COST ESTIMATING METHODOLOGY



Similar documents
Inventories: Cost Measurement and Flow Assumptions

Computer Integrated Manufacturing CIM A T I L I M U N I V E R S I T Y

How to Forecast Your Revenue and Sales A Step by Step Guide to Revenue and Sales Forecasting in a Small Business

Linear Programming Supplement E

CHAPTER 1. Introduction to CAD/CAM/CAE Systems

CLB 029 Wrap Rate Calculations

Lesson 5: Inventory. 5.1 Introduction. 5.2 Manufacturer or Retailer?

Understanding Manufacturing Execution Systems (MES)

DASH GROUP INC. Aviation Software

Gleim / Flesher CMA Review 15th Edition, 1st Printing Part 1 Updates

Quality and Quality Control

Cost Estimating Procedure. Table of Contents

CHAPTER 9 WHAT IS REPORTED AS INVENTORY? WHAT IS INVENTORY? COST OF GOODS SOLD AND INVENTORY

How to Develop a FAR-Compliant Cost or Price Proposal

Chapter 16 Inventory Management and Control

Summary of GAO Cost Estimate Development Best Practices and GAO Cost Estimate Audit Criteria

TEACHING AGGREGATE PLANNING IN AN OPERATIONS MANAGEMENT COURSE

Chapter 6. Inventory Control Models

The Thinking Approach LEAN CONCEPTS , IL Holdings, LLC All rights reserved 1

Everything You Always Wanted To know About Product Cost but Were Afraid to Ask.

Land Acquisition and Development Finance Part IV

FAR Table Instructions for Submitting Cost/Price Proposals When Cost or Pricing Data Are Required

INTERNAL CONTROL MATRIX FOR AUDIT OF ESTIMATING SYSTEM CONTROLS Version No. 3.2 June d Page 1 of 7

16 Learning Curve Theory

2.1 BUDGET PLANNING 2.2 BUDGETED INCOME STATEMENT 2.3 CASH BUDGETS MICROSOFT CORPORATION MANAGERIAL ACCOUNTING

Product, process and schedule design II. Chapter 2 of the textbook Plan of the lecture:

1.0 Chapter Introduction

Comprehensive Business Budgeting

Surgi Manufacturing Quality Manual

AS9100 Quality Manual

Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet.

Production and Operations Management

An Introduction to. Metrics. used during. Software Development

American Society of Heating Refrigeration and Air Conditioning Engineers (ASHRAE) Procedures for Commercial Building Energy Audits (2004)

Four strategies to help move beyond lean and build a competitive advantage

In today s dynamic workplace, change occurs

Q2A First Article Inspection (FAI) AS9102

Lamination Production. by: John Roberts / Sko Die, Inc

Management Accounting Theory of Cost Behavior

FULL COST METHODOLOGY MODEL

Understand How and Where Computers are used in Manufacturing

JD EDWARDS WORLD HOMEBUILDER AND REPETITIVE BUILDER MANAGEMENT

1 Aggregate Production Planning

Cendec Systems Inc.

CHAPTER 05 STRATEGIC CAPACITY PLANNING FOR PRODUCTS AND SERVICES

EST.03. An Introduction to Parametric Estimating

Introduction to Cost Accounting

Multiproject Scheduling in Construction Industry

Appendix B: Work Breakdown Structure (WBS)

Position Classification Standard for Management and Program Clerical and Assistance Series, GS-0344

ECONOMIC JUSTIFICATION

Indirect Cost Rates The hidden contract cost driver? Professor Greg Martin Defense Acquisition University gregory.

The Language of the Stock Market

Do You Need ERP? The Magnum Group Technical Publications Division

INCORPORATION OF LIQUIDITY RISKS INTO EQUITY PORTFOLIO RISK ESTIMATES. Dan dibartolomeo September 2010

Financial Statements for Manufacturing Businesses

Universidad del Turabo MANA 705 DL Workshop Eight W8_8_3 Aggregate Planning, Material Requirement Planning, and Capacity Planning

In this chapter, you will learn to use cost-volume-profit analysis.

Design Verification. Introduction

Cost Analysis Key Components Guidance and Checklist

Improvement Curves: An Early Production Methodology Brent M. Johnstone 11 June 2015

Demand forecasting & Aggregate planning in a Supply chain. Session Speaker Prof.P.S.Satish

Balance Sheet Valuation (MM- IM-VP)

TRAVERSE Manufacturing

Ch.1 Purchasing & Supply Chain Management

Supplier Change Notification Process

Functional Area Systems Lecture 5

The Make vs. Buy Scenario: Reducing Total Cost and Improving Time to Market

PROJECT COST MANAGEMENT

Marginal Costing and Absorption Costing

PROJECT MANAGEMENT PLAN CHECKLIST

Inventory Decision-Making

THE USE OF OUTSIDE CONTRACTORS FOR PORT MAINTENANCE. John R. Lethbridge

Chapter 11. MRP and JIT

M & V Guidelines for HUD Energy Performance Contracts Guidance for ESCo-Developed Projects 1/21/2011

Industrial Automation. Course Notes

The BASICS of CONSTRUCTION ACCOUNTING Workshop GLOSSARY

Inventory Management, Just-in-Time, and Backflush Costing

Outline PRODUCTION/OPERATIONS MANAGEMENT P/OM. Production and Operations. Production Manager s Job. Objective of P/OM

City of Austin, Texas

Planning Optimization in AX2012

USES OF CONSUMER PRICE INDICES

ENGINEERING ECONOMICS AND FINANCE

Position Classification Standard for Industrial Property Management Series, GS Table of Contents

Lesson-13. Elements of Cost and Cost Sheet

Seradex White Paper A newsletter for manufacturing organizations April, 2004

Supply Chain Inventory Management Chapter 9. Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall 09-01

Hands-on Sessions Each attendee will use a computer to walk-through training material.

Project Time Management

TOPIC 12 CONTRACT COST AND PRICE ANALYSIS

OFFICE OF PERSONNEL MANAGEMENT ATLANTA OVERSIGHT DIVISION ATLANTA, GEORGIA

Fundamentals Level Skills Module, Paper F5. Section A

Management Accounting 303 Segmental Profitability Analysis and Evaluation

Fundamentals of Measurements

Accounting System. Page 1 of 9

Factoring Buyer's Guide By the purchasing experts at BuyerZone

CHAPTER 4 TYPES OF COST ESTIMATES

Automated Inventory System

Transcription:

NCMA DINNER MEETING TRAINING COST ESTIMATING METHODOLOGY 1 David Maldonado

COST ESTIMATING METHODOLOGY TABLE OF CONTENT I. Estimating Overview II. Functional Estimating Methods III. Estimating Methods and Practice 2 David Maldonado

I. Estimating Overview What is Estimating? Estimating has a different meaning to each of us. It can be: Estimating the size of something in square feet Estimating a weight of popularity - poll Estimating the distance from one place to another in miles Estimating can be defined as the act of approximating the worth (or cost), extent, quantity, quality, or character of a future action, event, or product based on data or information available at the time. All business activity is estimated (measured) in resources like manpower, materials, facilities, or cost in money. 3 David Maldonado

I. Estimating Overview Cost Estimating Cost estimating is defined as the art of predetermining the lowest realistic cost and price of an item or activity which assure a normal profit. 4 David Maldonado

II. Functional Estimating Methods 5 David Maldonado

II Functional Estimating Methods 1.0 Engineering Labor Cost Estimating 2.0 Tooling Labor Cost Estimating 3.0 Manufacturing Planning Labor Cost Estimating 4.0 Production Labor Cost Estimating 5.0 Quality Assurance Labor Cost Estimating 6.0 Direct Material Cost Estimating 7.0 Raw Material Cost Estimating 8.0 Equipment Cost Estimating 9.0 Subcontract Cost Estimating 10.0 Indirect Cost 6 David Maldonado

1.0 Engineering Labor Estimating 1. Design Labor is difficult to estimate due to: o The complex nature of engineering work o Technology changes 2. A master plan efforts might make the problem manageable: o Firm and realistic performance specifications o Defined interfaces and responsibilities o Identification of risk areas o Verified technical approaches o Manpower requirement identification o Firm and realistic schedules 7 David Maldonado

1.0 Engineering Labor Estimating (contd.) 3. An engineering estimated can be quoted several ways: o Hours per drawing by each discipline o Relative hours by supporting engineering 4. Some engineering work is highly creative, some is routine o Creative engineering is required: New techniques, advancement of state-of-the-art can drastically increase engineering manhours Complexity of system drives level of engineering skills required o Less creative is: Preparing, updating, and correcting drawings Planning and developing tooling and setting up production lines Planning plant layouts and quality procedures 8 David Maldonado

1.0 Engineering Labor Estimating (contd.) - Development Phase 1. Staffing or task estimate by task managers 2. Historical design hours/lb times complexity factors: Weight/size Material type Prototype 3. Cost Estimating Relationships (CERs) for Drawing Design Groups Engineering Supporting Groups Project Management Engineering Liaison 4. Correlation to historical programs Ground Test Flight Test 9 David Maldonado

1.0 Engineering Labor Estimating (contd.) - Production Phase 1. Staffing or task estimate by task managers 2. Historical trend data: Hours per month for fixed staff Hours per a/c for mfg. supporting groups 3. Cost Estimating Relationships (CERs) for Drawing Design Groups Engineering Supporting Groups Project Management Engineering Liaison 4. Correlation to historical programs Ground Test Flight Test 10 David Maldonado

2.0 Tooling Labor Estimating 1. Production rate is a big driver of tooling cost What rate of production is planned and for what period of time? High rate/long time = "HARD" tooling Low rate/short time = "SOFT" tooling Sometimes excess tooling capacity is created in anticipation of future orders 2. Production labor hours vary inversely with the amount of tooling Tooling cost can be traded off against production labor cost 3. Tooling may require both engineering and manufacturing labor 4. Tooling often treated as direct charge to contract; may be amortized against production contract Tooling Hour Estimating Methods 11 David Maldonado

2.0 Tooling Labor Estimating (contd.) - Development Phase 1. Staffing or task estimate by task Managers 2. Historical tool design and fabrication hours per LB times complexity factors: Weight Material type Prototype Technology Tool design as a percent of tool fabrication 12 David Maldonado

2.0 Tooling Labor Cost Estimating (contd.) - Production Phase 1. Staffing or task estimate by task managers 2. Sustaining tooling based on current program trend of man-hours per month 3. Tooling hours as a percent of production hours 13 David Maldonado

3.0 Manufacturing Planning Labor Estimating Definition of Manufacturing Planning: The descriptive information to define the schedules, facilities, tooling, fabrication, assembly, test, personnel, and capital item to conduct a manufacturing operation for a program/project. The general activities include: 1. Develop/release plan manufacturing 2. Create assembly sequence and as planned Bill of Materials 3. Define fabrication requirements 4. Define manufacturing scheduling and resource requirement Develop and Implement Measure and status 5. Develop manufacturing work measurement standards 14 David Maldonado

4.0 Production Labor Estimating Definition of Production Labor: Production Labor (Touch Labor) : Associated directly with product Produces a change in the raw material Generally consists of "Fabrication" and "Assembly" 1. Fabrication is fashioning parts from raw material, including: Sawing Perforating Punching Cutting Forming Layout 2. Assembly is integration of parts or subassemblies into larger assemblies 15 David Maldonado

4.0 Production Labor Estimating (contd.) - Development Phase 1. Staffing or task estimate by project/task managers in Production 2. Similar program history Hours/LB adjusted complexity factors Weight Technology improvement 3. Cost Estimating Relationships (CERs) 16 David Maldonado

4.0 Production Labor Estimating (contd.) - Production Phase 1. Staffing or task estimate by project/task managers 2. Current program history using learning curve projections for Metal fabrication hours Composite fabrication hours Major assembly hours Final assembly & checkout hours 3. Manufacturing Planning as a ratio tooling & production hours based on similar program 4. Labor Standards and Realization factors 17 David Maldonado

4.0 Production Labor Estimating (contd.) - Production Phase Labor Standards and Realization A labor standard is a "Standard Time" for performing a particular factory operation. Some standards are based on a "A skilled worker working under ideal conditions." Others are based on a "An average worker working under normal conditions." The difference can be important. Sometimes it includes time for personal needs, fatigue, and delays; at other times, it does not. Depending on how it is defined, it may be achieved at the beginning of new production, in the middle, or never. 18 David Maldonado

4.0 Production Labor Estimating (contd.) - Production Phase Labor Standards and Realization: "Time Study" is an Industrial Engineering (IE) technique for developing labor standards. Realization (percent) = <Actual Hours>over <Standard Hours) Example: Actual Hours: 25 Standard Hours: 10 Then the realization factor is 2.5 This means that the realized performance is 2.5 times standard hours. 19 David Maldonado

5.0 Quality Assurance Labor Estimating - Development Phase Definition: Quality control is setting up for and conduction of mechanical or electrical tests to verify conformance to specifications. 1. Staffing or task estimate by project/task managers in Quality Assurance (QA) 2. Similar program history for (Factor Method) QA hours related to Engineering hours QA hours related to Production hours QA hours related to Tooling hours 20 David Maldonado

5.0 Quality Assurance Labor Estimating - Production Phase 1. Staffing or task estimate by project/task managers 2. Current program history for (Factor Method) QA hours related to Engineering hours QA hours related to Production hours QA hours related to Tooling hours 21 David Maldonado

6.0 Direct Material Estimating Direct materials includes: Raw Materials Purchased Parts Subcontracted items Definition of direct material cost 1. Direct materials become a part of the product 2. Quantity and price are significant 3. Measurement of quantity and price should be easy and inexpensive If the above 3 conditions are not met, classify as Indirect materials (see 10.0 Indirect Cost). 22 David Maldonado

6.0 Direct Material Estimating (contd.) Three Estimating Methods Method used depends on the state of knowledge, desired accuracy of the estimate, and time, and cost limitation of the estimate. 1. Priced Bill of Materials, current items 2. Priced Bill of Materials, modifications of preceding item 3. Projection of average per unit based on preceding lot or contract 4. Consider Other Considerations 23 David Maldonado

6.0 Direct Material Estimating (contd.) 1. Priced Bill of Materials, Current Items: Should properly reflect quantity requirements Should reflect most efficient use of materials (scrap, yield) Scrap and yield factors should have a reasonable basis Should reflect latest available price information Was the quote for the correct quantity? Is cost trend reasonably accounted for? Are prices negotiable downward? 24 David Maldonado

6.0 Direct Material Estimating (contd.) 2. Priced Bill of Materials, Modifications of Preceding Items: Same as for current items, plus: Review additions and deletions Review changes in manufacturing methods Review changes in tooling Review changes in Make or Buy program Review inflation adjustments 25 David Maldonado

6.0 Direct Material Estimating (contd.) 3. Projection of Average per Unit based on Preceding Lot or Contract: Application of learning curve may be appropriate Develop curve for 'Make" items Develop separate curves for each major subcontract Consider conditions which may have changes relative to previous item Scrap, spoilage, Tooling Make or Buy 26 David Maldonado

6.0 Direct Material Estimating (contd.) 4. Other Considerations: Inventory pricing methods First-in-First-Out (FIFO) Last-in-First-Out (LIFO) Weighted average Material Overhead Material handling Subcontract administration Receiving inspection Storage In-transit insurance Freight (may be direct) 27 David Maldonado

7.0 Raw Material Estimating - Development Phase 1. Dollars per LB by material type from similar program history adjusted for economics and improvement curve: Class 0: Pan stock Class 1: Raw material Class 2 & 3: Purchased parts Class 7: High value raw material 28 David Maldonado

7.0 Raw Material Estimating - Production Phase 1. Bill of material including allowance for usage and economics 2. Current program history using improvement curve 3. Class 0 as percent of total class 1 & 7 material 29 David Maldonado

8.0 Equipment Cost Estimating - Development Phase Class 6 High Value Equipment 1. Models (Price) 2. Similar equipment adjusted for Weight Test requirement Technology Schedule requirements 3. Supplier quotes 30 David Maldonado

8.0 Equipment Cost Estimating - Production Phase 1. Firm purchase orders 2. Cost analysis of supplier quotes 3. Estimates based on current program history 4. Historical bills of material for current program plotted on improvement curve 31 David Maldonado

9.0 Subcontract Cost Estimating (Class 8 & 9) Development Major Subcontract Bill of Material (Class 8) Supplier quote Estimate based on in-plant build Similar equipment cost adjusted program history Overload Subcontract (Class 9) Estimate on in-plant basis using history from current program 32 David Maldonado

9.0 Subcontract Cost Estimating (Class 8 & 9) Basic Production Major Subcontract Bill of Material (Class 8) Firm purchase orders Cost analysis of supplier quote Estimate based on current or peculiarities program Overload Subcontract (Class 9) Based on prior production manhour processes adjusted for: Increase/decrease based on in-plant capacity Improvement curve 33 David Maldonado

10.0 Indirect Cost Definition of Indirect Cost An indirect cost is a cost NOT directly identified with a single final cost objective Indirect = Overhead = Burden Generally, indirect costs are grouped into "Pool" which are allocated against the most appropriate direct costs. Analysis of Overhead Cost should consider: Recent overhead cost experience, reasonableness, and necessity to continue at this level, or increase, or decrease The base to which the overhead has been applied The expected future trends in this base 34 David Maldonado

10.0 Indirect Cost (contd.) Commonly seen overhead categories: Engineering Manufacturing Material General & Administration (G&A) 35 David Maldonado

III. Estimating Methods and Practice 36 David Maldonado

III. Estimating Methods & Practice 1.0 Introduction 2.0 Descriptive Estimating Method 3.0 Comparison Estimating Method 4.0 Standard Estimating Method 5.0 Historical Estimating Method 6.0 Parametric Estimating General Overview 7.0 Cost Model 8.0 Man-Loading 37 David Maldonado

1.0 Introduction The quality of the cost estimates begins with the estimator's awareness and ability to select the right set of tools for the job while understanding the limitations and capability of each. Each estimating method or tool has advantages and disadvantages for solving the problem at hand based on: Customer's requirements Time constraints (Turnaround time) Limited Data Availability Quality of Data Limited Resources - Cost Analysts & Computers 38 David Maldonado

2.0 Descriptive Estimating Method 2.1 Conference Estimating Method 2.2 Level of Effort Estimating Method 2.3 Discrete Estimating Method 39 David Maldonado

2.1 Conference Estimating Method Definition: Is also called round-table estimating. o Advantages 1. Used when no other experience, history or support exists or is unavailable. 2. Used on new designs, new configurations, or when the work scope has not been done before. o Disadvantages 1. Difficult to justify, support and prove credibility with the customer. 2. Lowest credibility with the customer. 3. Difficult to achieve full value in negotiations. 40 David Maldonado

2.2 Level of Effort Estimating Definition: An estimate to perform work or tasks which are based on the headcount level in nature such as field service reps and Program Office. It sells support by the headcount over time. o Advantages 1. Easy to generate and estimate. 2. Easy for customer to understand and comprehend. o Disadvantage 1. Difficult to justify without previous experience or history. 41 David Maldonado

2.3 Discrete Estimating Definition: Is characterized by a thorough, in-depth analysis of the Statement of Work (SOW) and identification/documentation of all tasks required to support the SOW effort. "Grass roots" or "bottom up" estimating is a method which develops costs by defining and calculating costs from the lowest element of work or task and identifying the hours it will take to accomplish those tasks. The estimator starts at the lowest level of engineering work such as engineering drawings, specifications, detailed tasks required to accomplish the SOW or project. The hours for all detail tasks are then summarized, to come up with the total hours of cost to perform the effort. 42 David Maldonado

2.3 Discrete Estimating (contd.) o Advantages 1. Used when no other experience, empirical or supporting data exists or is unavailable. 2. Provides better credibility than plain judgment estimate and level of effort without history. 3. Estimate is task by task; a lower level estimate. o Disadvantages 1. Limited by the experience level of the person developing the estimate. 2. Difficult to justify, support and prove credibility. 3. Difficult to achieve full value in negotiations. 4. Limited by the time-consuming nature of the tasks. 43 David Maldonado

3.0 Comparative Estimating Definition: Uses actual costs of a similar (analogous) existing or past program or project, and adjusts for complexity on technical or physical differences in order to drive the new system or task estimate. In comparative estimating, complexity factors or ratios may be used and applied to the known costs or cost elements (cost factor) to create the estimates. Factors must be fully explained. This method could be used in any stage of a program where there is insufficient actual cost data to use as a basis for a detailed approach. 44 David Maldonado

3.0 Comparative Estimating (contd.) If enough technical and cost information are available on the completed program, it can help validate comparison of the new program with the old program. The most common types of data used in preparing comparative cost estimates are: Actuals for the same or similar item or activity. Technical engineering actual data. Labor actuals or standards with adjusted historical efficiency factors. Similar projects or programs. 45 David Maldonado

3.0 Comparative Estimating (contd.) o Advantages 1. Easy to generate and estimate, provided historical data is available. 2. Provides better credibility than plain detailed estimating. 3. Quick and reasonable accuracy for similar systems, or end items. 4. Good accuracy for similar systems. o Disadvantages 1. Requires analogous product and program data. 2. Difficult to apply for differences in scope of work, design, configuration and number of aircraft or aircraft programs. 3. Requires a detailed program and technical definition of the analogous system as well, as the system being estimated. 4. Once the technical assessment has identified the analogous system, actual cost data on that system must be obtained. 5. Uncertainty due to subjective evaluations made by estimator. 46 David Maldonado

4.0 Standards Estimating Definition: Estimate based on standard hours generated by work measurement techniques. Time and motion study Industrial Engineering standards Theoretical standards Typically used for manufactured parts and hardware. Standard hours generated for each work sequence on shop order. o Advantages 1. Detail labor standards established for make parts or hardware. 2. Consistency in "Touch Labor" estimating. o Disadvantages 1. Time consuming (time and motion study for hundred, thousand parts). 47 David Maldonado

5.0 Historical Estimating Method Definition: An estimate based on actual cost history for the same work in the various area Labor hours Material dollars o Advantages 1. Strong correlation and support for estimate. 2. Plotting of learning curve or trend analysis based on history 3. High credibility level o Disadvantages 1. Required detailed program and product definition 2. difficult to apply for differences in scope of work, design, configuration and aircraft programs. 48 David Maldonado

6.0 Parametric Estimating Method Definition: Parametric estimating is the method of estimating costs by using mathematical equations that relate cost to one or more physical or performance variables associated with the item being estimated. o Advantages Fast execution and most cost effective estimating method. Easy to justify (consistent), support and prove credibility with a good data bank. Statistical data base can provide expected values and prediction intervals By making broader use of these techniques they anticipated realizing some of the following benefits: Improvement in the quality of estimates due to focusing more heavily on the use of historical data, and establishing greater consistency in the estimating process Streamlined data submission requirements decreasing the cost associated with preparing supporting rationale for proposals Reduced proposal evaluation cost and cycle time Decreasing negotiation cost and cycle time through quicker proposal updates 49 David Maldonado

6.0 Parametric Estimating Method (cont d) o Disadvantages Often too simple to forecast costs. Estimate is aggregate not detailed estimate. No way of knowing if past and present methods are the same - Difficult to apply when difference in scope of work, design, configuration and numbers of aircraft exist. Data collection, evaluation, and adjustment are a very critical and time consuming step in the parametric estimating process. Never use a model without reviewing the source documentation and hypothesis. 50 David Maldonado

7.0 Cost Model Definition: Commercial models are based on more universal data and almost always need some form of calibration to be useful, whereas the corporations internal cost model data has already gone through calibration via the data collection, analysis, and adjustment process. After calibration, the cost model must be tested for validity, and ultimately accepted by the customer. The validation process includes the following steps: Calibrate the model to historical cost data Parametrically estimate the cost of past completed projects using the parametric cost model developed Compare the estimates with actual costs to demonstrate acceptable accuracy A computer model is used to generate cost estimates based on mathematical relationship built in the software. Examples are Price and SEER model. 51 David Maldonado

7.0 Cost Model (cont d) o Advantages Can be used with design concepts & configurations which are too vague and sketchy to estimate accurately. May be used to develop ROM's and for new programs or new version of existing aircraft. o Disadvantages Difficult to use for Firm proposal pricing and estimating. Often too simple to forecast costs. Estimate is aggregate not detailed estimate. 52 David Maldonado

8.0 Man-Loading Method To establish a standard unit for measuring direct charge hours by manmonth or equivalent man-month. 1. Headcount Basis (153 Hours) a. Hours in average year (40 hrs/wk x 52 wks) = 2,080.0 b. Days per year not charged direct (less): (1) Holidays (13 Days/yr x 8 hrs) = 104.0 hours (2) Vacations (13 Days/yr x 8 hrs) = 104.0 hours (3) Sick Days (5 Days/yr x 8 hrs) = 40.0 hours c. Total work hours per year = 1,832.0 d. Man-month: (1,832 Hours / 12 Months) = 152.67(round 153) Hours/Mo 53 David Maldonado

8.0 Man-Loading Method (contd.) 2. Program Requirement (165 Hours) a. Hours in average year (40 hrs/wk x 52 wks) = 2,080.0 b. Days per year not charged direct (less): (1) Holidays (13 Days/yr x 8 hrs)= 104.0 hours c. Total work hours per year = 1,976.0 d. Man-month: (1,976 hours / 12 Months)=164.67 (round 165) hours/mo 54 David Maldonado

QUESTIONS? 55 David Maldonado