Dr. Jesús Gómez, P.E. 36th Annual Conference on Deep Foundations, Boston, MA



Similar documents
Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

The International Workshop on Micropiles, 2007

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS

MEMORANDUM: RECOMMENDATIONS FOR PIPE MATERIAL SELECTION

Value of Instrumentation Systems and Real-Time Monitoring: An Owner s Perspective

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

Wastewater Capital Projects Management Standard Construction Specification

Paper The relation of Micropile Diameters in case of Pressure casting and non-pressure casting (30)

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS

Guidelines for Earthquake Bracing Residential Water Heaters

MICROPILE FOUNDATIONS IN KARST: STATIC AND DYNAMIC TESTING VARIABILITY

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

Chapter. Restoration of Damaged Structures

GLOSSARY OF TERMINOLOGY

Guidelines for Earthquake Bracing of Residential Water Heaters

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training

APPENDIX B. I. Background Information

In-Track Repair of Concrete Ties. Deland Humpherys, Director Track Mtce

Post Grouted Single Bore Multiple Anchors at Hodenpyl Dam, Michigan

product manual HS-4210 HS-4210_MAN_09.08 Digital Static Cone Penetrometer

LEGACY REPORT ER ICC Evaluation Service, Inc. Reissued November 1, Legacy report on the 1997 Uniform Building Code

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta

METHOD OF STATEMENT FOR STATIC LOADING TEST

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

Meeting the Challenge of Pipeline Emergency Repair

APPENDIX A PRESSUREMETER TEST INTERPRETATION

Outline MICROPILES SUBJECT TO LATERAL LOADING. Dr. Jesús Gómez, P.E.

Fiberstars Mini Lighted Laminar Flow Fountains

UNDERPINNING OF NEW STUDENT HOUSING BUILDING USING MICROPILES, NORTH CAROLINA USA

Comprehensive Design Example 2: Foundations for Bulk Storage Facility

Beacon Hill Sewer District Standard Specifications

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

FARM A SYST Farmstead Assessment System. Drinking Water Well Condition

Specification Guidelines: Allan Block Modular Retaining Wall Systems

Specifications for Residential Property Owners Connection to New Public Sewer

Moving Small Mountains Vesuvius Dam Rehab

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

Section SEWER PIPE INSTALLATION AND TESTING

Measuring the Condition of Prestressed Concrete Cylinder Pipe

The Stabilizer TM. Benefits. Supplemental support system for sagging beams and floor joists within a crawl space

Section Installation of pipe and casing for sanitary sewer by methods of augering.

Residential Foundations and Basements

FY08 SEWER POINT REPAIRS BID TABULATION

STANDARD SPECIFICATIONS SECTION CLEANING AND LINING WATER MAINS

PART E SPECIFICATIONS

Section 2100-Trenching and Tunneling

ENGINEERED FOUNDATIONS. Department of Public Works Jeff Hill, PE

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe

SECTION 700 STRUCTURES SECTION 701 DRIVEN PILING MATERIALS Materials Materials shall be in accordance with the following:

INDEX. Sec. No. Items Page Nos.

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

NAPCA BULLETIN APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE

SECTION 1 GENERAL REQUIREMENTS

Guide for SOLID CONCRETE BLOCK SEALS

Lighthouse Engineering, L.L.C.

Attachment G-1: Pit Latrine Diagram. Fig E.1a: Pit Latrine. Fig E.1b: Plan View of Twin Pits

Annular Space Grouting of Slipline Products

Treatment Practice for Controlling Water Damage in the Annular Space of Shaft Freezing Hole

Using Williams Products

ITEM # OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT

1. ASTM C Sampling and Testing Concrete Masonry Units 2. ASTM C 1372 Standard Specification for Dry-Cast Segmental Retaining Wall Units

CHAIN-LINK FENCES BID SPECIFICATIONS DESCRIPTION

BUTE Department of Construction Management and Technology

ICC-ES Evaluation Report

Kentucky Lake Bridge Pile Load Testing Overview Ohio Transportation Engineering Conference Columbus, Ohio 10/28/2015

USE OF MICROPILES IN TEXAS BRIDGES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations

ENERGY ABSORPTION SYSTEMS

How To Use A Water Source Heat Pump

Foundation Code compliance and Best Practices By Michael Coello

Pro-Lift Steel Pile Foundation Repair

Metropolitan Builders Association Masonry & Concrete Standard

2005 WJTA American Waterjet Conference August 21-23, 2005 Houston, Texas Paper SAFE WATERJET CLEANING OF STEEL PROCESS LINES

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

New construction Repairing failed or old foundations Retrofit foundations Permanent battered piers Machinery/equipment foundations

ATLAS RESISTANCE Pier Foundation Systems

Unit Price Averages Reports

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils

Royal Seal Gasketed Sewer Pipe

System. Stability. Security. Integrity. 150 Helical Anchor

WHI 90-Minute Rated Veneered Door Frame Installation Instructions

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

SECTION ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

SECTION PRECAST CONCRETE UTILITY STRUCTURES

WATER MAIN CONSTRUCTION TECHNIQUES DEPARTMENT OF PUBLIC WORKS WATER & WASTEWATER DIVISION

Guidelines for Excavations

Tremie Concrete CM 420 CM 420 CM 420 CM 420. Temporary Structures. Tremie Concrete

load on the soil. For this article s examples, load bearing values given by the following table will be assumed.

High Strain Dynamic Load Testing of Drilled Shafts

Waste Collection Systems

Relining of Water Mains with. Flexible High Pressure Pipelines. Raedlinger Primus Line, Inc. Ivan Zubiaga Executive Vice President 2014

Transcription:

FHWA Hollow Bar Soil Nail (HBSN) Test Program Dr. Jesús Gómez, P.E. 36th Annual Conference on Deep Foundations, Boston, MA Outline Introduction and motivation Installation methods for testing Testing and results Conclusions 1

Hollow Core Bars Drill Bit Hollow Titan Bar Centralizer Coupling Bearing Plate Hex Nut Pipe Sleeve Hollow Core Bars Hollow Bar FLUSHING HEAD HOLLOW CORE BARS Cement grout The flushing grout cools the drill bit and increases the durability and efficiency. The flushing grout opens the bore hole and transports the soil out of the hole which is loosened by the drill bit. The grout suspension supports and prevents collapsing of the bore hole. 2

Grout Body 3. 1. Grout body of cement w/c = 0.4 red coloured, 2. Filter cake from flushing cement w/c = 0.8 green/grey coloured 3. Consolidated ground ground improvement Grout Body Consolidated ground Steel tendon Filter Cake from flushing grout w/c ~ 0.8 Final grout w/c ~ 0.4 3

Hollow Core Bars Great for granular formations Formations where casing is needed Faster installation in open areas Larger grout pressures Higher bond strength Can be installed in relatively hard formations Boulders Cost Corrosion protection Research Motivation HBSNs used very frequently How to debond for Proof and Verification Load Tests? What are typical bond strength values for HBSNs? Are they really higher than traditional, pre-drilled soil nails? Why? 4

Research Objectives Develop suitable installation procedure for Verification and Proof Load Test HBSNs. Develop suitable Verification and Proof Load Test testing protocol Increase database of grout-to-ground bond strength of HBSNs Correlation to published nominal values in FHWA-SA-96-069 Research Test HBSNs and pre-drilled soil nails in various sites across the US Try different procedures for debonding HBSNs Exhume nails after testing Compare results and develop recommendations 5

HBSN Installation Protocol: Method A Method A 6

Method A HBSN Installation Protocol: Method B 7

Installation of Casing (Method B) Unbonded Length (Method B) 8

Installation of HCB (Method B) Flushing and Extraction of Casing (Method B) 9

HBSN Installation Protocol: Method C Method D Only applied at one site Predrilled with hollow bar to depth of unbonded length Removed bar, let set Re-drilled to full length Flushed unbonded length 10

Installation of HBSN (Method C) Measurement of G S 11

Test Sites Site 1: City Creek Center, Block 76 (Block 76 Site), located in Salt Lake City, Utah Site 2: Posillico Storage Yard (Posillico Site), located in Bohemia, New York Site 3: Sunset Mesa Gravel Pit (Sunset Mesa Site), located in Montrose County, Colorado Site 4: DIS Wheeler Property (Olympia Site), located in Olympia, Washington Salt Lake City (Site 1) 12

Load Test Setup Typical test results Method A VERIFICATION SOIL NAIL LOAD TEST Hollow Core Bar Research - Salt Lake City, Utah Load (kips) 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 0.0 0.2 0.4 0.6 0.8 Displacement (inches) 1.0 1.2 1.4 1.6 1.8 20 2.0 2.2 2.4 2.6 2.8 3.0 Load Test 0.8Lu 13

Typical Test Results Method B VERIFICATION SOIL NAIL LOAD TEST Hollow Core Bar Research - Salt Lake City, Utah Load (kips) 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 0.0 0.2 0.4 0.6 0.8 Displacement (inches) 1.0 1.2 1.4 1.6 1.8 2.0 2.2 2.4 2.6 2.8 3.0 Load Test 0.8Lu Typical Test Results Method C VERIFICATION SOIL NAIL LOAD TEST Hollow Core Bar Research - Salt Lake City, Utah Load (kips) 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 0.0 0.2 0.4 0.6 0.8 Displacement (inches) 1.0 1.2 1.4 1.6 1.8 20 2.0 2.2 2.4 2.6 2.8 3.0 Load Test 0.8Lu 14

Summary Grout-to-Ground Nominal Strengths Soil Type FHWA (2005) Rotary Drilled Grout-to-Ground Nominal Strengths / Jet Grouted psi (kpa) Installation Installation Installation Installation Method A Method B Method C Method D psi psi psi psi (kpa) (kpa) (kpa) (kpa) Silty Sand (SM) 14.5-21.8/55.1 (100-150)/(380) 12.8-17.1 (88-118) 18.7-24.4 (129-168) Not performed 17.8-23.7 (123-163) Poorly Graded 14.5-26.1/55.1 13.2 71.2-79.6 63.7-131.7 Sand (SP) (100-180)/ (380) (91) (491-549) (439-908) - SP with Gravel 14.5-26.1/101.5 (100-180)/ (700) 50.5-82.2 (348-567) - - - GP with Sand 14.5-26.1/101.5 (100-180)/ (700) 53.2-64.5 (367-445) 62.4-156.3 (430-1059) 116.9-155.7 (806-1074) - Exhumed nails in Montrose, CO 15

16

Exhumed nails in Long Island Diameter = 7¾ At 1.5 from bottom of nail Diameter = 6¼ At 4 from bottom of nail. 2 jump in grout height at 6-9 from bottom of nail. Diameter = 9 At 7 from bottom of nail. 0-0 to 4-6 Grout appears to be smooth. No visible signs of cracking. Some rocks from soil adhered to the grout. 4-6 to 6-9 Grout has a rough texture. Project Title Hollow Core Bar Research Excavation of Soil Nails Project Number 07150064 17

Diameter = 10¼ At 10 from bottom of nail 3 horizontal bulge at 10 from bottom of nail. 2 drop in grout height at 11-8 from bottom of nail. Hairline crack from 12-2 to 13-5. Larger cracks and breaks from 13-5 to 16-4. Diameter = 8 At 13.5 from bottom of nail 6-9 to 9-5 Grout body diameter increased. 9-5 to 11-10 Bulge in grout. Rocks from soil adhered to the grout. 12-2 to 16-4 Grout cracked and broken. Project Title Hollow Core Bar Research Excavation of Soil Nails Project Number 07150064 Debonding Ax xial load from gauge (ki ip) 35.0 30.0 25.0 20.0 15.0 10.0 50 5.0 Test Nail B1 Test Nail C2 Test Nail D2 0.0 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 Jack load (kip) 18

Conclusions Ultimate bond strength of hollow core bars in granular soils may be significantly ifi larger than in pre-drilled nails About same values in fine-grained soils Debonding can be achieved efficiently Methods d B and D debonding di preferred Method A 19

Installation of 7 in casing and No 14 Bar (Method A) Tremie Grouting and Verification of grout level (Method A) 20

Extraction of Casing (Method A) Montrose- Summary 21

Other sites Montrose, Colorado. Hogback County Gravel Pit. Contractor: t Mountain Highwall Concrete, TEI Rock Drills Bohemia, Long Island. Posillico Group Yard. Contractor: Peterson Geotechnical Construction, LLC, Posillico Group Salt Lake City- Summary 22

Long Island- Summary HBSN Characteristics 23

Installation of HBSN (Method C) PVC PV appears to C be cut. 12 gap in PVC from 16 to 17 from bottom of nail. Nail bent 12½ from designed location. Grout exists in the annular space between the hollow core bar and the PVC. After observations were recorded, grout was chipped away from the nail. The end of the PVC was discovered at 15-3.5 from top of nail (6-10.5 from bottom of nail). 12-2 to 16-4 Grout cracked and broken. 16-4 to 18-0 PVC visible. 18-0 to 22-2 Hollow core bar visible. Some surface corrosion observed. Project Title Hollow Core Bar Research Excavation of Soil Nails Project Number 07150064 24

25