State-Based Probabilistic Scheduling Using STROBOSCOPE s CPM Add-On



Similar documents
Project Planning and Scheduling

Use project management tools

Project management: a simulation-based optimization method for dynamic time-cost tradeoff decisions

Project Time Management

Chapter 6: Project Time Management. King Fahd University of Petroleum & Minerals SWE 417: Software Project Management Semester: 072

Project Time Management

Project Time Management

A. O. Odior Department of Production Engineering University of Benin, Edo State.

Schedule Risk Analysis Simulator using Beta Distribution

Scheduling. Anne Banks Pidduck Adapted from John Musser

Scheduling Glossary Activity. A component of work performed during the course of a project.

APPLYING A STOCHASTIC LINEAR SCHEDULING METHOD TO PIPELINE CONSTRUCTION

ANT COLONY OPTIMIZATION ALGORITHM FOR RESOURCE LEVELING PROBLEM OF CONSTRUCTION PROJECT

Project Time Management Activity Definition Activity Sequencing Duration Estimating Schedule Development Schedule Control

8. Project Time Management

Application Survey Paper

Project and Production Management Prof. Arun Kanda Department of Mechanical Engineering Indian Institute of Technology, Delhi

CEE 536 CRITICAL PATH METHODS EXAMPLE PROBLEMS. Photios G. Ioannou, PhD, PE Professor of Civil and Environmental Engineering

SE351a: Software Project & Process Management

Operational Research. Project Menagement Method by CPM/ PERT

B D E F

ONLINE SUPPLEMENTAL BAPPENDIX PROJECT SCHEDULES WITH PERT/CPM CHARTS

PROJECT TIME MANAGEMENT. 1 Powered by POeT Solvers Limited

Scheduling Fundamentals, Techniques, Optimization Emanuele Della Valle, Lecturer: Dario Cerizza

ME 407 Mechanical Engineering Design Spring 2016

pm4dev, 2015 management for development series Project Schedule Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS

Chapter 9 Computer Scheduling Projects should be scheduled one byte at a time

Goals of the Unit. spm adolfo villafiorita - introduction to software project management

PROJECT TIME MANAGEMENT

CPM-200: Principles of Schedule Management

Chapter 6: Project Time Management

Program Evaluation and Review Technique (PERT) and Critical Path Method (CPM) Applications

Table of Contents Author s Preface... 3 Table of Contents... 5 Introduction... 6 Step 1: Define Activities... 7 Identify deliverables and decompose

Lecture 26 CPM / PERT Network Diagram

Project Scheduling and Gantt Charts

Basic CPM Calculations

Information Technology Project Management, Sixth Edition. Note: See the text itself for full citations. More courses at cie-wc.edu

Importance of Project Schedules. matter what happens on a project. projects, especially during the second half of projects

Project Time Management

10 Project Management with PERT/CPM

Priori ty

Prof. Olivier de Weck

Chapter 3 Managing the Information Systems (IS) Project

Quantitative Risk Analysis with Microsoft Project

Learning Objectives. Learning Objectives (continued) Importance of Project Schedules

Precedence Diagram Method. CSTM 462 Planning & Scheduling

Lecture 6: Project Time Management By: Prof. Lili Saghafi. Information Technology Project Management, Fifth Edition

Appendix A of Project Management. Appendix Table of Contents REFERENCES...761

TIME MANAGEMENT TOOLS AND TECHNIQUES FOR PROJECT MANAGEMENT. Hazar Hamad Hussain *

Project Management. Week 4- Project Planning and Network Diagrams

Network Diagram Critical Path Method Programme Evaluation and Review Technique and Reducing Project Duration

Cambridge International AS and A Level Computer Science

Chapter 6. (PMBOK Guide)

The Plan s Journey From Scope to WBS to Schedule

PERT/CPM. Network Representation:

PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT)

Project Planning. Lecture Objectives. Basic Reasons for Planning. Planning. Project Planning and Control System. Planning Steps

PROGRAMMING TECHNIQUES. Chapter 5(Part 2)

Module 3: The Project Planning Stage

CHAPTER 1. Basic Concepts on Planning and Scheduling

Unit 4: Time Management (PMBOK Guide, Chapter 6)

22 Project Management with PERT/CPM

Project Scheduling: PERT/CPM

Network analysis: P.E.R.T,C.P.M & Resource Allocation Some important definition:

Module 11. Software Project Planning. Version 2 CSE IIT, Kharagpur

Chapter 2: Project Time Management

BIM.03. Leveraging the Power of 4D Models for Analyzing and Presenting CPM Schedule Delay Analyses

Object-Oriented Analysis. with the Unified Process. John W. Satzinger Southwest Missouri State University. Robert B. Jackson Brigham Young University

A GUIDE TO NETWORK ANALYSIS by MICHAEL C GLEN

CISC 322 Software Architecture. Project Scheduling (PERT/CPM) Ahmed E. Hassan

INT 3 Schedule Risk Analysis

SYSTEMS ANALYSIS AND DESIGN DO NOT COPY

15. How would you show your understanding of the term system perspective? BTL 3

CRITICAL-PATH ANALYSIS FOR NETWORK SCHEDULING

Is Your Schedule Correct? Common Scheduling Mistakes and How to Avoid Them

A UNIT BASED CRASHING PERT NETWORK FOR OPTIMIZATION OF SOFTWARE PROJECT COST

Systems Analysis and Design

Review on Using Packages to Enhance the Teaching of Critical Path Networks

CRASHING-RISK-MODELING SOFTWARE (CRMS)

A Generalized PERT/CPM Implementation in a Spreadsheet

Time Management in Projects: Tools, Techniques and Methods

Software Project Scheduling under Uncertainties

ALGORITHM FOR DETERMINING CONTROLLING PATH CONSIDERING RESOURCE CONTINUITY

A Comparison Study Between Event Chain Methodology And Critical Path Method In The Construction Industry

Integrated Cost and Schedule using Monte Carlo Simulation of a CPM Model

Scheduling Best Practices

CRITICAL PATH METHOD (CPM) SCHEDULES

Chapter 4: Project Time Management

BPEL disadvantage: more time to product BPEL advantage: better reusability, analysis

The Project Planning Process Group

A SIMULATION MODEL FOR RESOURCE CONSTRAINED SCHEDULING OF MULTIPLE PROJECTS

Egypt Scholars Presented by Mohamed Khalifa Hassan Jan 2014

Basic Concepts. Project Scheduling and Tracking. Why are Projects Late? Relationship between People and Effort

Schedule Risk Analysis Simplified 1 by David T. Hulett, Ph.D.

Problems, Methods and Tools of Advanced Constrained Scheduling

Project Scheduling: PERT/CPM

Almost everyone in the planning and scheduling profession

V&V and QA throughout the M&S Life Cycle

Transcription:

Proceedings, Construction Congress V, ASCE Stuart D. Anderson,ed State-Based Probabilistic Scheduling Using STROBOSCOPE s CPM Add-On by Julio C. Martinez 1 and Photios G. Ioannou 2 Abstract Critical path scheduling is a well-developed tool for construction planning at the project level. A substantial amount of research has focused on adding probabilistic capabilities to the technique. Simulation-based methods are almost universally accepted as the most effective because of their modeling versatility and power. Some scheduling models based on simulation recognize correlation between activity durations and allow the probabilistic selection of paths within a network. Very few techniques, however, allow activity duration and sequencing to be defined in terms of the dynamic information that becomes available as a project evolves. This paper presents a program for probabilistic CPM scheduling designed as an addon to the STROBOSCOPE simulation system. The add-on allows the duration of an activity to be specified as a formula that depends on any scheduling information that may be available when the activity starts. This includes the actual start date and duration of activities already started as well as the dates and floats for activities yet to start. This capability and the ability to combine probabilistic scheduling with construction process simulation make the CPM add-on and the STROBOSCOPE simulation system one of the most powerful project planning tools available today. Introduction The Critical Path Method (CPM) is used to plan and control most modern construction projects. A CPM network represents the various activities that comprise a project and the precedence relationships between them. It can be 1 Assistant Professor of Civil Engineering, Virginia Tech, Blacksburg, VA 24061-0105 2 Associate Professor of Civil & Env. Engineering, University of Michigan, Ann Arbor, MI 48105 438 J.C. Martinez & P.G. Ioannou

analyzed to determine the criticality and float of activities; the level of resources needed during each day of construction; and the dates at which important milestones will be achieved. A CPM network is not necessarily an accurate representation of an actual construction plan. It assumes that activities have a fixed duration and that this duration is known at the beginning of the project. It also assumes that precedence relationships are fixed and absolutely necessary (i.e., all predecessors must finish before the successor can start). As a project is built, the CPM network is updated to reflect the actual dates of the completed activities and better estimates of the duration of future activities. Often, the logic of the network changes to represent a revised construction plan. The effectiveness of planning at the project level can be substantially enhanced if the plan can be formulated and evaluated more realistically ahead of time. This includes recognizing the uncertainty in the duration of activities as a function of the dynamic state of the project. Program Evaluation and Review Technique (PERT) was the first step in this direction. PERT can model probabilistic durations but its results are subject to merge-event bias and cannot model correlation between activity durations. Other tools typically overcome the merge-event bias problem by using Monte-Carlo simulation to model a CPM schedule (Van Slyke 1963). GERT (Phillips & Hog 1976) can additionally model uncertainty in the precedence of activities. VERT (Moeller & Digman 1981), MUD (Carr 1971) and DYNASTRAT (Morua Padilla 1986) can model correlation between the durations of activities and to a limited extent recognize the state of the project in progress. None of the existing tools, however, have the necessary flexibility and power to model uncertainty in the duration of activities as a true function of the state of the project, nor can they model the underlying process-level operations through concurrent simulation. The CPM add-on for STROBOSCOPE presented here is capable of modeling activities with probabilistic durations that depend on the state of the project and other concurrent process-level simulations. This add-on serves as an example of how STROBOSCOPE can be used as a development vehicle for special-purpose simulators and more sophisticated project-level simulation tools. STROBOSCOPE STROBOSCOPE is an acronym for STate and ResOurce Based Simulation of COnstruction ProcEsses. It is a simulation programming language based on activity cycle diagrams and the activity-scanning paradigm and was designed specifically for modeling construction operations. The STROBOSCOPE language is fully described in (Martinez 1996). Example applications that illustrate the language can be found in (Ioannou & Martinez 1996) and (Martinez & Ioannou 1995). Several other examples can be found in publications that appear in the references. 439 J.C. Martinez & P.G. Ioannou

STROBOSCOPE can be extended via add-ons written in a high-level compiled language such as FORTRAN or C++. STROBOSCOPE can also be controlled via OLE Automation by other applications. A STROBOSCOPE add-on is a 32-bit MS Windows Dynamic Link Library that extends the STROBOSCOPE language with new statements, functions, and variables. The code within the add-on can call back into the simulation engine using STROBOSCOPE s Application Programming Interface (API) described in (Martinez 1996). Add-ons are loaded into STROBOSCOPE with the LOADADDON statement: LOADADDON C:\Program Files\Strobos\Add- Ons\CpmAddOn.dll ; Once an add-on is loaded, its statements, functions and variables can be used as if they were a standard part of the language. The CPM Add-On When the CPM add-on is loaded, it provides the statements shown in Table 1. Table 1 - Statements registered by the CPM Add-On Statements Arguments Function CPMACTIVITY PRECEDENCE 1) Activity Name 2) Duration Expression 1) Predecessor Name 2) Successor Name Defines a CPM Activity with the provided name and duration sampled using the provided expression. Indicates that the successor cannot start until the predecessor is finished. CPMREPLICATE DOCPM CPMREPORT 1) Number of Replications Simulates the CPM network the number of times indicated and produces a report as described in the CPMREPORT statement. Performs a single forward and backward CPM pass. Prints the 90% Confidence Interval on project duration and a report showing the average duration, average early and late dates, average floats and criticality for each CPM Activity. 440 J.C. Martinez & P.G. Ioannou

Of particular interest is the second argument to the CPMACTIVITY statement. The argument is an expression that can include functions that sample from probability distributions and that can reference variables that access the state of project or of any concurrent process simulation. Assume, for example, that a concurrent process simulation produces a dynamic variable named RainfallLst48hrs (in centimeters). This variable could then be used to define the probabilistic duration of an activity as follows: CPMACTIVITY Pertpg[0.9,1.1,1.4]+RainfallLst48hrs*0.3; ExcSt14To17 The duration of the ExcSt14To17 activity defined above would be determined by sampling from a Beta distribution with 5 th percentile 0.9 days, Mode 1.1 days, and 95 th percentile 1.4 days; 0.3 days for each centimeter of rainfall accumulated during the 48 hours prior to the start of the activity would be added to the sampled value. The actual expression used to define the duration of the activity could be as complex as necessary, calling any number of functions and variables. The parameters of functions that sample from probability distributions can also include expressions or variables. The CPM add-on automatically defines variables that access the state of the project. These variables are listed in Table 2. Given these variables, CPM activities could be defined with statements such as (see Figure 1): CPMACTIVITY CounterEq Pert[1,2,4]; VARIABLE CntrEqRemDur Max[0,CounterEq.EarlyFinish- SimTime]; CPMACTIVITY FloorCvrngs Pert[2,4+CntrEqRemDur/2,8]; The first of the above statements defines the activity CounterEq with an optimistic duration of 1 day, most likely duration of 2 days, and pessimistic duration of 4 days. The second statement defines a function that returns the remaining duration of CounterEq. The last statement defines FloorCvrngs with an optimistic duration of 2 days, most likely duration of 4 days plus half a day for each day of remaining duration in CounterEq, and pessimistic duration of 8 days. An example such as this could be used to show that CounterEq interferes with FloorCvrngs due to a shared resource (e.g., they use the same crew or work space). Example The following example, shown in Figure 1, is adapted from a classic CPM textbook (Harris 1978). It is the network for the construction of a fast-food outlet and includes the activities for the installation of counter equipment and floor coverings that were used as examples above. 441 J.C. Martinez & P.G. Ioannou

Variable Prototype Table 2 - Variables defined by the CPM Add-On Value Returned CPMActivity.Critical CPMActivity.Duration CPMActivity.EarlyFinish CPMActivity.EarlyStart CPMActivity.Finished CPMActivity.FreeFloat CPMActivity.GoingOn CPMActivity.LateFinish CPMActivity.LateStart CPMActivity.Started CPMActivity.TotalFloat TRUE if CPMActivity is critical in the current run. The duration used for CPMActivity in the current run. The early finish of CPMActivity in the current run. The early start of CPMActivity in the current run. TRUE if CPMActivity has finished in the current run. The free float of CPMActivity in the current run. TRUE if CPMActivity is going on in the current run. The late finish of CPMActivity in the current run. The late start of CPMActivity in the current run. TRUE if CPMActivity has started in the current run. The total float of CPMActivity in the current run. 4 Roof trusses 7 Windows 9 Counter 12 Counter Equip 2 Wall panels 6 Roofing 10 Walk-in Fridge 14 Floor Covers 15 Tables 1 Base slab 8 Doors 13 Kitchen Equip 3 Parking area 5 Land scaping 11 Sign Figure 1 - CPM Network for fast-food outlet construction 442 J.C. Martinez & P.G. Ioannou

The entire source-code for this model is shown below. Refer to the source-code for the probability distributions of the activity durations. LOADADDON CpmAddOn.dll ; CPMACTIVITY BaseSlab Pert[3,6,12]; CPMACTIVITY WallPanels Pert[4,6,9]; CPMACTIVITY ParkingArea Pert[6,15,20]; CPMACTIVITY RoofTrusses Pert[1,2,5]; CPMACTIVITY Landscaping Pert[3,5,10]; CPMACTIVITY Roofing Pert[1,3,5]; CPMACTIVITY Windows Pert[1,2,4]; CPMACTIVITY Doors Pert[1,2,4]; CPMACTIVITY Counter Pert[3,8,10]; CPMACTIVITY WIFridge Pert[2,5,8]; CPMACTIVITY Sign Pert[3,4,6]; CPMACTIVITY CounterEq Pert[1,2,4]; VARIABLE CntrEqRemDur Max[0,CounterEq.EarlyFinish-SimTime]; CPMACTIVITY KitchenEq Pert[4,10,15]; CPMACTIVITY FloorCvrngs Pert[2,4+CntrEqRemDur/2,8]; CPMACTIVITY Furnishings Pert[5,10,15]; PRECEDENCE BaseSlab WallPanels; PRECEDENCE BaseSlab ParkingArea; PRECEDENCE WallPanels RoofTrusses; PRECEDENCE ParkingArea Landscaping; PRECEDENCE RoofTrusses Roofing; PRECEDENCE Roofing Windows; PRECEDENCE Roofing Doors; PRECEDENCE Windows Counter; PRECEDENCE Doors Counter; PRECEDENCE Windows WIFridge; PRECEDENCE Doors WIFridge; PRECEDENCE Landscaping Sign; PRECEDENCE Counter CounterEq; PRECEDENCE Windows KitchenEq; PRECEDENCE Doors KitchenEq; PRECEDENCE WIFridge FloorCvrngs; PRECEDENCE Counter FloorCvrngs; PRECEDENCE KitchenEq FloorCvrngs; PRECEDENCE FloorCvrngs Furnishings; CPMREPLICATE 1000; The source-code used above consists almost entirely of statements defined by the CPM add-on. The only standard STROBOSCOPE statements used are VARIABLE and LOADADDON. STROBOSCOPE, running this code on a 200 MHz Pentium Pro under Windows NT 4.0, produces the following output: STROBOSCOPE Model ProbCPM4.STR (1551032608) Number of replications performed : 1000 Average Project Duration : 44.95 90% CI on project duration : [44.78,45.11] 443 J.C. Martinez & P.G. Ioannou

CPM Activity Time ESD LSD EFD LFD FF TF %Critic ======================================================================= Doors 2.17 17.90 18.19 20.07 20.36 0.29 0.29 49.00% ParkingArea 14.35 6.42 20.94 20.77 35.29-0.00 14.52 0.00% Roofing 2.99 14.91 14.91 17.90 17.90 0.00-0.00 100.00% FloorCvrngs 4.56 30.39 30.39 34.96 34.96 0.00-0.00 100.00% Counter 7.48 20.36 22.91 27.84 30.39-0.00 2.55 13.80% Windows 2.17 17.90 18.19 20.07 20.36 0.29 0.29 51.00% RoofTrusses 2.35 12.55 12.55 14.91 14.91-0.00-0.00 100.00% BaseSlab 6.42 0.00-0.00 6.42 6.42 0.00-0.00 100.00% WIFridge 4.98 20.36 25.42 25.33 30.39 5.06 5.06 0.10% Furnishings 9.99 34.96 34.96 44.95 44.95 0.00-0.00 100.00% KitchenEq 9.89 20.36 20.50 30.25 30.39 0.15 0.15 86.10% CounterEq 2.16 27.84 42.78 30.00 44.95 14.94 14.94 0.00% Sign 4.15 26.28 40.79 30.43 44.95 14.52 14.52 0.00% WallPanels 6.13 6.42 6.42 12.55 12.55-0.00-0.00 100.00% Landscaping 5.50 20.77 35.29 26.28 40.79 0.00 14.52 0.00% ------------------------------------- Execution Time = 3.578 seconds Detailed statistics for each of the values shown in the report can be obtained by appending the REPORT statement to the code (this produces the standard STROBOSCOPE report). The detailed statistics would include the minimum, maximum, average, and standard deviation for each value. Notice that for all activities except FloorCvrngs the average duration is very close to the long term mean as given by the Pert approximation (a+4*m+b)/6. Without the interference from CounterEq, the average duration of FloorCvrngs would have been (2+4*4+8)/6=4.33. The average duration after 1000 iterations was 4.56, which reflects the extra time required when it overlaps with CounterEq. The CPM add-on and its source code in C++ are included with STROBOSCOPE. Beyond its utility, the CPM add-on serves to illustrate STROBOSCOPE s powerful API and the ease with which it can be used to extend the language. Thus, it is a solid starting point for a more sophisticated project-level analysis tool. Despite this, the CPM add-on is very useful and perhaps the most attractive probabilistic scheduling tool available, especially for teaching and research. In fact, a recently completed Ph.D. dissertation at the University of California at Berkeley used the CPM add-on as the primary tool for validating a heuristic approach for the evaluation of the impact of correlation between activities (Wang 1996). Acknowledgments The authors wish to thank the Horace H. Rackham Pre-Doctoral Fellowship Program at the University of Michigan and the National Science Foundation (Grant CMS-9415105) for supporting portions of the work presented here. Any opinions, findings, and conclusions or recommendations expressed in this paper are those of the authors and do not necessarily reflect the views of the National Science Foundation or of the Rackham School of Graduate Studies at the University of Michigan. 444 J.C. Martinez & P.G. Ioannou

References Van Slyke, R. M. 1963. Monte-Carlo Methods and the PERT Problem, Operations Research. Phillips, D. T. and Hogg, G. L. 1976. Stochastic Network Analysis with Resource Constraints, Cost Parameters and Queing Capabilities Using GERT Methodologies, Computers and Industrial Engineering. Moeller, G. L. and Digman, L. A. 1981. Operations Planning With VERT, Operations Research. Carr, R. I. 1979. Simulation of Construction Project Duration, Journal of the Construction Division, ASCE. Morua Padilla, E. 1986. Resource Strategies for Dynamic Construction Project Management, Ph.D. Dissertation, Department of Civil and Environmental Engineering, University of Michigan, Ann Arbor, MI. Martinez, J. C. 1996. STROBOSCOPE: State and Resource Based Simulation of Construction Processes, Ph.D. Dissertation, Department of Civil and Environmental Engineering, University of Michigan, Ann Arbor, MI. Ioannou, P. G. and Martinez, J. C. 1996. Comparison of Construction Alternatives Using Matched Simulation Experiments, Journal of Construction Engineering and Management, ASCE, (112) 3, New York, NY. Martinez, J. C. and Ioannou, P. G. 1995. Advantages of the Activity Scanning Approach in the Modeling of Complex Construction Processes, Proceedings of the 1995 Winter Simulation Conference, Society for Computer Simulation, San Diego, CA. Harris, R. B. 1978. Precedence and Arrow Networking Techniques for Construction, John Wiley & Sons, New York, NY. 445 J.C. Martinez & P.G. Ioannou