A Step-Up Transformer Online Monitoring Experience at Euzébio Rocha UTE [Thermal Power Plant]



Similar documents
Step Up Transformer Online Monitoring Experience in Tucuruí Power Plant

Application of On-line Monitoring Systems in the view of Maintenance Engineering of Eletrobras Furnas

On-line monitoring of substation condition a Romanian experience. V. ZAHARESCU, Vl. ROSCA Nova Industrial SA. CN Transelectrica SA Romania

Intelligent maintenance decisions with ABB TrafoAssetManagement TM proactive services

GE Energy Transformer Monitoring: How Moving forward from Monitoring to Diagnostics can Positively Impact Indian Business and Industry

Smart Asset Management

Enhance Power Equipment Reliability with Predictive Maintenance Technologies

Transformer Fleet Management with e-terraassetcare

SMART ASSET MANAGEMENT MAXIMISE VALUE AND RELIABILITY

Online Transformer Insulation Monitoring System BushingGard Product Focus. Maximizing Transformer Uptime and Reliability

On-line Dissolved Gas Analysis

Siemens TMDS transformer monitoring and diagnostic system. Solutions for transformer life-cycle management. Answers for energy.

Outages Happen 24/7 So Should Monitoring / SAFEGUARD YOUR HIGH VOLTAGE ASSETS WITH VAISALA ONLINE MONITORING

On-line Condition Monitoring and Diagnosis for Power Transformers their Bushings, Tap Changer and Insulation System

Real-Time Temperature Monitoring of 13.7 kv Breaker Outputs Using Fiber Optic

Design and Implementation of SCADA System Based Power Distribution for Primary Substation ( Monitoring System)

How To Control Power At Petrobras Research Center

Alstom Grid Services. Transformer lifecycle management GRID

ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F

SCADA Systems Automate Electrical Distribution

Table of Contents. TransformerIQ FAQs 1

REMOTE MONITORING AND CONTROL OF THE KAKKONDA GEOTHERMAL POWER PLANTS

Monitoring and diagnostics

Root-Cause Analysis of Transformer Failure Scenario at Power Sub-Station

Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components

DGA - Method in the Past and for the Future

Practical Transformers: Operation, Maintenance and Testing

TMDS Smart Monitor. Solutions for transformer life-cycle management. Answers for energy.

AMSC s Superconductor Cable Technologies for Electric Utilities

14. Troubleshooting Guide

ANCILLARY EQUIPMENT AND ELECTRICAL EQUIPMENT Power Supply Systems and Electrical Equipment for Desalination Plants - Y.M. Hamud and A.H.

Evolution in Automation

On-line PD Monitoring Makes Good Business Sense

System integration oriented data center. planning. In terms of ATEN's eco Sensors DCIM solution

Power transformers. Generator step-up and system intertie power transformers Securing high-quality AC transmission

MONITORING DEVICE FITTED ON-BOARD A MV CIRCUIT-BREAKER, IN REMOTE AS WELL AS LOCAL ACCESS

ABB Brasil. Power Transformers: Life Cycle and Operational Cost Optimization From Purchase to Minimum Maintenance

Intelligent Vibration Monitoring

Reconstruction Support after the Great East Japan Earthquake

Wireless Sensor Networks

Efficient remote access to machines and plants with SIMATIC

REMOTE SYSTEM FOR MONITORING AND CONTROL OF CONTROLLED AREA OF NUCLEAR INSTALLATION

Remote Monitoring and Satellite Communications

Distributed Temperature Sensing - DTS

EFFICIENT ELECTRICAL ENERGY TRANSMISSION AND DISTRIBUTION INTERNATIONAL ELECTROTECHNICAL COMMISSION

Achieving Operational Efficiencies through On-Line Substation Monitoring. Vince Polsoni Powerstream Inc. Manager Station Sustainment EDIST 2016

Power Plant Electrical Distribution Systems

University of Iowa Main Power Plant 2008 Flood Preparations, Event, & Recovery

Practical On-Line Vibration Monitoring for Papermachines

Proactive Asset Management for GIS A six step process for reducing risk, cost, and improving reliability

Electric Power Systems An Overview. Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas

Safe and secure distribution of medium voltage with AX1

Server Access point. FIGURE 1 A typical Wireless LAN Network

Certification Awarded to ABB LTDA. AV. DOS AUTONOMISTAS, 1496, VILA CAMPESINA, OSASCO/SP BRAZIL

EDP DISTRIBUIÇÃO S ASSET MANAGEMENT TOOL SUPPORTED BY REAL TIME MONITORING

AUTOMATED TEST SYSTEM FOR MONITORING THE EFFICACY AND RELIABILITY OF LEAKAGE DETECTION IN PIPELINES

Design of WSN-Based Remote Monitoring System for Environmental Parameters in Substation

Power products and systems. Intelligent solutions for power distribution Zone concept

Portable Gas Analyzer with Wireless Transmission of Gas Concentrations and GPS Coordinates

Incipient Failure Detection in Power Transformers through Frequency Sweep Response

Green Energy Solutions

ORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric energy and heat -

Distribution Voltage Regulators

Product overview brochure. ABB Medium Voltage Products Our one-stop approach for every medium voltage application

Interpretation of Remote Backup Protection Operation for Fault Section Estimation by a Fuzzy Expert System

Technologies for Data Centres

CONSULTATION PAPER FOR PROPOSED MODIFICATIONS TO THE TRANSMISSION CODE

Using battery test equipment with asset management software. Megger is a registered trademark

Heat Trace Fundamentals. Monte Vander Velde, P.E. President, Interstates Instrumentation

Federal Wage System Job Grading Standards for Air Conditioning Equipment Operating, Table of Contents

Product brochure Multi Functional Switchgear PASS M kv Flexible and compact switchgear solutions for windfarms

SECTION ELECTRICAL ACCEPTANCE TESTS

Quick Connect. quick - simple - efficient.

MOBILE SYSTEM FOR DIAGNOSIS OF HIGH VOLTAGE CABLES (132KV/220KV) VLF-200 HVCD

Tour of new eircom Data Centre Blanchardstown by Dervan Engineering Consultants 11 th March 2015

10 Nuclear Power Reactors Figure 10.1

Investor day. November 17, Energy business Michel Crochon Executive Vice President

HAZARDS, INCLUDING SHOCK, ARC FLASH AND FIRE

Web SCADA Employing Application Program Interface as Data Source

Statement of Work. 3.0 Details of Service Pre Start-up Cooling Start-up Service. Installation Service. Table of Contents. 1.0 Executive Summary

WHAT IS INFRARED (IR) THERMOGRAPHY

N4385A / N4386A Distributed Temperature System (DTS)

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM

TORKEL 820 Battery Load Unit

The Intelligent AX1 Switchgear for Medium Voltage

REMOTE MONITORING SYSTEM MATURE FIELDS UNCONVENTIONALS MONITORING SYSTEM. Solving challenges.

Fuzzy Knowledge Base System for Fault Tracing of Marine Diesel Engine

INTERNATIONAL POWER DISTRIBUTION CONGRESS CIDEL ARGENTINA 2002

Cyber Security of the Smart Grid

Smart DeviceNet Remote I/O Terminals

RENEWABLE ENERGY SUBSTATIONS SOLAR PHOTOVOLTAIC AND WIND POWER. tgood.com. Energy. Fast.

MAINTENANCE INSTRUCTIONS. Thermia Robust heat pump

The Business case for monitoring points... PCM architecture...

REMOTE MONITORING AND CONTROL SYSTEM

ETAP 11 The Future of Power Systems Engineering & Operation - Today

SCADA and Monitoring for Solar Energy Plant

Sensor network infrastructure for intelligent building monitoring and management system

Doc.No. NDP 192U-02. Electric Pump Controller CE-124P. Instruction Manual

Solutions for Photovoltaic Systems. Large buildings and power plants

2. INDUCTIVE VOLTAGE TRANSFORMERS Oil-paper insulation Gas insulation

Transcription:

A Step-Up Transformer Online Monitoring Experience at Euzébio Rocha UTE [Thermal Power Plant] Ivan da Costa Vieira (2) 2 Lucas Pavan Fritoli (3) 3 Fábio Marcelino de Paula Santos (1) 1 ABSTRACT The step-up transformers at the Euzébio Rocha Thermal Power Plant in Cubatão - SP [São Paulo] are key for the Brazilian national electric power supply. Due to their significance and to their severe operating conditions, Petrobras has always invested on and kept a strict preventive maintenance program for this equipment. Leader in technology and committed to keeping a high power supply quality level, Petrobras installed an online monitoring system on its step up transformers, with the purpose of identifying early possible incipient defects and mitigate catastrophic failure risks even more. The implementation of this system, with sensors and software, took place in 2014, and four transformers which were already operating at the plant began to be monitored. The implementation of the monitoring system used IEDs which were already in place and took advantage of the modularity and expandability features of the decentralized architecture. Here we describe the architecture and the solutions used in system implementation, as well as the results obtained, successfully reaching goals such as maintenance focused in reliability and greater personal, equipment and facility safety. KEYWORDS: Online monitoring, Diagnosis, Prognosis, Predictive Maintenance, Sensors, Software, Transformers. 1.0 - INTRODUCTION Natural gas-fired Euzébio Rocha Thermal Power Plant, in Cubatão-SP, one of Petrobras's power plants, contributes with over 200MW to the Brazilian Electric Power System. With the ability to supply a 600-thousand inhabitant city with electric power, it demands great operating efficiency to guarantee seamless electric power supply. It operates with two step-up transformers: a 225 MVA one and a 70 MVA one, plus two ancillary 16MVA transformers. They entered operation in 2009. 1 Euzébio Rocha Thermal Power Plant (Petrobras) Cubatão-SP - Equipment Engineering 2 Euzébio Rocha Thermal Power Plant (Petrobras) Cubatão-SP - Maintenance Engineering 3 Treetech Sistemas Digitais - Application Engineering

2 These transformers play a key role in the transmission of the electric power generated by the plant. Due to their significance and to their extreme operating conditions, including high temperature, strongly corrosive atmosphere and the normal dielectric requirements for system operation, Petrobras has always kept a strict preventive maintenance program for them. However, conventional practices are not enough to ensure plant reliability. Therefore an online monitoring system was implemented to reduce failure risk with the detection of the main types of defects at an incipient phase - the monitoring of the transformer operating status. Some of the sensors which were needed for the project were already in place in the transformers and were used. 2.0 - TRANSFORMER FAILURE STATISTICS An international research of operating power transformers performance [1], carried out by Cigré with data from failures occurred between 1968 and 1978 involving over 1,000 failures revealed the main causes of downtime, both forced and planned, for several transformer kinds and applications. Figure 1 shows those data for NLTC transformers in power plants. According to those statistic data, the bushings are the main cause for transformer failure, responsible for one third of the occurrences, with the active part virtually tied with it, in second place, followed by tank and oil. These three subsystems of the transformer together answer for virtually 84% of the equipment downtime. Bushing; Buchas; 33,3% 33,3% Tank Tanque and e oil; Óleo; 17,4% 17,4% Active Parte part; Ativa; 33,3% 33,0% Other; 16,3% Outras; 16,3% Fig. 1 - Statistics of the causes for NLTC transformers downtime [1]. Based on these statistics and on the previous experience by Petrobras, step-up transformer and ancillary transformer variables to monitor were selected. This was done in addition to the required data processing functions so the measured variables could be turned into useful information for transformer diagnosis and prognosis. That procedure aimed at covering the main transformer subsystems and therefore reducing failure and unavailability risks. 3.0 - TRANSFORMER SENSING The variables measured in step-up transformers in Mauá and Cubatão plants are shown in table 1, grouped by subsystem.

3 Table 1 - Variables monitored in the step-up transformers grouped by subsystems. System Sensor Variable Capacitance Tangent Delta Bushing Monitor Leakage current Phase-ground and phase-phase voltages Oil Temperature Winding temperature (hot spot) Temperature Monitor Ambient temperature Load percentage Bushings Active part Tank and Oil Other Moisture Monitor Water content in oil (ppm) Relative water saturation (%) in oil; Saturation relative to the ambient temperature Saturation relative to the reference temperature Water content evolution trend Alarm contacts: - Buchholz relay, - Pressure relief valve, - Oil level, etc.. In order to completely comply with its objectives, the monitoring system must process the data listed above so useful information is obtained about transformer status, as detailed below. 4.0 - DATA HANDLING FOR DIAGNOSES AND PROGNOSES. To handle the data obtained from the sensors mentioned above, the installed monitoring system has in its software an Engineering Module, which includes the engineering models shown in table 2. Table 2 - Engineering Models for transformer condition diagnosis and prognosis. System Engineering Model Diagnoses and Prognoses Capacitance evolution trend (pf/day) Tangent delta evolution trend (%/day) Bushing Status Remaining time before critical capacitance levels are reached (days) Remaining time before critical tangent delta levels are reached (days) Remaining Insulation service life Insulation aging Insulation service life trend (% / day) Remaining isolation service life (years) Moisture in Paper Water content in the role (% dry mass) Acceleration factor of isolation life loss through Bushings Active part

4 hydrolysis Bubble formation temperature Free water formation temperature Gases dissolved in oil Temperature prediction Simulation Gas chromatography test offline reports Future hot spot temperature after stabilization Time to reach alarm temperature Time to reach shutdown temperature Temperature evolution simulation with load step Temperature evolution with load curve 24h Hypothetical loss of service life Physicochemical test offline reports Tank and Oil Physicochemical Water content evolution trend (ppm / day) Cooling system Cooling efficiency Cooling maintenance Top oil calculated temperature Difference between measured and calculated temperatures Cooling system efficiency Cooling group total operating time Cooling group operating time after maintenance Remaining time before cooling group maintenance Pump vibration alarm Therefore, raw data from sensors allow of useful information to be obtained for transformer status diagnosis and prognosis [2], [3]. 5.0 - MONITORING SYSTEM ARCHITECTURE Euzébio Rocha Thermal Power Plant 's transformer monitoring system architecture is shown in figure 2. Variables already shown in Table I were measured through intelligent sensors (Intelligent Electronic Devices), designed and tested to be specifically used in the substation yard environment, which allows them to be installed directly in the transformer body. Those sensors are provided with communication ports that allow them to be directly connected to a communication network, which makes it possible to directly transmit measurements to a transformer monitoring server. The sensors communicate with the server via Modbus-RTU protocol.

5 The server, in turn, also communicates with the Supervisory Control System of the Thermal Power Plant UTE-EZR through OPC protocol. Therefore the data can be monitored by the operations team, stored in a history server or even be made available for other systems. In the transformer monitoring server, the Sigma monitoring software, which processes the date shown in Table II, is executed. Through Petrobras's Intranet, the users have remote access to the monitoring system through an HTML interface with Web 2.0 technology. Transformer Panel Transformer Panel Ambient Temperature Ambient Temperature Shielded cable 2x18 Existing F.O F.O/485 Conversor Shielded cable 2x18 485/TCP conversor Users conected to the internet Petrobras Server SIGMA4NET Fig. 2. Transformer monitoring system architecture The architecture chosen by Petrobras is decentralized [4], that is, it does not utilize a sole central element in the transformer body, thus avoiding additional costs and eliminating a failure point [5]. This architecture has also brought some additional benefits in installation, listed below: Due to its modularity, the system can be easily expanded to several transformers in the plant. It is also possible to expand it to include other equipment in the plant, such as circuit breakers, disconnect switches, current transformers (CTs) etc. It is possible to expand the system by adding new sensors 6.0 - SYSTEM FUNCTIONALITIES

6 The main functionalities available through monitoring software are: Local access in the plant and remote access from any point of the Petrobras network through Web pages, eliminating the need for plug-in installation in enduser computers. Possibility of remote access through smartphones, with permission by system and network administrators; Alerts sent by email if there are any diagnosis alarms or alerts, Sensor data and engineering data storage in an SQL Server database, keeping a track record of the whole transformer service life; Access to online or historic data for viewing; History consultation through graphs, tables or exportation to XLS files (MS, Excel) Alarm issuing interface with alert and alarm beginning, acknowledgment and resolution information recorded in the database; All access and operations by users are recorded by the system; Access is protected by username and password, with a specific access category for each user. Viewer, Operator and Administrator Easy integration with other systems through the OPC communication protocol; 7.0 - SYSTEM INSTALLATION The first IEDs entered operation with the energizing of the first transformers in 2009. Petrobras already had the basic online monitoring setup, and was already making use of the sensor-equipped assets's benefits. The installation of the complete monitoring system was finalized in the first semester of 2014, during the technical downtime scheduled for that year. All installation and commissioning services respected the plant's scheduling availability. Installation details are shown in figures 3 to 6 below.

7 Fig. 3. One of the 225MVA, 18/230 kv stepup transformers Fig. 4. Detail of adapter installation on the 230 kv bushing capacitive tap to monitor their capacitance and tangent delta. Fig. 5. Panel with intelligent sensors (IEDs) in the transformer's body. Fig. 6. Monitoring server in the control room 8.0 - RESULTS Several results are expected with the installation and operation of the monitoring system we have just described, with the following objectives in mind: Increased power supply availability and system continuity. Reduction of the risk of catastrophic failure, with the detection of early defect onset 6]; Consequently, increase in plant personnel safety, both for the equipment and for the facility; Extension of equipment service life due to faster accelerated aging detection; Preservation of the corporate image by reducing accident chance;

8 Maintenance routine optimization, which allows gradual migration from preventive to predictive maintenance - based on equipment status rather than on time; Equipment preparation for the application of Reliability-Centered Maintenance (RMM) philosophy; With the graph generation feature available in the monitoring software (Fig. 7) it was possible to follow the evolution of defects in real time, thus allowing a comparative analysis between several operational values, which brought easy and increased reliability when issuing diagnostics of incipient defects. Fig. 7. Monitoring software graph generation tool 9.0 - CONCLUSION Considering the importance of the contribution of the electric power supplied by Euzébio Rocha Thermal Power Plant for the Brazilian national electric power grid, the implementation of an online monitoring system on its step-up transformers is a significant measure to increase power generation reliability and availability. With the implementation of this system Petrobras has also reached an important corporate goal: To stay ahead of the competition by installing state-of-the art equipment in their physical facilities. Furthermore, the installation of monitoring systems has received a highly positive evaluation by insurance companies, which brings benefits at the time of purchasing coverage with those companies for the Petrobras's Thermal Electric Power Plant.

9 10.0 - REFERENCES [1] ELECTRA, "An International Survey on Failures in Large Power Transformers in Service", Paris, CIGRE, Ref. number 88 1983 [2] Ammon, Jorge Alves, Marcos, Vita, Andrew, Kastrup Filho, Oscar Ribeiro, Adolfo, et. al., "Sistema de Diagnósticos para o Monitoramento de Subestações de Alta Tensão e o Gerenciamento das Atividades de Manutenção: Integração e Aplicações" ("Diagnostic System for High Voltage Substation Monitoring and Maintenance Activity Management: Maintenance Management Activities: Integration and Applications ", X ERLAC - Latin American Regional Meeting of CIGRÉ, Puerto Iguazu, Argentina, 2003. [3] Alves, Marcos, "Sistema de Monitoração On-Line de Transformadores de Potência" ("Online Monitoring System for Power Transformers"), Revista de Eletricidade Moderna (Modern Electric Power Journal), May 2004. [4] Melo, Marcos A.C., Alves, Marcos, "Experiência com Monitoração On-Line de Capacitância e Tangente Delta de Buchas Condensivas" ("Experience with On-Line Monitoring and Tangent Delta Condensive Bushings"), XIX SNPTEE - National Seminar on Production and Transmission of Electric Power. Rio de Janeiro, Brazil, 2007. [5] Alves, Marcos, Silva, Gilson, "Experiência de Campo com Monitoração On-Line de um Transformador 343MVA 230kV, com 2 Comutadores sob Carga" "Experience in the Field with Online Monitoring of a 343 MVA 230kV Transformer with two OLTCs", IV Workspot Workshop on Power Transformers, Recife, Brazil, 2005. [6] Alves, Marcos, Vasconcellos, Vagner, "Monitoramento da Umidade no Óleo Isolante de Transformadores de Potência Visando o Aumento da Confiabilidade Operativa" ("Monitoring the Moisture in the Insulating Oil of Power Transformers to Increase Operating Reliability"), V Workspot Workshop on Power Transformers, Belém, Brazil, 2008.