The 91 st Avenue Unified WWTP Targets 100 Percent Reuse



Similar documents
CENTRAL ARIZONA SALINITY STUDY ---- Phase I. Technical Appendix O. Municipal TDS Research

Maricopa Association of Governments. Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS. August 2001

US Army Corps of Engineers Los Angeles District. Rio Salado Oeste Salt River-Phoenix, Arizona FEASIBILITY REPORT SUMMARY

DIRECT POTABLE REUSE: A PATH FORWARD:

Arizona s Legacy and Leadership in Wastewater Reuse

Tres Rios del Norte Feasibility Study

Getting More Out of the Water We Have

Water Reuse in Central Arizona A Technical Report by Decision Center for a Desert City

Life Cycle Assessment of Three Water Scenarios: Importation, Reclamation, and Desalination

PREPARING INDUSTRIAL ENGINEERING REPORTS

Evaluation of Alternatives to Domestic Ion Exchange Water Softeners. Mara Wiest Dr. Peter Fox Dr. Lee Wontae, HDR Tim Thomure, HDR

NEVADA CITY WASTEWATER TREATMENT INQUIRY

San Diego Citizen s Forum. USIBWC San Diego Field Office

Alternatives to Conventional Wastewater Treatment

Horseshoe Ranch Management Planning Process

City of Lakeland s Wetlands Treatment System An Overview

Plan Groundwater Procurement, Implementation and Costs, prepared for the Brazos River Authority, July 2005.

Arizona Department of Education Adult Education Services

William E. Dunn Water Reclamation Facility. Facility Overview & Information

Christopher Harto Argonne National Laboratory

Request to Accept Trade Adjustment Assistance Community College and Career Training Grant

ARIZONA DEPARTMENT OF WATER RESOURCES

MEMBRANE TECHNOLOGY TREATING OILY WASTEWATER FOR REUSE

The Importance of Master Planning Ibrahim S. Nassar, P.E. Facilities Planning Department Saudi Aramco

Water Equipment Technologies. Advanced Membrane Technologies for Solving Worldwide Water Problems

PROPOSED REHABILITATION SAN CARLOS IRRIGATION PROJECT FACILITIES. Pinal County, Arizona. Scoping Information and Opportunity to Comment

Integrated Urban Water Management in Dunedin, Florida, USA: Sustainable Practices from a Small Coastal City in the Gulf of Mexico

NEWS Media Contact: Christie Silverstein Valley Forward Association (602)

California Wastewater

A Long-Range Plan: Melbourne s Drinking Water Supply

West Valley Collaborative

Roosevelt Water Conservation District ROOSEVELT WATER CONSERVATION DISTRICT

ASSESSMENT OF WASTEWATER TREATMENT AND WATER REUSE PRACTICES IN THE GULF COUNTRIES

Industrial Water Use and Reuse Workshop

WATER REUSE IN SPAIN: DATA OVERVIEW AND COSTS ESTIMATION OF SUITABLE TREATMENT TRAINS

Incorporating the Triple Bottom Line (Sustainability) Into a WWTP Improvement/Relocation

CHAPTER 8 UPGRADING EXISTING TREATMENT FACILITIES

Alberta Environment Standards for Advanced Waste Systems

TESTIMONY OF RONNIE LUPE, TRIBAL CHAIRMAN THE WHITE MOUNTAIN APACHE TRIBE FORT APACHE INDIAN RESERVATION, ARIZONA SENATE COMMITTEE ON INDIAN AFFAIRS

INFORMATION SHEET ORDER NO. R XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY

Description of the Water Conserv II Facility

4 th & Carey Groundwater. Remediation Project and Reverse Osmosis Water Treatment System

Greater Los Angeles County Region

Proposed General Plan Update Goals, Policies, and Implementation Actions

Water Solutions for Downstream Oil & Gas

Healthy Forests Resilient Water Supply Vibrant Economy. Ecological Restoration Institute

May 23, 2006 MEMORANDUM TO: David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Identifying the Best Potable Reuse Treatment Approach with the Triple Bottom Line in Mind

The City of Boulder 75 th Street Wastewater Treatment Facility

The Budget: Effectively Implementing The 2014 Water Bond

Water Forever: South West Margaret River Forum

PUBLIC NOTICE Application for Permit

City of Inglewood Well No. 2 Rehabilitation. City of Inglewood Thomas Lee

Introduction to the Envision Sustainability Rating System

Phoenix AMA References and Supplemental Reading

Section 5: Conserve to Enhance Program Goals What is Conserve to Enhance All About?

Wasser Berlin International GWP Forum: Challenges in North America. Alberta s Water Challenges and Opportunities

Capital Improvement Plan Utilities-Wastewater

Texas Commission on Environmental Quality Page 1 Chapter Design Criteria for Domestic Wastewater Systems

Proposed Terms of Reference for EIA studies

Water Recycling in action in South Australia: a review of agricultural and municipal reuse schemes and innovation.

Sewer servicing and integrated resource management

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington

COMPANY PROFILE & CAPABILITY STATEMENT

INVENTORY AND ANALYSIS

Phosphorus Removal. Wastewater Treatment

GOALS, OBJECTIVES AND POLICIES

experience matters our services

WASTEWATER TREATMENT PERFORMANCE AND COST DATA TO SUPPORT AN AFFORDABILITY ANALYSIS FOR WATER QUALITY STANDARDS

United States Depmiment of the Interior Bureau of Reclamation Western Colorado Area Office Grand Junction, Colorado

Transcription:

SROG GLEND LE The 91 st Avenue Unified WWTP Targets 100 Percent Reuse 26 th Annual WateReuse Symposium September 14, 2011

Presentation Outline Facility Location and Ownership Basic Facility Information Current Reuse Customers Potential Future Reuses Unified Plant Concept to Support Reuse Market Resource Center Questions

91 st Avenue WWTP Location SCOTTSDALE GLENDALE PHOENIX TEMPE MESA 91 ST AVENUE WWTP GLEND LE

91 st Avenue WWTP Ownership Sub-Regional Operating Group (SROG) City Capacity Ownership Phoenix 55.16% Glendale 6.45% Scottsdale 9.90% Tempe 14.20% Mesa 14.29%

230 mgd current capacity 91 st Avenue WWTP Expandable to 385 mgd 140 mgd current flows Nitrification / denitrification Arizona Class B+ effluent 25-year master plan for all future expansions (Unified Plant concept)

Current Water Reuse Locations

Palo Verde Nuclear Generating Station Only nuclear plant in world using effluent (since 1985) Cooling tower use Accepts unfiltered secondary effluent, accepted 67,700 AFY (6/11) Additional treatment: trickling filters, 2-stage clarification, lime softening, filtration 80,000 AFY allotment per new agreement Now nation s largest energy producer

Buckeye Irrigation Company Receiving effluent since 1971 for agricultural irrigation Diverts effluent from river downstream of WWTP and Tres Rios Diverted 28,200 AFY (6/11) and 20,000 AFY (7/11) Can take up to 20,000 AFY through 2015, with options to extend to 2030

Tres Rios Constructed Wetlands Cost-effective treatment for continued discharge to Salt River Increases fish and wildlife habitat Reduces potential for flood damage Provides public recreation opportunities Accepted 1,400 AFY (6/11), 45,000 AFY (7/11) When fully operational (1/12), can take up 56,000 AFY

Current Reuse Reuse Customer Palo Verde Nuclear Generating Station Buckeye Irrigation Company Tres Rios Constructed Wetlands Amount (AFY) June 2011 Total Current Reuse 97,300 (60% of production) Amount (AFY) July 2011 67,700? 28,200 20,000 1,400 45,000? (70% of production) Current Plant Production 158,000?

Proposed Agua Fria Linear Recharge Project 101 Agua Fria Linear Recharge (40,000 60,000 AFY) GLENDALE 17 51 101 SCOTTSDALE Pipeline to Agua Fria Gila River Tres Rios Wetlands 10 91 st Avenue WWTP Gila River PHOENIX 10 TEMPE 202 MESA

Other Potential Environmental Habitat Projects Phoenix Rio Salado Oseste (8,000 AFY) Phoenix Rio Salado (4,000 AFY) Restore habitat, recreation, and educational value Effluent could come from 91 st Avenue WWTP or other Phoenix plants

BIC TRES RIOS PROJECT Unified Plant Concept to Support Reuse MARKET RESOURCE CENTER ANPP UNIFIED PLANT EXISTING PLANT SALT RIVER UP05 TRES RIOS

Unified Plant Concept Treatment process units operate as part of integrated system Processes are disassociated by common channels, flow can go to any unit in next area Single process units can be removed without affecting effluent quality Process units sized such that follow-on units with decreased influent quality can still meet quality requirements Benefit: reliable reclaimed water production is maintained even during process upsets or maintenance events

Market Resource Center Master Plan anticipated need for future advanced treatment (regulatory or customer requirements) Reserved space on the 91 st Avenue WWTP master-planned site Space for membrane filtration and reverse osmosis, including brine treatment and disposal Estimated that up to 60 mgd from the plant could be allocated to end uses requiring advanced treatment by 2025

Potential for 100% Reuse Reuse Customer Palo Verde Nuclear Generating Station Reuse Amount (AFY) 80,000 Buckeye Irrigation Company 20,000 Tres Rios Constructed Wetlands 56,000 Potential Agua Fria Linear Recharge 40,000 60,000 Other Potential Recharge/Habitat Projects 12,000??? Potential AWT Customers 67,000 Total Potential Reuse 275,000 295,000+ Current Plant Production 158,000 Current Plant Capacity 257,600

SROG Questions? GLEND LE For Information: Steve Rohrer Steve.rohrer@arcadis-us.com