ENGINEERING AND CONSTRUCTION BULLETIN



Similar documents
ENGINEERING AND CONSTRUCTION BULLETIN

GUIDANCE FOR THE CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (CPARS)

Chapter 4: Contractor Quality Control

Design-Build Mississippi Gate Additional Lane

Appendix A Contractor Quality Control Plan The Contractor Quality Control Plan is the Contractor s management plan for executing the contract.

REGIONAL MUNICIPALITY OF WOOD BUFFALO VENDOR / CONTRACTOR PERFORMANCE EVALUATION FOR SERVICES & CONSTRUCTION

Contractor Performance Information

NATIONAL FLOOD INSURANCE PROGRAM. Progress Made on Contract Management but Monitoring and Reporting Could Be Improved

VDOT GOVERNANCE DOCUMENT

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE DIVISION PROCEDURES MANUAL PROGRAM AND PROJECT MANAGEMENT

Notes. Score. 1 Basic Services 1.1. A few instances; could have been more proactive

CONTRACTOR PERFORMANCE SYSTEM PROCEDURAL DOCUMENT. Revision date: May 25, 2015

Controlling Our Critical Path: A CDOT Guide to Better Project Management Practices

U.S. Army Corps of Engineers, New York District Monitoring of a Hurricane Sandy Contract Needs Improvement

PROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT

a. Proposals shall be submitted in a sealed envelope and addressed as follows:

Vendor Performance Evaluation Requirements

Old Phase Description New Phase Description

GRANT AND CONTRACT ACCOUNTING GRANT REVIEW TOOLKIT POST AWARD PROCESS

Assistant Project Management - Training Program A 3-year Program Beginning strategy places the new employee into a three-year program that provides

Schneps, Leila; Colmez, Coralie. Math on Trial : How Numbers Get Used and Abused in the Courtroom. New York, NY, USA: Basic Books, p i.

GENERAL CONTRACTOR / CONSTRUCTION MANAGER SERVICES

City of Brantford Vendor Performance Scorecard for Consultant Services

Request for Proposals. Security Advisory Services for the International Executive Service Corps

ATTACHMENT 1: CONTRACTOR PAST PERFORMANCE REPORT CONSULTING SERVICES Note: Continuation sheets may be used if more space is required.

Monitoring Subcontracts. The views expressed in this presentation are DCAA's views and not necessarily the views of other DoD organizations

The purpose of the policy is to establish guidelines for the administration of the School Planning and the School Construction programs.

REQUEST FOR QUALIFICATIONS PROPERTY APPRAISAL SERVICES. Prepared by. City of Richmond Finance Department. February 18, 2016 RESPONSES DUE:

U.S. Army Corps of Engineers Transatlantic District-North Needs To Improve Oversight of Construction Contractors in Afghanistan

CITY OF SAN MATEO, CALIFORNIA

CHAPTER 5 - SAFETY ASSESSMENTS, LOG OF DEFICIENCIES AND CORRECTIVE ACTION PLANS

Performance Management Review Process Draft for Management Consultation Review

Module 1: INTRODUCTION. Submodule 1: What is Construction Quality Management (CQM)? "PROACTIVE PREVENTION vs. REACTIVE INSPECTION"

CMS DID NOT ALWAYS MANAGE AND OVERSEE CONTRACTOR PERFORMANCE

1. Delete Clause HQ G INVOICE INSTRUCTIONS and ADD the following two Clauses in full text to Section G:

How to Write the Construction Management RFQ/RFP

Module 5: SUBMITTALS. Objectives: After completing this module, you will be able to:

SAMPLE PWS FOR HRC MEO

Disabled Veteran 3% Comment [A1]: These will have to HUB Zone 3%

Request of Qualification Proposal for Construction Management Services

Open FAR Cases 7:58:07AM

DEPARTMENT OF DEFENSE Defense Contract Management Agency INSTRUCTION. Small Business Process

SCOPE OF WORK FOR PERFORMING INTERNAL CONTROL AND STATUTORY/REGULATORY COMPLIANCE AUDITS FOR RECIPIENTS OF SPECIAL MUNICIPAL AID

GOVERNMENT OF MALAYSIA STANDARD FORM OF DESIGN & BUILD / TURNKEY CONTRACT (PWD FORM DB/T)

Office of Audits. Independent Auditor s Report on the Application of Agreed-Upon Procedures Related to Selected DynCorp Invoices UNCLASSIFIED

REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER

Federal Acquisition Certification for Contracting Officers Representative (FAC-COR) Program Handbook

Orbit Group Advisory Services LLC INVESTMENT ADVISORY CONTRACT. 100 International Drive, Buffalo, New York 14221

CPAR Quality Checklist

NEWBURGH ENLARGED CITY SCHOOL DISTRIST NEWBURGH, NEW YORK REQUEST FOR PROPOSAL ARCHITECTURE SERVICES

Construction Management Services Delmar School District RFP No. DSD16001-CONSTR_MAN

ATTACHMENT A. Ozarks Technical Community College Pre-Established Criteria for Construction Management and Design Build Construction Projects

LOCAL AGENCY CONTRACT ADMINISTRATION CHECKLIST

PARTNERSHIP AGREEMENT Between The U.S. Small Business Administration And The Commodity Futures Trading Commission

Lawrence Livermore National Laboratory

TxDOT Internal Audit Report Equipment Maintenance and Repair

UNIFIED FACILITIES GUIDE SPECIFICATIONS

IMMUNOTEC INC. AUDIT AND DISCLOSURE POLICY MANAGEMENT COMMITTEE CHARTER AND WHISTLEBLOWER POLICY

GEORGETOWN PUBLIC SCHOOLS REQUEST FOR PROPOSALS. Perley Elementary School Roof Replacement Project DESIGN SERVICES

Construction Bond Audit Report. Office of Auditor General

LOAN APPLICATION TRI-COUNTY COUNCIL FOR WESTERN MARYLAND, INC. SUMMIT FINANCING SOLUTIONS State Lottery Terminal Fund (SLoT)

REQUEST FOR PROPOSAL (RFP) FORM. Enter title here. Invitation to Bid. Utica College invites you to submit a proposal to brief description.

QUALITY MANAGEMENT SYSTEM (QMS) PROGRAM MANAGEMENT DIVISION

REQUEST FOR PROPOSAL FOR ARCHITECTURAL SERVICES

Multifamily Cost Estimator Contractor

ALLEGIANT TRAVEL COMPANY AUDIT COMMITTEE CHARTER

DOE O 226.1A, IMPLEMENTATION OF DEPARTMENT OF ENERGY OVERSIGHT POLICY CONTRACTOR ASSURANCE SYSTEMS CRITERIA ATTACHMENT 1, APPENDIX A

CORPORATION FOR PUBLIC BROADCASTING Request for Proposals Moderated Online Focus Groups and Data Analysis

DEPARTMENT OF HEALTH CARE FINANCE

City of Winooski. Request for Proposals Department of Public Works ASSET MANAGEMENT SOFTWARE, IMPLEMENTATION AND TRAINING

REQUEST FOR PROPOSALS FOR Franchise Fees, Sales and Use Tax Audits

DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Washington, DC Construction CONTRACTOR SUBMITTAL PROCEDURES TABLE-OF CONTENTS

Procedure & Training Manual Flying Training Directorate

ACQUISITION ALERT Delegation of Invoice Approval Authority

STATE OF MINNESOTA MINNESOTA STATE COLLEGES AND UNIVERSITIES Minnesota State University, Mankato/System Office

Improving the ACT Building Regulatory System

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES

Audit Committee Charter

Professional & Scientific Performance Appraisal

Never confuse effort for results. If you're measuring effort as progress, you're not measuring the right thing

REQUEST FOR PROPOSALS VOLUNTEER SECURITY VETTING SERVICES

Module 8: QUALITY CONTROL SYSTEM (QCS) and RESIDENT MANAGEMENT SYSTEM (RMS) Submodule 1: Introduction and Overview

Request for Proposal HIPAA Security Risk and Vulnerability Assessment

Tobacco Point of Sale Marketing Software, Training and Technical Assistance

Exhibit 1 to Part 3 Project-Specific Terms

Transcription:

ENGINEERING AND CONSTRUCTION BULLETIN No. 2014-13 Issuing Office: CECW-CE Issued: 22 May 2014 Expires: 22 May 2016 Subject: Contractor Performance Assessment Reporting System (CPARS) Transition Guidance Applicability: Guidance 1. References: a. Federal Acquisition Regulation Subpart 42.15, Contractor Performance Information b. GAO-09-374, Federal Contractors: Better Performance Information Needed to Support Agency Contract Award Decisions, dated 23 April 2009. c. Engineering Regulation 415-1-17, Construction Contractor Performance Evaluations, dated 24 January 2012. d. DD Form 2626, Performance Evaluation (Construction), dated June 1994. e. Engineer Pamphlet 715-1-7, Architect-Engineer Contracting in USACE, dated 29 February 2012. f. DD Form 2631, Performance Evaluation (Architect-Engineer), dated April 1999. 2. The purpose of this ECB is to provide guidance for Architect-Engineer and Construction Contractor evaluations created in the new CPARS system. In April 2009, GAO issued report 09-374, Better Performance Information Needed to Support Agency Contract Award Decisions. The report in part recommended the Office of Federal Procurement Policy (OFPP), Standardize evaluation factors and rating scales government wide for documenting contractor performance. As a direct result of this report OFPP is implementing a single system to be used by all Federal agencies for the collection of past performance information for use in the source selection process. The CPARS, ACASS, and CCASS modules will be merged into a single application under the CPARS name and the ACASS and CCASS will no longer exist. 3. No new evaluations may be initiated in ACASS, CCASS, or CPARS after 28 May 2014 at 11:59 PM ET. All existing evaluations initiated prior to 28 May 2014 must be completed with all required signatures by 27 June 2014 at 11:59 PM ET or contract data, ratings, and narratives will

ECB No. 2014-13 Subject: Contractor Performance Assessment Reporting System (CPARS) Transition Guidance be lost and the assessment will be required to be recreated under the merged application available on 01 July 2014. It is imperative that all evaluations be completed in ACASS, CCASS, and CPARS prior to the merger. The Resident Management System (RMS) evaluation link will be taken offline on 28 May 2014. If the intent is to issue an unsatisfactory evaluation, it is recommended that field offices target an earlier submission date to allow for additional processing time. This will allow Contractors the full 30 day review period and time for field offices to complete evaluations before the 27 June 2014 blackout. 4. The news CPARS format will have fewer categories to evaluate contractor performance and require narratives, rather than an itemized list of detailed performance areas. Each assessment area has a text field that allows up to 24,000 characters to be entered. It is important that Assessing Officials capture the most important performance elements of our contractors in the simplified CPARS structure. The new CPARS categories are: a. Quality b. Schedule c. Cost Control d. Management e. Utilization of Small Business f. Regulatory Compliance g. Other Evaluation Area (1) See attachments to this ECB for required information h. Other Evaluation Area (2) Optional i. Other Evaluation Area (3) Optional Although these broader categories will no longer highlight specific performance disciplines and attributes, an appropriate level of details is still attainable by evaluation initiators. Therefore, it is recommended that the narratives under each of these categories be factual, concise, to the point, and include information that will make a meaningful difference when reviewed by source selection boards. This ECB includes two enclosures that provide the minimum required evaluation criteria to be used when completing contractor evaluations: (1) Typical USACE Construction Contractor Performance Evaluation Standards, and (2) Typical USACE Architect-Engineer Performance Evaluation Standards. These typical standards are modified versions of DD Form 2626 and DD Form 2631 that better align with CPARS. 5. Revisions to FAR Subpart 42.15 require that evaluation rating narratives include specific benefit(s) and impact(s) to the Government when ratings other than satisfactory are selected. Detailed descriptions on the use of Exceptional, Very Good, Marginal, and Unsatisfactory ratings can be found in FAR 42.1503, Tables 42-1 and 42-2. 2

ECB No. 2014-13 Subject: Contractor Performance Assessment Reporting System (CPARS) Transition Guidance 6. CPARS has multiple web-based training modules available for users located here: http://www.cpars.gov/allapps/cpcbtdlf.htm. It is highly recommended that all personnel involved with Contractor evaluations take the 40-minute CPARS merge on-demand training. Additional training modules may be completed at the discretion of field offices. 7. This guidance only applies to official interim and final evaluations completed by Assessing Officials. Field offices are not required to change any local documentation processes and are encouraged to maintain additional detailed performance notes in local files. At a minimum, CPARS requires that evaluations be prepared annually beginning with the period of assessment starting on the date of award. Assessments are to reach the completed phase in CPARS within 120 days after the annual anniversary date. 8. Engineering Regulation 415-1-17, Construction Contractor Performance Evaluations is being revised to reflect these changes. Engineer Pamphlet 715-1-7, Architect-Engineer Contracting in USACE will also reflect these changes in the next update. 9. The point of contact for this ECB is Rick Calloway, CECW-CE, 202-761-7500. Encls //S// JAMES C. DALTON, P.E., SES Chief, Engineering and Construction Division U.S. Army Corps of Engineers 3

Typical USACE Construction Contractor Performance Evaluation Standards 21 May 14 1. Evaluation Areas. This area outlines mandatory performance elements to be included in assessments for Construction Contractors to include Design-Build contracts. The main categories listed (A-I) are fixed elements within the revised Contractor Performance Assessment Reporting System (CPARS), which replaces the Construction Contractor Appraisal Support System (CCASS). All USACE construction contract assessments will include safety as a standalone rating element. Each narrative will be individually rated using Exceptional, Very Good, Satisfactory, Marginal, Unsatisfactory, or N/A. The overall rating will be selected from a range of (would/would not) recommend. A. Quality. This narrative should reflect the contractor s management of the quality control program, the quality of the work itself, and the product performance outlined in the contract s quality objectives. Factors to consider: i. Adequacy and implementation of Contractor s Quality Control Plan ii. Contractor s ability to maintain quality control and accuracy of QC documentation iii. Implementation of the 3-phase inspection process iv. Quality of workmanship v. Work is in accordance with the plans and specifications B. Schedule. This narrative should assess the timeliness of the Contractor against the required completion date of the contract, milestones, delivery schedules, and administrative requirements. Factors to consider: i. Quality and timeliness of the initial schedule submission ii. Adherence to the approved schedule iii. Communication and submittal of schedule revisions iv. Corrective action taken by the Contractor when schedule has slipped through fault of Contractor C. Cost Control. This rating area may be rated N/A for fixed-price contracts. Factors to consider for cost-type contracts: i. Were the Contractor s billings current, accurate, and complete? ii. Are the Contractor s budgetary internal controls adequate? iii. Was innovation used that resulted in cost savings? D. Management. The management narrative should reflect the Contractor s internal and external day-to-day business operations as they relate to meeting contract requirements. Factors to consider: i. Management of resources and key personnel ii. Coordination and control of subcontractor(s) Enclosure 1, Page 1 of 4

iii. Review and resolution of subcontractor s issues iv. Management responsiveness E. Utilization of Small Business. This category may be rated N/A for small business contracts. This area must be rated for all contracts and task orders that contain a small business subcontracting plan. Assess compliance with all terms and conditions in the contract relating to Small Business participation. Factors to consider: i. Compliance with Federal Acquisition Regulation (FAR) 52.219-8, Utilization of Small Business ii. Compliance with FAR 52.219-9, Small Business Subcontracting Plan iii. Contractor s good faith effort(s) to meet contract goals and requirements F. Regulatory Compliance. This rating area shall focus on environmental and labor laws and regulations. Safety regulations shall be addressed in item (G.) below. Factors to consider: i. Contractor s enforcement of laws and regulations ii. Correction of deficiencies when out of compliance iii. Communication of laws and regulations to subcontractor(s) iv. Compliance with the Davis-Bacon Act G. Other Evaluation Area (1). This narrative is required for Construction Contracts to be named Safety. Assessing Officials are required to provide a safety rating for Other Evaluation Area (1) in CPARS. Safety factors to consider: i. Adequacy of Contractor s Safety Plan ii. Implementation of Safety Plan iii. Identification and correction of safety deficiencies iv. Quantitative evaluation of accidents and injuries H. Other Evaluation Area (2). This narrative is not mandatory and can be used at the discretion of the local Assessing Official. I. Other Evaluation Area (3). This narrative is not mandatory and can be used at the discretion of the local Assessing Official. 2. Evaluation Ratings Definitions. Reference FAR 42.1503 Table 42-1 for revised evaluation rating definitions. A simplified version of the table is provided here: Rating Contract Requirements Problems Corrective Action Exceptional Exceeds Many - Gov't Benefit(s) Few Minor Highly Effective Very Good Exceeds Some - Gov't Benefit Some Minor Effective Satisfactory Meets All Some Minor Satisfactory Enclosure 1, Page 2 of 4

Marginal Unsatisfactory Does Not Meet Some Gov't Impact Does Not Meet Most Serious: Recovery Still Possible Serious: Recovery Not Marginally Effective; Not Fully Implemented Ineffective Gov't Impact(s) Likely Note: Plus or minus signs may be used to indicate an improving (+) or worsening (-) trend insufficient to change the evaluation status. For rating definitions to be used only for Utilization of Small Business, reference FAR 42.1503 Table 42-2. 3. Roles and Responsibilities. It is USACE policy that a designated representative of the construction office responsible for monitoring contractor performance, such as the Resident Engineer, Area Engineer, or Administrative Contracting Officer (ACO), evaluates the Construction Contractor s performance in CPARS. Official CPARS guidance, section 3.5 provides suggested responsibilities for completing assessments that may be modified by each agency. A. CPARS Focal Point (FP). The Focal Point(s) and alternates shall come from Construction Division (or its equivalent responsible for construction). Each District can determine how many FPs are needed to manage evaluations. Assignments shall be coordinated with the Procuring Contracting Officer (PCO) for information purposes. B. Assessing Official Representative (AOR). Multiple AORs can be assigned to input the narratives for each evaluation and shall be at the Quality Assurance, Office Engineer, or Project Engineer level. When multiple AORs are assigned to an evaluation, coordination is needed to determine who will forward the evaluation to the Assessing Official (AO) when narratives are complete. Depending on each District s workflow, it may be advantageous to assign a FP or alternate FP as an AOR for administrative purposes. C. Assessing Official (AO). The AO shall come from the Construction Division (or its equivalent) responsible for construction. The AO shall be at the Resident Engineer or Administrative Contracting Officer (ACO) level. i. It is recommended that before the AO sends the Contractor an assessment with a rating of I would not recommend them for similar requirements in the future, a copy of the evaluation first be provided to the Reviewing Official (RO) and PCO. D. Reviewing Official (RO). The RO shall be at one level above the AO, or the Chief of Construction Branch or Division. i. Formal CPARS guidance recommends RO involvement when a Contractor Representative chooses not to concur with an evaluation. HQUSACE strongly recommends that the RO remains involved with the process as determined by the local Districts. Enclosure 1, Page 3 of 4

Local variations to the AOR, AO, and RO roles may be determined and documented by the Districts. 4. CPARS Helpful Links. Reference the following hyperlinks for additional CCASS to CPARS transition information: A. CPARS Guidance: Revised guidance not posted yet. (Attached to request for comment) B. CPARS Merge FAQs: http://www.cpars.gov/merge-faqs/merge-faqs.htm C. CPAR Quality Checklist: http://www.cpars.gov/cparsfiles/pdfs/cparsqualitychecklist.pdf Enclosure 1, Page 4 of 4

Typical USACE Architect-Engineer Contractor Performance Evaluation Standards 21 May 14 1. Evaluation Areas. This area outlines mandatory performance elements to be included in assessments for Architect-Engineer (AE) Contractors. The main categories listed (A-I) are fixed elements within the revised Contractor Performance Assessment Reporting System (CPARS), which replaces the Architect-Engineer Contract Administration Support System (ACASS). All USACE AE Contractor assessments will include a post-award construction phase services rating when in the AE s scope. Each narrative will be individually rated using Exceptional, Very Good, Satisfactory, Marginal, Unsatisfactory, or N/A. The overall rating will be selected from a range of (would/would not) recommend. A. Quality. This narrative should reflect the contractor s management of the quality control program, the quality of the work itself, and the product performance outlined in the contract s quality objectives. Factors to consider: i. Did the AE follow their Quality Management Plan? ii. Did the AE perform appropriate site investigations to support the engineering services? iii. Were the plans, specifications or other deliverables accurate and coordinated? iv. Were the deliverables clear and sufficiently detailed? v. Did the AEs provide a functional and useable product as was intended by the scope of AE services? vi. For facility designs, did the AE provide an appropriate aesthetically designed facility? vii. Did the AE provide appropriate and timely responses to the review comments and correct the deliverables as required? viii. Was the design prepared in accordance with the present sustainability and environmental requirements? ix. Did the AE develop and implement any innovative approaches or technologies to improve the design product? x. If a solicitation was prepared and issued, was it biddable with a minimum number of amendments? xi. Were all design products (CADD files, specifications, design analysis, studies, etc.) submitted in the appropriate format? B. Schedule. This narrative should assess the timeliness of the Contractor against the required completion date of the contract, milestones, delivery schedules, and administrative requirements. Factors to consider: i. Did the AE adhere to the schedule within their contract/task order? ii. Were all deliverables submitted as required per the schedule? iii. If the AE was not able to adhere to their schedule, did they develop a corrective action plan and follow this plan? Enclosure 2, Page 1 of 4

C. Cost Control. This element is typically used to evaluate Cost Contracts. For AE contracts, the purpose of this element will be to evaluate the AE s cost estimating performance. If there was no cost estimating in the AE s scope, then this area shall be N/A. Factors to consider: i. If a design, was the cost within the cost limitations specified in the contract/task order? ii. For other products such as studies, was meaningful cost data provided to support the results of the product? iii. Were the submitted estimates performed with sufficient detail and accuracy? iv. If a Value Engineering study was performed, was AE cooperative in implementing approved recommendations? D. Management. The management narrative should reflect the Contractor s internal and external day-to-day business operations as they relate to meeting contract requirements. Factors to consider: i. Did the AE s project manager provide the appropriate leadership? ii. Did the AE exhibit reasonable and cooperative behavior? iii. Did the AE manage their consultants? iv. Did the key personnel identified to participate remain involved? E. Utilization of Small Business. This category may be rated N/A for small business contracts. This area must be rated for all contracts and task orders that contain a small business subcontracting goal. Assess compliance with all terms and conditions in the contract relating to Small Business participation. Factors to consider: i. Compliance with Federal Acquisition Regulation (FAR) 52.219-8, Utilization of Small Business ii. Compliance with FAR 52.219-9, Small Business Subcontracting Plan iii. Contractor s good faith effort(s) to meet contract goals and requirements F. Regulatory Compliance. Architect-Engineer evaluations shall be N/A unless a specific component of design or engineering services is governed by an environmental regulation is important enough to be broken out from the quality rating (A.) above. G. Other Evaluation Area (1). This narrative is required for AE Contracts to be named Post-Award Construction Phase Services. Assessing Officials are required to provide a Construction Phase Services rating for Other Evaluation Area (1) in CPARS. This rating area will be N/A for evaluations completed before the award of a construction contract and Architect-Engineer deliverables that are not constructed. Factors to consider: i. Was the constructed facility based on the design both maintainable and operable? ii. Did the plans reflect the true conditions and were the plans clear, sufficiently detailed, accurate and coordinated? iii. Was the design constructible and had minimal errors? Enclosure 2, Page 2 of 4

iv. Was the AE responsive in correcting errors and omissions of the engineering services? v. Did the AE perform timely and accurate review of shop drawings and submittals? vi. Was the AE responsive in providing technical assistance as required by the contract? H. Other Evaluation Area (2). This narrative is not mandatory and can be used at the discretion of the local Assessing Official. I. Other Evaluation Area (3). This narrative is not mandatory and can be used at the discretion of the local Assessing Official. 2. Evaluation Ratings Definitions. Reference FAR 42.1503 Table 42-1 for revised evaluation rating definitions. A simplified version of the table is provided here: Rating Contract Requirements Problems Corrective Action Exceptional Exceeds Many - Gov't Benefit(s) Few Minor Highly Effective Very Good Exceeds Some - Gov't Benefit Some Minor Effective Satisfactory Meets All Some Minor Satisfactory Marginal Does Not Meet Serious: Marginally Effective; Some Recovery Still Not Fully Implemented Gov't Impact Possible Unsatisfactory Does Not Meet Most Gov't Impact(s) Serious: Recovery Not Likely Ineffective Note: Plus or minus signs may be used to indicate an improving (+) or worsening (-) trend insufficient to change the evaluation status. For rating definitions to be used only for Utilization of Small Business, reference FAR 42.1503 Table 42-2. 3. Roles and Responsibilities. It is USACE policy that the Procuring Contracting Officer (PCO), or a designated representative of the engineering office responsible for monitoring contractor performance, will evaluate the Architect-Engineer Contractor s performance and prepare a performance assessment in CPARS. Official CPARS guidance, section 3.5 provides suggested responsibilities for completing assessments that may be modified by each agency. A. CPARS Focal Point (FP). The Focal Point(s) and alternates shall come from Engineering Division (or its equivalent responsible for Architect-Engineer Contractor oversight). Each District can determine how many FPs are needed to manage evaluations. Assignments shall be coordinated with the Procuring Contracting Officer (PCO) for information purposes. Enclosure 2, Page 3 of 4

B. Assessing Official Representative (AOR). The AOR will be usually assigned to the Engineering Division staff member who performs oversight of the AE contract and it s Quality Assurance Plan. Multiple AORs can be assigned to an assessment and when multiple AORs are assigned, coordination is needed to determine who will forward the assessment to the Assessing Official (AO) when narratives are complete. Depending on each District s workflow, it may be advantageous to assign a FP or alternate FP as an AOR for administrative purposes. When an Architect-Engineer Contractor s product is constructed, the FP shall assign a COR overseeing construction as an additional AOR. This AOR will be solely responsible for providing an assessment of the Architect-Engineer Contractor s Post-Award Construction Phase Services as outlined in item 1.G above. i. It is recommended that the AOR overseeing construction review the Architect- Engineer Contractor s interim quality evaluation outlined in item 1.A above. The AOR overseeing construction shall provide feedback to the AO and make a recommendation to either maintain or change the Contractor s quality rating. The AO will determine what, if any changes are made to the previous quality rating. C. Assessing Official (AO). The AO shall come from the Engineering Branch or Division responsible for providing Quality Assurance on the contract. The AO shall be at the Branch or Section Chief level and is typically the COR. i. It is recommended that before the AO sends the Contractor an assessment with a rating of I would not recommend them for similar requirements in the future, a copy of the evaluation first be provided to the Reviewing Official (RO) and PCO. D. Reviewing Official (RO). The RO will normally be the Chief of the Engineering Branch or Division responsible for providing Quality Assurance on the contract. i. Formal CPARS guidance recommends RO involvement when a Contractor Representative chooses not to concur with an evaluation. HQUSACE strongly recommends that the RO remains involved with the process as determined by the local Districts. Local variations to the AOR, AO, and RO roles may be determined and documented by the Districts. For example, it may not be appropriate for the Engineering Branch or Division to lead evaluations on Planning projects. 4. CPARS Helpful Links. Reference the following hyperlinks for additional ACASS to CPARS transition information: A. Revised CPARS Guidance: http://www.cpars.gov/main/cparsmain.htm (On 01 JUL 14) B. Merge FAQs: http://www.cpars.gov/merge-faqs/merge-faqs.htm C. Quality Checklist: http://www.cpars.gov/cparsfiles/pdfs/cparsqualitychecklist.pdf Enclosure 2, Page 4 of 4