MAGA Engineering Sri Lanka Economic benefits of standards. October 2011 March 2012



Similar documents
Juhayna Food Industries S.A.E. Egypt Economic benefits of standards Case Study. November 2011 June 2012

Xinxing Ductile Iron Pipes Co. Ltd., China Economic benefits of standards Case study. July 2011 February 2012

Mapei, Italy Economic benefits of standards Case Study. September 2011 June 2012

Overview of case studies: South Africa. Case study: Pretoria Portland Cement Company (PPC Cement) (May 2011)

Quality Product Certification Scheme for Mechanical Couplers (QS/MC)

Resource Management - The challenges and opportunities in the construction sector Miles Watkins

Best Practices and Approaches to Supply Chain Management

Is securing personal information a priority? Reassure clients and achieve data protection compliance with BS 10012

CONTRACT PRICE ADJUSTMENT PROVISIONS (CPAP)

Procurement guidance Prequalifying suppliers

A Guide to Structural Waterproofing

Australian Industry Participation (AIP) Plan for Midal Cables Aluminium Rod and Conductor Facility Tomago NSW

Logiwiz Limited. 408/A, Nungamugoda, Kelaniya, Sri Lanka. Tel: , Fax: Website:

BEST PRACTICES CATALOGUE

Chapter 22. Lump Sum Project Guidelines

Training Prospectus. Sri Lanka Standards Institution 1

PURCHASE DEPARTMENT AT/PO: BANHARPALI ; DIST.JHARSUGUDA (ODISHA),INDIA

OHS Contractor Management Procedure

Georgia Department of Transportation. Office of Materials and Research. Standard Operating Procedure (SOP) 19

CHAPTER 7: SUBDIVISION CONSTRUCTION, INSPECTION AND BONDING Subdivision Improvement Performance Bond Requirements

Knowledge is the food of the soul ~Plato. Knowledge Transferred Transferencia del Saber

INDIANA DEPARTMENT OF TRANSPORTATION QUALIFIED LABORATORY AND TECHNICIAN PROGRAM

IMPROVING DELIVERY PROCUREMENT AND SUPPLY CHAIN MANAGEMENT

Construction Contractors

Wastewater Capital Projects Management Standard Construction Specification

Acceptance on the Approved List of contractors cannot however guarantee that any work orders will be issued to that contractor.

Definition of Quality. New Definition of Quality. The changing trend... INTRODUCTION. Vendor Approval & Performance Monitoring

SALES AND USE TAX TECHNICAL BULLETINS SECTION 18

SAMPLE QUESTIONS EXAM EXEMPLAR QUESTIONS. AD6 - Operations management in supply chains. Level 5 Advanced Diploma in Procurement and Supply

Exceptional... Everytime!

City of Fort Smith Building Permit Process Frequently Asked Questions

Sustainability in Global Supply Chains Information and Guidance for Companies

Please use a separate sheet for each location Date Notes taken / / By. Name of Company: Tel No: Mobile: Contact at Company: E mail Fax:

Construction of A hospital Building

Title: Rio Tinto management system

Contract Relationship Management DRAFT

SECTION STORM DRAINAGE SYSTEM

Overview of case studies: Vietnam. Case study: VinaKip (April 2011)

Profile. Marine ingenuity In just two words, we show what we do, how we do it, and what makes us different. Dredging and Marine Contractors

Module 6: QUALITY MANAGEMENT FOR CONSTRUCTION PROJECTS. Submodule 1: Introduction. Objectives: After completing this submodule, you will be able to:

AFRA has a set of adopted principles in relation to training

North American Development Bank. Model Prequalification Document: Prequalification of Contractors

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

Information for Construction Contractors. Terry O Neill Taxpayer Service Specialist

Overview of case studies: Singapore. Case study: NTUC FairPrice (March 2011)

ACIL POSITION PAPER PROCUREMENT AND EFFECTIVE PRACTICE OF CONSTRUCTION MATERIALS ENGINEERING AND TESTING SERVICES

VDOT GOVERNANCE DOCUMENT

ASBESTOS CONTAINING MATERIALS POLICY

R E Q U E S T F O R Q U O T A T I O N S REPAIRS AND MAINTENANCE OF ROOF STRUCTURES AT HECKROORDT CLUB KROONSTAD, MOQHAKA MUNICIPALITY, FREE STATE

Planning, Organisation and Control of Resources in Construction and the Built Environment

SAMPLE QUESTIONS EXAM EXEMPLAR QUESTIONS. AD5 - Sustainability in supply chains. Level 5 Advanced Diploma in Procurement and Supply

STEEL fabrication quality SySTEmS guideline

a) To achieve an effective Quality Assurance System complying with International Standard ISO9001 (Quality Systems).

1. Introduction 2 2. Financial evaluation of resource efficiency projects 3

Recommended Good Practice for. contractor SAFETY CSI. World Business Council for Sustainable Development

SHAIYO TRIPLE A GROUP. Hochiminh City, 16 September 2013

Professional Indemnity Proposal Form Surveyors

ata ports & harbours airports railways roads & highways info@ata-recruitment.co.uk

POSITION DESCRIPTION

Department of Treasury and Finance

C. Section TESTING LABORATORY SERVICE.

Proven roofing SyStemS

QUALITY CONTROL AND QUALITY ASSURANCE MANAGEMENT IN UPPER-KOTMALE HYDROPOWER PROJECT

3Dcities INDIA. Architecture and Engineering Outsourcing Company since 1999

Professional Indemnity Insurance Specialist Supplier Presentation

NECAQ Sustainability Program The Business Case

ASSOCIATION OF INDEPENDENT SCHOOLS OF NSW BLOCK GRANT AUTHORITY GUIDE TO PROCUREMENT PROCESSES

JOHN HART GENERATING STATION REPLACEMENT PROJECT. Schedule 9. Quality Management

TRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS. LEC (Company Audit) Guidance Notes

Guidelines on Prior Approval (PA) Application to recruit Foreign Workers (Construction)

INCORPORATION OF COMPANIES. The method of incorporating a Company includes Sections No. 04 and 05 of the Companies Act No. 07 of 2007.

How To Install An Overhead Sewer

The Asset Management Landscape

C-2 Construction, Inc. - NAICS Codes

CIVIL AND MINING CONTRACTORS

Logical steps to logistics optimization. Preparing for smart metering mass deployment

TOTAL CAPABILITY IN SCAFFOLDING & ACCESS SYSTEMS REACHING NEW HEIGHTS OF INNOVATION & SAFETY

Human Resources Management. in Construction. Dr. Nabil I. El Sawalhi Construction Management. 1 HRM Ch 2

Steel procurement in major projects: Guidance on the application of social issues. Purpose

ENGINEERING COMPETENCIES ENTRY LEVEL ENGINEER. Occupation Specific Technical Requirements

CONTRACTUAL LIABILITY INSURANCE ENGINEERING CONTRACTORS PROPOSAL FORM

Quality Management Subcontractor QM Guide-Section Two

ISSUING AGENCY: New Mexico Public Regulation Commission, Insurance Division. [7-1-97; NMAC Rn & A, 13 NMAC 17.6.

UK Certification Authority for Reinforcing Steels

CORPORATE RESPONSIBILITY

COMPANY PROFILE. The main markets serviced by Bahra Cables Company are Saudi Arabia and the countries belonging to the Gulf Cooperating Council (GCC).

A new age of industrial production The Internet of Things, Services and People

Three Counties Termite Control

Transcription:

MAGA Engineering Sri Lanka Economic benefits of standards October 2011 March 2012

Content of this presentation Maga Engineering (Maga) Basic company information The construction industry and Maga s value chain Use of standards at Maga Quantification of the impacts of standards Additional qualitative considerations 2

Maga Engineering Company overview (1) Maga started business as a construction company in 1984, when it became involved with several international contractors executing projects in Sri Lanka It is the market leader in volume and quality of work and is the first Sri Lankan company to be recognized as a Business Superbrand (finest reputation in its field) and has won the most quality awards issued by the Institute for Construction Training and Development (ICTAD) The company gained ICTAD «M1» status 1 in the categories of Buildings in 1990, Highways and Bridges in 1996, Water Supply and Drainage in 1999 and «C1» status in all of the above in 2009 Engaged in construction activities outside the country since 1987, Maga has completed over a dozen building, civil and marine engineering projects overseas *ICRTAD «M1» status: a national registration and grading scheme for construction contractors a screening process to determine the capabilities of prospective contractors to undertake different types and sizes of projects. Registration and grading is determined by evaluating a contractor mainly on financial capability, technical ability of staff, plant and machinery, and experience gained in relevant fields. Initially under this scheme, contractors were claissified on financial ability under 10 grades (M1 to M10) 3

The building construction process 4

The construction industry Governance, organization and core process 5

Model of a company value chain (M. Porter) The value chain is used as a tool in the assessments to structure and analyze the activities of companies 6

Key value drivers at Maga Engineering Maga s competitive advantage lies mainly in its: professional expertise and construction quality, coupled with: flexibility mutual cooperation, and dedicated teamwork reputation and increased turnover enabling the company to maintain market leader status in the Sri Lankan construction industry extensive resource base which has helped to provide costeffective design and construction management solutions as well as a country-wide supply of ready-mixed asphalt and pre-cast concrete products 7

Attitude of Maga Engineering towards standards Since its inception, Maga has ensured that its operations comply with relevant standards Maga holds certifications to: ISO 9001 quality management systems ISO 14001 environmental management system OHSAS 18001 occupational health and safety management system and implements relevant national standards for raw materials ISO 9001 for most of its purchasing processes (selection and evaluation of suppliers, stores management such as sorting, stock verification and preparation of monthly bills ISO 14001 to manage energy use and key emissions 8

Preliminary analysis of the standards impact In agreement with Maga, it was decided to limit the scope of the case study to the following key business functions for the building construction sector: Procurement Inbound logistics Production (construction project management) 9

Value chain of Maga Engineering Business functions selected for the assessment of the impacts of standards are highlighted 10

Selection of a sample construction project Building projects undertaken by large companies like Maga are very complex and cannot be evaluated using a simple annual framework. Owing to this construction industry characteristic, it was decided to determine the impact of standards on a single sample project. The Sambuddha Jayanthi building project has been selected for the case study for the following reasons: it was completed recently, enabling to obtain reliable data and information the project duration could be considered as average compared to other projects undertaken by Maga The findings from the Sambuddha Jayanthi project have been applied to 11 similar concurrent building construction projects having an average duration of 22 months to calculate the total average contribution of standards for all 11 projects over the period of one year. 11

Main standards used by Maga Steel bars for the reinforcement of concrete (SLS 26) Steel wire (SLS 139) Cement (SLS 107) Ceramic tiles (SLS 1181) Quality management systems (ISO 9001) 12

Financial impact of standards (1) Assuming that no standards had been implemented in 2001, but that by 2011 all relevant standards currently used by Maga had been implemented, the financial impact over the past ten years is estimated to be: Procurement: 1 054 048 00 LKR (~ 803,084 USD) Inbound logistics: 63 600 00 LKR (~ 48,457.1 USD) Production: 1 739 972 08 LKR (~ 1 325 690 USD) Total savings derived from the use of standards over 10 years: 2 857 620 08 LKR (~ 2 177 230 USD) 13

Financial impact of standards (2) By applying the findings from the Sambuddha Jayanthi building to similiar projects and assuming that Maga uses more or less the same standards, it was estimated that the Total average contribution of standards for 11 projects over a period of one year represents a contribution to total annual revenue of 0.54 % 14

Some additional qualitative considerations Most of the purchasing processes such as selection and evaluation of suppliers, and stores management processes e.g. sorting, stock verification and preparation of monthly bills have become more efficient following ISO 9001:2008 implementation Maga has switched to alternative energy sources as a result of ISO 14001 implementation, buts it impact cannot be quantified since the company does not keep comprehensive energy sayings records A reduction in the costs of testing and rejecting raw materials, in rework and repairing defects were identified for three major raw materials only since data required for other raw materials such as roofing sheets and pipes were not available in detail. Therefore some of those impacts were not totally quantified. Maga has gained a significant marketing advantage in winning contracts as a result of ISO 9001 certification 15