Integrated Data Management: COMOS Making data work Gerald Sturm-Ofenböck, General Manager Plant Engineering Software COMOS siemens.at/future-of-energy
Siemens Vision 2020 The partner of choice for Electrification Automation Digitalization The partner of choice for Electrification Automation Digitalization Siemens stands for the electrification of the world Siemens stands for the electrification of the world Page 2
COMOS Making data work. What we do. Providing answers to business challenges around Plant Lifecyle Management Improved competitiveness Better quality decision making Workflow optimization Saving potential across the entire plant lifecycle Page 3
Global trends within energy industry Why are we doing it. Trends towards green energy (must-runs like wind, solar) is changing the requirements or conventional power plants Increasing cost pressure due to a energy market policy Long term availability of assets (like gas turbine) in challenging operating conditions Outdated infrastructure Risk awareness in regards to health, safety & environment (HSE) Strict regulatory requirements Efficient information and knowledge management Regional differences in energy markets/policies Page 4
COMOS enables EPCs and O/O s to work with documents and data throughout the entire plant lifecycle Building the plant Building the plant (smarter) Engineering and Operating the plant Working to make documents Will not enable future requirements or needs Focused on delivery Working to make data Limits future solutions and functions Does not fully increase asset value Focused on engineering Making data work! Non-limited foundation for future Continuous increment of asset value by adding & managing data Information mobility Page 5
Intelligent Data Management Intelligent data management for highest plant availability and safety Transparent documentation Secure plant & project documentation Investment security & cost reduction Covering the entire plant lifecycle Intelligent data management for highest plant availability and safety Transparent documentation Secure plant & project documentation Investment security & cost reduction Covering the entire plant lifecycle Page 6
Manually initiated Information and document handover Manual comparison of all information and documentation is mandatory required Device Specification Tag lists Configuration data Connection diagram Function diagram I/O lists Device lists Tag lists I/O lists Device lists Configuration data Device Specification Requirement specification (URS and FDS) Test plans (IQ/OQ protocols FAT/SAT protocols) Manuals Device Specification Requirement specification (URS and FDS) Connection diagram Function diagram Configuration drawing Loop- and single line diagram Process flow diagram P & ID Isometric diagram 3D drawings Function diagram Hook up diagram Project management Document management Time schedule Maintenance planning Resources management Device manuals External documents All kind of PDF documents Revision documents Document management Excel Access Word Visio CAD MS-Project PDF Change of a Vortex Flow Meter to a Coriolis Mass Flow Meter Impact of the Change to the Information and Documentation Information flow only in one direction without any automatic update of information Hardware configuration CFC SFC Interlocks Configuration data I/O lists HW-Config SFC CFC HMI drawings Parameter list Recipes Reports Interfaces Scripts Possible inconsistence of all documents with higher costs for document management Page 7
Electronic Workflow based on Objects No manual update of information is required The information is based on objects Every document is a view to a object Reduces costs and effort for documentation All information are every time consistent Only one tool for all crafts Process Flow Diagram Single-Line- Diagram Device List Tag List Specification (Devices, Functions) HW-Config SFC CFC Test Plan FAT / SAT IQ / OQ Isometric Drawing Comos Database Hook-up Diagram Change 3D Drawing of a Vortex Flow Meter to a Coriolis Mass Flow Meter Impact of the Change to the Information and Documentation I/O-List Function Diagram P&ID Configuration Drawing Loop- Diagram Requirement URS FDS Detail Configuration Data Page 8
Answers for your business challenges COMOS answers How can I boost the efficiency of my plant throughout its entire lifecycle? How can I successfully counter increasingly short innovation cycles over the long term? How can I reliably manage increasingly complex data volumes? Integrated system landscape from engineering to operations Shorter project times and faster time to market through global collaboration Consistent, up-to-date documentation and reusability Page 9
Siemens Answers: COMOS Your Benefits for Energy Highest plant security and safe operations Efficient and effective maintenance & modification Regulatory compliance Intelligent data availability in all lifecycle phases Management of high data complexity Consistent plant and project documentation Interoperability and global collaboration Effective supply chain collaboration and sourcing Predictability (meeting schedules and plans) High planning flexibility Attraction, retention and efficient use of human resources Page 10
Our promise COMOS - Making data work. Seamless flow of information based on a globally consistent database end-to-end, across all disciplines and all phases of the plant lifecycle Access at all times to data that is always up to date in real time, independent of time zones Better quality decisionmaking throughout the plant s entire lifecycle More productivity More efficiency More flexibility Page 11
Stadtwerke Hannover AG (enercity), Owner Operator "One of the big advantages of COMOS is that the software is flexibly adapted to the existing work processes, and not the other way around, as is usual with other software products. David Röbbing, System Administrator at the power plant Linden Page 12
Andritz Oy, Finland We are already seeing significant improvements in terms of reduced engineering time and higher overall engineering performance. Because the pulp and paper industry is very cost-driven and for us, engineering is a major cost factor in our projects having a software solution such as COMOS really helps a lot. Ismo Lätti COMOS Administrator Andritz Oy, Finland Page 13
Contact information Ing. Gerald Sturm-Ofenboeck, MBA General Manager AT/IL Siemens Industry Software GmbH Tel.:+43 (664) 9682 490 www.siemens.at/comos E-mail: gerald.ofenboeck@siemens.com siemens.at/future-of-energy Page 14