asbestos-Contaminated Vermiculite

Home Energy Evaluation Report for Fritz Kreiss and Catherine McQueen

CRAWLSPACE ISSUES IN THE NORTHWEST

A Breath of Poor Air: Inspecting Indoor Air Quality in the Classroom Ashley Schopieray

NILM Applications for the Energy-Efficient Home

Measure Guideline: Water Management at Tub and Shower Assemblies

Cost and Performance Assumptions for Modeling Electricity Generation Technologies

Building Energy Codes 101 October 23, Matthew Giudice Building Policy Associate Midwest Energy Efficiency Alliance

Key energy-efficient features of your new home

1.0 Purpose Definitions Hot Work Operations. 5

Get The Mold Out: Mold Clean-Up Guidance for Residences. Introduction

Situated Usability Testing for Security Systems

OFFICIAL GEORGIA WOOD INFESTATION INSPECTION REPORT

Photos showing the change in condition from 2006 to 2012 are located in Appendix A.

Structure Survey Findings:

2012 OPEN ENROLLMENT SCHEDULE Environmental, Health & Safety Training State & Federal EPA Accredited Programs

Safety Training Needs Assessment

2013 AHERA 3 Year Re-Inspection Report For. Northeast Elementary School 82 Scofieldtown Road Stamford, CT. Performed by

ASBESTOS IN THE HOME

ASBESTOS REGULATIONS Government Notice No 155 Gazette No dated 10 February 2002

Category Measure Minimum Efficiency / Certification Requirements

bout your HOUSE before you start Renovating Your Basement Structural Issues And Soil conditions

CERTIFIED LEAD-BASED PAINT RENOVATION CONTRACTOR. License Requirements & Work Practice Standards

ASBESTOS MANAGEMENT PROGRAM

No. Name of Legislation Applicable Issues and Requirements Demonstration of Compliance 1. Health and Safety at Work Act 1974

Transcription:

NREL Job Task Analysis: Crew Leader Chuck Kurnik National Renewable Energy Laboratory Cynthia Woodley Professional Testing Inc. NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Technical Report NREL/TP-7A20-51673 May 2011 Contract No. DE-AC36-08GO28308

NREL Job Task Analysis: Crew Leader Chuck Kurnik National Renewable Energy Laboratory Cynthia Woodley Professional Testing Inc. Prepared under Task. ARIG.2250 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 www.nrel.gov Technical Report NREL/TP-7A20-51673 May 2011 Contract No. DE-AC36-08GO28308

NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States government or any agency thereof. Available electronically at http://www.osti.gov/bridge Available for a processing fee to U.S. Department of Energy and its contractors, in paper, from: U.S. Department of Energy Office of Scientific and Technical Information P.O. Box 62 Oak Ridge, TN 37831-0062 phone: 865.576.8401 fax: 865.576.5728 email: mailto:reports@adonis.osti.gov Available for sale to the public, in paper, from: U.S. Department of Commerce National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 phone: 800.553.6847 fax: 703.605.6900 email: orders@ntis.fedworld.gov online ordering: http://www.ntis.gov/help/ordermethods.aspx Cover Photos: (left to right) PIX 16416, PIX 17423, PIX 16560, PIX 17613, PIX 17436, PIX 17721 Printed on paper containing at least 50% wastepaper, including 10% post consumer waste.

NREL Job Task Analysis Crew Leader Introduction A Job Task Analysis is a foundation for any valid credentialing program and helps identify the core knowledge areas, critical work functions, and/or skills typically found across a representative sampling of current practitioners or job incumbent workers. Empirical results from a job analysis provide examinees and the public with a valid, reliable, fair, and realistic assessment that reflects the skills, knowledge, and abilities required to competently perform a job. In July of 2010, a group of 12 Subject Matter Experts (SMEs) met to perform the Job Task Analysis and to create an examination blueprint that would serve as the basis for the worker certification. A trained psychometrician facilitated the meeting and helped guide the development of these analyses. In the fall of 2010, an online survey was administered to validate the results of the JTA and to finalize the examination blueprint. One hundred and fifteen Crew Leaders from across the United States responded to the survey. This report contains the Crew Leader Specifications and a content outline. In addition, the attached Exam Blueprint builds on these specifications by providing the optimum percentage of exam questions that should be asked about each task. Scope A Crew Leader is a residential energy efficiency professional who is responsible for supervising the retrofitting activities specified in the scope of work. A committee of SMEs considered to be experts in the field created the Crew Leader Job Task Analysis. This document is intended to include all of the tasks a Crew Leader may perform, as well as the knowledge, skills, and abilities required to do these tasks. Please note that certification is not a license to practice. All certificants must comply with applicable federal, state, and local laws and regulations governing the profession. Content A Job Task Analysis for a Crew Leader An Exam Blueprint for a Crew Leader Page 1

Crew Leader Specifications and Content Outline Job Description: A Crew Leader is responsible for supervising the retrofitting activities specified in the scope of work. He or she is responsible for interacting with the client plus managing personnel and materials on the job site in a safe and effective manner. The Crew Leader is responsible for quality control, testing procedures, documentation, and conducting a final walk through to ensure that all work is completed in a satisfactory manner. Domains/Tasks Domain 1: Develop and/or Review the Work Order Task 1: Identify and disperse necessary paperwork, (e.g. permits, releases, lead-based paint EPA requirements, historic preservation, etc.) Task 2: Read, evaluate and discuss with relevant others (auditor, coordinator, program manager, etc.) both audit and homeowner concerns Task 3: Develop strategy for corrective actions necessary to achieve goals Task 4: Develop production schedule for crews and subs Domain II: Identify materials and staffing needs Task 1: Identify skill sets of individuals necessary for job (i.e. crew and contractors) Task 2: Identify total hours and number of individuals necessary to safely complete the job Task 3: Identify, obtain and maintain tools, equipment and materials necessary to complete job Task 4: Identify Personal Protective Equipment (PPE) necessary for job Domain III: Develop plan to execute work order on site Task 1: Establish rapport and expectations with homeowner Task 2: to confirm with client the completion of any prerequisite work Task 3: to perform initial job site safety inspection Task 4: to develop site-specific safety plan to address any unsafe conditions and possible hazards and inform crew Task 5: to document pre-existing conditions (e.g. cracked window, cracked ceiling and walls) Task 6 to ensure work areas are accessible and scoped properly Task 7: to identify need for job change orders Task 8: to adjust work schedule as needed Task 9: Conduct informative walk through with homeowner to explain what crew will be doing and answer questions and concerns Task 10: Conduct informative walk through with homeowner to verify specific homeowner issues (allergies, valuable items, etc.) Task 11: Conduct informative walk through with homeowner to obtain all necessary signoffs before work begins Page 2

Domain IV: Prepare house to execute work order Task 1: Protect interior/exterior of house (e.g. with drop cloths, poly, Tyvek booties, pressurization) Task 2: Set up proper containment, if necessary Task 3: Test in (e.g. blower door, room to room pressure tests, IR scans, combustion appliances) Task 4: Revise work order if necessary to reflect current conditions Domain V: Execute work order and manage project Task 1: Monitor safety practices for employees, contractors and job site Task 2: Communicate with and support crew to ensure job efficiency (e.g. unforeseen circumstances, materials and tools not originally specified) Task 3: Document work progression and work order changes with photos and notes Task 4: Maintain quality control Task 5: Clean up containment zones as necessary Task 6: Communicate with homeowner as necessary Task 7: Monitor use of resources (e.g. materials, manpower) Task 8: Verify that installers track and document material usage Task 9: Actively mentor crew (e.g. safety, work practices, professionalism) Task 10: Monitor contractor for job site compliance Task 11: Conduct daily final walk through to verify that all components of that day s work scope have been completed and cleaned up appropriately Domain VI: Job finalization activities Task 1: Walk through to verify that all components of the work scope have been completed Task 2: Test out (e.g. blower door, IR scans, worst-case draft, combustion testing) Task 3: Complete clean up Task 4: Final walk through with homeowner/responsible party Domain VII: Final Documentation Task 1: Obtain homeowner/ responsible party job-completion sign-off signature Task 2: Complete all final job documentation (e.g. materials, man hours, photos, time sheets, certified renovator signatures, information for inspectors) Page 3

Crew Leader Specifications and Content Outline SAFE WORK PRCTICE SKILLS Knowledge of: U.S. Department of Energy (DOE) program regulations/policy and Environmental Protection Agency (EPA) guidelines for asbestos, lead, mold, and other health hazards Material Safety Data Sheets Occupational Safety and Health Act (OSHA) standards Ladder safety Fall protection Personal protective equipment Respiratory protection Safe motor vehicle operation Power-operated tools and machinery used on the job site Fire prevention Permit-required confined spaces OSHA 30 Construction Safety Outreach Training Other worker-related OSHA standards (e.g. scaffolding, aerial lifts) Demonstrate the ability to: Select and use the appropriate Personal Protection Equipment for a particular task Safely use basic hand and power tools Use a basic first aid kit to treat common job-site injuries Work lead safe Identify serious mold conditions Assess work area safety hazards Use CPR, first aid and AED as required General Knowledge, Skills and Abilities Knowledge of: Federal, state and local codes, regulations and requirements Building science (e.g. heat, moisture, pressure flow; ventilation; thermal and pressure boundary) Building techniques and terminology (e.g. critical junctures, flooring systems, crawl spaces, roof framing, mechanical systems) Building materials (e.g. dry wall, insulation, house wrap, windows) Retrofit techniques (e.g. air tightening, duct sealing, insulation) What certifications are required for each job task Material inventory and availability Material performance All activities being performed by crews and contractors on site Ability to: Read and interpret the audit report Integrate information from multiple sources Page 4

Estimate time required to complete each component of the work scope Sequence required tasks Assess crew member and contractor capabilities Estimate job and personnel requirements based on conditions Estimate amount of materials needed to complete job Communicate at an appropriate level (e.g. technical to layman level, language barriers) Relate well with others in tactful and professional manner Conduct oneself in an ethical manner Identify materials and methods appropriate for the current job Job coach and relay retrofit techniques appropriately Install appropriate containment zones with best practices Perform and record all diagnostic procedures (e.g. blower door, manometer, duct blower, combustion analyzer) Assess skills and recommend additional formal training for crew and contractors Manage multiple operations and/or tasks on the job site Use construction math (e.g. measure and compute area, volume, circumference) Page 5

Crew Leader Exam Blueprint Duties and Tasks Final A Develop and/or Review the Work Order 12% Identify and disperse necessary paperwork, (e.g. permits, releases, leadbased 1 paint EPA requirements, historic preservation, etc.) 3% 2 Read, evaluate and discuss with relevant others (auditor, coordinator, program manager, etc.) both audit and homeowner concerns 3% 3 Develop strategy for corrective actions necessary to achieve goals 3% 4 Develop production schedule for crews and subs 3% B Identify materials and staffing needs 13% 1 Identify skill sets of individuals necessary for job (i.e. crew and contractors) 3% 2 Identify total hours and number of individuals necessary to safely complete the job 3% 3 Identify, obtain and maintain tools, equipment and materials necessary to complete job 3% 4 Identify Personal Protective Equipment (PPE) necessary for job 4% C Develop plan to execute work order on site 18% 1 Establish rapport and expectations with homeowner 2% 2 to confirm with client the completion of any prerequisite work 1% 3 to perform initial job site safety inspection 2% 4 to develop site-specific safety plan to address any unsafe conditions and possible hazards and inform crew 3% 5 to document pre-existing conditions (e.g. cracked window, cracked ceiling and walls) 2% 6 to ensure work areas are accessible and scoped properly 2% 7 to identify need for job change orders 1% 8 to adjust work schedule as needed 1% 9 Conduct informative walk through with homeowner to explain what crew will be doing and answer questions and concerns 2% 10 Conduct informative walk through with homeowner to verify specific homeowner issues (allergies, valuable items, etc.) 1% 11 Conduct informative walk through with homeowner to obtain all necessary sign-offs before work begins 1% D Prepare house to execute work order 9% Protect interior/exterior of house (e.g. with drop cloths, poly, Tyvek booties, 1 pressurization) 1% 2 Set up proper containment, if necessary 4% 3 Test in (e.g. blower door, room to room pressure tests, IR scans, combustion appliances) 3% 4 Revise work order if necessary to reflect current conditions 1% E Execute work order and manage project 27% 1 Monitor safety practices for employees, contractors and job site 5% 2 Communicate with and support crew to ensure job efficiency (e.g. unforeseen circumstances, materials and tools not originally specified) 2% 3 Document work progression and work order changes with photos and notes 2% Page 6

4 Maintain quality control 3% 5 Clean up containment zones as necessary 3% 6 Communicate with homeowner as necessary 1% 7 Monitor use of resources (e.g. materials, manpower) 2% 8 Verify that installers track and document material usage 2% 9 Actively mentor crew (e.g. safety, work practices, professionalism) 2% 10 Monitor contractor for job site compliance 3% 11 Conduct daily final walk through to verify that all components of that day s work scope have been completed and cleaned up appropriately 2% F 12 Job finalization activities 14% 1 Walk through to verify that all components of the work scope have been completed 3% 2 Test out (e.g. blower door, IR scans, worst-case draft, combustion testing) 5% 3 Complete clean up 3% 4 Final walk through with homeowner/responsible party 3% G Final Documentation 7% 1 Obtain homeowner/ responsible party job-completion sign-off signature 3% 2 Complete all final job documentation (e.g. materials, man hours, photos, time sheets, certified renovator signatures, information for inspectors) 4% 100% Page 7