Speeds and Feeds NEC Express5800/A2000 Series Scalable Enterprise Server.OR CX (Core Xeon) High Scalability Max. 4 (60cores/120threads) Intel Xeon Processor E7 v2 family CPU Max. 4TB memory with 64 x64gb DIMM Max. 16 slots of PCI-Express 3.0 (Class No.1 rich IO slot) High Availability Advanced memory RAS features MCA Recovery, Memory Chip RAS, Memory patrol and scrubbing, Predictive failure analysis & de-allocation of CPU resource, ECC memory Redundant system resource Redundant clock source, core IO logic and service processor. High Operation-ability CPU core capacity on demand feature for flexible resource optimization Memory riser card on-line addition I/O card on-line addition 40 HTA supported Page 2 NEC Corporation 2014
Technology to Address Business Priorities CIO PRIORITY * Virtualization Disaster Recovery Lower Operational Costs Consolidation: 9:1 conversion ratio Solution for DR SOLUTION PLAYS Large Scale Virtualization Cloud Computing Agility and Performance: COPT Availability and Reliability: Data Center RAS Heavy Transactional Workloads ERP BI & Analytics Instant Access to Data Business Decision in Minutes vs. Hours In-Memory Databases * Page 3 NEC Corporation 2014
High Density for Large Scale Virtualization More virtual machines per server One NEC Express5800/A2040b replaced nine legacy HP servers = VM > One NEC CX Server handled 8x more VMs than a single legacy server Consolidated NINE legacy servers into one NEC CX Server Page 4 NEC Corporation 2014
High Density for Large Scale Virtualization Message: CX Server is ideal platform for virtualization of mission critical applications More virtual machines per server Lab Validated Conversion Ratio of 9-to-1 Previous High Availability features on Unix or MF platforms now available on X86 COPT, Core De-allocation, Core Sparing, MCA, PFA, Resource Sparing Supporting Collateral (www.necam.com/cxserver) Principled Technologies - Lab Validation: White Paper, Video, Infographic Aberdeen Group: White Paper, Ebook, Infographic Page 5 NEC Corporation 2014
Heavy Transactional Workloads COPT (Capacity OPTimization): Providing CPU Core Processing Resources in accordance with workload requirements Workload 8 Initial Sizing 6 # of Core 4 2 Enabled Core Disabled Core (spare) future Initial Add Key Add Key 2 2 6 Page 6 NEC Corporation 2014
Heavy Transactional Workloads Advanced reliability features ensure continuous operation added agility CPU Core Sparing Dynamic Core Addition Dynamic Core De-allocation Dynamic Core De-allocation & Enablement Enable Spare Core De-allocate CPU Core CPU Core Sparing Dynamic replacement of CPU Core w/spare Enable Spare Core COPT Model: with Activation Key Core Components System Clock(s) Service Processor(s) Spare I/O Subsystem(s) Clock Spare Clock Redundant Core Components Service Processor Spare SP Core I/O Spare I/O 7 Page 7 NEC Corporation 2014
Heavy Transactional Workloads Message: Ideal for Large ERP systems (SAP) and large DB systems (SQL Server, Oracle) 2X performance over previous generation: 50% increase in core count, 2X memory, and 16 I/O slots Unique COPT features allows customers to pay-as-they grow Lower up front hardware investment and option of enabling additional cores as workloads increase Supporting Collateral (www.necam.com/cxserver) Penton Media: SQL Server White Paper, Video/Webcast Recording ESG: White Paper, Video (https://www.youtube.com/watch?v=4euw22- iaba&feature=youtu.be) Intel: SQL Server Appliance White Paper NEC: Reference Architecture with SQL Server Appliance Page 8 NEC Corporation 2014
In-Memory Databases Providing large amount of reliable memory for In-Memory DB workload requirements Accessing Data on Disk 148x Faster Up to 4TB of Memory for Database Advanced Memory Resiliency Dynamic Memory Page De-allocation PFA (Predictive Failure Analysis) More memory = greater chances for errors Hot-Add Memory Upgrade without Downtime Accessing Data in Memory Page 9 NEC Corporation 2014
In-Memory Databases Message: In-Memory DBs enable customers to manage and analyze Big Data in near real time The CX provides up to 4TB of reliable memory for In-Memory DB Workloads Advanced RAS features ensures system uptime and data integrity Dynamic Memory Page De-allocation, PFA, Hot-Add Memory Supporting Collateral (www.necam.com/cxserver) SAP HANA Data Sheet IDC: Technology Spotlight ESG: Best of Breed Cloud Solutions (NEC & Iron Mountain) Page 10 NEC Corporation 2014
SAP HANA Appliance Innovation and fusion with HW and SW SAP HANA is an appliance server which combines SW(Inmemory computing engine) and HW (standardized and validated). SAP HANA appliance to be delivered as an installed and preconfigured system to customer site for Innovation of the hardware Multi core Huge parallel scale out 64-bit address space 2TB main memory 100GB/s through put + Innovation of the software + Row and Colum store Data compression Partitioning and parallel query HW&SW SW SW SW Advantage of HANA All data is in main memory to avoid bottle neck. Thus HANA run extremely fast. Load data fast by Partitioning and parallel query. Fast response due to the efficiency of analysis by data compression and column store. Table Join is no longer needed thus we can reduce development efforts. Automated DB replication realize reduction development and maintenance effort. Copy right SAP AG Page 11 NEC Corporation 2014
Express5800/A2040b based SAP HANA HANA Model Scale-up Up to 512GB 1TB 2TB Release Plan Jun-2014 Jun-2014 Q3/CY2014 (Target) Scale-out (Up to 16 nodes) Late Q4/CY2014 (Target) Base Server A2040b A2040b A2040b A2040b CPU 2 x E7-4890 v2 or 2 x E7-4880 v2 (30C) 4 x E7-4890 v2 or 4 x E7-4880 v2 (60C) 4 x E7-4890 v2 or 4 x E7-4880 v2 (60C) 4 x E7-4890 v2 or 4 x E7-4880 v2 (60C) Memory 128/256/512GB 1TB 2TB 1TB OS Server Management Remarks SUSE Linux Enterprise Server for SAP Application SP3 Or Red Hat Enterprise Linux for SAP6.5 EXPRESSSCOPE Engine & NEC ESMPRO/Server Manager For BW on HANA, DataMart and Business Suite on HANA Only for Business Suite on HANA Only for BW on HANA and DataMart Page 12 NEC Corporation 2014
NECAM Case Study NEC Corporation of America Corporate IT Service Division adopted SAP HANA for their IT platform (SAP BW OLAP). 4 Mona based SAP HANA systems were delivered in early May. Now in system development phase. 4 x Express5800/A2040b 512GB appliances on SuSE SLES 11 SP3 Development system for BW Sandbox system for BW Development system for SCM Sandbox system for SCM Multi instance installation (Optional configuration) Quality Assurance System for BW Quality Assurance System for SCM Multi instance installation (Optional configuration) Production System for BW Production System for SCM Page 13 NEC Corporation 2014
Memory Controller Memory Controller SQL Server Appliance System bottleneck from performance gap between in-box memory / storage and external disks Performance tuning is getting more complicated, needs a lot of external storage and Host Bus Adapters to provide enough IO bandwidth for a high-performance DWH/BI system (Storage Capacity) Balanced CPU-IO configuration restricted by the latest QPI architecture-based processors The architecture requires extra CPU sockets, even if customer just wants to have more IO slots (or memory). The extra CPU sockets contribute to increased power consumption and system cost 1PB 100TB 10TB 1TB DRAM Huge Performance gap PCIe SSD SAS SSD SAS Disk Array SATA Disk Array QPI QPI QPI CPU IO Controller PCIe slot PCIe slot PCIe slot DIMM DIMM DIMM DIMM DIMM DIMM DIMM DIMM DIMM DIMM DIMM DIMM DIMM DIMM DIMM DIMM QPI based CPU CPU Cache <ns <1us <150us ~2ms ~8ms ~20ms Page 14 NEC Corporation 2014 (Access latency) * QPI = Quick Path Interconnect (Interconnect between CPUs) PCIe SSD (server-mounted flash storage) and Rich IO slots (per CPU) are the keys to solve those issues
NEC PCIe SSD Appliance for Microsoft SQL Server - Reference configuration per node - Optimized performance combining fast clock CPU (E7-8893 v2:6c, 3.4GHz) and high-performance HGST FlashMAX II PCIe server-mounted flash storage (FM2) No data loss by utilizing software-mirrored storage pool feature of Windows OS Balanced CPU-IO performance depending on number of FM2 (i.e., data size ) DW Benefits: 69% less rack space 27% less power 173% better performance 4CPU (3.4GHz, 6C) 512GB RAM 8x FM2 in mirrored storage pool Express5800 Scalable Enterprise Server 128GB RAM 128GB RAM OLTP Benefits: 178% better performance 53% less impact on IO 2CPU (3.4GHz, 6C) 256GB RAM 4x FM2 in mirrored storage pool Scale Up Scale Up 3CPU (3.4GHz, 6C) 384GB RAM 6x FM2 in mirrored storage pool FlashMAX II SW Mirroring FlashMAX II FlashMAX II SW Mirroring FlashMAX II Internal Drive E7-8893 v2 E7-8893 v2 128GB RAM QPI E7-8893 v2 E7-8893 v2 128GB RAM FlashMAX II SW Mirroring FlashMAX II FlashMAX II SW Mirroring FlashMAX II Page 15 NEC Corporation 2014
Benefits of Appliance for Microsoft SQL Server Best fit for High-Performance & Scalable DWH/BI system Express5800 Scalable Enterprise Server High-performance PCIe server-mounted flash storage X Balanced and Predictable Performance Balanced and proven CPU-IO performance depending on customer data size. Consistent high-performance even under heavy IO load. Easy to Introduce Customer can choose best practice configuration depending on data size. Configuration guide, including best parameter setting will be available in CQ3/2014* * NEC is capable to Pre-install depends on demand. TCO Reduction Less platform integration cost Less rack apace Less power consumption Initial Cost Operating Cost Time to introduction Down Page 16 NEC Corporation 2014
Iron Mountain Technology Escrow SaaSProtect w/nec By offering IaaS with NEC, Iron Mountain s Technology Escrow Services enriches the offering by incorporating IRM Data Centers and new services. The combination of NEC s Nblock infrastructure, services, and OpEx model allows technology escrow clients to be hosted in Iron Mountain Data Centers and rented to Escrow clients as private cloud environments. Contingency Planning Guidance Level Four Verification Testing Data Recovery Testing with NEC Neutral 3 rd Party Administration Servers, Storage & Networking Remote Managed Services IRM Data Center Disaster Recovery All provided as a Service Page 18 NEC Corporation 2014
Iron Mountain & NEC SaaSProtect Solution Framework Escrow Storage 3 rd Party Administration Managed Services Infrastructure Data Center Page 19 NEC Corporation 2014
Escrow Standards to Support Contingency Plans Required Deposit Material Verification Testing Rights Release Conditions Objection Period Contrary Instructions Rights Following a Release Payment of Fees Notices Repeatable Process Page 20 NEC Corporation 2014
IaaS Proposal Framework Iron Mountain Data Center Boyers, PA Proxi Server Web Servers Admin Servers Storage Servers Clover Webapp SFTP/SMTP Server DB Servers VMware Virtualization NEC CX Enterprise Server NEC CX Enterprise Server NEC M-Series M300 Storage Array NEC Managed Services Page 21 NEC Corporation 2014
Data Center Partnership InfoWorld Green Award Iron Mountain finds limestone a natural fit for data center efficiency NEC chose Iron Mountain s Data Centers because of the deep industry understanding of managing data and overall quality of the company in terms of Stability, Efficiency, Security, Compliance, and Disaster Resilience. Natural disaster protection: Weather resistant location (220 ft. underground), Zero Seismic Zone, Elevated priority from Federal government (due to customer base) Operational PUE under 1.3 (Natural & Geothermal cooling) Power (Multiple grids, among lowest Kw/$ in country) Networks (All Carriers & Dark Fiber to hubs) Site Security Level IV security (defined by US Department of Justice) 24/7: Armed guards, facility monitoring via closed circuit cameras, critical facilities and NOC staffing Fire Detection & Suppression Onsite OSHA-certified fire brigade Designed to Class A, three-hour fire rating Page 22 NEC Corporation 2014
ECM Market Forrester Wave (Q3 2013) http://www.project-consult.de/files/forrester%20wave%20ecm%202013.pdf Page 23 NEC Corporation 2014
Project: Document Archive Project Iron Mountain s Datacenter team (Emerging Business) wishes to offer an Alfresco based alternative to IRM s (Legacy Business) DRCi (Digital Records Center, IBM based solution) to expand data center private cloud document management solutions (in place of loosing content / customers). IRM s DRCi team (Legacy Business) is not interested in considering another application provider / solution at this time. Partnership with Alfresco s top partner Micro Strategies creates formation to address market need. Legacy DRCi System IBM Proprietary (License & iseries) Limited Workflow (Multi-Tenant) Expensive to Operate & Support Enterprise Content Mgmt. Open System (Nblock & Open Source) Extensive Workflow (Single-Tenant) Inexpensive (Shared Ops. & Open Sys) Data Center Team Data Center (Emerging Biz) Enterprise Content Management Infrastructure Market Place Private Cloud Client Base Alfresco Top Partner Cloud Expertise & ECM ProSVC Nblock OpEx Financing Page 24 NEC Corporation 2014
ECM Framework Options Document Storage Document Retrieval & Conversion Content Management System Computer System (Legacy Business) (Legacy Business)? Data Center (Emerging Business) Page 25 NEC Corporation 2014
Page 26 NEC Corporation 2014