Mercedes-Benz US International, Inc. Supplier Connection Guidelines IMPORTANT: Check with MBUSI for any late-breaking changes to this specification. https://daimler.portal.covisint.com/web/mbusi
Table of Contents 1. Audience... 3 2. Overview of Connection... 3 2.1. Description of Connections... 3 2.2. Data flow between MBUSI and Suppliers... 3 2.3. Critical Suppliers... 3 3. Benefits of Electronic Data Interchange (EDI)... 4 4. Setup of EDI Connection... 6 4.1. Setup Options Available... 6 4.2. VAN Setup Option... 6 4.3. Direct Connection - OFTP2 Option... 7 4.4. Direct Connection AS2 Option... 8 4.5. Direct Connection - SFTP Option... 9 5. EDI Communication Changes... 10 6. Communication Readiness... 10 7. EDI Message Types... 10 8. MBUSI ASC X12 Parameters... 11 8.1. MBUSI X12 Parameters for Production... 11 8.2. MBUSI X12 Parameters for Testing... 11 8.3. Supplier X12 Parameters... 11 9. Contacts... 12 9.1. T-Systems Customer Support... 12 9.2. MBUSI EDI Team... 12 Revision 1.2 Released Date: 4 March 2016 Page 2 of 12
1. Audience Mercedes-Benz US International, Inc. uses state-of-the-art processes and manufacturing techniques which require it to maintain a close relationship with all its suppliers. It is essential to have the most reliable communications possible to ensure the continuity of MBUSI operations is not interrupted. This document outlines the connection methods and connection requirements for MBUSI suppliers. 2. Overview of Connection 2.1. Description of Connections MBUSI will primarily use standard-based Electronic Data Interchange (EDI) communications with its suppliers such as Accredited Standards Committee (ASC) X12. Suppliers can connect over a Value Added Network (VAN) or directly to MBUSI s EDI system called EDIS to transmit and receive messages. Suppliers choosing to connect to EDIS directly must connect over the internet using OFTP2, AS2, or SFTP. See Section 2.3 for an important note regarding Critical Suppliers 2.2. Data flow between MBUSI and Suppliers MBUSI T-Systems EDIS OFTP2 (all critical), AS2, SFTP Supplier. VAN Supplier 2.3. Critical Suppliers MBUSI may determine that one of its suppliers is time critical to its operations; it is a requirement that such critical supplier connect using OFTP2 over the internet directly to EDIS. No other connection option can be used. It is solely the responsibility of MBUSI to determine whether a supplier is critical and is not the decision of the supplier. Examples of critical suppliers are listed below. This is not an exhaustive list and the items below are subject to revision at any time by MBUSI without notice. Just in Sequence (JIS) or sometimes referred to as Sequence Parts Suppliers (SPS) Supply to Line (S2L) or sometimes referred to as Just in Time (JIT) Suppliers with high frequency of deliveries per day Suppliers with very short delivery times Other suppliers identified as critical by MBUSI Revision 1.2 Released Date: 4 March 2016 Page 3 of 12
In view of the increasing globalization of the automotive industry MBUSI chose to adopt a standard method of communication for EDI data with critical suppliers utilizing state-of-the-art technologies within the automotive industry. Transmission of data for critical suppliers will take place using OFTP2 over an internet connection. The data transmission will be directly to/from Daimler/EDIS system, which is a global EDI solution for Daimler AG and its subsidiaries. The system is supported by T-Systems International GmbH (TSI). This provides reliability, security, and efficiency in communications between MBUSI and our suppliers. In order to guarantee this reliability, MBUSI requires all critical suppliers to ensure the following: Support OFTP2 connections over internet o Have OFTP2 certificates from an approved CA o Use an OFTP2 software that is approved by Odette to have interoperability with other OFTP vendors (if you have any questions about your software s compatibility you should address them directly to T-Systems) Fully redundant internet connection (with diverse path) Reliable and high availability (HA) EDI systems Ability to send/receive production related EDI messages from/to supplier s production systems through the EDIS system, reliably during MBUSI operating hours without interruptions For further general information about OFTP2 as a standard refer to Odette s website, www.odette.org, and search for OFTP2. 3. Benefits of Electronic Data Interchange (EDI) EDI is now well established as a reliable state-of-the-art channel of communication for doing business in today s world. Particularly in view of advances in logistics, MBUSI and its suppliers will be working more closely together than in the past. This will mean increased process synchronization, which would not be feasible without the use of electronic communication channels. The main aims of EDI communication are as follows: fast and secure data interchange paper-free data interchange elimination of repeated data entry by the recipient (time and cost) reduction of errors caused by having to re-input the data standard interfaces for processing regularly recurring bulk data communications no printing on expensive multiple-copy forms Revision 1.2 Released Date: 4 March 2016 Page 4 of 12
However, EDI is more than just another channel of communication. By enabling fast, standardized data interchange, it creates the basis for enhancements to other related processes, thereby generating potential savings. Examples of these enhancement opportunities include: Reductions in administration expenses through: - standardization of work processes, and therefore simplification of processes both across multiple workplaces and within individual workplaces - immediate availability of data for further processing with user programs Faster flow of information, resulting in - immediate reaction to changed requirements - faster flow of goods - fewer one-off operations, such as special transport consignments - more accurate planning - greater flexibility - less capital tied up in inventories These enhancements are available to all parties involved in the communication process. The prerequisite is the successful integration of EDI into internal systems and processes. We expect all our partners, including component suppliers, area contract freight forwarders and external service providers, to make effective use of these state-of-the-art communication technologies and resources, becoming more competitive in the process. We see this as a fundamental requirement for our mutual efforts to optimize the costs and processes of our business operations. Our purchasing partner selection decisions will be based not only on optimum quality of the actual service, e.g. material or transport, but also implicitly on the provider s readiness to display flexibility and innovation, and therefore the ability to use state-of-the-art communication systems. This attitude is also shared by other automotive producers and in other sectors, so showing some initiative in this area is very much in your own best interests as well. Accordingly, these requirements which we have been voicing for some years now are not seen as an appropriate area for any investment contribution on our part. Revision 1.2 Released Date: 4 March 2016 Page 5 of 12
4. Setup of EDI Connection 4.1. Setup Options Available MBUSI allows two general methods of connection for EDI data. 1. Value Added Network (VAN) Any VAN which already has an interconnect with EDIS 2. Direct connection to our EDI system managed by T-Systems International, GmbH (TSI) The below connections methods are available OFTP2 AS2 SFTP Critical suppliers can only use option two above with OFTP2 and other additional requirements, which are outlined in Section: Critical Suppliers. 4.2. VAN Setup Option This option is not available to a supplier if MBUSI has determined you are critical, see Section: Critical Suppliers for additional information on this. General procedure Please make sure you have completed the following steps before beginning any integration testing (content testing) with MBUSI. Careful testing helps all parties to set up a reliable and secure data interchange, in terms of both technical and content aspects. Setup Procedures for Suppliers When you are setting up electronic data interchange with MBUSI using a VAN or plan to change your existing EDI connections, please complete the following steps: 1. Contact your MBUSI representative for the relevant message types 2. MBUSI will initiate contact with T-Systems (TSI) to begin setup 3. Contact T-Systems within 2 weeks for connection setup (see Section: Contacts for contact details) 4. Confirm with T-Systems your VAN is supported (interconnect with EDIS already exists) 5. T-Systems provides EDI connection information to supplier 6. Supplier contacts their VAN to setup the necessary EDI connection with T-Systems 7. Arrange a date and time for a procedure test with the EDIS system by contacting T-Systems 8. Complete the procedure test with the EDIS test system 9. T-Systems will send notification to Supplier and MBUSI that connection setup is complete 10. A data test with the relevant plant must then be made. Please inform your MBUSI contact partner that you are ready to begin data content testing for the relevant message types. Revision 1.2 Released Date: 4 March 2016 Page 6 of 12
Procedure test with T-Systems During the procedure test with TSI line connections will be tested. This must be done before any data interchanges with our plants. This test will ensure all parameters have been configured correctly. 4.3. Direct Connection - OFTP2 Option General procedure Please make sure you have completed the following steps before beginning any integration testing (content testing) with MBUSI. Careful testing helps all parties to set up a reliable and secure data interchange, in terms of both technical and content aspects. Setup Procedures for New Suppliers When you are setting up electronic data interchange with MBUSI using OFTP2 or plan to change your existing EDI connections, please complete the following steps: 1. Contact your MBUSI representative for the relevant message types 2. MBUSI will initiate contact with T-Systems (TSI) to begin setup 3. Contact T-Systems within 2 weeks for connection setup (see Section: Contacts) 4. Select and implement an OFTP2 system If you are a critical supplier also follow the requirements in Section: Critical Suppliers 5. Enter all the communication parameters for data interchange with MBUSI in your system or ask your software supplier to do this for you 11. Complete the form (provided by T-Systems) with your OFTP2 partner data and fax or email it to T-Systems (see Section: Contacts) 12. Arrange a date and time for a procedure test with the EDIS system with our EDI Customer Supports 13. Complete the procedure test with the EDIS test system 14. T-Systems will send notification to Supplier and MBUSI that connection setup is complete 15. A data test with the relevant plant must then be made. Please inform your MBUSI contact partner that you are ready to begin data content testing for the relevant message types. Procedure test with T-Systems During the procedure test with TSI line connections will be tested. This must be done before any data interchanges with our plants. This test will ensure all parameters have been configured correctly. Revision 1.2 Released Date: 4 March 2016 Page 7 of 12
4.4. Direct Connection AS2 Option General procedure Please make sure you have completed the following steps before beginning any integration testing (content testing) with MBUSI. Careful testing helps all parties to set up a reliable and secure data interchange, in terms of both technical and content aspects. Setup Procedures for New Suppliers When you are setting up electronic data interchange with MBUSI using AS2 or plan to change your existing EDI connections, please complete the following steps: 1. Contact your MBUSI representative for the relevant message types 2. MBUSI will initiate contact with T-Systems (TSI) to begin setup 3. Contact T-Systems within 2 weeks for connection setup (see Section: Contacts) 4. Supplier completes setup on their AS2 system 5. Complete the form (provided by T-Systems) with your AS2 partner data and fax or email it to T- Systems (see Section: Contacts) 6. Arrange a date and time for a procedure test with the EDIS system with our EDI Customer Supports 7. Complete the procedure test with the EDIS test system 8. T-Systems will send notification to Supplier and MBUSI that connection setup is complete 9. A data test with the relevant plant must then be made. Please inform your MBUSI contact partner that you are ready to begin data content testing for the relevant message types. Procedure test with T-Systems During the procedure test with TSI line connections will be tested. This must be done before any data interchanges with our plants. This test will ensure all parameters have been configured correctly. Revision 1.2 Released Date: 4 March 2016 Page 8 of 12
4.5. Direct Connection - SFTP Option General procedure Please make sure you have completed the following steps before beginning any integration testing (content testing) with MBUSI. Careful testing helps all parties to set up a reliable and secure data interchange, in terms of both technical and content aspects. Setup Procedures for New Suppliers When you are setting up electronic data interchange with MBUSI using SFTP or plan to change your existing EDI connections, please complete the following steps: 1. Contact your MBUSI representative for the relevant message types 2. MBUSI will initiate contact with T-Systems to begin setup 3. Contact T-Systems (TSI) within 2 weeks for connection setup (see Section: Contacts) 4. Supplier completes setup on their SFTP client to connect to TSI s SFTP server It is supplier s responsibility to schedule jobs to check TSI s SFTP server to receive their messages 5. Complete the form (provided by T-Systems) with your SFTP partner data and fax or email it to T- Systems (see Section: Contacts) 6. Arrange a date and time for a procedure test with the EDIS system with our EDI Customer Supports 7. Complete the procedure test with the EDIS test system 8. T-Systems will send notification to Supplier and MBUSI that connection setup is complete 9. A data test with the relevant plant must then be made. Please inform your MBUSI contact partner that you are ready to begin data content testing for the relevant message types. Procedure test with T-Systems During the procedure test with TSI line connections will be tested. This must be done before any data interchanges with our plants. This test will ensure all parameters have been configured correctly. Revision 1.2 Released Date: 4 March 2016 Page 9 of 12
5. EDI Communication Changes If you wish to change your communication method only or change any individual parameters, contact T- Systems and inform MBUSI before beginning any changes. You are responsible to contact MBUSI any time you are changing your EDI system or ERP/Production system. An MBUSI representative will schedule appropriate tests with you. Careful setup and testing of any changes helps to keep a reliable and secure data interchange. 6. Communication Readiness MBUSI is constantly producing data. This data has to be sent directly to our communication partners (suppliers). This means that it is important to keep your communication system ready to receive at all times. In any case, please inform MBUSI s EDI team well in advance of any planned outage. 7. EDI Message Types MBUSI chooses to use EDI standards wherever possible. The most common standard used by MBUSI is the ASC X12. The actual transaction sets within the ASC X12 standards used and specifications for implementing those transaction sets are available on the Daimler supplier portal. Please refer to your MBUSI contact to determine which message types apply to you. MBUSI may, at its discretion, make changes to the format or contents of its EDI messages at any time. The MBUSI portal can be found here: https://daimler.portal.covisint.com/web/mbusi Revision 1.2 Released Date: 4 March 2016 Page 10 of 12
8. MBUSI ASC X12 Parameters MBUSI uses a single ID for sending messages, but uses two separate EDI IDs for receiving - one receiving ID for Production and a different receiving ID for Testing. Please configure this in your systems. MBUSI follows the ASC X12 standard and requires the ISA15 element to contain a T for any test message. The GS ID of a message will depend on the specific MBUSI business process behind that message. This is outlined in separate documentation on the Daimler portal with the specifications for each message type. 8.1. MBUSI X12 Parameters for Production ISA Qual ISA ID ISA15 GS ID * Receiving Messages from MBUSI ZZ MBUS002 P MBUS002 MBUS002A MBUS002S MBUS002T Sending Messages to MBUSI ZZ MBUS003 P MBUS003 MBUS003A MBUS003S MBUS003T *GS ID defined by business process 8.2. MBUSI X12 Parameters for Testing ISA Qual ISA ID ISA15 GS ID * Receiving Messages from MBUSI ZZ MBUS002 T MBUS002 MBUS002A MBUS002S MBUS002T Sending Messages to MBUSI ZZ MBUS005 T MBUS005 MBUS005A MBUS005S MBUS005T *GS ID defined by business process 8.3. Supplier X12 Parameters If you are using a VAN to connect to EDIS, you will provide T-Systems with your EDI ID and qualifier. If you are connecting directly to EDIS, then your EDI qualifier will be ZZ and your EDI ID will be your 10 digit MBUSI supplier number. Revision 1.2 Released Date: 4 March 2016 Page 11 of 12
9. Contacts The contact point for changing, setting up, or testing communication connections to MBUSI and receiving error reports regarding communication with EDIS systems is generally the T-Systems EDI Customer Support. If a message was communicated successfully, but you have issues with the content of that message you may contact MBUSI s EDI team. In any contact (email or phone) with either T-Systems or MBUSI be sure to include your MBUSI plant 138, supplier number, and message type. 9.1. T-Systems Customer Support When you are contacting the T-Systems EDI Customer Support T-Systems International GmbH EDI Customer Support US Phone: +1 866 405 5305 German Phone: +49 391 5976 2016 E-Fax: +49 391 580 211 271 E-Mail: edi.hotline@t-systems.com Subject line for all emails must use the format: "Daimler w138 10 Digit Supp# Message Type Description" The T-Systems EDI Customer Support is available 24 hours, 365 days a year. Urgent incidents will be handled appropriately. Service requests for setups and non-urgent incidents are handled during T- Systems business hours. Normal business hours are Monday to Friday between 1am to 3pm US Central Time excluding MBUSI plant holidays. Outside of these hours only processing exceptions will be handled. 9.2. MBUSI EDI Team Mercedes-Benz US International, Inc. Email: mbusi_edi@daimler.com M-F 8:00am 4:00pm, US Central Time, excluding plant holidays MBUSI Control Room Phone: +1 205 462 6600 Email: ITControl.Room@daimler.com 24/7 emergency support only *For most emergencies, such as connection interruptions, contact T-Systems first. Revision 1.2 Released Date: 4 March 2016 Page 12 of 12