Nuclear A Canadian Strategy for Energy, Jobs and Innovation

Similar documents
OPG READY TO DELIVER REFURBISHMENT OF DARLINGTON NUCLEAR STATION OPG also planning continued operation of Pickering Station

Nuclear Power s Role in Enhancing Energy Security in a Dangerous World Al Shpyth, B.A., M.E.S. Director, Government Relations Cameco Corporation

Siemens Canada Ltd Dr. Donald Wilson Industry DT Large Drives Mining and Minerals

Cyber Security and the Canadian Nuclear Industry a Canadian Regulatory Perspective

Achieving Balance. Ontario s Long-Term Energy Plan

Imperial Oil Limited 237 Fourth Avenue S.W. Calgary, Alberta T2P 3M9 imperialoil.ca

Financial statements of. Youth Science Canada. June 30, 2010

Ministry of Training, Colleges and Universities Skills Training for Green Jobs

SaskPower CCS Global Consortium Bringing Boundary Dam to the World. Mike Monea, President Carbon Capture and Storage Initiatives

Biomass Funding Solutions. Have Your Investment Pay its Way. The renewable energy experts throughout East Anglia

Canada Population: Fertility rate: GDP per capita: Children under 6 years: Female labour force participation:

Electric Vehicles in Canada

Nuclear Energy in the Education of Sustainable Engineering Practices

I would like to talk to you today about how the three Early Years Studies helped to mobilize change in Canadian early childhood policy and practice.

A Nuclear New Deal. Jacques Besnainou. President, AREVA Inc. AREVA

Levelised Unit Electricity Cost Comparison of Alternate Technologies for Baseload Generation in Ontario

Our Employees. CIBC s vision, mission and values are at the centre of our commitment to create an environment where all of our employees can excel.

3 rd Review Meeting Convention on Nuclear Safety First Anniversary Report Status of Actions on Canada April 2006

CANADIAN STRATEGY. July 2015

Canadian Manufacturers and Exporters

The Economics of Nuclear Power: Is New Nuclear Competitive?

Maryland Nuclear Power Plant s Contribution to the State Economy

CANADIAN RENEWABLE ENERGY POLICIES. Matthew H. Brown InterEnergy Solutions 2007

10 Nuclear Power Reactors Figure 10.1

AREVA: supply chain network principles and company s vision

YOUR HOME ELECTRICITY BILL

Ontario s s Water and Wastewater Energy Management Best Practices

Ontario Pre- Budget Consultation Submission. Presented to: Standing Committee on Finance and Economic Affairs

2013 Cape Breton Celtic Classic Sydney, Nova Scotia

Michigan Nuclear Power Plants Contribution to the State Economy

Ministry of Finance. Plan for saskatchewan.ca

Economic Impacts of MLS Home Sales and Purchases in Canada and the Provinces

A Green Sector Overview

New York s Upstate Nuclear Power Plants Contribution to the State Economy

BC s Colleges: Putting British Columbians First in Line

4.0 Health Expenditure in the Provinces and Territories

Renewable is Doable: Affordable and flexible options for Ontario s long term energy plan SEPTEMBER 2013

The Economic Contribution of the Oil and Gas Industry In Kern County

Appendix 2 Ontario s Nuclear Generating Facilities: A History and Estimate of Unit Lifetimes and Refurbishment Costs

Compensation of Full-Time Employees in Small Charities in Canada (2010)

Table of GRI indicators

ONTARIO GREEN BOND Q&A s

Pension Sustainability

The Economic Impacts of Reducing. Natural Gas and Electricity Use in Ontario

The World Nuclear Supply

Building a Future Through Investment

green public procurement in sweden

Public Service Commission. Plan for saskatchewan.ca

His Worship Jim Watson Mayor of the City of Ottawa 110 Laurier Avenue West Ottawa, Ontario K1P 1J1 Dear Mr. Mayor,

Nuclear and Sustainable Power Engineering Ph.D. education in Poland Polish experience INSPE studies

Employees. Our Commitment. Our Approach

CANADIAN NORTHERN ECONOMIC DEVELOPMENT AGENCY. Statement of Management Responsibility

Township of Terrace Bay Drinking Water System Financial Plan

Convince Execs Why a Wellness Program Is Worth the Investment

How To Plan For A New Power Plant In Manitoba

Canada A Global Leader in Renewable Energy Enhancing Collaboration on Renewable Energy Technologies

MAGAZINE Publisher s Statement 6 months ended June 30, 2015 Subject to Audit

COST EFFICIENCIES/PRODUCTIVITY

photos.com Cost, Quality and Accountability Public Tendering versus Self-Performance for Municipal Infrastructure Delivery in Canada

The automotive manufacturing sector is

HR TRENDS AND INSIGHTS: FALLING OIL PRICES AND DECREASED INDUSTRY SPENDING - EMPLOYMENT IMPACTS

Measuring GDP and Economic Growth

SNC-Lavalin Group Inc. (SNC) - Financial and Strategic SWOT Analysis Review

The UK Offshore Wind Experience

COMPARISON OF ELECTRICITY GENERATION COST OF NPP WITH ALTERNATES IN PAKISTAN

Energy [R]evolution vs. IEA World Energy Outlook scenario

Retirement Planning Your Retirement Transition Plan

The Fiscal Sustainability of Canadian Publically Funded Healthcare Systems

Transportation and Public Works. Business Plan

BCSE Briefing: Driving US Economic Growth and Jobs. Chris Perrault, Vice President January 26, 2011

Without policies that foster small business growth, the province s productivity, level of innovation, and overall competitiveness stand to suffer.

Transcription:

Nuclear A Canadian Strategy for Energy, Jobs and Innovation November 2012

CME Studies Economic Benefits of Nuclear in Canada The Canadian Nuclear Association engaged Canadian Manufacturers and Exporters to verify, update and extend knowledge of the economic benefits of nuclear. CNA values CME s independent economic modelling and research expertise. The work was carried out from April to September 2012 with cooperation and support from CNA members. CME applied best methods with consistently conservative assumptions throughout the study. Major themes: Nuclear is a key and integral part of Canada s innovation, manufacturing and export capacity Nuclear is a Canadian strategy for energy, jobs and innovation

Executive Summary www.cme-mec.ca Canada s nuclear industry today sustains tens of thousands of quality jobs. The industry has the potential to sustain many more such jobs through 2050 to 2070 and beyond, if plans for plant refurbishments, new builds, and uranium mine expansion are realized. This goes far beyond the employment, supply orders, GDP and tax revenue that these tens of thousands of jobs represent: These expansion and refurbishment plans are an integrated Canadian strategy for energy, jobs and innovation. Nuclear industry jobs are long-lasting (5 to 50 years), well-paid (averaging about $100,000/yr), and knowledge-rich (with excellent training and development). Nuclear is also part of our national science and innovation system, involving over 30 universities and six major research centres. Employment at Canada s uranium mines is over 45% Aboriginal and nearly 50% northern residents, and the mines are expected to double production over the next five years. Nuclear energy s minimal emission profile helps Canadians meet our clean air goals. Sufficient affordable electric power is both a benefit to ratepayers, and a core advantage for Canada s economic growth. Canada has the opportunity to sustain and grow all these benefits through the 21 st century

Our Commercial Nuclear Assets

Part of our Science & Innovation System Advancing mining technology, designing and operating reactors and developing the workforce gives the industry strong linkages to the Canada-wide ecosystem of nuclear science, engineering and innovation

Where the Jobs Are Uranium exploration (several provinces and territories) Uranium mining (sites in northern Saskatchewan major employers of Aboriginal Canadians) 17 nuclear power reactors (capacity ratings vary) Eight at Bruce Power, Tiverton (Huron County), ON Four at Ontario Power Generation s Darlington site, Clarington, ON Six at OPG s Pickering site, Pickering, ON One at NB Power s Point Lepreau site, NB Refurbishments planned for 10 of 17 operating reactors Other reactors are already in their second (post-refurb) operating life. Two new nuclear power reactors planned at Darlington Research reactors, laboratory & testing organizations etc. AECL Nuclear Laboratories, Kinectrics/Candesco, universities, CLS, TRIUMF Nuclear medical businesses and organizations The economic impact of most of these industry elements is analyzed directly in the CNA-CME Studies of Nuclear Power and Mining

Nuclear Jobs Last Mining industry jobs: 10,000++ indefinitely (resource is very high quality and large; will remain competitive for decades; growth likely) Operating plants: 19,000+- until about 2050 (assuming full refurbishment program in Ontario plus Darlington new build) Refurbishing plants: 10,000+ for about 11 years (assuming ten refurbishments in Ontario Long Term Plan but not Gentilly-2) Building new plants: 21,000+ for about five years (assuming two full-sized reactors at Darlington with majority Canadian content) Notes: All assumptions are conservative, including 1:1 relationship of direct to secondary employment. Figures exclude nuclear-related jobs outside mining and power sectors (i.e. medicine, universities, research laboratories, standards and auditing organizations). Figures also exclude employment in the plant shutdown/decommissioning process. No assumption about new build other than Darlington, such as CANDU units outside of Canada or small modular units, which would materially increase employment.

Nuclear Jobs Learn This is a high-knowledge, high-innovation industry. The industry s large number of highly qualified personnel (HQP) create formative training and work-experience opportunities for other workers. They also transfer knowledge and skills into other Canadian workplaces when they change employment. This drives innovation and adoption of best practices, and enriches the knowledge and skills of Canada s entire workforce. An electrical control system supplier: Nuclear s just two percent of our revenue, but it drives our whole company to meet high standards, learn best practices and pass quality audits. That s worth a lot more. This industry invests heavily in employees. Some illustrations: A reactor component firm: We do all our workforce development in-house; our industry has lots of proprietary knowledge, and a culture of training. We spend a bigger share of revenue on our people than most companies do. Jobs from subsidizing renewable energy are said to be highquality, but they don t come close to ours in terms of durable skills and capabilities. Major uranium mining firms: Cameco has provided $2 million in funding toward Credenda Virtual High School, a live, web-based program that gives students in remote northern areas access to math and science courses. AREVA provides over $130,000 in annual scholarships such as the Northern Saskatchewan Scholarship Program, while Cameco offers more than $300,000 per year in direct support for students. AREVA has sponsored the Mining Engineering Technology program at the Saskatchewan Institute of Applied Science and Technology (SIAST); the company provided $100,000 to support SIAST in educating new workers for the industry.

Nuclear Jobs Pay www.cme-mec.ca Average salary of direct employees in Canada s nuclear industry is approximately $100,000. Illustrative Company # Highly Qualified Personnel Avg Salaries HQP vs Others Company A 227 $141,711 / N/A Company B 2,000 $130,000 / 85,000 Company C 160 $130,000 / 90,000 Company D 1120 $159,000 / 88,000 Note: Salary figures do not include investments in employee benefits or workforce development.

2012 Potential Jobs Trajectory 2070 Mining: 10,000++ Strong growth is likely due to good resource base and opening export markets. Operating plants: 16,000+ Given refurbishments, these jobs will last at least to mid-century. Refurbishing ten plants: 10,000+ Currently planned program would last about 11 years. Build takes about five years, with refurbishment around mid-century. Building two new reactors: 21,000+ Further new builds (inside or outside of Canada) and operations Calculated in CNA-CME study

More Than Direct Jobs Building a new, full-sized, two-reactor plant requires: 400,000 cubic meters of concrete 20,000 tonnes of steel 700 kilometres of wiring 70 kilometres of piping

Uranium Mining in Saskatchewan Total value of goods & services purchased: 75% of total spent in Saskatchewan 43% of total spent in Northern Saskatchewan $1.08 billion Paid to Province of Saskatchewan: $145.9 million Paid to local governments $5.9 million Licensing fees $6.3 million Surface Lease Fees $12.1 million Donated to community & charity $4.5 million Scholarships $340,500 Contributions to government (via direct hires): $133.2 million Income Tax $111.1 million Canada Pension Plan $15.9 million Employment Insurance $6.2 million

Annual Benefits of Refurbs and Operations Combining 10 Refurbs and All Operations During the Refurbishment Program Period Refurbishment Operations Total Impact Employment 10,636 16,640 27,276 Labour Income $1,248 m $2,073 m $3.3 b Fuel Cost Not Applicable $518 m $518 m Equipment, materials and supplies $1,890 m $1,241 m $3.1 b TOTAL $3.1 b $3.8 b $6.9 b Includes ongoing operation of the plant at Point Lepreau, NB. Does not include operations at the new-build Darlington plant (which will raise the impact in the operations and total impact columns), as operations might not occur during the 11-year period considered. Does not include refurbishment or ongoing operation of Quebec s Gentilly-2 plant (which would further raise the impact in all columns).

Annual Economic Impact of Building a New Full-Sized, Two-Reactor Nuclear Power Plant Direct Impact Secondary Impact Total Impact Employment 10,800 10,800 21,600 Labour Income $799m $1.12b $1.92b Equipment, materials & supplies $1.38b $1.52b $2.90b TOTAL (Annual for five years) $2.18b $2.64b $4.82b

Economic Impact in Canada of Building a Nuclear Power Plant Abroad Parameter Total Capital Cost (C$ Million) Canadian Content Impact in Canada of Building Two Enhanced CANDU 6 (EC6) Reactors Person Years of Work in Canada Project management Engineering and procurement $1040 m 20% $208 m 460 $960 m 76% $729 m 1824 Equipment $2380 m 69% $1642 m * CANADIAN IMPACT $2.57 BILLION >2284 Duration of work is 66 months from first concrete to unit 2 being in service. Capital costs are expressed in 2012 dollars and are overnight, i.e. excluding escalation. *While equipment manufacture presumably generates significant economic impact in Canada, insufficient data were available to estimate this figure reliably.

Cost, Employment and Schedule for a New Small Modular 2-Reactor Plant Parameter Engineering and procurement On-site labour cost Direct employment Schedule (Duration of physical works) 2 x 180MW Modular Reactors $1.6 billion $ 400 million 2,400 person-years 3 years Local content assumption: 20% for engineering and procurement (net $320 million), 90% for on-site labour (net $360 million). $320M + $360M = $680M expenditure in Canada over three years, or $226 million and 800 jobs annually for three years.

A Canadian Strategy for Energy, Jobs and Innovation Nuclear power has a 50-year track record of delivering affordable clean air energy to Canadians. These growth plans are an integrated Canadian strategy for energy, jobs and innovation. Nuclear is an integral art of our national science, technology, engineering and innovation system. Nuclear is a major employer of Aboriginal Canadians and northern residents. Nuclear industry jobs are long-lasting, well-paid, and knowledge-rich. Canada has the opportunity to sustain and grow all these benefits through the 21 st century.

Thank you For more details and methodology: Stewartj@cna.ca Martin.lavoie@cme-mec.ca