(Always POWER DOWN printer and UNPLUG before doing any repair work)



Similar documents
Accessing the printer system board

Removing memory and option cards

Front Panel Board Cable Replacement Instructions

EPSON Stylus. Start Here

Replacing the Gateway M675 Keyboard

Replacing the transfer belt

UPGRADING AND SERVICING GUIDE

Replacing the Gateway M320 Keyboard

Mini multi-purpose sewing machine

FRONT WINDSHIELD SEAL INSTALLATION

Installing the Video Input and TV Tuner Cards in a Compact Computer or a Dual PCI-Slot Tower Computer

5800 Temperature Sensor Cable Assembly

HP Pavilion All-in-One MS200 series PC. Upgrading and Servicing Guide. Printed in

Use subject to terms and conditions posted at

Manual for GlobePharma Mini-Press II Rotary Tablet Press

Service Guide. Gateway M275

Z-Truck (Vertical Moving) Z-truck Flag. Y-Truck (Horizontal Moving) FIGURE 1: VIEW OF THE Z-TRUCK. Flexshaft Assembly

FUEL CELL CAR SCIENCE KIT ASSEMBLY GUIDE. Battery operation instructions:

CETAC Z-Drive Assembly

430 Power/Electronics Replacement

INSTALLATION INSTRUCTIONS

The Ultimate XBOX 360 Guide to Fix 3 Red Lights (RROD)

18974 (736) Singer No SINGER No ELECTRIC SEWING MACHINE INSTRUCTION MANUAL

Replacement Instructions. Warning: During this procedure, keep small parts away from children.

apple Service Source PowerBook G4 (DVI) Updated 4 December Apple Computer, Inc. All rights reserved.

Memory Modules User Guide

RULE # 1 is DON T mess with things that you don t know anything about! (Take them to a pro & pay them to fix it)

Compaq Presario Desktop Products. Upgrading and Servicing Guide

Lunette 2 Series. Curved Fixed Frame Projection Screen. User s Guide

SERVICE MANUAL. Corpus 3G. Seat system for electric wheelchair

CONFER ABOVE GROUND CURVE STEP / ABOVE GROUND CURVE STEP SYSTEM ASSEMBLY AND INSTALLATION MANUAL

Ford Ranger and Mazda Pickup Odometer Worm Gear Replacement

PORTABLE PA SYSTEM #1 LAST UPDATED: FEBRUARY 2011

MAINTENANCE & TROUBLESHOOTING

Processor Cage Fans, Front and Rear Replacement Instructions

Continuous ink supply system (CISS) For printer EPSON C65/ C67C64 C63/C68/C88/D68/D88/C87

Table of Contents. What to Expect with. Preparation. Tools Needed. Wiring. Hanging the Fan. Blades. Motor Housing.

Installation Instructions S

Memory Modules. Document Part Number: This guide explains how to replace and upgrade memory in the computer. May 2006

Assembly and Set-Up Instructions

POOL ROVER SERIES 2 ROBOTIC POOL CLEANER PRODUCT SETTINGS AND TROUBLESHOOTING GUIDE

Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors

Epson Stylus Pro 7900/9900 QUICK REFERENCE GUIDE

Epson Stylus Photo R1900 Series. Printer Parts. Accessories. Ink Cartridges. 11/07 Epson Stylus Photo R1900 Series - 1. Edge guide

Pet hair clipper. Model Diagrams within this manual may not be drawn proportionally.

Building A Computer: A Beginners Guide

Packard Bell Easy Repair

MAINTENANCE & TROUBLESHOOTING

Fading Red Tones on Color LaserJet 2600s

Main Library Meeting Room Use

KNITTING MACHINE Quick Tips for Knitting Success

UNPACKING AND ASSEMBLY

Retrofit Instructions Installing a Sport Heated Steering Wheel - Leather, Multifunction BMW X5, E53,

Upgrading and Servicing Guide

Navico-Northstar 2kW JRC Radar Package, Scanner Cable Removal and Replacement

SET-UP AND INSTALLATION FOR LEAD SCREW CARTRIDGE ASSEMBLY

Memory Modules. Document Part Number: This guide explains how to replace and upgrade memory in the computer.

Written By: Walter Galan

CAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED.

SC 7000 and SC 9000XL Patient Monitors SC 9000XL Monitor 12in (30.5cm) Display Service Manual Supplement Two

Written By: Walter Galan

Sublimation Frequently Asked Questions

PrintPAD CN3/4/3e/4e. User Guide

C5 Sound Deadening & Insulation Kit Interior Removal & Installation Instructions

MINI ELECTRIC SEWING MACHINE OPERATION MANUAL

GT3B Hack Kit Install Instructions Written By Austin Hutchison

KAWAI VERTICAL PIANO REGULATION MANUAL

HEAVY DUTY STAIR LIFT SYSTEM Installation and Service Manual

EPSON Stylus C66. Printer Parts. Printer Specifications. Accessories. User Replaceable Parts. Printing. Ink Cartridges. Mechanical.

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

SCREAMIN' EAGLE "HEAVY BREATHER" PERFORMANCE AIR CLEANER KIT

SERVICE GUIDE. Gateway Notebook

Inspiron 15. Service Manual Series

2-SLICE COOL TOUCH TOASTER

User Manual Important: First read the Medication Guide that comes inside your FORTEO carton.

Written By: Walter Galan

TENSION ISSUES? ROLLER SEE PAGE 7

GENUINE PARTS INSTALLATION INSTRUCTIONS

Bydureon 2 mg powder and solvent for prolonged-release suspension for injection

OWNER S MANUAL Table Tennis Table Patent Pending

Replacing the noisy cooling fan in ICOM IC-2KL by Bert Almemo, VE3OBU/SM7BUR

Afinia L801. Label Printer. Version 1.0

TOYOTA TACOMA HANDS FREE BLU LOGIC Preparation

In addition to information on preventing jams and what causes a paper jam, this section includes instructions for clearing the following jams:

BACKPACK SPRAYERS. MODEL NOS: KSP16 & KSP20 Part Nos: & OPERATING & MAINTENANCE INSTRUCTIONS GC04/12

Thread Tensions All Machines

M V Intake Manifold INSTALLATION INSTRUCTIONS

COMPACT ELITE MAT CUTTER

Repair Section. We need to remove both heat syncs from the motherboard. Heat syncs are shown in the picture below.

Written By: Walter Galan

apple Service Source Power Mac G4 Cube Updated June 2, Apple Computer, Inc. All rights reserved.

Quick Setup Guide MFC-240C STEP 1 STEP 2. Setup is Complete! Setting Up the Machine. Installing the Driver & Software

Caring for Your PleurX Pleural Catheter

Juice Box Stages 1&2 135&335 Installation Guide 5/10/08

This kit may void factory warranty please check with manufacturer.

3. Loosen 3 x grub screws in the Dec end cap and unscrew the cap and counterweight shaft. NEQ6 Belt Modification Kit.

Packard Bell Easy Repair 1. Packard Bell Easy Repair

TOYOTA Tundra BACK-UP CAMERA SYSTEM Preparation

Upgrading or Replacing a Host Interface Card in a Xanadu-230 Controller-Drive Tray

Transcription:

PRINTHEAD CABLE REPLACEMENT: 1. Release carriage from capping station and roll out to middle of printer. (Indicated below 1-A) Place rag under the area you are working on.just to catch any ink that might be dropped during the install. 2. Release pressure off of the CMYK lines by loosening the caps on the ink bottles. (Indicated on pg.2 Fig. 1-C) 3. Unscrew two thumscrews from carriage (Indicated below 1-A) Fig 1-A Two thumscrews that hold the RETAINER BAR to the carriage. Remove those screws in order to remove retaining bar. RETAINER BAR Fig 1-B Carefully slide RETAINER BAR out

4. Carefully slide the RETAINER BAR out (indicated previous page 1-B) 5. Insure that the CMYK ink bottles have no pressure by loosening the bottle caps (Indicated below 1-C) Fig 1-C (Always POWER DOWN printer and UNPLUG before doing any repair work) Loosen CMYK caps to insure that there is no pressure on those ink lines. 6. Pull the CMYK dampers off one at a time. Then pull the white ink dampers out (white ink are all connected through the White Ink Manifold) they will all come out together. (Indicated below 1-D) NOTE: Let the dampers hang loosely over the rag. CMYK dampers will hang over the LEFT side, and the WHITE will hang over RIGHT side. Fig 1-D White Ink Manifold lift up on this to get the white ink dampers off

7. Gently pull the printhead out of the carriage. Be careful where you pull from, it s best to use the area indicated below. Sometimes it will require both hands to get the head out. Usually pushing back, then lifting up, wiggling the head as you are lifting up. Notice the adjustment screw, this screw has been factory set to keep the printhead tilt correct. We do not want to adjust this screw. It s best to work around it when replacing the printhead. WARNING: Becareful not to damage the FACE of your printhead while installing the new one. NEVER touch the face of the printhead or lay it face down on anything. Fig 1-E ADJUSTMENT SCREW Place your fingers in the areas indicated (along the walls on bothe sides of dampers recievers). It might take both hands. 8. Pull the FFC cables straight out, be careful not to damage the Teeth on the cables. (Indicated in 1-F and 1-G) Fig 1-F Fig 1-G Pull FFC cables straight out, be careful not to damage teeth Pull FFC cables straight out, be careful not to damage teeth

9. Notice which direction the cables are facing in relation to eachother. The teeth (electrical tabs) are facing AWAY from eachother. (Indicated below 1-H) Fig 1-H LOWER SLOT CABLE (SLOT 2 on printhead) UPPER SLOT CABLE (SLOT 1 on printhead) Be sure to replace cables ONE AT A TIME, this insures the placement and direction for the cables are correct. 10. Remove the black plastic cover (this houses the CR BOARD) (Indicated below 1-I) Fig 1-I slide the cover forward then lift to remove Take the two screws holding the cover into place out. Slide the cover forward then remove. (This will reveal the CR BOARD)

11. In some cases your NEW FFC cables will not be PRE-FOLDED to fit yout machine. If your cables are PRE-FOLDED move on to step 12. If they ARE NOT PRE-FOLDED follow the steps below. Mark your EXISTING cables on the print head end. (Indicated below 1-J),then follow each cable to the CR BOARD and mark it the with corresponding marks on that end. (Indicated below 1-K) Then tape the EXISTING cables together (in this example I am using paper clips to hold the cables together) Remove the cables from the CR BOARD and use them as a template to fold your new cables. Fig 1-J Fig 1-K UPPER SLOT CABLE (SLOT 1 on printhead) LOWER SLOT CABLE (SLOT 2 on printhead) The fold doesn t have to be an EXACT match, the main goal is too insure that the cables are plugged in correctly. For example: The 1U (SLOT 1 UPPER CABLE) is plugged into the corresponding slot on the CR BOARD. If the cables aren t facing the right direction or the slot on the head or CR BOARD are switched, the printer will error upon start up. Fig 1-L This is the correct position for the UPPER SLOT CABLE on the CR BOARD (SLOT 1 on printhead) (J205 to HEAD CN2) This is the correct position for the LOWER SLOT CABLE on the CR BOARD (SLOT 2 on printhead) (J204 to HEAD CN1) 12.Gently unplug your existing cables from the CR BOARD. Plug your new cables into the CR BOARD. Be sure the teeth of the cables are facing correct way, start with slot 1. (Indicated below 1-L)

13. Connect the FFC cables to your new printhead. Insure that you are placing the correct cable into the correct slot on the head. Start with Slot one, and then insert slot two. (Indicated below 1-M) Fig 1-M SLOT 2 (lower slot) SLOT 1 (upper slot) Insert FFC cables into new printhed. Start with the SLOT 1, and insure that the cable teeth are facing the right way. Line up the cable into the SLOT before you push inn, be careful not to damage cable teeth. 14. Carefully re-seat the print head back into carriage. Be careful not to touch or damage the printhead FACE, push back on head and wiggle into position. (Indicated below 1-N) Ensure that the head is placed correctly, check that it is FLUSH with black plastic ramps on either side. (Indicated below 1-O) Fig 1-N Ensure that printhead face is flush with these plastic black ramps Fig 1-O

11. Carefully re-seat the white dampers first. (Indicated below 1-P) Fig 1-P 12. Re-Seat the CMYK dampers next, be sure to place the colors back into the correct order. (from left the order should be BLACK, CYAN, MAGENTA, YELLOW) (Indicated below 1-Q) Fig 1-Q Be sure to place the CMYK dampers back in the correct order from left the order should be BLACK, CYAN, MAGENTA, YELLOW

13. Re-Seat the retainer bar. Push down on tabs on reatainer bar as you are putting the thumbscrews back in. This ensures that printhead stays flush with ramps, and that dampers are seated correctly. (Indicated below 1-R) Fig 1-R Push down on retainer bar tab while putting thumbscrew back into place. 14. Re-check printhead and insure everything is placed correctly. (Check damper order, and printhead flush with plastic black ramps) 15. After double checking everything, we can dock the carriage back over the capping station, restart printer, tighten the CMYK bottle caps. 16. Do at least 2 head cleanings in order to prime the new head and pull out any air that got into dampers or ink lines. It also helps to wait about 10 minutes after head cleanings, just to allow any to find it s way out. 17. Do a nozzle check, the first one usually comes out a little spotty, at this point you can normally begin printing as usual.