DAMANG MINE: SWINGING BACK TO PROFITABILITY ALFRED BAKU EVP & Head of West Africa NG Mining Summit, Cape Town, June 2015

Similar documents
West Africa Region. Analyst Day 3 November Peter Turner Head of West Africa Region

AFRICAN GOLD GROUP, INC. DEFINITIVE FEASIBILITY STUDY FOR KOBADA GOLD PROJECT GENERATES ROBUST ECONOMIC OUTCOME

ALCYONE REPORTS JORC SILVER RESOURCES

For personal use only

Mining Indaba Presentation. Capetown, South Africa 8 th 10 th February 2016

Mako Project, Eastern Senegal Completion of Scoping Study

Armadale Capital Plc Armadale or the Company Robust Project Demonstrated by Mpokoto Feasibility Study HIGHLIGHTS

Endeavour Management Presentation

Cannon Big Pit Given the Green Light

INVESTOR PRESENTATION JULY 2013

September 2015 Quarterly Activities Report

Keras Resources plc ( Keras or the Company ) Moving Towards First Production in Q at Grants Patch Gold Tribute Project, Australia

RED 5 Limited The next gold producer

FOCUS MINERALS LIMITED

Paladin Energy. Development & Expansion of the Langer Heinrich Operation in Namibia. June 2009

Update on Heap Leach potential of the Murchison gold project

Resources Rising Stars

Savannah North Scoping Study Looking into the future 3 February 2016

Mar Qtr Ore Mined t 79,000 68, , ,000 Mine Grade g/t Contained Gold oz 21,511 13,252 18,262 19,759

CANADA S INTERMEDIATE GOLD PRODUCER

PNG Mining & Petroleum Investment Conference December Geoff Day Executive General Manager PNG and Indonesia

Exploration and Development Activity

NEWS RELEASE. Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW

C o r p o r a t e P r e s e n t a t i o n A u g u s t

Queensland Mining Corporation L I M I T E D. Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District

De Grey Mining Ltd. Wingina Deeps Drilling Commenced (Turner River Project) Highlights. Turner River Unlocking Shareholder Value

The Point Rousse Project - An Economic Analysis

Corporate Presentation October 2015

HIGHLIGHTS. Corporate. Broken Hill

BUILDING A COPPER COMPANY IN BRAZIL. PDAC Feb TORONTO

Bendigo Mining Limited Investor Briefing February 2010

For personal use only

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY

Wonawinta Silver Project to be acquired; Mount Boppy development cost and risk cut back

Quarterly Activities Report

Business Review OZ Minerals limited abn a modern mining company

Detour Gold Provides New Life of Mine Plan for Detour Lake

ACQUISITION OF TWO QUALITY MINES IN NEVADA

THE VALUATION OF ADVANCED MINING PROJECTS & OPERATING MINES: MARKET COMPARABLE APPROACHES. Craig Roberts National Bank Financial

AIM: KEFI 6 March KEFI Minerals Plc. ( KEFI or the Company ) SAUDI ARABIAN EXPLORATION AND DEVELOPMENT UPDATE

Q Results Conference call transcript Q RESULTS FOR THE PERIOD ENDED 30 JUNE

AngloGold Ashanti La Colosa Site Visit November, 2011

Ferrex plc ( Ferrex or the Company ) Acquisition of Gold Mining Company in Australia and Strategic Review

Punching Above Its Weight

Quarterly Report Highlights. Ulysses Gold Project, Western Australia. Viking Gold Project, Western Australia

Second Quarter Earnings Release Conference Call. July 23, 2009

FY13 was a year of transformation, including: The Company enters FY14 well positioned, with: ST BARBARA LIMITED 30 JUNE 2013

THIRD QUARTER EARNINGS NOVEMBER 12, 2015

HIGH GRADE GOLD DRILL RESULTS MT EGERTON PROJECT

Krasny license: Operational update September 2015

For personal use only

Quarterly Report Newcrest Mining Limited For the three months ending 31 December 2009 (These figures are unaudited)

Avion will host a conference call at 10:30 AM (EST) on Monday, April 2, 2011 to discuss the results. To participate in the call please dial:

AGNICO-EAGLE MINES LIMITED

FIJI GOLD LION ONE METALS

Financial and Operating Highlights through and subsequent to March 31, 2016: Completion of Flow-Through Share Financing

The final quarter of 2015 recorded 7,924 ounces of gold production, giving a year-end total of 32,629 ounces.

Unaudited Interim Results for the six months ended 30 June 2014

African Barrick Gold. BMO Global Metals & Mining Conference February 2013

ANNUAL GENERAL MEETING November 2015

Positioned for Production: Exploring for Growth

Xtract Resources Plc (AIM:XTR) Chepica Gold Mine: Quarterly Results Presentation

QUARTERLY ACTIVITIES REPORT TO 30 SEPTEMBER 2015

Growth Through Cash Flow. Investor Presentation May 2016

NEW GOLD DISCOVERY IN GHANA WEST AFRICA

CHALICE GOLD MINES AND SUB SAHARA RESOURCES ANNOUNCE PROPOSED MERGER TO CONSOLIDATE AND FUND ERITREAN GOLD PROJECT

NOVEMBER January 2013

Exploration. Exploration methods

INVESTOR PRESENTATION

KATANGA MINING ANNOUNCES 2013 YEAR END RESULTS AND COMMITMENT OF GLENCORE TO EXTEND AND INCREASE LOAN FACILITIES

Developing the Tanlouka Gold Project. AGM Presentation 18th November 2015

Barkerville Gold Mines Investor presentation q The last great Canadian gold mining camp controlled by a junior mining company.

QUARTERLY ACTIVITY REPORT FOR THE PERIOD ENDED 31 st December 2015

Trip to Pulacayo. Pulacayo - Paca

g/t Au (BAGC00504) g/t Au (BAGC00516) A$11.4 M cash at hand as at December 31, 2015

Q4 & FY2015 OPERATING HIGHLIGHTS. January 29, 2016

PanAust Quarterly Report for the three months to 31 December 2015

2012 Results Conference Call Presentation. 15 February 2013

ALCYONE TO RAISE $5M TO UNDERPIN TRANSITION TO SILVER PRODUCTION AT TEXAS PROJECT

Endeavour Mining Creating A Premier African Gold Producer

How To Find Gold In Kukon

For personal use only

African Barrick Gold plc ( ABG ) reports half year 2014 results

NEWS RELEASE NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO U.S. WIRE SERVICES

How To Know If Goldcorp Is A Successful Company

CNSX: TV


TIGER RESOURCES LTD ACN

Candelaria and Ojos del Salado Chile

EXPLORATION TONY HOUSTON Head of Exploration

Presentation to Analysts and Investors, Leonora Operations

(NYSE-MKT:XRA, TSX:XRC,

Acquisition of Rice Lake. December 2015

BEACONSFIELD GOLD NL Report on Activities for the Quarter ended 30 June 2008

For personal use only

Mt Carrington Gold Silver Project Positive Scoping Study

Nuevas tendencias de la Minería Subterránea profunda Planeación, operación y estabilización del macizo rocoso

News release. No. 7/2015 KATANGA MINING ANNOUNCES 2015 SECOND QUARTER RESULTS

HSBC 6th Annual LATAM Conference

Golden Band Resources Inc.

Transcription:

DAMANG MINE: SWINGING BACK TO PROFITABILITY ALFRED BAKU EVP & Head of West Africa NG Mining Summit, Cape Town, June 2015

CONTENT GLOBAL OPERATIONS WHERE WE VE COME FROM REVERSING THE TREND TRANSFORMATION PILLARS SUSTAINING THE TURNAROUND WAY FORWARD 2

GOLD FIELDS LIMITED Global Operations Damang Member of the Gold Fields group Peru West Africa South Africa Australia Damang Located in Western Region of Ghana 280km by road from Accra 30km by road from Tarkwa Concession covers an area of 25,016ha Annual rainfall averages 2,030mm In 2014, produced 178koz @ AISC of US$ 1,175/oz 3

WHERE WE VE COME FROM Significant Negative Cash Flows and Financial Loss 2012 2013 Lower grades mined (Huni Sandstone) Lower gold production (average 39koz per quarter) AISC/Gold Price Ratio 2013 Average US$1,450/oz (Av. gold price US$1,412/oz) Closure/Care & Maintenance considered High AISC/Gold Price Ratio 2012 Average US$1,753/oz (Av. gold price US$1,668/oz) Reserve dropped to 1 moz due to significant fall in gold price Damang 4moz Super Pit Project shelved due to low gold price. 4

ORE TONNES(Mt) AISC/Gold Price (US$/oz) Cashflow (US$m) WHERE WE VE COME FROM Key Financial Metrics 2 500 2 000 1 500 1 000 500 0-500 -1 000-1 500-2 000 AISC/Gold Price/Cash Flow Q4 12 Q1 13 Q2 13 Q3 13 Q4 13 Q1 14 Q2 14 Q3 14 Q4 14 C2014 AISC Gold price received Cashflow Actual Cashflow Plan 25,0 20,0 15,0 10,0 5,0 0,0-5,0-10,0-15,0-20,0 Production Profile 2,00 1,80 1,60 1,40 1,20 1,00 0,80 0,60 0,40 0,20-2012 Q1 2012 Q2 2012 Q3 2012 Q4 2013 Q1 2013 Q2 2013 Q3 2013 Q4 2014 Q1 2014 Q2 Planned Ore tonnes Actual Ore Tonnes 2012-2013: implementation of a 3-cycle,4 shift roster. Reduced tons mined in Apr May 2013 due to industrial strike and Go slow Reduced production in 2014 due to a strategic decision to reposition the mine in 2014. Changed from 3 shifts to 2 shifts. 5

REVERSING THE TREND 3 Key Strategic Steps Put in place a turnaround strategy Consolidate and stabilize increase waste strip, extend life of mine, and stabilize the processing plant Increase relevance put Damang back on the map as a Productive member of the Gold Fields family 6

TRANSFORMATION PILLARS Damang Turnaround Strategy Safety Human Resources Processing Business Improvement Efficiency and Productivity Financial Discipline and Cost Management SD and Social Responsibility While maintaining the company s core values of: Safety Respect Responsibility Innovation Honesty Delivery 7

TRANSFORMATION PILLARS Safety If we cannot mine safely, we will not mine Visible Leadership exemplified by HOD walk-the-talk Zero tolerance approach to safety. Human Resources 855 GF Employees; 530 Contractors Rigorous Talent Management Accelerated training and development programs Employee Wellbeing Program/Facilities: Description 2013 2014 End of Q1 2015 Employees in Service 1,038 845 855 Contractors 474 637 530 TE+C 1,512 1,482 1,416 Tonnes mined/tec 1,491 1,078 1,064 Oz sold/tec 9 10 11 8

TRANSFORMATION PILLARS Processing Strategic Intervention Improved on plant recovery to reduce metallurgy cost by ~25% Metric UoM 2012-2013 2014 New Approach Leach efficiency % 30.9 56.1 Added aqueous instead of solid lead nitrate to passivate sulphides in the leach feed. Adsorption efficiency % 33.0 89.2 Adopted optimal carbon movement and the installation of the CIL TK08. Acid wash efficiency % 29.1 44.0 Electrowinning efficiency % 94.7 97.9 Acid-washed every batch of elution at the CIL train to remove all inorganic foulants Improved the caustic strength and closely monitored the purity of every batch of caustic soda Regeneration efficiency % 81 102 Adopted continuous running of the kiln to remove all organic contamination. Elution efficiency % 77.0 92.5 Closely monitored elution temperatures, pressures, caustic concentrations. Adopted monthly maintenance of the elution circuit. Improved water quality. Gravity circuit efficiency % 13.7 30.4 Frequent planned maintenance of the knelsons. Grind efficiency % 77.6 77.8 Fine Carbon in the CIL train % 5.0 2.0 Adopted single stage pumping for the carbon advance pumps, reduced carbon attrition losses 9

TRANSFORMATION PILLARS Process Optimization Strategic Intervention Initiatives Adopted single stage milling. SAG mill now runs independently Improved SAG mill effect by ensuring 10-15% oversize rocks in the SAG mill feed Weekly planned maintenance at crushing/milling circuit Postponed US$25million capital spend on new tailings dam by raising the existing dam wall Improved upon the tailings dam management 10

TRANSFORMATION PILLARS Efficiency and Productivity Switch from V- 71 to SV-2 Juno Go-Line Fuel Facility Operation Sneipner Operation Fly the Rigs Blast Optimization Pre-Split Drilling Efficiency & cost saving initiatives 9m to 12m Blasts Extending Lubricant Life Components Rebuild Centre Fuel Capping for Light Vehicles Geological and Dilution Control 11

TRANSFORMATION PILLARS Business Improvement Benefits delivered in 2013 Cost Usage Initiatives Benefits delivered in 2013 Throughput Initiatives Benefits delivered in 2014 Benefits delivered in 2014 12

TRANSFORMATION PILLARS Sustainable Development and Social Responsibility Strong relationships with stakeholders, based on trust, open, honest and frequent engagement Creating shared value and leaving positive legacy for host communities Infrastructure 16% COMMUNITY SPEND Education 42% Agriculture 22% Water and Sanitation 11% Health 9% Total community investment (2002 2014): USD$5.1M 13

Total Mine Cost Control SUSTAINING THE TURNAROUND Action Plans and Initiatives Greater focus on maintaining and improving the cost base Stringent Cost Review Approach daily and weekly Departmental monthly peer review and use of Dashboards Departmental Interventions GM and Finance Team will hold intervention meetings if a Department s costs blow out. Owner Blast Hole Drilling and Maintenance Conceptual Studies of Underground Mining Consider including grade control. Look at equipment that can do both blast hole and RC grade control. Damang: High volume, medium grade Amoanda: Low volume, high grade Continued Processing Plant Optimization Improving availability and utilization Improving operational flexibility Synergies with Tarkwa Mine Exchange of equipment as required HME and Fixed Plant Engineering 14

THE WAY FORWARD Exploration Saddle-Huni Bridge Part of Greater Damang AGC down to 42m yielded 14,442oz Resource/information gap observed below 50m depth 2015 Plan Detailed drilling to model and evaluate of prospective zone below 50m N Juno East and South Possible dip and strike extension of favourable geological horizon in pit First pass drilling has given indication of mineralisation in the target areas Plan 2015 Close drill spacing for robust geological and resource models to be built Tamang Sothern extension of Juno South Potential for both hydrothermal and palaeo-placer mineralisation 7 Scout holes drilled in 2014 to prepare for detailed drilling in 2015 2015 Plan Detailed drilling to delineate, model and evaluate the Banket quartzite host Tomento North Strike extension of the Tomento Pit 1 reefs Initial program in 2014 generated an potential resource of 209koz @1.63g/t 2016 Plan Close-up drill spacing to refine geological domains and re-evaluate the project Nyame Strike extension of Damang orebody Potential for high grade oxide ore in close proximity to the plant Plan 2015 RC and DD drilling to develop the oxide potential and delineate the Damang Fault. Amoanda South Strike extension of Amoanda orebody Limited drill testing Plan 2016 Close drill spacing from current 40X20m to 20X20m and re-evaluate the orebody 15

Thank you