Performance Based Maintenance Scheduling for Building Service Components



Similar documents
How To Manage Multi-Dimensional Building Performance Data Management

A Data-Warehouse Architecture supporting Energy Management of Buildings

Integration of radio frequency identification and building information modelling for decentralised information management

Maximizing return on plant assets

Building Analytics Improve the efficiency, occupant comfort, and financial well-being of your building.

MDM and Data Warehousing Complement Each Other

Building Energy Management: Using Data as a Tool

Computer-Aided Facilities Management - A Logical Trend

Smarter Buildings & Management of Buildings

Automated Commissioning for Energy (ACE) Platform for Large Retail Property. Overview

Leveraging the Power of Intelligent Motor Control to Maximize HVAC System Efficiency

Case Based Model to enhance aircraft fleet management and equipment performance

Realizing the full potential of high performance buildings

Predictive Maintenance Strategy for Building Operations: A Better Approach

Plan Number A Cross Beam Dr. Charlotte, NC Simplified Service Plan. Air Conditioning.

Business Intelligence in Oracle Fusion Applications

Optimization of Clinical Engineering in Private Healthcare

Introducing Computational Fluid Dynamics Virtual Facility 6SigmaDC

Best Practice Guide BPGCS007

A Guide to Efficient MRO Procurement & Management White Paper

Confidence. Convenience flexibility

UNITED TECHNOLOGIES CARRIER CORPORATION. Remote Monitoring MONITORING YOUR BUILDING 24/7 SO YOU DON T HAVE TO

DATA MINING TECHNIQUES SUPPORT TO KNOWLEGDE OF BUSINESS INTELLIGENT SYSTEM

The 5th Greater Pearl River Delta Conference - Smart Management System in Building Facilities for Sustainability of Low Carbon Environment

HEATING, VENTILATION & AIR CONDITIONING

Three-phase and single-phase voltage optimisation systems

AQUACIAT2 HYBRID THE COMPACT DUAL-ENERGY SOLUTION HEAT PUMP & GAS BOILER. Cooling and heating capacities of 45 to 80 kw AVAILABLE 2 ND QUARTER OF 2014

Energy. Management. BTU Meter Installation BTU Meter Commissioning Maintenance Billing and Collection ISO Management.

Movicon in energy efficiency management: the ISO standard

Business Intelligence. A Presentation of the Current Lead Solutions and a Comparative Analysis of the Main Providers

ENERGY EFFICIENT BUSINESS TEAM. David Malicki Senior Team Leader Energy Efficient Business Office of Environment and Heritage

Accenture Utilities Podcast Series A perspective on enterprise asset management in the power generation sector

monitoring High Energy Usage Rate

HVAC Repair and Maintenance Strategies by Ron Prager

Data center management suite. Providing optimal control and efficiency to data center management.

red zone management white paper Making the most of Distribution Use of System (DUoS) Charges

HVAC System Cloud Based Diagnostics Model

Intelligent Systems Applied to Optimize Building s Environments Performance

Distributed Temperature Sensing - DTS

Towards a Wireless Sensor Platform for Energy Efficient Building Operation

DUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD

GAS HEATING IN COMMERCIAL PREMISES

Energy Audits. Good energy management begins with an energy audit

Mechanical-Electrical Technology MECHANICAL-ELECTRICAL TECHNOLOGY Sacramento City College Catalog

of The New England Water Works Association

Real-time asset location visibility improves operational efficiencies

HOW INTELLIGENT BUILDING TECHNOLOGY CAN IMPACT YOUR BUSINESS BY REDUCING OPERATING COSTS

Benefits gained from using new maintenance concepts and international logistics standards

A Design and implementation of a data warehouse for research administration universities

IMPROVING PRODUCTIVITY USING STANDARD MATHEMATICAL PROGRAMMING SOFTWARE

HVAC Processes. Lecture 7

Township of T Tay Energy Conservation and Demand Management Plan July 1, 2014 to June 30, 2019

Training Engineers for Managing Intelligent HVAC Systems in Modern Office Buildings

Greening The Data Center

Avantis Enterprise Asset Management Suite

ENHANCED LABORATORY HVAC SYSTEM

Design Guide. Retrofitting Options For HVAC Systems In Live Performance Venues

CMMS/EAM. Maintenance Solutions

Scope of Work. See for resources available

IMARDA i360 MANAGING FLEET-WIDE COMPLIANCE COMPLIANCE ISSUES:

ORACLE ENTERPRISE ASSET MANAGEMENT

Modeling and Simulation of HVAC Faulty Operations and Performance Degradation due to Maintenance Issues

A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project.

Oracle Enterprise Asset Management

Balancing Uptime and Working Capital: Maintenance and Inventory Strategies in Mining

Data Management Practices for Intelligent Asset Management in a Public Water Utility


Business Process Modeling. Introduction to ARIS Methodolgy

How To Host An Incompany Project For An Msc Student At Cranfield

EMC PERSPECTIVE Managing Energy Efficiency in the Data Center

Classification and Qualification STANDARDS

218 Chapter 11. Conclusions. Therefore, this thesis aims to contribute to improving productivity of SMEs through DM and Project Communication.

Carnegie Mellon University School of Architecture, Department of Mechanical Engineering Center for Building Performance and Diagnostics

Industrial Internet: Putting the vision into practice

CASE STUDY FOR NEWCASTLE UNITED ENERGY MANAGEMENT PROGRAM

How To Manage Assets

REQUEST FOR PROPOSAL FOR DORCHESTER COUNTY COUNCIL HVAC SERVICES DCG Due Date December 6, 2011

Optimising Energy Use in Cities through Smart Decision Support Systems

The Complete SQL Server Health Checks

META DATA QUALITY CONTROL ARCHITECTURE IN DATA WAREHOUSING

BEYOND DIAGRAMS AND SPREADSHEETS DATA CENTER INFRASTRUCTURE MANAGEMENT (DCIM)

The role of Linked Data and the Semantic Web in Building Operation

NECAQ Sustainability Program The Business Case

Energy Management. System Short Guides. A Supplement to the EPA. Guidebook for Drinking Water and Wastewater Utilities (2008)

Chapter-5 Introduction to Building Automation System (BAS)

Utilities Engineering Technician Trailblazer Assessment Plan ASSESSMENT PLAN. Utilities Engineering Technician

24/7 Monitoring Pro-Active Support High Availability Hardware & Software Helpdesk. itg CloudBase

GRAHAM FACILITIES MANAGEMENT DEFINING, DEVELOPING, DELIVERING.

Heating, ventilation and air conditioning equipment. A guide to equipment eligible for Enhanced Capital Allowances

HomeReACT a Tool for Real-time Indoor Environmental Monitoring

your comfort. our world. DNSS EcoSave A/C remote monitoring and malfunction prediction

California Department of Corrections and Rehabilitation

Monitoring Energy Use: The Power of Information

Reducing Data Center Loads for a Large-Scale, Net Zero Office Building

Heating, ventilation and air conditioning zone controls

Guide Specification SECTION COMMISSIONING OF HVAC PART 1 - GENERAL 1.1 SUMMARY

Collaborative Asset Lifecycle Management and PAM

Locality Energy Action Group

Procurement, Inventory Management and Supply Chain solutions for the Petrochemicals sector

Environmental Data Management, Analysis, and Compliance Systems - Rethinking the Creation and Use of Emissions Data by the Regulated Community

Transcription:

Performance Based Maintenance Scheduling for Building Service Components Karsten Menzel 1, Ena Tobin 1, Kenneth N. Brown 2, Mateo Burillo 2 1 University College Cork, IRUSE, k.menzel@ucc.ie, e.c.tobin@student.ucc.ie 2 Cork Constraint Computation Centre, Department of Computer Science, University College Cork, Ireland Abstract. This paper discusses Performance Based Maintenance Scheduling as an enabler for Optimised Building Operation in terms of cost, energy usage, and user comfort, and the role of collaborative networks in achieving these optimal conditions. We finally explain what categories of constraints need to be considered to organize performance based maintenance scheduling in a holistic and integrated manner Keywords: Performance Based Maintenance, ITOBO 1 Introduction Performance based maintenance is a meeting point between scheduled and reactive maintenance. It allows for faults which were not foreseen at the time of scheduling to be dealt with before they become a failure, i.e. before reactive maintenance is needed. Also performance based maintenance has added benefit over reactive maintenance due to the fact that cost allocation can be carried out for performance based but not for reactive maintenance. How to achieve this allocation of costs will be discussed briefly, with respect to the information needed to do so, in the following paper. This paper deals with performance based maintenance so it is necessary to have a facility management model which describes this type of maintenance. For performance based maintenance scheduling one must ensure for easy information transfer, information regarding component status, historical information and operation guideline information. Consider a Public Private Partnership (PPP) contract agreement, i.e. when a construction company is responsible for carrying out the maintenance works in a building for a specific amount of time (e.g. 10 years). The company may be based abroad and may have multiple contracts with locally based service companies. To allow for performance based maintenance scheduling it will be necessary for each of the appropriate entities in the organisation to have access to the necessary data and if possible within the contract rules, to share maintenance trends which have been noticed by individual companies in previous work with the network.

488 Karsten Menzel, Ena Tobin, Kenneth N. Brown, Mateo Burillo 2 Models for Facility Management This chapter reviews models for Facility Management (FM) being utilized presently to ensure the enactment of maintenance activities. The following is a description of the most widely used models in the Anglo-American world as described in Facility Management Towards Best Practice (Barrett & Baldry, 2003): Office Manager Model In this model FM is not usually a distinct function within the organization. Instead it is undertaken by someone as part of their general duties such as office manager Single Site Model - This model applies to organisations that are large enough to have a separate FM-department but are located at just one site. It also applies to organisations who own the buildings that they occupy. Localised Sites Model - This model applies to organizations having buildings on multiple sites. Multiple Sites Model - this model is generally applicable to large organisations that operate across widely separated geographic regions. Operational issues are dealt with at regional level. International Model- this model is similar to Multiple Sites model but applies to large international organisations. The following table summaries the above mentioned models: Table 1: Facility Management Models summary Model Type Size Coverage Decision Making: Headquarter Decision Making: On site Single Site 1 site One site All on site All on site Local Site 1 site Site in same metropolitan area Technical assist., problems, budgets Simple operational decisions Multiple Site International Many sites Many sites National geographically separated sites Multi-national geographically separated sites Set Policy, Guidance to regional HQ Set Policy, Guidance to regional HQ Operation matters Operation matters 3 Prerequisites and Current Deficits The first assumption in this paper is that the use of wireless sensors and meters to monitor and control building services and energy consumption is increasing. This is due to a reduction in the cost of such devices and the decreasing installation costs based on the lack of wires. This leads to an increase in available (bulk) data. The second assumption is that an integrated tool for holistic information modeling allowing the holistic, multidimensional management and analysis of building

Performance Based Maintenance Scheduling for Building Service 489 performance data in relation to the buildings energy usage will be available. Our colleagues here at University College Cork, under a project entitled ITOBO (Information and Communication Technology for Sustainable and Optimised Building) develop such a tool based on Data Warehouse (DW) technology. This tool supports complex queries and advanced features for aggregating, analyzing, and comparing data. It is also used to discover trends and patterns in data (Ahmed et al, 2009). DW technology has been introduced to the construction management domain to improve the management of historical data (Ahmed & Nunoo 1999), (Lee & Lee 2002). So it is a natural progression for this technology to now be used in the building management sector especially as the availability of building documentation will lead to efficiency in this sector but however, few efforts have been made to explore the impacts of DW technology on building performance management supporting the creation of sophisticated data aggregation and analysis tools. By introducing collaborative networks into the scenario, it will become possible to ensure valid data and assumptions when aggregating the data and creating the analysis tools. To facilitate our research with real example data the ERI building, a 4500 m² Living Laboratory located on the campus of University College Cork, Ireland, is used as Living Laboratory. The building has a wireless sensor network installed along with a wired BMS system. It is equipped with multiple types of solar panels, geothermal heat pumps and an under floor heating system. Building Performance Data is provided by 180 (wired) sensors. Additionally, a test bed for wireless sensors and actuators has been installed since April 2008 in three phases. Sensors include humidity, temperature, CO 2, and lighting sensors. Meters include devices to measure electricity, mains water, cold water, gas, lighting energy consumption, boiler heat, solar heat and under floor heat. In the case of our example, aggregated performance data can be generated from the sensed and metered fact data and the dimensional data derived from Building Information Models which include information to structure the fact data (e.g. per location, per time, per user, etc.). Therefore, different stakeholders can retrieve customized information about the building performance. However, in future research further problems need to be addressed, such as how the maintenance and calibration for the sensors are organized. The need for on site inspection for these sensors should be on the lowest frequency possible. Secondly, manufacturer s data for HVAC components is very conservative so if this data is used in a diagnostic tool it will give a level of required maintenance which is too frequent. The next difficulty comes in the form of existing companies. Large companies which have worked in the FMsector for some time will have discovered trends in building service components. For example, they may have noticed that when x amount of vibration is recorded by a sensor on a fan motor then the fan is close to failure. This knowledge is only gained by experience. However, this large company may be unwilling to share this knowledge as it gives them an edge over their smaller competitors.

490 Karsten Menzel, Ena Tobin, Kenneth N. Brown, Mateo Burillo 4 Maintenance Planning Models Currently, there is a lot of space for improvement in the manner in which buildings are maintained. Performance based maintenance will allow for a reduction in reactive and scheduled maintenance which is necessary in built artifacts. First we will discuss the two most widely used maintenance types, reactive and scheduled maintenance: Scheduled maintenance includes preventative maintenance activities such as lubrication, visual inspection and testing. It also includes predictive maintenance activities such as obtaining checking filters, taking vibration measurements and drawing lubricant samples for analysis. In short routine maintenance is comprised of nearly all of what is referred to as preventative/predictive maintenance. In case of FM scheduled maintenance has an element of wasteful expenditure. Take for example, an Air Handling Unit (AHU), every six months the filters are cleaned. This is a scheduled event and it takes place without fail. However, depending on the environmental conditions and the intensity of usage the filters need either only is cleaned yearly or in case of extreme use cases 6 times a year. In this case scheduled maintenance will impede the users comfort and will result in unnecessary spending, due to over and under maintenance scheduling. Reactive Maintenance requires immediate action to address breakdowns and other suddenly developing conditions. Traditionally reactive maintenance consumes excessive maintenance resources. Although an absolute necessity, it is a totally reactive function. Proper attention to the routine work and timely backlog relief will minimize the demand for reactive maintenance, (Kister, Hawkins, 2006). In case of FM reactive maintenance results, firstly, in a diminished level of user comfort due to the waiting time for the maintenance to be detected appropriately and consequently scheduled and also due to the unavoidable disturbance which is prominent during reactive (emergency response) maintenance. Secondly as this type of maintenance may require certain skills or stock at a minimal time delay this also invariably results in higher expenditure. In case of performance based maintenance scheduling the following scenario is proposed, with respect to the situation described for scheduled maintenance: pressure sensors would be installed at either side of the filters, a vibration senor would be installed on the fan motor and room temperature and humidity sensors would be installed in the conditioned space. Sensed data would be sent to the data warehouse regularly, the data warehouse would analyse the data and discrepancies in the performance profiles (based on historical data and a predicted outcome) would trigger relevant maintenance activities. As a summary of this section, scheduled maintenance has the disadvantages of large cost overheads and unnecessary downtime. Reactive maintenance has no facility to determine costs and includes unexpected downtime. Performance based maintenance has the ability to reduce and control cost overheads and also to eliminate unnecessary downtime.

Performance Based Maintenance Scheduling for Building Service 491 5 Collaborative Networks A CN is constituted by a variety of entities that are largely autonomous, geographically distributed and heterogeneous in terms of their: operating environment, culture, social capital and goals. Nevertheless these entities collaborate to better achieve common or compatible goals and whose interactions are supported by computer networks. (Camarinha Matos LM, 2005). In the FM-industry of today, due to outsourcing, technical advancements and contract conditions, CN are constantly being introduced by large since buildings include components of the structural domain, mechanical domain and electrical domain, etc. To maintain all these components, a large variety of skills are necessary. This is an advantage for performance based maintenance. There are two types of FM-company structures; the first is the in-house structure. This is when all the necessary skilled staff is employed by the company. When a problem occurs the appropriately skilled person will undertake the task. The second structure is the outsourcing company. This is when a company maintains a core number of skilled staff and when a problem occurs which needs the attention of a skill which is not available within the company s staff; the task is outsourced to a specialized company. For each of these two types, performance based maintenance can be used but to ensure cost effectiveness, it is necessary for both types to available of infrastructures set up by other sectors, i.e. document sharing, data sharing. Therefore collaborative networks are a necessity for viable performance based maintenance. According to Camarinha Matos A collaborative network is characterized by four variables: the external interactions amoung autonomous entities, roles of these entities, the main components that define the proper interactions of these entities, and the value system that regulates the evolution of the collaborative association and the emerging collective behaviour. (Camarinha Matos LM, 2005). For performance based maintenance scheduling the individual components are specified in Table 2 below. Table 2: Collaborative Network Variables Type External Interactions Role of entities Main components Value system Performance Based Maintenance Scheduling Periodic virtual meetings, Email notifications FM provider, Maintenance Provider, Bldg. Owner, Tenants Invent. Mgmt. & Mainten. Web Interface, Inventory &Task DB Mandatory regulations, codes, etc. determine contract cond The overall components for a maintenance scheduling system are: (1) a wireless sensor network to monitor the performance of building service components, (2) the data warehouse which will store and analysis the performance data recorded, (3) the Maintenance task database, and (4) the web-based user interfaces which will allow to view data trends, check stock of spare parts, track maintenance activities, view

492 Karsten Menzel, Ena Tobin, Kenneth N. Brown, Mateo Burillo purchase orders, etc. The main components for a performance based maintenance scheduling methodology with an emphasis on topics (3) and (4) - their purposes and interactions will be described in more details in the following paragraphs. 6 Maintenance Process Management The first component discussed is a maintenance template management system, consisting of process models for different maintenance tasks. Each building service component will have their appropriate maintenance tasks recorded in this template system. Each of these tasks templates details the position of the component with regard to the overall building service system, the sequence of actions which needs to be performed, the estimated time for each action, and the required resources (e.g. spare parts, tools, etc.). In our case the template management system will be complied using the ARIS methodology. This methodology was chosen due to its ability to allow for good decomposition and synthesis of complex value chains and the ability to drill down from value chain level to extended Process Chain Level. More about this methodology can be found in ARIS - Business Process Modeling (Scheer A.W, 2000). By using this methodology it is possible to attach documents and codes to the process models. The responsible actors will also be detailed in these models through the use of organizational units. This will allow the maintenance support system to determine the employee skills type required to carry out a particular task. The task template can be evaluated by the predictive maintenance scheduling components and finally be attached to the work schedule forwarded to the individual member of the collaborative network. Fig 1: ARIS Maintenance Task Model The ARIS diagram on the left is for the main wheel section of a thermal wheel component. This component is used for two purposes, as a heat exchanger and as humidity control device.

Performance Based Maintenance Scheduling for Building Service 493 We envisage triggering fault reports automatically through data analysis of building performance data in the Data Warehouse briefly described in section 3. Since the dimensional data of the DW will contain the multiple dimensions, such as building services system hierarchies, location hierarchies, etc. each fault report could specify the component by tracing the component through a building service component list and recording its position. This will allow the component to be isolated in terms of it whole system down to its own unique purpose and will allow for the exact determination of the maintenance task needed from the ARIS processes. As performance based maintenance is dependant on past experience and past data trends, it will be possible to update these maintenance task with additional data as a building operational period progresses. As a building may incur a change in functionality over time and as a result the maintenance tasks may vary from original definition. The functionality of a collaborative network is paramount to ensure the transfer of knowledge with regard to such changes. 7 Constraints for Maintenance Scheduling Performance based maintenance scheduling has to consider various constraints, such as (1) availability of staff, (2) availability of parts, (3) temporal constraints on tasks, (4) building use patterns, (5) criticality of repairs. Criticality of repairs is where the scheduling connects to the aims of performance based maintenance. We assume that we have diagnosis information which tells us the effect the part of the system is having on the performance of the building. The following paragraph describes two components created to deal with the above constraints. The space management component checks the accessibility of locations, such as rooms, floors, zones to perform a maintenance tasks. It will serve the facility managers or the building operators of the building management company. The facility managers will use it to check the accessibility of rooms and that they need to access to carry out individual maintenance tasks. If rooms are available they will be booked and the maintenance will be scheduled. The tool helps to solve accessibility constraints within the Collaborative Network. The inventory control component checks the availability of spare parts and tools which are needed to perform maintenance tasks. It will serve the building technicians, the building operators and also the purchasing and accounting departments of the building management company. The operators and technicians will use it to book stock that they need to carry out individual maintenance tasks. If there is no available stock, the user will be able to check if a delivery is already scheduled and if not then the user will have the option to order the stock needed. There are a series of constraints that help the technicians pin point the appropriate stock that they need. It begins with the technician defining the location where the task will be carried out and then the type of stock needed the quantity and the time period when it will be needed. The accounting department will also be able to utilize the information gathered in order to analyse the financial constraints. The interfaces for this purpose have no been included here but they would display the history of stock usage and the suppliers most used, etc.

494 Karsten Menzel, Ena Tobin, Kenneth N. Brown, Mateo Burillo The competency management component checks the accessibility of staff with required skill sets and expertise within the Collaborative Network. It will serve the facility managers and the sub-contractors. The facility managers will use it to check the availability of subcontractors. Subcontractors will use the tools to offer available resources and skills to the Collaborative Network. The tool helps to solve competency constraints within the Collaborative Network. 8 Conclusions and Acknowledgements The integration of complex renewable energy systems, such as solar panels, geothermal heat pumps etc. increases the complexity of required maintenance activities and the need to access more specialized skills and competencies. Both, this need for more specialized knowledge and changing business models for Facility Management create a need for the introduction of Collaborative Network scenarios in the FM sector. In our paper we propose a scenario and a methodology for integrated information management to support a new paradigm for maintenance management performance based maintenance scheduling. We argue that the availability of wireless sensing and metering devices complemented by advanced data management and analysis tools will enable the introduction of predictive maintenance in the FM-sector and contribute to the more efficient operation of buildings. The work presented in this paper is jointly supported by Science Foundation Ireland (grant-number 07.SRC.I1170) and five industry partners. Further information is available at http://zuse.ucc.ie/itobo. References 1. Ahmed A, Menzel K, Ploennigs J, Cahill B. Aspects of multi-dimensional Building Performance Data Management, to be published in Proceeding of EG-ICE, Berlin, July, 2009. 2. Ahmed, I., & Nunoo, C. (1999). Data Warehousing in the Construction Industry: Organizing and Processing Data for Decision Making. 8DBMC (pp. 2395-2406). Vancouver: NRC Research Press. 3. Barrett P, Baldry D. Facility Management towards best practice. Blackwell publishing, 2003 4. Camarinha Matos LM. Collaborative networks: a new scientific discipline. Journal of Intelligent Manufacturing, 16, 439-452, 2005. 5. Kister TC, Hawkins B. Maintenance Planning and Scheduling Handbook. Elsevier Inc, 2006 6. Lane, P. (2007). Data Warehousing Guide, 119g Release 1 (11.1), Oracle Data Base,. Oracle. 7. Lee, J., & Lee, H. (2002). Principles and Strategies for applying Data Warehouse Technology to Construction Industry. ECPPM, ework and ebusiness in Architecture, Engineering and Construction (pp. 341-353). Slovenia: Swets & Zeitlinger. 8. Scheer, August-Wilhelm, ARIS - Business Process Modeling, Springer, New York, Heidelberg, 2000.