SOP through Long Term Planning Transfer to LIS/PIS/Capacity. SAP Best Practices



Similar documents
Accounts Receivable. SAP Best Practices

Budget Control by Cost Center

Production Subcontracting (External Processing) SAP Best Practices

User Experience in Custom Apps

USDL XG WP3 SAP use case. Kay Kadner

SAP Business ByDesign Reference Systems. Scenario Outline. SAP ERP Integration Scenarios

SAP Best Practices for Subsidiary Integration in One Client Production with Intercompany Replenishment

Intelligent Business Operations Chapter 1: Overview & Strategy

OData in a Nutshell. August 2011 INTERNAL

SAP Service Tools for Performance Analysis

SAPFIN. Overview of SAP ERP Financials COURSE OUTLINE. Course Version: 15 Course Duration: 2 Day(s)

RUN BETTER Become a Best-Run Business with Remote Support Platform for SAP Business One

Ariba Network Integration to SAP ECC

HR400 SAP ERP HCM Payroll Configuration

How To Improve Your Business Process With Sap

Next Generation Digital Banking with SAP

Understanding HR Schema and PCR with an Example

AC200. Basics of Customizing for Financial Accounting: General Ledger, Accounts Receivable, Accounts Payable COURSE OUTLINE

Enterprise Software - Applications, Technologies and Programming

Unified Service Description Language Enabling the Internet of Services

TM111. ERP Integration for Order Management (Shipper Specific) COURSE OUTLINE. Course Version: 15 Course Duration: 2 Day(s)

How to Configure Access Control for Exchange using PowerShell Cmdlets A Step-by-Step guide

Application Lifecycle Management

Table of Contents. How to Find Database Index usage per ABAP Report and Creating an Index

SAP Master Data Governance- Hiding fields in the change request User Interface

Business One in Action - How can we post bank fees and charges while posting Incoming or Outgoing Payment transactions?

Fixed Asset in SAP Business One 9.0

SAP Business One for iphone and ipad. Version 1.5.x January 2012

SAP Central Process Scheduling (CPS) 8.0 by Redwood

R/3 and J2EE Setup for Digital Signature on Form 16 in HR Systems

Ten reasons small and midsize enterprises (SMEs) choose SAP to help transform their business. Copyright/Trademark

Third Party Digital Asset Management Integration

Integrating Easy Document Management System in SAP DMS

Matthias Steiner SAP. SAP HANA Cloud Platform A guided tour

Process Archiving using NetWeaver Business Process Management

How to Create a Support Message in SAP Service Marketplace

GRC 10.0 Pre-Installation

Data Archiving in CRM: a Brief Overview

Maintaining Different Addresses and Ids for a Business Partner via CRM Web UI

Alert Notification in SAP Supply Network Collaboration. SNC Extension Guide

Run SAP like a Factory

AC 10.0 Centralized Emergency Access

September 10-13, 2012 Orlando, Florida. Step-by-step guidelines for building an information governance strategy

Compliant, Business-Driven Identity Management using. SAP NetWeaver Identity Management and SBOP Access Control. February 2010

BW Workspaces Use Cases

SAP NetWeaver BRM 7.3

SAP Portfolio and Project Management

Portfolio and Project Management 5.0: Excel Integration for Financial and Capacity Planning

UI Framework Task Based User Interface. SAP Enhancement Package 1 for SAP CRM 7.0

Download and Install Crystal Reports for Eclipse via the Eclipse Software Update Manager

K in Identify the differences between the universe design tool and the information design tool

3 rd party Service Desk interface

Finding the Leak Access Logging for Sensitive Data. SAP Product Management Security

UI Framework Simple Search in CRM WebClient based on NetWeaver Enterprise Search (ABAP) SAP Enhancement Package 1 for SAP CRM 7.0

SAP Sustainability Solutions: Achieving Customer Strategies

ERP Quotation and Sales Order in CRM WebClient UI Detailed View. SAP Enhancement Package 1 for SAP CRM 7.0 CRM Sales - SFA

AC 10.0 Business Role Management

NetWeaver Business Client (NWBC) for Incentives and Commissions Management (ICM)

Secure MobiLink Synchronization using Microsoft IIS and the MobiLink Redirector

AC 10.0 Customizing Workflows for Access Management

Integration of SAP Netweaver User Management with LDAP

BICS Connectivity for Web Intelligence in SAP BI 4.0. John Mrozek / AGS December 01, 2011

Implementing Outlook Integration for SAP Business One

CREATING A PURCHASE ORDER STORE RECORD WEB SERVICE

Introducing the SAP Business One starter package. A Great Start to help you to Streamline Your Small Business

How To Use the ESR Eclipse Tool with the Enterprise Service Repository

How To... Migrate Custom Portal Applications to SAP NetWeaver 7.3

Configuring Distribution List in Compliant User Provisioning

SAP Cloud Strategy - Timeless Software. Frank Stienhans on behalf of Kaj van de Loo SAP

Ronald Bueck SBO Product Definition

Certificate SAP INTEGRATION CERTIFICATION

Sales Planning Detailed View. SAP Enhancement Package 1 for SAP CRM 7.0 CRM Sales - SFA

Data Source Enhancement Using User Exit

Sending Additional Files from SAP Netweaver PI to third Party System

Ten Reasons to Choose SAP for Enterprise Mobility. Copyright/Trademark

Log Analysis Tool for SAP NetWeaver AS Java

SAP DSM/BRFPlus System Architecture Considerations

Integration of Universal Worklist into Microsoft Office SharePoint

E-Recruiting Job Board Integration using XI

How-to-Guide: Middleware Settings for Download of IPC Configuration (KB) Data from R/3 to CRM System

Project Governance The Role Of The Business Process Owner

How To Configure MDM to Work with Oracle ASM-Based Products

UI Framework Logo exchange without skin copy. SAP Enhancement Package 1 for SAP CRM 7.0

Business Requirements... 3 Analytics... 3 Typical Use Cases... 8 Related Content... 9 Copyright... 10

How to Schedule Report Execution and Mailing

How To Use the BPC Mass User Management Tool in BPC 10.0 NW

BUSINESS PROCESS MANAGEMENT

SAP NetWeaver MDM 7.1 Features at a Glance. November, 2011

BUSINESS STRUCTURE: FUNCTIONS AND PROCESSES

Migration Guide Remote Support Component 1.0 to SAP Solution Manager 7.1. Target Audience System Administrators Technology Consultants

CHANNEL PARTNER (VAR) Technical Support Network. SAP Global Service & Support March 2011

Configuring Single Sign-on for SAP HANA

SAP BusinessObjects BI4.0 Upgrade Workflows

Integrated Release Management Maximize IT s business value. Swen Conrad, PMP Senior Director Solution Marketing IT Business Management

Variable Exit in Sap BI How to Start

HANA Operations for Outsourcing Providers. SAP Ecosystem & Channels, SAP Hosting Certifications November 7, 2013

Transcription:

SOP through Long Term Planning Transfer to LIS/PIS/Capacity SAP Best Practices

Purpose, Benefits, and Key Steps Purpose Check if the budgeted sales quantities can be produced, assess material requirements and utilization of the manufacturing cost centers. Benefits Avoid bottlenecks, over- and under-absorption in production. Material requirements planning as a basis for purchasing contracts. Key Steps Create sales plan and transfer to SOP (Sales and Operations Planning). Rough matching of budgeted sales quantities and production resources in SOP. Create planning scenario in Long Term Planning to simulate production planning for the budgeted sales quantities. Based on simulated production and operative production data (bills of material, routings), work center capacity and material requirements are calculated. Use material requirements for AOP purchase material price planning. Use work centers capacity in AOP general cost center planning. 2011 SAP AG. All rights reserved. 2

Required SAP Applications and Company Roles Required Enhancement package 5 for SAP ERP 6.0 Company Roles Strategic Planner 2011 SAP AG. All rights reserved. 3

Detailed Description AOP SOP through Long Term Planning Transfer to LIS/PIS/Capacity Please refer to specification 172 AOP - Sales Quantity Budget and Transfer to SOP for all steps concerning the planning of sales quantities. The current specification starts with the transfer of confirmed sales quantities to Sales and Operations Planning (SOP). In SOP rough cut capacity planning is carried out in order to verify whether the goods planned to be sold can run through the company s bottleneck resources needed for production. After the production plan has been proven feasible by SOP, it is passed on to a planning scenario in Long Term Planning module (LTP). In LTP, planned independent requirements (PIR) are created. Based on these PIRs, Materials Requirements Planning (MRP) is simulated to create and review planned requirements for all the materials (components, raw materials) and resources. Simulation of MRP also allows review of capacities of the plants. Capacity leveling can then be carried out to smooth out the bottlenecks. After having run MRP as described above, one of the key objectives of the logistics part of AOP is achieved: calculate the total utilization of the activity types assigned to the manufacturing work centers needed to produce the budgeted sales quantities. The utilization is based on the consumption of activity types indicated in the routings of the (semi finished and finished) products of the production plan. 2011 SAP AG. All rights reserved. 4

Strategic Planner Event Flow Diagram SOP through Long Term Planning Transfer to LIS/PIS/Capacity Annual Operating Plan AOP Standard Cost Calculation (178) AOP - Manufacturing Cost Center Planning (176) AOP - Purchased Material Price Planning (174) AOP - Sales Quantity Budget and Transfer to SOP (172) Yes Operative Production Data SOP Verification Transfer to Inactive Demand Management LTP LTP MRP Capacity Planning Acceptabl e Plan? No AOP= Annual Operating Planning LTP= Long Term Planning SOP= Sales and Operations Planning MRP= Materials Requirements Planning 2011 SAP AG. All rights reserved. 5

External to SAP <Function> Legend Symbol Description Usage Comments Symbol Description Usage Comments Band: Identifies a user role, such as Accounts Payable Clerk or Sales Representative. This band can also identify an organization unit or group, rather than a specific role. The other process flow symbols in this table go into these rows. You have as many rows as required to cover all of the roles in the scenario. External Events: Contains events that start or end the scenario, or influence the course of events in the scenario. Role band contains tasks common to that role. Diagram Connection Hardcopy / Document To next / From last Diagram: Leads to the next / previous page of the Diagram Hardcopy / Document: Identifies a printed document, report, or form Flow chart continues on the next / previous page Does not correspond to a task step in a document; instead, it is used to reflect a document generated by a task step; this shape does not have any outgoing flow lines Flow line (solid): Line indicates the normal sequence of steps and direction of flow in the scenario. Flow line (dashed): Line indicates flow to infrequently-used or conditional tasks in a scenario. Line can also lead to documents involved in the process flow. Connects two tasks in a scenario process or a non-step event Financial Actuals Financial Actuals: Indicates a financial posting document Does not correspond to a task step in a document; instead, it is used to reflect a document generated by a task step; this shape does not have any outgoing flow lines Business Activity / Event Business Activity / Event: Identifies an action that either leads into or out of the scenario, or an outside that happens during the scenario Does not correspond to a task step in the document Budget Planning Budget Planning: Indicates a budget planning document Does not correspond to a task step in a document; instead, it is used to reflect a document generated by a task step; this shape does not have any outgoing flow lines Unit Reference Unit : Identifies a task that is covered in a step-by-step manner in the scenario Reference: If the scenario references another scenario in total, put the scenario number and name here. Corresponds to a task step in the document Corresponds to a task step in the document Manual Manual : Covers a task that is manually done Does not generally correspond to a task step in a document; instead, it is used to reflect a task that is manually performed, such as unloading a truck in the warehouse, which affects the process flow. Sub- Reference Sub- Reference: If the scenario references another scenario in part, put the scenario number, name, and the step numbers from that scenario here Corresponds to a task step in the document Existing Version / Data Existing Version / Data: This block covers data that feeds in from an external process Does not generally correspond to a task step in a document; instead, this shape reflects data coming from an external source; this step does not have any incoming flow lines Decision Decision: Identifies a decision / branching point, signifying a choice to be made by the end user. Lines represent different choices emerging from different parts of the diamond. Does not usually correspond to a task step in the document; Reflects a choice to be made after step execution System Pass/Fail Decision System Pass / Fail Decision: This block covers an automatic decision made by the software Does not generally correspond to a task step in the document; instead it is used to reflect an automatic decision by the system that is made after a step has been executed. 2011 SAP AG. All rights reserved. 6

2011 SAP AG. All rights reserved No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information contained herein may be changed without prior notice. Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors. Microsoft, Windows, Excel, Outlook, and PowerPoint are registered trademarks of Microsoft Corporation. IBM, DB2, DB2 Universal Database, System i, System i5, System p, System p5, System x, System z, System z10, System z9, z10, z9, iseries, pseries, xseries, zseries, eserver, z/vm, z/os, i5/os, S/390, OS/390, OS/400, AS/400, S/390 Parallel Enterprise Server, PowerVM, Power Architecture, POWER6+, POWER6, POWER5+, POWER5, POWER, OpenPower, PowerPC, BatchPipes, BladeCenter, System Storage, GPFS, HACMP, RETAIN, DB2 Connect, RACF, Redbooks, OS/2, Parallel Sysplex, MVS/ESA, AIX, Intelligent Miner, WebSphere, Netfinity, Tivoli and Informix are trademarks or registered trademarks of IBM Corporation. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries. Adobe, the Adobe logo, Acrobat, PostScript, and Reader are either trademarks or registered trademarks of Adobe Systems Incorporated in the United States and/or other countries. Oracle is a registered trademark of Oracle Corporation. UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group. Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are trademarks or registered trademarks of Citrix Systems, Inc. HTML, XML, XHTML and W3C are trademarks or registered trademarks of W3C, World Wide Web Consortium, Massachusetts Institute of Technology. Java is a registered trademark of Sun Microsystems, Inc. JavaScript is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and implemented by Netscape. SAP, R/3, SAP NetWeaver, Duet, PartnerEdge, ByDesign, SAP BusinessObjects Explorer, StreamWork, and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and other countries. Business Objects and the Business Objects logo, BusinessObjects, Crystal Reports, Crystal Decisions, Web Intelligence, Xcelsius, and other Business Objects products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of Business Objects Software Ltd. Business Objects is an SAP company. Sybase and Adaptive Server, ianywhere, Sybase 365, SQL Anywhere, and other Sybase products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of Sybase, Inc. Sybase is an SAP company. All other product and service names mentioned are the trademarks of their respective companies. Data contained in this document serves informational purposes only. National product specifications may vary. The information in this document is proprietary to SAP. No part of this document may be reproduced, copied, or transmitted in any form or for any purpose without the express prior written permission of SAP AG. This document is a preliminary version and not subject to your license agreement or any other agreement with SAP. This document contains only intended strategies, developments, and functionalities of the SAP product and is not intended to be binding upon SAP to any particular course of business, product strategy, and/or development. Please note that this document is subject to change and may be changed by SAP at any time without notice. SAP assumes no responsibility for errors or omissions in this document. SAP does not warrant the accuracy or completeness of the information, text, graphics, links, or other items contained within this material. This document is provided without a warranty of any kind, either express or implied, including but not limited to the implied warranties of merchantability, fitness for a particular purpose, or non-infringement. SAP shall have no liability for damages of any kind including without limitation direct, special, indirect, or consequential damages that may result from the use of these materials. This limitation shall not apply in cases of intent or gross negligence. The statutory liability for personal injury and defective products is not affected. SAP has no control over the information that you may access through the use of hot links contained in these materials and does not endorse your use of third-party Web pages nor provide any warranty whatsoever relating to third-party Web pages. 2011 SAP AG. All rights reserved. 7