UMZINYATHI DISTRICT MUNICIPALITY IT DISASTER RECOVERY PLAN



Similar documents
OKHAHLAMBA LOCAL MUNICIPALITY

MATATIELE LOCAL MUNICIPALITY DISASTER RECOVERY PLAN

Planning for a Disaster Using Tivoli Storage Manager. Laura G. Buckley Storage Solutions Specialists, Inc.

Tk20 Backup Procedure

BUSINESS CONTINUITY PLAN

DNS must be up and running. Both the Collax server and the clients to be backed up must be able to resolve the FQDN of the Collax server correctly.

POLICY NAME IT DISASTER RECOVERY POLICY AND PLAN POLICY NUMBER POLICY FILE REFERENCE 3/3/6 DATE OF ADOPTION REVIEW OR AMENDMENT DATES

2.1 To define the backup strategy for systems and data within the Cape Winelands District Municipality (CWDM).

ecotton System Configuration White Paper

SmartFiler Backup Appliance User Guide 2.0

Version: Page 1 of 5

UMHLABUYALINGANA MUNICIPALITY

PCGenesis Backup / Reorganization / Restore Checklist

Missed Recovery Techniques for SQL Server By Rudy Panigas

NETWORK SERVICES WITH SOME CREDIT UNIONS PROCESSING 800,000 TRANSACTIONS ANNUALLY AND MOVING OVER 500 MILLION, SYSTEM UPTIME IS CRITICAL.

Disaster Recovery Plan

The Carbonite Appliance HT10 User Guide

NetVanta Unified Communications Server Backup and Restore Procedures

Stellar Phoenix Exchange Server Backup

Attachment to Data Center Services Multisourcing Service Integrator Master Services Agreement

BrightStor ARCserve Backup for UNIX

How To Backup An Exchange Server With 25Gb And More On A Microsoft Smartfiler With A Backup From A Backup To A Backup Point Set On A Flash Drive On A Pc Or Macbook Or Ipad On A Cheap Computer (For A

What you need to know about cloud backup: your guide to cost, security and flexibility.

Installing and Configuring Windows 7 Client

HP One-Button Disaster Recovery Solution for ProLiant Servers

Business Continuity. Disaster Recovery Plan

HP External Hard Disk Drive Backup Solution by Seagate User Guide. November 2004 (First Edition) Part Number

Module 7: System Component Failure Contingencies

SmartFiler Backup Appliance User Guide 2.1

Table of Contents. Online backup Manager User s Guide

4 Backing Up and Restoring System Software

Overview Customer Login Main Page VM Management Creation... 4 Editing a Virtual Machine... 6

6422: Implementing and Managing Windows Server 2008 Hyper-V (3 Days)

Side-by-side Migration Guide for Snare Server v7

SIMIAN systems. Setting up a Sitellite development environment on Windows. Sitellite Content Management System

How To Create A Large Enterprise Cloud Storage System From A Large Server (Cisco Mds 9000) Family 2 (Cio) 2 (Mds) 2) (Cisa) 2-Year-Old (Cica) 2.5

VMware vcenter Configuration Manager Backup and Disaster Recovery Guide vcenter Configuration Manager 5.7

Archiving File Data with Snap Enterprise Data Replicator (Snap EDR): Technical Overview

HP Data Protector Express Single Server Edition technical white paper

San Francisco Chapter. Information Systems Operations

Information Technology Security Procedures

File Protection Using Rsync User Guide

USING GENIE REMOTELY

North Street Global, LLC. Business Continuity Plan

DISASTER RECOVERY PLAN

VOICE IMPROVEMENT PROCESSOR (VIP) BACKUP AND RECOVERY PROCEDURES - Draft Version 1.0

Backup with synchronization/ replication

Entrust IdentityGuard Comprehensive

SYMANTEC BACKUPEXEC2010 WITH StorTrends

M6422A Implementing and Managing Windows Server 2008 Hyper-V

Access to easy-to-use tools that reduce management time with Arcserve Backup

Tiburon Master Support Agreement Exhibit 6 Back Up Schedule & Procedures. General Notes on Backups

VMware vcenter Configuration Manager Backup and Disaster Recovery Guide vcenter Configuration Manager 5.4.1

BACKUP AND RECOVERY PLAN MS SQL SERVER

Planning a Backup Strategy

IT Assurance - Business Continuity and Disaster Recovery

Education and Workforce Development Cabinet POLICY/PROCEDURE. Policy Number: EDU-06 Effective Date: April 15, 2006 Revision Date: December 20, 2012

EaseUS Todo Backup PXE Server

DISASTER RECOVERY PLAN FOR MKHAMBATHINI MUNICIPALITY

Implementing Microsoft Windows 2000 Clustering

Business Continuity Planning (BCP) / Disaster Recovery (DR)

«Disaster Recovery» A DOM Restore Guide for Thecus NAS

Using Emergency Restore to recover the vcenter Server has the following benefits as compared to the above methods:

CDP 3.0 Release Notes

NBU651 BMR. Avi Weinberger

Creating a New Domain Tree in the Forest

VDI can reduce costs, simplify systems and provide a less frustrating experience for users.

Implementing and Managing Windows Server 2008 Hyper-V

IT - General Controls Questionnaire

Integrating Data Protection Manager with StorTrends itx

PCLaw Scheduled Backup

HP Device Manager 4.6

COMPELLENT SERVER INSTANT REPLAY: A COMPLETE BOOT FROM SAN SOLUTION WHITE PAPER MARCH 2007

Hyper-V backup implementation guide

FileCruiser Backup & Restoring Guide

Disaster Recovery Checklist Disaster Recovery Plan for <System One>

Year

Server Installation Procedure - Load Balanced Environment

Local Government Cyber Security:

Administering the Web Server (IIS) Role of Windows Server

DRAFT Disaster Recovery Policy Template


Transcription:

UMZINYATHI DISTRICT MUNICIPALITY IT DISASTER RECOVERY PLAN

Index 1. Aims Of The Disaster Recovery Plan 2. Ownership 3. Disaster Recovery Plan Coverage 4. Emergency Contact Details Of Key Persons 5. Priority Levels Of Key Systems 6. Deadline for Key Recovery 7. Key System Requirements 8. Preventative Measures 9. Financial Management Systems 10. Mail Server 11. Separate Recovery Site 2

This is a formal Disaster Recovery Plan for UMZINYATHI DISTRICT Municipality. 1. Aim of the Disaster Recovery Plan The main aim of the IT Disaster Recovery Plan is to ensure that should the Municipality experience disaster of any nature (e.g., firebreak, power surge or building is damaged etc.), the Municipality has contingency plans for backup systems. The plan is there to make staff aware of what procedures should be followed when connecting backup systems and who are the key contact persons for the systems. The DRP is there to ensure that the Disaster Recovery Team is appointed and trained properly, so that even if the IT staff is not in the office the team can take charge successfully. 2. Ownership The Municipality has several departments amongst which there is Financial Services Department. The Financial Services Department is responsible for managing all computer systems for the Municipality; hence, they must make sure that in times of disasters they are supposed to have a proper plan in place. The Financial Services Department is therefore the custodian of the Disaster Recovery Plan. The designated Disaster Recovery Plan contact person is IT Officer. The contact details are as follows: Tel : (W) 034 (H) 034 (Cell) (consider providing a municipal cellphone) 076 089 1543 The Information Technology Disaster Recovery Plan shall be kept at Umzinyathi District Municipality or in with the Municipal Bank. The contact person is the Branch Manager. Tel: 034 3

Fax: 034 Cell: 3. Disaster Recovery Plan Coverage The person who has authority to declare a disaster is the is the Information Technology Administrator(ITA) in consultation with the Municipal Manager and IT Committee. The Disaster Recovery Team will consist of IT Manager, Chief Financial officer and Accountant. Ex-Officio members are HOD s from Corporate Services. The Systems that the Municipality has are: Sebata Financial Management System Sebata Integrated Payroll System VIP Vizual Personel Internet E-mail facilities All the above systems are in different servers within the municipality. 4. Emergency Contact Details of Key Persons Details Contact Person Telephone Number Fax Number Sebata FMS Sebata Payroll System Internet E-mail Network & Hubs In the event that a problem that cannot be resolved locally, the Disaster Recovery Team in consultation with the Municipal manager would recommend the relevant companies to be contacted to fix the problem. 5. Priority Levels of Key Systems 4

The Municipal systems will be listed according to their priority order, the 1 st one being the: Sebata Financial Management System Sebata Payroll Systems Firewall Network, routers and Hubs Mail Server & Internet Server 6. Deadline for Recovery If there is a disaster of any kind, it must only take a maximum of three days to recover and have all users online. 7. Key System Requirements Financial Management System is running on a windors 2003.UNIX Operating System, the programming language used is COBOL. Mail Server and Firewall are running on BSD Operating System built on Redhat Configuration Settings Details IP address Contact Sebata Financial Management System Payroll System Mail Server Firewall Internet 5

8. Preventative Measures There is a 20 KVA UPS that can power the servers and processing facilities for a minimum of an hour. There is also an air conditioning system in the Server room for the purpose of maintaining a constant cool temperature. There are Backups taken on a daily, weekly & monthly basis for Sebata Financial Management System, Payroll System & File Server. The SH-Month backup should be done on a monthly basis that backs Payday system, Sebata Financial Management System as well as Hardware & Software of the UNIX machine. It is therefore this SH-Month backup that we keep off-site together with a monthly backup of a File Server. The other tape backups we keep on-site in a Safe. The tapes that are off-site are kept at Umzinyathi District municipality. The contact person is the Assistant Chief Financial Officer : IT division. The backup tapes are tested on a regular basis. Procedure for the Retrieval of Backup tapes The type of tapes used for Sebata Financial Management System is HP DDS 4 Phone Umzinyathi District Municipality to get SH-Month backup tape for the previous month DDS 4 Also get a previous monthly backup tape for a File server. 9. Sebata Financial Management System 6

Install basic UNIX this will be done by Sebata Financial Management System Systems Sebata Financial Management System: Put in an SH-Month backup tape and Login as root In root you type the following command: Once this is done, you then put in the latest daily backup tape You Login name On your main menu you choose R: for Security Utilities after which you choose B for Restoring Data and then restore all modules then exit. 10. MAIL SERVER Mail server and Firewall would only need re-installation then re-configuration The STU s are rented with Telkom and the Routers are rented with ( ), as a result in time of disaster the district office will only need to call ( ) for the replacement of these devices. 11. Payroll System Insert tape backup Login as root In the shell prompt type Remove tape Exit 12. Separate Recovery Site The Municipality is in a process of buying backup Servers in the order of importance as mentioned above. All of the servers will be installed and configured to be the same as the existing machines. Once that exercise is complete those machines will be placed off-site, so 7

that if the whole building gets damaged the backup machines will just be taken from off-site, plug in and be online immediately thus minimizing down time. The off-site equipment will always be used as a test once a month to make sure that everything is in order. The command centre where all members of the recovery team will report to is the Director Corporate. There is no company contracted to assist in the recovery process, but the emergency contact details of key persons afore-mentioned can be utilized. COUNCIL APPROVAL AND EFFECTIVE DATE Approval of Policy by Council and Effective date: 17 December 2008 8