GAO Peng PetroChina Planning & Engineering Institute September 24th - 26th, 2013 Xi An

Similar documents
China Railways Development, Financing and Challenges

CHINA OIL AND GAS PIPELINE STANDARD SYSTEM

LNG Poised to Significantly Increase its Share of Global Gas Market David Wood February 2004 Petroleum Review p.38-39

Enhancing the Gas and Electricity Business Model to Meet Social Needs

Development and Outlook of Internet of Things in China. CATR of MIIT June 5, 2012

Status of China s regional trading programs: progress and challenge

Ukraine s Gas Market Reform: Green Light to Investments in Natural Gas Transmission, Production and Energy Efficiency

Questions to be responded to by the firm submitting the application. Why do you think this project should receive an award? How does it demonstrate:

CHINA MOBILE LIMITED ANNUAL REPORT Business Review

The Company participated in overseas exhibitions. We provide an integrated package of services through all stages of operators value chain.

Canada s Energy Sector in a Changing Global Market. Kristi Varangu Director, International Energy Division March 10, 2014

Machinery and equipment manufacturing in China

China s Economic Miracle in 30 Years

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

TURKISH GAS NETWORK & PIPELINES RECENT DEVELOPMENTS

China s Technology Development and Innovation Strategy

Electricity market drivers

World Energy Outlook Presentation to the Press London, 10 November 2009

World Energy Outlook 2007: China and India Insights. International Energy Agency

Challenges and Opportunities for Small Businesses Engaged in Energy Development and Energy Intensive Manufacturing

Natural Gas and Electricity Coordination Experiences and Challenges

Implications of the 12 th Five-Year Programme for Hong Kong Businesses

Sinopec Corp. Announces FY2010 Interim Results

Natural Gas Information Contents

The Future of Biogas in China

Global growth rates Macroeconomic indicators CEDIGAZ Reference Scenario

Policies and Practices of China In Commercialization of Public R&D Outputs

Electric and Natural Gas Distribution Systems. Presented by Brian Beam New Jersey Board of Public Utilities Division of Reliability & Security

Developing Estonian energy policy hand in hand with EU energy packages

China s Natural Gas Market

CNOOC Natural Gas Business

PIPELINE FUNDAMENTALS. texaspipelines.com

Coalbed Methane Production!

Natural gas distribution in Serbia. Author: Božidar Mijović,B.Sc.Mech.Eng. Director natural gas distribution E mail: bozidar.mijovic@srbijagas.

Slides prepared by the Northeast Gas Association

Air China Limited Announces 2014 Annual Results

Medium-term management plan (FY )

OUR CONVERSATION TODAY

CB(1)401/12-13(01) Natural Gas Supply to CAPCO/CLP

Dominion. Dan Weekley Vice President, Corporate Affairs. Dan Stoddard Senior Vice President, Nuclear Operations. March 24, 2016

OUR CONVERSATION TODAY

S Y S T E M M O D E R N I Z A T I O N

AN OVERVIEW OF INDIA S ENERGY SECTOR

Economic Planning in China by Gregory C. Chow, Princeton University CEPS Working Paper No. 219 June 2011

Nabucco Gas Pipeline Project

J. Freihaut, Ph.D. Architectural Engineering, Professor Penn State Univesity

The Pipelines Regulations, 2000

DANISH DISTRICT ENERGY PLANNING EXPERIENCE

Business Policy of CEZ Group and ČEZ, a. s.

TMK ANNOUNCES 4Q 2012 AND FULL-YEAR 2012 IFRS RESULTS

BMEI BMEI CO., LTD. Environmental Total Solution Vender.

中 國 石 油 天 然 氣 股 份 有 限 公 司 PETROCHINA COMPANY LIMITED. Connected Transaction. Assets Transfer

Challenge 2020 Vision

Smart Cities. Smart partners in tomorrow s cities

Good afternoon, and thanks to the Energy Dialogue for your kind invitation to speak today.

South Stream Project

INTERNATIONAL. Technical journal for piping system integrity and efficiency

Study on Driving Force of Economic Growth in Beijing and Outlook on Prospect of Economic Growth during 11th Five-year Plan Period

Economic Analysis on Development of Marine Insurance in Shanghai. 1 Introduction

Fifty years of Australia s trade

Opportunities and Challenges for Australian Gas Presentation by James Baulderstone at the Australia Gas Conference

Russia s gas sector and gas export developments. Marc-Antoine Eyl-Mazzega June 2015

Harbin Bank s Featured Road to Inclusive Finance

Comparative Analysis of Shanghai and Hong Kong s Financial Service Trade Competitiveness

TECHNICAL INFORMATION ABOUT NATURAL GAS TRANSPORT

New York State Department of Taxation and Finance Taxpayer Services Division Technical Services Bureau. TSB-A-96 (10) C Corporation Tax March 25, 1996

Energy Situation in Egypt

Development of consumer credit in China

CHINA 2050 HIGH RENEWABLE ENERGY PENETRATION SCENARIO AND RODAMAP STUDY

Development of O&M Information Management Framework using Configuration Management for Gas Pipeline Project in Permafrost Areas

Testimony of Matthew Paxton President, Shipbuilders Council of America

LNG terminal project in Lithuania November, 2012

Issue. September 2012

Testimony of Barbara D. Lockwood, P.E. Manager, Renewable Energy Arizona Public Service Company

Soil Contamination Legislation in China: Progress and Prospect

Gas Marketplace Work? July 9-13, 2007

Greece s Role as the Emerging Energy Hub of South- Eastern Europe: DESFA s Role and Perspectives

Announcement on Providing Guarantee for the Subsidiary Company - Offshore Oil Engineering (Qingdao) Co., Ltd. by Offshore Oil Engineering Co., Ltd.

Global Marine Trends 2030

Transcription:

Natural Gas Pipeline Network Construction in CNPC: Current Status and Trends GAO Peng PetroChina Planning & Engineering Institute September 24th - 26th, 2013 Xi An 1

Contents Current status of natural gas pipeline network construction in CNPC Development fundamentals of natural gas pipeline network construction in CNPC Development Trends of natural gas pipeline network construction in CNPC 2

Natural gas pipeline network construction in CNPC Source: CNPC Press In operation In construction In 1996, the 1st Shaanxi-Beijing gas pipeline was put into construction, which opened the large-scale construction of natural gas pipelines for China. Since then, the SeNingLan pipeline, the 1 st and 2 nd west-east gas pipeline, the 1 st,2 nd and 3 rd Shaanxi-Beijing pipeline, Jining inter-connection pipeline have been built. By the end of 2012, the trunk and 8 branches of the 2nd West-East Gas Pipeline were put into operation, connected with more than 20 domestic and foreign pipelines. The clean energy was delivered to the areas along the routes, which greatly improved China's energy consumption structure. Thus, the natural gas ratio in the total primary energy consumption rose from less than 3% to nearly 5%. 3

Natural gas and pipeline business in CNPC CNPC is China s largest oil and gas pipeline contractor and operator. In 2012, CNPC gas and pipeline business focus on achieving the goal of Green CNPC. Our natural gas operations and sales revenues continued to grow. Pipeline network: About 40 thousand kilometers of natural gas pipeline in China in operation; 5 Pipeline regional companies, be responsible for the corresponding region of pipeline operations and management. Underground gas storages : We extracted more gas from our underground gas storages in Dagang, Huabei and Jintan to meet the needs of seasonal peakshaving. LNG receving terminal: The LNG terminals in Jiangsu and Dalian maintained steady operation, playing an effective role in peak-shaving and providing emergency supplies. Natural gas marketing:natural gas sales reached 97.3 bcm of natural gas in 2012, up 17.7% year-on-year, covering 29 provinces, municipalities and autonomous regions in China Source: www.cnpc.com.cn 4

Gas pipeline technical level In 1997, the Shaanxi-Beijing pipeline put into operation. China natural gas pipeline construction began toward long-distance, large-diameter, high-pressure and highly automated management direction In 2004 and 2005, the 1st West- East Pipeline and the 2rd Shaanxi-Beijing Pipeline put into operation Create the new record of longdistance, large-diameter, highpressure for China gas pipeline construction, making 1016 mm diameter, X70 pipe steel, design pressure of 10 MPa been successfully applied In 2009, the west section of the 2nd West-East Pipeline put into operation China gas pipeline reached 1219 mm in outside diameter, X80 in pipe steel,12 MPa in design pressure and 30 bcm annually 5

The technology of natural gas infrastructure construction and major project construction has improved continuously With the 2nd West-East Pipeline and the other large-scale pipeline projects being implemented gradually. It has driven the domestic X70 and X80 serious steel pipes, 40- inch and 48-inch high-pressure and large-diameter pipe welded ball valves, 20-Megawatt class electric drive compressors been successfully developed and applied. The own technologies in underground gas storage, LNG terminal and the other engineering construction are mastered. Localization of major equipment for large-diameter, high-pressure, high-grade and long-distance pipelines Technology about thin multilaminated construction of salt cavern underground gas storage Independent design, construction technology and capabilities for LNG terminals X80 离 心 式 压 缩 机 6

The introduction of social capital investment into the 3 rd West-East Gas Pipeline project In 2012, the 3rd West-East Gas Pipeline project was launched. Its investment are from CNPC and the National Council for Social Security Fund, Urban Infrastructure Construction Investment Fund, Baosteel as shareholders. And the private capital from the Industrial and Commercial Bank of China (ICBC) will flow to the project through the urban infrastructure facilities investment fund. 7

Contents Current Status of natural gas pipeline network construction in CNPC Development fundamentals of natural gas pipeline network construction in CNPC Development Trends of natural gas pipeline network construction in CNPC 8

1 The rapid economic development in China is the driving force for the oil and gas demand The development of China's economy is always maintaining a high development speed in the past thirty years, and the economic account is ranking the second in the world. It is estimated that it will keep the development of high speed (7% - 8%) in the next period of time. Economic development will drive the development of car and transport and other related industry, and it will drive the growth of oil and gas consumption. Gross Domestic Product (billion Yuan) Car ownership (thousand car) freight turnover (million ton-kilometers ) 52 trillion Yuan 2nd of the world 3rd of the world 4th of the world 17 trillion ton-km 6th of the world 100 million cars 10th of the world the economic development situation of cars and cargo industry in China 9

2 Energy consumption is growing rapidly. But the consumption structure is unreasonable, and the environment stress is huge The total energy consumption in China is 3.62 billion tons of standard coal in 2012, and the coal accounted for 66.2%. In the first half year of 2013, the average ratio of air quality standard number of days in 74 cities is 54.8%, and the excessive number ratio is 45.2%. The situation of energy consumption in China between 1980 and 2012 40 35 (100 million tce) 水 Wind 核 风 power 电 天 Natural 然 气 gas 石 Oil 油 煤 Coal 炭 能 Energy 源 增 growth 速 经 Economic 济 增 速 growth 30 25 8% 5% 19% 20 15 10 5 6.0 68% 0 1980 1990 1992 1994 1996 1998 2000 2002 2004 2006 2008 2010 10

3 The growth rate of gas consumption in China is the first among the world The natural gas consumption in 2012 is 147.1 bcm, and it is the fourth in the world. And it accounted for 5.5% of the total primary energy consumption in China. China's natural gas consumption is growing by an average rate of 21% since 2005. 11

4 Strong demand in China's natural gas market The official commercial operation of West to East project in 2004 is marking the China gas market turn from the start-up period into the development period. If consider the management of PM2.5, it is estimated that the demand of natural gas market will be considerable. 12

5 12 th Five-Year Plan for Natural Gas and Energy successively released, and more clear policy direction for pipeline construction 12 th Five-Year Plan for Natural Gas (2011-2015) (Issued in October 2012, NDRC), and 12 th Five-Year Plan for Energy (2011-2015) (Issued in January 2013, State Council ) Both the plans put forward clearly to key missions on accelerating the oil and gas backbone pipeline network construction, and speeding up the construction peak-shaving facilities. The focus is natural gas pipeline construction. 13

Contents Current Status of natural gas pipeline network construction in CNPC Development fundamentals of natural gas pipeline network construction in CNPC Development Trends of natural gas pipeline network construction in CNPC 14

1 CNPC will implement diversified natural gas resource supply for China market in the future To meet the huge demand of domestic market, CNPC will form diversified natural gas resources supply, such as the domestic conventional gas, unconventional gas(cbm, shale gas), coal-based synthetic natural gas, imported LNG, pipeline gas imports and so on. 15

2 Development Trends of natural gas pipeline network technology in CNPC Technology dvelopment goals: With the safe, economical and optimized operation ability for the large pipeline network; Newly-built trunk pipeline to achieve a high level of design, construction and operation management, reaching the world advanced level; Reduce energy consumption for the pipeline transmission; Strengthen pipeline safety management, and reduce pipeline accident rate. Key technology research Pipeline Leak Detection Technology Automatic pipeline welding and ultrasonic testing integrated technology Pipeline production information system Geographic Information System Pipeline safety assessment and risk management technolgy Pipeline quick repair and maintenance technology Energy-saving and environmental protection technology 16

The development direction of large-diameter, high-pressure, and Highgrade steel Keep progressing for the direction of large-diameter, highpressure, and High-grade steel Diameter: DN700 DN1000,DN1200 Pressure: 6.3MPa 10MPa,12MPa Steel grade: X65 X70,X80 Capacity: 17bcm 30bcm annually Diameter: 1420mm Pressure: 11.8MPa Steel grade: X80 Capacity: 50bcm annually Diameter: 1219mm Pressure: 17.2MPa Steel grade: X80 Capacity: 45-59bcm annually China 1 st and 2 nd West-East Pipeline 3 rd West-East Pipeline (Under construction) Russia USA Baffa Petrenko-Ucha pipeline Alaska-Alberta pipeline (Under construction) (In plan) 管 道 建 设 世 界 发 达 国 家 17

The degree of network keep increasing Compared with the developed countries or regions, there is still a large difference in the degree of natural gas network in China. The construction of natural gas pipeline network still is the development trend in China. 18

The process of localization of the key equipments and control systems will be continued to advance At present, via the 3 rd West-East pipeline project, CNPC is to gradually realize the gas pipeline localization of key equipments, such as high-power long-distance pipeline compressor. 19

The next few years will continue to be the peak period of China gas pipeline construction With the import of large foreign resources and the production growth of some domestic gas-fields as well as the market booming, the natural gas infrastructures is bound to be substantially developed. It is estimated that until 2020, CNPC will shaped a comprehensive national gas pipeline supply system with connected to the import resources, the major domestic natural gas producing fields, the LNG receiving terminals, the underground gas storages. The system will be resource-diversified, scheduling-flexible, supply-stabile and peakshaving facility-complete. 20

3 The pipeline interconnection problems need to be concerned 1st: Especially note the construction of the supporting underground gas storages, the LNG emergency peak-shaving terminals and some hub stations, in order to ensure the safe operation of the pipeline network running smoothly. 21

2nd: Recommend to formulate a standard on pipeline pressure rating, for convenience of the pipeline network planning and wholy building At present, China has not yet formed a unified standard of the pipeline pressure rating series. Suggestion: 12MPa (Trans-national pipelines, national interregional trunk, interconnection pipeline) 10MPa (National interregional trunk, interconnection line, Branch trunk line 6.3MPa(Subtransmission branch) 4.0MPa(Branch line,distribution network 22

3rd: Recommend a standardized network gas property conditions, and make the timely implementation of energy metering When the gas with different Calorific values from the different resources enter the same network, such as the import pipeline gas, import LNG, CBM, shale gas, SNG, and the domestic natural gas, the gas property standard problem is particularly critical. Source: [1]LUO Dongxiao. Natural Gas Industry, 2006 [2] LI Luguang. Natural Gas Industry, 2011 23

Thank you for your attention! 24